This Statement of Work (SOW) details electrical infrastructure installation for a Remote Surveillance System - Maritime (RSS-M) at Selfridge Air National Guard Base for the U.S. Customs and Border Protection (CBP) Swanton Sector. The project involves installing a 100A 240VAC single phase electrical service, including trenching between a transformer and a proposed post location, installing a 6x6 post approximately 25 feet off a gravel road, mounting a NEMA 3R fusible safety disconnect switch with specific fuse requirements, and laying underground PVC and above-ground metal conduit for electrical conductors.
The contractor must complete the work as soon as practical after contract award, following county, base, and state of Michigan regulations. Specific deliverables include the post, safety disconnect switch, conduit runs, and associated cabling. The RSS-M is described as a temporary, self-contained 85-foot relocatable tower supporting a rotating marine radar with a FLIR long-range video system. The installation is located at precise geographical coordinates (42.62768867533351, -82.81993288979298) and is designed to be removable as location requirements change.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work DTM-016 Electrical Service
FAALC/CBP
For Official Use Only (FOUO)
Federal Aviation Administration U.S. Customs and Border Protection
DTM-016, Selfridge Air National Guard Base
Remote Surveillance System – Maritime (RSS-M)
Electrical Statement of Work
Published: October 10, 2025
Support Agency:
Federal Aviation Administration (FAA) FAA Logistics Center 6500 S. MacArthur Blvd Oklahoma City, OK 73069
Distribution Statement: Distribution authorized to the U.S. Customs and Border Protection Agency and Federal Aviation Administration Logistics Center and their Contractors. This document contains non-technical data for administrative use. Requests for this document must be referred to FAALC
FAALC/CBP
FAALC/CBP P a g e | iii
Table of Contents
1.0 Background
2.0 Scope
3.0 Requirements
4.0 Schedule
5.0 Deliverables
FAALC/CBP P a g e | iv For Official Use Only (FOUO)
Change History
Derived from/Original File Name Effective Date Original Repository Author/Editor
Rev # Effective
Date Sections Affected
Description of Change Author/Editor
Draft 10/08/2025 All Initial Draft Greg Barker A 10/10/2025 3 Incorporated Technical Comments Greg Barker
Approvals on file: Reference SCM/Harvest for Approval Date:
Management Approval
Reference SCM/Harvest for Process Owner Date:
Process Owner
FAALC/CBP P a g e | 1 For Official Use Only (FOUO)
Background The Customs and Border Protection (CBP) for the Swanton Sector is installing an electrical service for a Remote Surveillance System – Maritime (RSS-M). The RSS-M is a self contained, 85 foot relocatable tower that supports a rotating marine radar with a FLIR long range video system. This document addresses the power requirements for the RSS-M. This is a temporary installation, all infrastructure being installed will be removed as requirements change and a new location is identified.
Figure 1. Proposed Location of RSS-M
2.0 Scope
The contractor must provide all labor, tools, material, transportation, inspections, and any other incidentals required to install the electrical infrastructure needed for the RSS-M. The contractor must also schedule any inspection required by Selfridge Air National Guard Base.
The contractor will install a fused disconnect switch attached to a transformer on the Northeastern section of Selfridge Air National Guard Base.
3.0 Requirements.
Contractor must install infrastructure required to support the deployment of the RSS-M. The contractor must follow all rules and regulations required by county, Selfridge Air National Guard Base and the state of Michigan. If instructions from this SOW contradicts the rules and regulations of the county, Selfridge Air National Guard Base or the state of Michigan, the contractor must follow the rules and regulations of county, Selfridge Air National Guard Base or the state of Michigan.
The contractor can recommend deviations from the statement of work. Any deviation must be approved via email to the contractor.
FAALC/CBP P a g e | 2
Figure 2. Site Overview
3.1 The contractor will trench between the transformer located at 42.62783471332071, -82.81992081985244 and the proposed location of the post at 42.6276886753351, -82.81993288979298. Contractor will trench between the two locations by the shortest path. Trench will conform to rules and regulations of county, Selfridge Air National Guard Base or the state of Michigan for a 100A 240VAC single phase service.
3.2 The contractor will install a post, 6 x 6, 42.6276886753351, -82.81993288979298. This location is approximately 25’ off the gravel road directly south of the transformer located at 42.62783471332071, -82.81992081985244. The highest point of the post must be 5 feet above grade. Contractor can recommend a different post.
3.3 The contractor will install a 100A 240 VAC single phase, NEMA 3R, fusible safety disconnect switch. The safety disconnect switch will have three 100 A, time delay, blade type, non-indicating, fuses installed, Mersen TR100RID. Contractor can recommend a different safety disconnect and fuses.
3.4 The contractor will install grounds and ground rods for the safety disconnect switch for a 100A 240 VAC single phase service in accordance with county, Selfridge Air National Guard Base or the state of Michigan. The grounding will be tied into the bus bar in accordance with county, Selfridge Air National Guard Base or the state of Michigan.
3.5 The contractor will install PVC Schedule 40 conduit below grade from the transformer vault to safety disconnect switch. The conduit will be a minimum of 1.5”. Above grade, the contractor will install Heavy-Wall Rigid RMC Metal conduit. Heavy-Wall Rigid RMC Metal conduit should transition below grade from the PVC Schedule 40 to the 100A Safety Disconnect Switch. The contractor will install Contractor can recommend a different conduit.
3.6 The contractor will install three 1/0 conductors for a 100A 240 VAC single phase service in accordance with county, Selfridge Air National Guard Base or the state of Michigan from the transformer vault to the safety disconnect switch. The 1/0 conductors will be tied into the input side of the safety disconnect switch.
FAALC/CBP P a g e | 3 For Official Use Only (FOUO)
3.7 The contractor will install connect the 1/0 conductors to the transformer for a 100A 240 VAC single phase service in accordance with county, Selfridge Air National Guard Base or the state of Michigan.
4.0 Schedule.
The contractor must perform the work described in this SOW as soon as practical, based on ground conditions, after the contract has been awarded.
5.0 Deliverables.
• Post
• Safety Disconnect Switch
• Conduit runs
• Cabling inside and to the Safety Disconnect Switch
| 1.0 Background |
| 2.0 Scope |
| 3.0 Requirements. |
| 3.1 The contractor will trench between the transformer located at 42.62783471332071, -82.81992081985244 and the proposed location of the post at 42.6276886753351, -82.81993288979298. Contractor will trench between the two locations... |
| 3.2 The contractor will install a post, 6 x 6, 42.6276886753351, -82.81993288979298. This location is approximately 25’ off the gravel road directly south of the transformer located at 42.62783471332071, -82.81992081985244. The highest point of the p... |
| 3.3 The contractor will install a 100A 240 VAC single phase, NEMA 3R, fusible safety disconnect switch. The safety disconnect switch will have three 100 A, time delay, blade type, non-indicating, fuses installed, Mersen TR100RID. Contractor can recomm... |
| 3.4 The contractor will install grounds and ground rods for the safety disconnect switch for a 100A 240 VAC single phase service in accordance with county, Selfridge Air National Guard Base or the state of Michigan. The grounding will be tied into the... |
| 3.5 The contractor will install PVC Schedule 40 conduit below grade from the transformer vault to safety disconnect switch. The conduit will be a minimum of 1.5”. Above grade, the contractor will install Heavy-Wall Rigid RMC Metal conduit. Heavy-Wall ... |
| 3.6 The contractor will install three 1/0 conductors for a 100A 240 VAC single phase service in accordance with county, Selfridge Air National Guard Base or the state of Michigan from the transformer vault to the safety disconnect switch. The 1/0 cond... |
| 3.7 The contractor will install connect the 1/0 conductors to the transformer for a 100A 240 VAC single phase service in accordance with county, Selfridge Air National Guard Base or the state of Michigan. |
| 4.0 Schedule. |
| 5.0 Deliverables. |