This document is a detailed Transformer Schedule for Selfridge Air National Guard Base (ANGB) that specifies technical requirements for transformer and meter installations. The key requirements include: 1) verifying field conditions for each transformer/building, 2) installing new meter assemblies with voltage and current safety disconnects, and 3) using utility-grade solid-core current transformers in outdoor-rated weatherproof cabinets that meet National Electrical Safety Code (NESC), NEC, and federal/state safety codes. The schedule provides comprehensive technical details for two specific transformers (T903 and T-CAMP), including their electrical specifications such as primary/secondary voltages, connection types, kVA ratings, manufacturer information, serial numbers, and installation dates, with specific notes about conductor types and installation configurations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. The contractor shall verify field conditions for each transformer/ building.

2. All new meter installations shall be provided with voltage, and current safety disconnects and fuses or equivalent, so that the meter assembly can be worked on safely over the life of the meter installation and not require utility outages for servicing. All new meter installations shall include the installation of new properly sized utility grade solid core current transformers (CTs). All new meter installations shall be installed in outdoor rated weatherproof cabinets that meet the National Electrical Safety Code (NESC), the NEC, Federal, and State codes based on the prevention of hazards to life and property.

3. Utility grade solid-core current transformers are required for the project.

4. The location of the new electric meters will be on the tenant building pad mount transformers load side except several locations that have pole mount transformers. The meter locations for Selfridge Tenant buildings that have pole mounted transformers will be on each Tenant building just outside the Tenant building electrical room

Selfridge ANGB - Transformer Schedule

Transformer

ID

Old

ID

Facility Feeder Source Easting Northing Manufacturer Primary

Volts Secondary

Volts Primary

Connection Secondary

Connection kVA

Rating Impedance

Class

Mounting Type

Tap Setting

Tap Voltage

Live front?

Feed Through?

Fuses Gallons of Oil Weight Serial #

Manuf.

Date

Primary Conductor

Secondary Conductor

# of Second.

Conductor Comments

T903 Bldg 903 9 151-1 350767.649 4721091.891 ABB 4800 240/120 Delta Delta 300 1.67 KNAN Pad 1 4800 No Yes Yes 251 5450 13JC700000001 11/01/13 #2 350 MCM, 2/0 1, 1

T-CAMP 9 T903 350719.067 4720928.609 ABB 4800 240/120 Delta Delta 300 1.67 KNAN Pad 1 4800 No Yes Yes 251 5450 13JC700000002 11/01/13 #2 Secondary cables disconnected