DTFH71-17-R-00006_Amendment_0003.pdf

PDF 74 KB Posted

Attached to
Arlington Memorial Bridge Federal contract opportunity
Solicitation number
DTFH71-17-R-00006
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment 3 Clarifications to submitted questions.

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE OF PAGES

1 4

Federal Highway Administration Eastern Federal Lands Highway Division Acquisition Office 21400 Ridgetop Circle Sterling VA 20166-6511

Federal Highway Administration Eastern Federal Lands Highway Division Acquisition Office 21400 Ridgetop Circle Sterling VA 20166-6511

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

DTFH7117R00006

9B. DATED (SEE ITEM 11)

03/21/2017

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

0003 03/21/2017 See block 14

6. ISSUED BY CODE EFLHD-AC 7. ADMINISTERED BY (If other than Item 6) CODE EFLHD-CO

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: GWMP 11(4), 11(7), Arlington Memorial Bridge

The purpose of this Amendment is to:

1. Answer additional questions and provide clarifications since Amendment 0002.

Continued … Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

Note: Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.

The due date of the Statement of Qualifications (SOQs) will remain March 28, 2017 at 2:00 p.m. EST in order to be considered for further evaluation.

Arlington Memorial Bridge, Project No. GWMP 11(4), 11 (7) Solicitation No. DTFH71-17-R-00006, Amendment 0003

Questions and Answers

March 21, 2017

No. Question/Comment Answer

1. Will a copy of the sign in sheets for both site visits be made available? Yes, both will be posted with Amendment 0003.

2. Addendum 2, Question 4 response states: “The three owner performance evaluations, 2 references, responses to legal questions, and organizational documents requested on page 12 and 13 will not be excluded from the page count.” This is in contradiction to Addendum 1, fourth question response:

“Yes, EFLHD will exclude the Past Performance from the page count.” and in contradiction to Addendum 1, eighth question, Q:“Do the organization documents that allow the offeror to do business in the District of Columbia count against the 40 page limit?”, A: “No”. Please confirm that the three owner performance evaluations and organizational documents excluded from the page count in Addendum 1 are still excluded from the 50 page count limit.

The three owner performance evaluations, two references and financial condition are excluded from the 50 page count.

3. Addendum 2, Question 27 refers to paragraphs 4 and 6. Please identify the RFQ page number and/or referenced paragraph content of these paragraphs.

See page 12 of the RFQ.

4. Seeking additional clarification of Amendment 2, question 26, we are still unclear if a SF 330, Part II form is required only for the design builder and lead design firm, or if it is required for all design sub consultants that are part of our team.

Part II – General Qualification:

Prepare a separate Part II for each firm that will be a part of the design-build team.

5. Please advise if the duration requirement listed in Part 5. Project Understanding and Approach, subpart 4, can be provided on one 11x17 page due to the 12 point font constraint and still only be counted as one page?

No change. Please provide on 8.5”x11”.

Additional Clarification to Amendment 0002 Answers

25. Section 5 of the RFQ (Project Understanding and Approach), item #4 ask for each team to address “Duration of each project stage/option including the total construction duration and the planned number of construction crews.”

Yes, we want the offerors to provide the requested information in “Section 5, Item 4” as part of the

No. Question/Comment Answer

This level of detail is commonly addressed in the Technical Proposal, but will be difficult to address prior to design and quantification of the work.

Please clarify the intent of this item as well as to what level the teams should address the schedule in their RFQ responses.

qualification phase.

30. Please explain the duties you would expect the “Project Engineer” to perform. It appears to us that position “Responsible for all engineering decisions, judgments and work at the site” would be the responsibility of the Designer of Record. Can this position be eliminated or the DOR fill this position?

No, the project engineer and designer of record have different duties and experiences. Refer to the RFQ and draft RFP for their duties and experiences.

34. Please confirm that all design activities for the construction of Options 1 through 4 are completed as part of the base contact for the project. Design of the westbound concrete approach spans, the bascule span and rehabilitation of the existing piers and abutments are not specifically described as part of the base contract, but inferred to be included as all waivers, exceptions, permits, and approvals for the construction of the Options 1 through 4 are required to be competed in the base contract. With this understanding, Contract Options 1 through 4 consist primarily of construction activities.

The design work for options 1 & 2 shall be completed under the base contract. The design for options 3 shall be completed under option 3, and the design for options 4 shall be completed under option 4.