13_Approach_Span_Rehabilitation_-_R_set-Optimized.pdf
PDF 43 MB Posted
- Attached to
- Arlington Memorial Bridge Federal contract opportunity
- Solicitation number
- DTFH71-17-R-00006
About this file
13_Approach Span Rehabilitation - R_set
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
PROJECT TEAM LEADER
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
George Choubah
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
GEORGE WASHINGTON MEMORIAL PARKWAY
BRP NO.
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
Concrete: 150 pcf.
Future Wearing Surface: 25 psf.
Provide 2" cover for reinforcing steel unless otherwise noted
GENERAL NOTES
SPECIFICATIONS:
Design:
Construction:
Dead loads:
Live loads:
Structural Concrete:
Prestressing Steel:
Bearings:
Reinforcing Steel:
DESIGN LOADS:
MATERIALS:
Structural Steel:
MATERIALS, cont.:
Grade 60 deformed
Furnish reinforcing steel conforming to AASHTO M 31 (ASTM A615), Follow AASHTO LRFD design method A
60 durometer hardness
Section 18.2 of the AASHTO LRFD Bridge Design Specifications, with
Provide elastomeric bearing pads conforming to the requirements of
FP-14, U.S. Customary Units
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, :Miscellaneous
Verify locations of utilities in field prior to any work
Verify all dimensions and locations in field prior to ordering materials
UTILITIES:
HL-93
-J a n -2
:2
P
M
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
No Scale
M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
LW/AF LW/BK/CC HC
otherwise noted
Use uncoated reinforcing steel in beams and crosswalls unless
Strand diameter: 0.5 in
Wobble coefficient: 0.00
Friction coefficient: 0.00
Pretensioning:
Maximum stress after anchor set: 200 ksi (75% ultimate)
Maximum anchoring stress at anchorages after anchor set: 189 ksi (70% ultimate)
Maximum jacking stress: 216 ksi (80% ultimate)
Apparent Modulus (for calculation of elongations): 28,500 ksi
Strand: AASHTO M 203/M 203 M seven wire, grade 270, low relaxation
Prestressing Parameters (Strand):
A C
T U
A L F I L E G
N .D
G N
GENERAL NOTES
MISCELLANEOUS:
bridge structure throughout the entire contract period.
The Contractor is responsible for the stability of the entire exisitng during and after contract period.
to ensure that there is not additional stress to any member of the bridge
The Contractor is required to evaluate the existing bridge structure a corrective measure.
differences from these contract plans, notify the CO and recommend before performing necessary rehabilitation work. If there are any
All sketches and dimensions are approximate. Verify all the conditions
Verify all dimensions prior to any work.
Grade 60 deformed
Furnish stainless reinforcing steel conforming ASTM A955, panels, and CIP deck unless otherwise noted
Use stainless reinforcing steel in precast approach slabs, precast
U.S. Customary Units, 2014
AASHTO LRFD Bridge Design Specifications, Seventh Edition, 2016 Interim
Furnish welds conforming to AASHTO/AWS D1.5 Bridge Welding Code
(ASTM A709, Grade 50) unless otherwise noted on the plans
Furnish structural steel conforming to AASHTO M270, Grade 50 in close proximity to utilities
Provide protection and use extreme caution when working Concrete cover is 2 in, unless otherwise noted in, unless otherwise noted4 3Chamfer exposed edges
Furnish class UHPC for closure pours and haunches sleeper slabs precast deck panels, approach slabs, and f'c = 6,000 psi at 28 daysFurnish class HPC concrete for deck and
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
DATE
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
ARLINGTON MEMORIAL BRIDGE
FOR INFORMATION ONLY
R02
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
No Scale LW/AF LW/BK/CC HC
A C
T U
A L F I L E S
C O
P E
O F
W O
R K .D
G N
INDEX OF BRIDGE PLAN SHEETS
SHEET NO. SHEET TITLE SHEET NO. SHEET TITLE SHEET NO. SHEET TITLE
Typical Deck Panel UD471
Typical Deck Panel UD1-UD2-UD3 - 270
Typical Deck Panel UD1-UD2-UD3 - 169
Typical Deck Panel UM368
Typical Deck Panel UM267
Typical Deck Panel UM166
Typical Deck Panel UR10 and UR1165
UR7, and UR8 - 2
Typical Deck Panel UR3, UR4, UR5, UR6,64
UR7, and UR8 - 1
Typical Deck Panel UR3, UR4, UR5, UR6,63
Typical Deck Panel UR262
Typical Deck Panel UR1 and UR961
Typical Deck Panel P1I and P2I60
Typical Deck Panel P1EM and P2EM59
Typical Deck Panel P1E and P2E58
Typical Deck Panel AR3, AR4, AR5, and AR657
Typical Deck Panel AR1 and AR256
Typical Deck Panel AD1, AD2, and AD3 - 255
Typical Deck Panel AD1, AD2, and AD3 - 154
Top of CIP Deck Elevations Over Underpasses53
Top of Deck Panel Elevations Over Pier 4, 5, and 652
Top of Deck Panel Elevations Over Pier 1, 2, and 351 and West Underpass
Top of Deck Panel Elevations Over Abutment 4 50
Top of Deck Panel Elevations Over Arch 949
Top of Deck Panel Elevations Over Arch 848
Top of Deck Panel Elevations Over Arch 747
Top of Deck Panel Elevations Over Arch 646
Top of Deck Panel Elevations Over Arch 445
Top of Deck Panel Elevations Over Arch 344
Top of Deck Panel Elevations Over Arch 243
Top of Deck Panel Elevations Over Arch 142
East Underpass
Top of Deck Elevations Over Abutment 1 and41
Deck Panel Layout for Pier 3 and 440
Deck Panel Layout for Pier 2 and 539
Deck Panel Layout for Pier 1 and 638
Deck Panel Layout for Arch 4 and 637
Deck Panel Layout for Arch 3 and 736
Deck Panel Layout for Arch 2 and 835
Deck Panel Layout for Arch 1 and 934
Deck Panel Layout for Abutment 433
Deck Panel Layout for Abutment 132
Sections - 2
Abutment 1 and 4 Proposed Longitudinal 31
Sections - 1
Abutment 1 and 4 Proposed Longitudinal 30
Concrete Beam Replacement - 429
Concrete Beam Replacement - 328
Concrete Beam Replacement - 227
Concrete Beam Replacement - 126
New Beam Locations25
Concrete Beam Removal and Replacement24
Top of Crosswall Repair - 223
Top of Crosswall Repair - 122
Underpass Wall Replacement - 221
Underpass Wall Replacement - 120
Wall 59 Replacement - 3 - Arch 919
Wall 59 Replacement - 2 - Arch 918
Wall 59 Replacement - 1 - Arch 917
Bascule Wall Replacement - 3 - Abutment 2 and 316
Bascule Wall Replacement - 2 - Abutment 2 and 315
Bascule Wall Replacement - 1 - Abutment 2 and 314
Replaced
Locations of Concrete Crosswalls Repaired or 13
Bridge Deck Concrete Removal - 212
Bridge Deck Concrete Removal - 111
Bridge Construction Staging - 210
Bridge Construction Staging - 1 9
Typical Arch Proposed Longitudinal Section 8
Typical Proposed Section - 2 7
Typical Proposed Section - 1 6
Typical Existing Section - 2 5
Typical Existing Section - 1 4
Plan and Elevation 3
Scope Of Work And Index 2
General Notes 1
Concrete Deterioration - Pier 4 Frames131
Concrete Deterioration - Pier 4 Frames130
Concrete Deterioration - Pier 4129
Concrete Deterioration - Bottom of Arch 6128
Concrete Deterioration - Top of Arch 6127
Concrete Deterioration - Abutment 3126
Concrete Deterioration - Abutment 2125
Concrete Deterioration - Bottom of Arch 4124
Concrete Deterioration - Top of Arch 4123
Concrete Deterioration - Pier 3 Frames122
Concrete Deterioration - Pier 3 Frames121
Concrete Deterioration - Pier 3120
Concrete Deterioration - Bottom of Arch 3119
Concrete Deterioration - Top of Arch 3118
Concrete Deterioration - Pier 2 Frames117
Concrete Deterioration - Pier 2 Frames116
Concrete Deterioration - Pier 2115
Concrete Deterioration - Bottom of Arch 2114
Concrete Deterioration - Top of Arch 2113
Concrete Deterioration - Pier 1 Frames112
Concrete Deterioration - Pier 1 Frames111
Concrete Deterioration - Pier 1110
Concrete Deterioration - Bottom of Arch 1109
Concrete Deterioration - Top of Arch 1108
Frames
Concrete Deterioration - Channel Side Abutment 1 107
Frames
Concrete Deterioration - Channel Side Abutment 1 106
Concrete Deterioration - Channel Side Abutment 1105
Underpass
Concrete Deterioration - Bottom of Arch - East 104
Underpass
Concrete Deterioration - Top of Arch - East 103
Frames
Concrete Deterioration - Approach Side Abutment 1 102
Frames
Concrete Deterioration - Approach Side Abutment 1 101
Concrete Deterioration - Approach Side Abutment 1100
Concrete Repair - 299
Concrete Repair - 198
Substructure Concrete Crack Repair97
Abutment 2 and 3 Repairs96
Intermediate Pier Repairs95
Miscellaneous Details - 294
Miscellaneous Details - 193
Expansion Joint Pier 2 and 592
Expansion Joint Pier 1, 3, 4, and 691
West Approach Sidewalks90
East Approach Sidewalks89
Approach Sidewalk Repair88
Underpass and Abutments - 2
Typical CIP Sidewalk Details Over West 87
Underpass and Abutments - 1
Typical CIP Sidewalk Details Over West 86
Underpass and Abutments - 2
Typical CIP Sidewalk Details Over East 85
Underpass and Abutments - 1
Typical CIP Sidewalk Details Over East 84
Manhole
Typical CIP Sidewalk Details Over Piers with 83
Typical CIP Sidewalk Details Over Piers82
Typical CIP Sidewalk Details Over Arches81
Sidewalk Plan - 280
Sidewalk Plan - 179
Approach Slab and Sleeper Slab Closures - 278
Approach Slab and Sleeper Slab Closures - 177
Approach Sleeper Slab76
Approach Slab Panel AS3 and AS475
Approach Slab Panel AS1 and AS274
Approach Slab73
CIP Bridge Deck Over Underpasses72
Between Abutment 4 & West Pedestals
Bridge Rail Condition Survey175
Between Pier 6 And Abutment 4
Bridge Rail Condition Survey174
Between Pier 5 And Pier 6
Bridge Rail Condition Survey173
Between Pier 4 And Pier 5
Bridge Rail Condition Survey172
Between Abutment 3 And Pier 4
Bridge Rail Condition Survey171
Between Abutment 2 And Abutment 3
Bridge Rail Condition Survey170
Between Pier 3 And Abutment 2
Bridge Rail Condition Survey169
Between Pier 2 And Pier 3
Bridge Rail Condition Survey168
Between Pier 1 And Pier 2
Bridge Rail Condition Survey167
Between Abutment 1 And Pier 1
Bridge Rail Condition Survey166
Between Abutment 1 & East Pedestals
Bridge Rail Condition Survey165
Exterior Deterioration Abutment 4 South Pedestal164
Exterior Deterioration Abutment 4 North Pedestal163
Exterior Deterioration Abutment 4162
Exterior Deterioration Arch 9161
Exterior Deterioration Arch 8160
Exterior Deterioration Arch 7159
Exterior Deterioration Arch 6158
Exterior Deterioration Arch 4157
Exterior Deterioration Arch 3156
Exterior Deterioration Arch 2155
Exterior Deterioration Arch 1154
Exterior Deterioration Abutment 1 South Pedestal153
Exterior Deterioration Abutment 1 North Pedestal152
Exterior Deterioration Abutment 1151
Frames
Concrete Deterioration - Approach Side Abutment 4 150
Concrete Deterioration - Approach Side Abutment 4149
Underpass
Concrete Deterioration - Bottom of Arch - West 148
Underpass
Concrete Deterioration - Top of Arch - West 147
Frames
Concrete Deterioration - Channel Side Abutment 4 146
Frames
Concrete Deterioration - Channel Side Abutment 4 145
Concrete Deterioration - Channel Side Abutment 4144
Concrete Deterioration - Bottom of Arch 9143
Concrete Deterioration - Top of Arch 9142
Concrete Deterioration - Pier 6 Frames141
Concrete Deterioration - Pier 6 Frames140
Concrete Deterioration - Pier 6139
Concrete Deterioration - Bottom of Arch 8138
Concrete Deterioration - Top of Arch 8137
Concrete Deterioration - Pier 5 Frames136
Concrete Deterioration - Pier 5 Frames135
Concrete Deterioration - Pier 5134
Concrete Deterioration - Bottom of Arch 7133
Concrete Deterioration - Top of Arch 7132
INDEX OF PLAN SHEETS
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R03
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
CLPier 6 CLPier 5 CLPier 4
CLPier 3 CLPier 2 CLPier 1
CL Abutment 3
CL Abutment 2
166'-0" 32'-0" 33'-0"172'-8" 35'-0"177'-4" 180'-0" 41'-0" 92'-0"
CL Bascule
92'-0" 41'-0" 180'-0" 35'-0" 33'-0"177'-4" 32'-0"172'-8" 166'-0"
Abutment 4
Face of
PLAN
ELEVATION
PLAN
ELEVATION
CL Bascule
CL Bascule
To Virginia
To Washington
N
Abutment 1
Face of
Sidewalk
Sidewalk
Sidewalk
Sidewalk
CL Structure
CLExisting Joint
End Bascule Span
CLExisting Joint
Begin Bascule Span
Bascule Span
Bascule SpanApproach Span
Approach Span
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
PLAN AND ELEVATION
-J a n -2
:2
P
49'-4"50'-0"35'-6"
49'-4" 50'-0" 71'-3"
Arch 9 Arch 8 Arch 7 Arch 6
Arch 4 Arch 3 Arch 2 Arch 1
(Bascule span)
Arch 5
(Bascule span)
Arch 5
Pier 6 Pier 5 Pier 4
Pier 3 Pier 2 Pier 1
Abutment 3
Abutment 2 basin (Typ.)
Replace catch
"8 3931'-4
"8 3931'-4
Bridge Length: 2162'-0"
"8 1133'-1
Begin Bridge
End Bridge
CL Structure
CL Bascule
Underpass
East
Underpass
West
LW LW/BK/CC HC
A C
T U
A L F I L E P
E .D
G N
(Typ.)
Exp. jt.
1" = 40'
(Typ.)
manhole
Replace
Submit shop drawings and design calculations to the CO for approval.
inch.8 3Furnish manhole cover with minimum thickness of conforming to ASTM A536.
Furnish new ductile iron manhole frames and manhole covers 3.
Submit shop drawings and design calculations to the CO for approval.
shape, and material of the existing gratings and frames.
Furnish new catch basin frames and gratings that match size, 2.
set of plans.
The replacement of Arch 5 (Bascule span) is shown a seperate 1.
Notes:
aproval.
lamp posts to the existing. Submit detailed drawing to the CO for
Replace the lamp posts that are missing or damaged. Match the new5.
Submit shop drawings and design calculations to the CO for approval.
AASHTO M 232.
to ASTM A325. Galvanize bolts, nuts, and washers according to
- Use high strength bolts Type 1, nuts, and washers conforming according to AASHTO M 111.
all members of the fixed ladders. Galvanize all structural steel
- Use structural steel conforming to AASHTO M 270, Grade 50 for requirements and conforming to the following material specifications:
Furnish new manhole access fixed ladders conforming to OSHA4.
Sta.
Elev.
Sta. Sta. Sta. Sta.
Sta.
Elev.
Sta. Sta. Sta. Sta.
"2 122'-2 and sleeper slab
Approach slab
(See Note 5) lamp post (Typ.)
Remove and reset
"2 1167'-7
(Typ.)
Expansion joint sidewalk approach
Northwest sidewalk approach
Southwest
(pylon) pedestal
Northwest
(pylon) pedestal
Southwest
"2 122'-2 and sleeper slab
Approach slab sidewalk approach
Northeast
(pylon) pedestal
Northeast sidewalk approach
Southeast
(pylon) pedestal
Southeast
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
R04
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
TYPICAL EXISTING SECTION - 1
CL Structure
Travel lanesTravel lanesSidewalk Sidewalk
D e c k
30'-0" 30'-0"
94'-0"
"2 113'-8"2
13'-3 "2 113'-8 "2
13'-3
Crosswall
TYPICAL EXISTING SECTION AT CONCRETE APPROACH ARCH
(Typ.)
Granite step
(Typ.)
Granite curb
Travel lanesSidewalk
30'-0"
94'-0"
"2 113'-2"2
13'-9
"2
(Typ.)
3'-6"
(Typ.)
(Typ.)
Granite step
(Typ.)
Granite curb
D e c k
30'-0"
CL Structure
Travel lanes Sidewalk
"2 113'-2 "2
13'-9
Crosswall
Sidewalk
30'-0"
94'-0"
"2 113'-8 "2
13'-3
CL Structure
Travel lanes
30'-0"
Travel lanes
D e c k
(Typ.)
Granite curb
Sidewalk
"2 113'-8"2
13'-3
(Typ.)
Granite step
Face of bridge
Face of bridge
Face of bridge Face of bridge
Face of bridge
Face of bridge
TYPICAL EXISTING SECTION AT PIER
TYPICAL EXISTING SECTION AT BENCH OVER PIERS
LW LW/BK/CC HC
A C
T U
A L F I L E T
Y P
X S E
X I S
T I N
G .D
G N
Verify all dimensions prior to any work.
Note:
" = 1'4
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R05
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
TYPICAL EXISTING SECTION - 2
Travel lanesTravel lanesSidewalk Sidewalk
D e c k overlay with mesh
" Concrete2
30'-0" 30'-0"
94'-0"
"2 113'-8"2
13'-3 "2 113'-8 "2
13'-3
(Typ.)
Granite step
(Typ.)
Granite curb
Travel lanesSidewalk
30'-0"
94'-0"
"2 113'-8"2
13'-3
(Typ.)
Granite step
(Typ.)
Granite curb
30'-0"
CL Structure
Travel lanes Sidewalk
"2 113'-8 "2
13'-3
Face of bridge
Face of bridge
Face of bridge
Face of bridge
CL Structure concrete arch (Typ.)
steel trusses in
Possible enclosed deck and concrete arch
Opening between bridge concrete arch (Typ.)
steel trusses in
Possible enclosed a r c h
C o n c r e te c h
C o n c r e te
A A B
B
CL Underpass concrete arch steel trusses in
Possible enclosed
LW LW/BK/CC HC
A C
T U
A L F I L E T
Y P
X S E
X I S
T I N
G .D
G N
As Shown
TYPICAL LONGITUDIAL CENTER SECTION OF UNDERPASS ARCHES
SECTION A-A - TYPICAL EXISTING SECTION OF UNDERPASS ARCHES AT OPENING
SECTION B-B - TYPICAL EXISTING SECTION AT CENTER OF UNDERPASS ARCHES
Verify all dimensions prior to any work.2.
prior to any work.
Verify locations of all possible enclosed trusses1.
Notes:
" = 1'4 1Scale:
" = 1'4 1Scale:
" = 1'8 1Scale:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R06
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
TYPICAL PROPOSED SECTION - 1
Travel lanesTravel lanes Sidewalk
30'-0" 30'-0"
94'-0"
"2 113'-8"2
13'-3 "2 113'-8 "2
13'-3
Crosswall
Travel lanesSidewalk
30'-0"
94'-0"
"2 113'-2"2
13'-9
(Typ.)
30'-0"
CL Structure
Travel lanes Sidewalk
"2 113'-2 "2
13'-9
Sidewalk
30'-0"
94'-0"
"2 113'-8
"2 13'-3
CL Structure
Travel lanes
30'-0"
Travel lanesSidewalk
"2 113'-8"2
13'-3
Face of bridge
Face of bridge
Face of bridge Face of bridge
Face of bridge
Face of bridge
TYPICAL PROPOSED SECTION AT BENCH OVER PIERS AND ABUTMENTS
6"
6"
6"
2.0%2.0%
2.0% 2.0%
2.0% 2.0%
T y p
T y p
T y p deck panel
10" Precast deck panel
10" Precast deck panel
10" Precast
3'-6"
(Typ.)
Reset granite curb
(Typ.)
Reset granite curb
(Typ.)
Reset granite step
(Typ.)
Reset granite curb
21'-4"22'-4"
6" (Typ.)
22'-4"21'-4"
6" (Typ.)
21'-4"
6" (Typ.)
22'-4" 22'-4"
6" (Typ.)
21'-4"
44'-2" 44'-2"
Crosswall
Sidewalk
(Typ.)
Reset granite step
3" Revealed height
(Typ.)
3" Revealed height
(Typ.)
3" Revealed height
(Typ.)
existing elevation (Typ.)
elevation to match
Granite step proposed existing elevation (Typ.)
elevation to match
Granite step proposed existing elevation (Typ.)
elevation to match
Granite step proposed
Reset granite step (Typ.)
Varies
Varies
Varies Varies
Varies
Varies overlay
2" Concrete overlay
2" Concrete overlay
2" Concrete
TYPICAL PROPOSED SECTION AT PIER AND ABUTMENTS
LW LW/BK/CC HC
A C
T U
A L F I L E T
Y P
X S P
R O
P O
S E
D .D
G N sidewalk
CIP concrete
KEY
TYPICAL PROPOSED SECTION AT CONCRETE APPROACH ARCH
" = 1'4
(Typ.)
and granite torus
Reset bridge rail
(Typ.)
and granite torus
Reset bridge rail
(Typ.)
and granite torus
Reset bridge rail pour closure
UHPC
pour closure
UHPC
pour closure
UHPC
UHPC closure pour UHCP closure pour
UHPC closure pourUHPC closure pour
(See Note 2)
(Typ.)
wall connection
Deck to spandrel
(See Note 2)
(Typ.)
wall connection
Deck to spandrel
(See Note 2)
(Typ.)
wall connection
Deck to spandrel for deck to spandrel wall connection details.
See "MISCELLANEOUS DETAILS - 2"2.
in all closure pours.
Use ultra high performance concrete1.
Note:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R07
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
TYPICAL PROPOSED SECTION - 2
Travel lanesTravel lanes Sidewalk
30'-0" 30'-0"
94'-0"
"2 113'-8"2
13'-3 "2 113'-8 "2
13'-3
Crosswall
Sidewalk
30'-0"
94'-0"
"2 113'-8
"2 13'-3
CL Structure
Travel lanes
30'-0"
Travel lanesSidewalk
"2 113'-8"2
13'-3
Face of bridge
Face of bridge Face of bridge
Face of bridge
6"
6" pour
Closure
2.0%2.0%
2.0% 2.0%
T y p
T y p deck panel
10" Precast (Typ.)
Reset granite curb
(Typ.)
Reset granite step
(Typ.)
Reset granite curb
(Typ.)
Reset bridge rail
(Typ.)
Reset bridge rail
44'-2" 44'-2"
Crosswall
Sidewalk
(Typ.)
Reset granite step
3" Revealed height
(Typ.)
3" Revealed height
(Typ.)
existing elevation (Typ.)
elevation to match
Granite step proposed existing elevation (Typ.)
elevation to match
Granite step proposed
Varies
Varies Varies
Varies overlay
2" Concrete overlay
2" Concrete
30'-10" C.I.P bridge deck 30'-10" C.I.P. bridge deck bridge deck
8" CIP
LW LW/BK/CC HC
A C
T U
A L F I L E T
Y P
X S P
R O
P O
S E
D .D
G N
TYPICAL PROPOSED SECTION OF UNDERPASS ARCHES AT OPENING
TYPICAL PROPOSED SECTION AT CENTER OF UNDERPASS ARCHES
concrete
CIP sidewalk
KEY
" = 1'4 pour closure
UHPC
(See Note 2)
(Typ.)
wall connection
Deck to spandrel for deck to spandrel wall connection details.
See "MISCELLANEOUS DETAILS - 2"2.
in all closure pours.
Use ultra high performance concrete1.
Note:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R08
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
2'-0" 2'-0" 2'-0" 2'-0" 1'-9" 1'-9" 1'-9"1'-6"1'-6" 1'-6" 1'-6"1'-6" 1'-6" 1'-9" 2'-0" 2'-0" 2'-0" 2'-0"
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
To ShoreTo Channel
To ShoreTo Channel
2'-0" 2'-0" 2'-0" 2'-0" 1'-9" 1'-9" 1'-9"1'-6"1'-6" 1'-6" 1'-6"1'-6" 1'-6" 1'-9" 2'-0" 2'-0" 2'-0" 2'-0"
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
W a ll
(Typ.)
deck panel
Precast concrete
(Typ.)
deck panel
Precast concrete
8'-0"
(Typ.)
8'-0"
(Typ.)
Varies
VariesVaries span
Bascule
LONGITUDINAL SECTION
TYPICAL PROPOSED ARCH
(Arch 4 shown, Arch 6 similar but opposite hand)
LW LW/BK/CC HC
A C
T U
A L F I L E T
Y P L
O N
G A
R C
H S
E C
T I O
N P
R O
P O
S E
D .D
G N
No Scale
TYPICAL PROPOSED ARCH LONGITUDINAL CENTER SECTION
CENTER SECTION NEAR BASCULE SPAN
TYPICAL PROPOSED ARCH LONGITUDINAL
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R09
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
BRIDGE CONSTRUCTION STAGING - 1
"2 13'-3 "2
113'-8 30'-0" 30'-0" "2 113'-8 "2
13'-3
94'-0"
CL Structure
Travel lanesTravel lanesSidewalk Sidewalk
Work zone
EXISTING BRIDGE SECTION
STAGE 1
28'-3" (Three 9'-5" travel lanes)45'-9" barrier
Temporary concrete
CL Structure
6"
1'-6"
LW LW/BK/CC HC
A C
T U
A L F I L E C
O N
S T
R S
T A
G I N
G .D
G N existing granite curb Remove and reset granite step reset existing Remove and rail granite bridge reset existing Remove and
" = 1'4 pour closure
UHPC
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R10
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
BRIDGE CONSTRUCTION STAGING - 2
30'-0" (Three 10'-0" travel lanes) 30'-0" (Three 10'-0" travel lanes)"2 113'-8 "2
113'-8
SidewalkSidewalk
STAGE 2
COMPLETED BRIDGE DECK REPLACEMENT
LW LW/BK/CC HC
A C
T U
A L F I L E C
O N
S T
R S
T A
G I N
G .D
G N
28'-3" (Three 9'-5" travel lanes) barrier
Temporary concrete
1'-6" 45'-9" CL Structure existing granite curb Remove and reset
Work zone granite step reset existing Remove and bridge rail reset granite Remove and
6"
" = 1'4 pour closure
UPHC
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R11
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Crosswall
CL Structure
CL Structure
(See Note 2) granite curb (Typ.)
Remove and reset
(See Note 2) granite curb (Typ.)
Remove and reset
(See Note 2) granite curb (Typ.)
Remove and reset
(See Note 2) granite rail (Typ.)
Remove and reset
(See Note 2) granite rail (Typ.)
Remove and reset
(See Note 2) granite rail (Typ.)
Remove and reset
6"
"2 11'-6
"2 11'-6
(Typ.)
(Typ.)
(Typ.)
T y p
T y p
T y p
60'-0" 1'-0" 1'-0"
"2 112'-8 "2
112'-8
"2 11'-9
"2 11'-9
60'-0" 1'-0" 1'-0"
"2 112'-2 "2
112'-2
"2 12'-3
"2 12'-3
60'-0" 1'-0" 1'-0"
"2 112'-8 "2
112'-8
"2 11'-9
"2 11'-9 deck removal
Limits of bridge
LIMITS OF BRIDGE DECK REMOVAL
TYPICAL SECTION AT PIERS AND ABUTMENTS
LIMITS OF BRIDGE DECK REMOVAL
TYPICAL SECTION AT BENCH OF PIERS AND ABUTMENTS
LIMITS OF BRIDGE DECK REMOVAL
TYPICAL SECTION AT CONCRETE APPROACH ARCH AND ABUTMENTS
BRIDGE DECK CONCRETE REMOVAL - 1
LW LW/BK/CC HC
A C
T U
A L F I L E C
O N
C R
E T
E D
E C
K R
E M
O V
A L .D
G N
Section 556.
For rail removal and reset details, refer to 3.
and details.
for granite curb and granite step reset notes
See "MISCELLANEOUS DETAILS - 2" sheet 2.
concrete removal for approval.
Submit demolition plans and methods of 1.
Notes:
KEY
" = 1'4
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R12
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
(See Note 2) granite curb (Typ.)
Remove and reset
(See Note 2) granite curb (Typ.)
Remove and reset
60'-0" 1'-0" 1'-0"
(See Note 2) granite rail (Typ.)
Remove and reset
6"
(Typ.)
T y p
"2 112'-8
"2 11'-9
"2 112'-8
"2 11'-9 deck and concrete arch
Opening between bridge
(See Note 2) granite step (Typ.)
granite rail and
Remove and reset
1'-0" 1'-0" "2
112'-8 "2 112'-860'-0"
M a x c h
C o n c r e te c h
C o n c r e te deck removal
Limits of bridge
(See Note 4) using hydrodemolition only
Remove concrete deck concrete arch (Typ.)
steel trusses in
Possible enclosed concrete arch (Typ.)
steel trusses in
Possible enclosed
M a x
BRIDGE DECK CONCRETE REMOVAL - 2
LW LW/BK/CC HC
A C
T U
A L F I L E C
O N
C R
E T
E D
E C
K R
E M
O V
A L .D
G N
LIMIT OF BRIDGE DECK REMOVAL
TYPICAL SECTION OF UNDERPASS ARCHES AT OPENING
LIMIT OF BRIDGE DECK REMOVAL
TYPICAL SECTION AT CENTER OF UNDERPASS ARCHES
truss members in concrete arch.
sidewalk. Do not damage the enclosed with a new 8-in CIP deck and 6-in CIP demolition with care as needed to replace
Remove the concrete deck using hydro-4.
Section 563.
For rail removal and reset details, refer to3.
and details.
for granite curb and granite step reset notes
See "MISCELLANEOUS DETAILS - 2" sheet 2.
concrete removal for approval.
Submit demolition plans and methods of 1.
Notes:
KEY
" = 1'4
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R13
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
ABUTMENT 4 - ARCH 9 - PIER 6
LONGITUDINAL CENTER SECTION
ABUTMENT 3 - BASCULE SPAN - ABUTMENT 2
LONGITUDINAL CENTER SECTION
PIER 1 - ARCH 1 - ABUTMENT 1
LONGITUDINAL CENTER SECTION
Abutment 4 - Approach side Abutment 4 - Channel side Pier 6
Arch 9
Bascule Span
Abutment 3 Abutment 2
Abutment 1 - Channel side Abutment 1 - Approach side
East underpass
West underpass
Arch 1
Pier 1
N full-height wall replacement
Bascule span - Abutment 3 full-height wall replacement
Bascule span - Abutment 2 full-height replacement
Wall 59 of Arch 9 top of wall repair
Wall 59 of Arch 1
REPAIRED OR REPLACED
LOCATIONS OF CONCRETE CROSSWALLS
LW LW/BK/CC HC
A C
T U
A L F I L E L
O C
A T I O
N S O
F C
R O
S S
W A
L L S R
E P
A I R
E D .D
G N
No Scale full-height wall replacement
Abutment 4 approach side
West underpass -full-height wall replacement
Abutment 4 channel side
West underpass -full-height wall replacement
Abutment 1 channel side
East underpass full-height wall replacement
Abutment 1 approach side
East underpass top of crosswall repair
Wall 9 of Arch 9 repair top of crosswall
Wall 9 of Arch 1
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
R14
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
DATE
George Choubah
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d bridge
Face of
(Abutment 2 shown, Abutment 3 opposite)
ABUTMENT 2 AND 3
CL Structure bridge
Face of
SECTION A-A
A
A
83'-8"
Limits of removal
3'-0"
(Typ.)
3'-0"Limits of removal 3'-0" Limits of removal
L im it s o f r e m o v a l
(Abutment 2 shown, Abutment 3 opposite) bridge
Face of bridge
Face of
BASCULE WALL REPLACEMENT - 1
to remain (Typ.)
Existing reinforcement to remain (Typ.)
Existing reinforcement
A C
T U
A L F I L E B
A S
C U
L E W
A L L R
E P
L A
C E
M E
N T .D
G N
LW/BK/CC HC
1'-2"
2'-0" platform
Existing
Top of arch
Top of arch
WEST ELEVATION - LIMITS OF CONCRETE REMOVAL
As Shown
Base of wall superstructure
Bascule span
Wearing surface
Existing bridge deck
LW/AF
Base of wall
Limits of removal existing rebar to remain
Limits of removal with
1'-0"
KEY
and design calculations to the CO for approval.
the existing bascule span. Submit detailed drawings accomodate the design of the new span replacing
If needed, change the design of these walls to 4.
arch during the removal of abutment walls.
Do not damage the existing concrete wall and3.
removal for approval according to Section 203.
Submit demolition plans and methods of concrete2.
REPAIRED OR REPLACED" sheet for locations.
See "LOCATIONS OF CONCRETE CROSSWALLS1.
Notes:
" = 1'16 3Scale:
" = 1'16 3Scale:
No Scale
WEST ELEVATION - LIMITS OF CONCRETE REMOVAL WITH EXISTING REBAR TO REMAIN
R15
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
DATE
George Choubah
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
(Abutment 2 shown, Abutment 3 opposite)
ABUTMENT 2 AND 3
(Abutment 2 shown, Abutment 3 opposite) bridge
Face of bridge
Face of
Limits of new concrete bridge
Face of
(T y p
(Typ.)
bridge
Face of
A
A
CL Structure
BASCULE WALL REPLACEMENT - 2
A C
T U
A L F I L E B
A S
C U
L E W
A L L R
E P
L A
C E
M E
N T .D
G N
(Typ.) (Typ.)
LW/BK/CC HC
"4 35'-3
Constr. jt.Precast deck panel
Top of arch
(Typ.)
out 3'-0" rebar to extend
Existing horizontal out 5'-0" (Typ.)
rebar to extend
Existing vertical
(Typ.)
Wall opening
Access portal
Construct the wall during Stage 2 Construct the wall during Stage 3
WEST ELEVATION - AFTER CONCRETE REMOVAL
WEST ELEVATION - LIMITS OF NEW CONSTRUCTION
Base of wall
Top of arch
Base of wall
LW/AF
89'-8"
30'-0"14'-10" 30'-0" 14'-10"
3" Top of wall 2.0% slopeTop of wall level Top of wall 2.0% slope Top of wall level
B
B
"4 310'-9"4
310'-9 "4 35'-3
(Typ.)
" = 1'16
9'-11"
B
B
REPLACEMENT - 3, ABUTMENT 2 AND 3" sheet.
For Section A-A and Section B-B, see "BASCULE WALL6.
and design calculations to the CO for approval.
replacing the existing bascule span. Submit detailed drawings
Design these walls to accomodate the design of the new span5.
For rail removal and reset details, refer to Subsection 556.08.4.
drawings for approval.
truck load. Submit detailed design calculations and shop
Design the falsework and shoring to accomodate HS-203.
same time.
Remove the falsework and shoring from both stages at the 2.
falsework and shoring are ready for removal.
until after the Stage 3 construction has been completed and the
Maintain falsework and shoring under the Stage 2 construction1.
Notes:
R16
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
DATE
George Choubah
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
ARLINGTON MEMORIAL BRIDGE
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
ABUTMENT 2 AND 3
A C
T U
A L F I L E B
A S
C U
L E W
A L L R
E P
L A
C E
M E
N T .D
G N
BASCULE WALL REPLACEMENT - 3
LW LW/BK/CC HC
beam superstructure
Bascule span
Precast deck panel
2" Concrete overlay
Top of arch
Existing rebar to remain
SECTION B-B
of existing wall
Match back face of existing wall
Match back face
SECTION A-A
Existing rebar to remain
Top of arch
" = 1'8
Precast deck panel beam superstructure
Bascule span
CIP sidewalk
AND 3" sheet for location of Section A-A and Section B-B.
See "BASCULE WALL REPLACEMENT - 2, ABUTMENT 24.
spans, including steps and/or platforms.
Design these walls to provide access to the approach3.
to the CO for approval.
Submit detailed drawings and design calculations the new span replacing the existing bascule span.
Design these walls to accomodate the design of 2.
the system to the CO for approval.
can be monitored for at least 75 years. Submit
Provide active cathodic protection system that1.
Notes:
R17
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
DATE
George Choubah
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Face of
SECTION A-A
A
A
83'-8"
Limits of removal
3'-0"
(Typ.)
3'-0"Limits of removal 3'-0" Limits of removal
L im it s o f r e m o v a l bridge
Face of bridge
Face of
ARCH 9
A C
T U
A L F I L E A
R C
H W
A L L
R
E P
L A
C E
M E
N T .D
G N
WALL 59 REPLACEMENT - 1
AF LW/BK/CC HC
arch during the removal of abutment walls.
Do not damage the existing concrete wall and3.
removal for approval according to Section 203.
Submit demolition plans and methods of concrete2.
REPAIRED OR REPLACED" sheet for locations.
See "LOCATIONS OF CONCRETE CROSSWALLS1.
Notes:
WEST ELEVATION - LIMITS OF CONCRETE REMOVAL
As Shown
"2 11'-5
1'-1"
2'-0"
Top of arch
Top of arch
Base of wall
Base of wall
Existing bridge deck
Limits of removal existing rebar to remain
Limits of removal with
KEY
" = 1'16 3Scale:
" = 1'16 3Scale:
No Scale
WEST ELEVATION - LIMITS OF CONCRETE REMOVAL WITH EXISTING REBAR TO REMAIN
R18
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
DATE
George Choubah
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Face of
A
A
89'-8" bridge
Face of bridge
Face of
Limits of new concrete
(T y p
(Typ.)
"2 17'-1
(Typ.)
A C
T U
A L F I L E A
R C
H W
A L L
R
E P
L A
C E
M E
N T .D
G N
ARCH 9
WALL 59 REPLACEMENT - 2
"2 17'-0 "2
17'-1
(Typ.)(Typ.)
AF LW/BK/CC HC
2'-0"
9 1
1'-1"
2" Concrete overlay
Precast deck panel
Top of arch
Base of wall
(Typ.)
out 5'-0" rebar to extend
Existing vertical
(Typ.)
out 3'-0" rebar to extend
Existing horizontal
WEST ELEVATION - AFTER CONCRETE REMOVAL
WEST ELEVATION - LIMITS OF NEW CONSTRUCTION
(Typ.)
Wall opening
9'-5"
Pier 6
Access portal
3"
Constr. jt.Precast deck panel
Construct the wall during Stage 1 Construct the wall during Stage 2
Top of arch
Base of wall
As Shown
Base of wall Top of arch
14'-10" 30'-0" 30'-0" 14'-10"
For rail removal and reset details, refer to Subsection 556.08.4.
drawings for approval.
truck load. Submit detailed design calculations and shop
Design the falsework and shoring to accomodate the HS-203.
same time.
Remove the falsework and shoring from both stages at the 2.
falsework and shoring are ready for removal.
until after the Stage 3 construction has been completed and the
Maintain falsework and shoring under the Stage 2 construction1.
Notes:
SECTION A-A
Top of wall level Top of wall 2.0% slope Top of wall 2.0% slope Top of wall level
9'-5"
" = 1'16 3Scale:
" = 1'16 3Scale:
No Scale(Typ.)
Utility conduit opening
R19
-J a n -2
:2
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
175 November 2016 BRP-1160
Structure Number 3300-016P
CONCRETE APPROACH SPAN REHABILITATION
NP-GWMP 11(4),11(7)
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
PROJECT TEAM LEA
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .