14_Bascule_Span_Replacement_-_X_set.pdf
PDF 10 MB Posted
- Attached to
- Arlington Memorial Bridge Federal contract opportunity
- Solicitation number
- DTFH71-17-R-00006
About this file
14_Bascule Span Replacement - X_set
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X01
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
PROJECT TEAM LEADER
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
George Choubah
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
GEORGE WASHINGTON MEMORIAL PARKWAY
BRP NO.
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
NP-GWMP 11(4),11(7)
January 2017
Concrete: 150 pcf.
Future Wearing Surface: 25 psf.
Provide 2" cover for reinforcing steel unless otherwise noted
SPECIFICATIONS:
Design:
Construction:
Dead loads:
Live loads:
Structural Concrete:
Prestressing Steel:
Bearings:
Reinforcing Steel:
DESIGN LOADS:
MATERIALS:
Structural Steel:
MATERIALS, cont.:
Grade 60 deformed
Furnish reinforcing steel conforming to AASHTO M 31 (ASTM A615), FP-14, U.S. Customary Units
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, :Miscellaneous
Verify locations of utilities in field prior to any work
Verify all dimensions and locations in field prior to ordering materials
UTILITIES:
HL-93
-F e b -2
:3
P
M
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
No Scale
M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n otherwise noted
Use uncoated reinforcing steel in beams and crosswalls unless
Strand diameter: 0.5 in
Wobble coefficient: 0.00
Friction coefficient: 0.00
Pretensioning:
Maximum stress after anchor set: 200 ksi (75% ultimate)
Maximum anchoring stress at anchorages after anchor set: 189 ksi (70% ultimate)
Maximum jacking stress: 216 ksi (80% ultimate)
Apparent Modulus (for calculation of elongations): 28,500 ksi
Strand: AASHTO M 203/M 203 M seven wire, grade 270, low relaxation
Prestressing Parameters (Strand):
A C
T U
A L F I L E G
N .D
G N
MISCELLANEOUS:
LW LW/BK
SHEET TITTLE
INDEX OF BRIDGE PLAN SHEETS
SHEET NO.
GENERAL NOTES:
GENERAL NOTES AND INDEX
Section 18.2 of the AASHTO LRFD Bridge Design Specifications
Provide bearing systems conforming to the requirements of panels, and CIP deck unless otherwise noted
Use stainless reinforcing steel in precast approach slabs, precast
Grade 60 deformed
Furnish stainless reinforcing steel conforming to ASTM A955, Miscellaneous Details21
Fascia Removal Details - 220
Fascia Removal Details - 119
Sidewalk Plan18
Deck Panel Layout17
Elevation View Below Bridge Deck16
Underside View15
North Exterior Girder14
South Exterior Girder13
Typical Interior Girder12
Bridge Deck and Framing Plan11
Abutment - 210
Abutment - 1 9
Foundation Layout 8
Bridge Construction Staging - 2 7
Bridge Construction Staging - 1 6
Typical Sections - 2 5
Typical Sections - 1 4
Sidewalks At Abutments 3
Plan and Elevation 2
General Notes and Index 1
Furnish welds conforming to AASHTO/AWS D1.5 Bridge Welding Code
(ASTM A709, Grade 50) unless otherwise noted on the plans
Furnish structural steel conforming to AASHTO M270, Grade 50
", unless otherwise noted4 3Chamfer exposed edges
Furnish class UHPC for closure pours and haunches sleeper slabs precast deck panels, approach slabs, and f'c = 6,000 psi at 28 daysFurnish class HPC concrete for deck and
U.S. Customary Units, 2014
AASHTO LRFD Bridge Design Specifications, Seventh Edition, 2016 Interim in close proximity to utilities.
Provide protection and use extreme caution when working before performing any work.
All sketches and dimensions are approximate. Verify all the conditions
Verify all dimensions prior to any work.
FOR INFORMATION ONLY
X02
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
To Virginia To Washington
N
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
PLAN AND ELEVATION
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
-F e b -2
:3
LW
A C
T U
A L F I L E P
E .D
G N
1" = 15'
CL
CLAbutment 3
Sidewalk
Sidewalk
Structure
CL
CLRoadway
LW/BK
PLAN
CL Abutment 2
(Typ.)
New catch basin
ELEVATION
"2 1280'-0
225'-0"
R o a d w a y
R o a d w a y
Face of bridge
Edge of granite step
Edge of granite step
Face of bridge
(See Note 3) lampost (Typ.)
Remove and reset aproval.
lamp posts to the existing. Submit detailed drawing to the CO for
Replace the lamp posts that are missing or damaged. Match the new3.
Submit shop drawings and design calculations to the CO for approval.
shape, and material of the existing gratings and frames.
Furnish new catch basin frames and gratings that match size, 2.
a seperate set of drawings.
The rehabilitation of concrete approach arches is shown on1.
Notes:
B B B
B
A A bascule span
Existing
C u r b
C u r b
C C exp. jt. (Typ.)
Strip seal exp. jt. (Typ.)
Strip seal
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
DATE
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
ARLINGTON MEMORIAL BRIDGE
X03
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
LW LW/BK " = 1'2
J o in t
(See Note 2) 30'-2" Long. jt.
PLAN VIEW - SIDEWALK AT ABUTMENT
(Abutment 3 shown, Abutment 2 similar)
N
Edge of granite step
Edge of granite step
Bridge rail
Bridge rail
Edge of granite step
Edge of granite step
Existing seat
Sidewalk
Sidewalk
Bridge rail
Bridge rail
Existing cabin
SIDEWALK AT ABUTMENTS
A C
T U
A L F I L E B
S S I D
E W
A L
K
A B
U T .D
G N
Existing joint Existing joint expansion/contraction at both ends of the span.
Provide bearing system with stopper to allow equal thermal3.
the CO for approval.
of the span. Submit detailed design calculations and drawings to
Furnish a longitudinal joint system to accomodate the movement2.
" expansion joints on the north sidewalks.2 1of the existing 1
Match the 2-inch expansion joint locations to the same locations1.
Notes:
Exp. jt. Exp. jt.
(See Note 3)
(See Note 3)
(See Note 3)
Exp. jt. (Typ.)
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X04
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
NP-GWMP 11(4),11(7)
January 2017
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
TYPICAL SECTIONS - 1
CL Structure
Travel lanesTravel lanesSidewalk Sidewalk
30'-0" 30'-0"
94'-0"
"2 113'-8"2
13'-3 "2 113'-8 "2
13'-3
(Typ.)
Granite step
(Typ.)
Granite curb
Sidewalk
30'-0"
94'-0"
"2 113'-8 "2
13'-3
CL Structure
Travel lanes
30'-0"
Travel lanesSidewalk
"2 113'-8"2
13'-3
Face of bridge
Face of bridge Face of bridge
Face of bridge
LW
(Typ.)
Reset granite step
3" Revealed height
2.0%
6" pour
Closuredeck panel
10" Precast overlay
2" Concrete sidewalk
CIP concrete
KEY
2.0% Varies Varies existing elevation (Typ.)
elevation to match
Granite step proposed
4'-0"5 Spa. @ 8'-0" = 40'-0"3'-0" 4'-0" 3'-0"
EXISTING CROSS SECTION AT CENTERLINE OF EXISTING BASCULE SPAN
A C
T U
A L F I L E T
Y P
X S .D
G N
5 Spa. @ 8'-0" = 40'-0"
LW/BK " = 1'4
BRIDGE RAIL RESET CONCEPT
(See Note 3) and fascia (Typ.)
Reset bridge rail
CIP sidewalk deck panel
Precast
PROPOSED CROSS SECTION AT CENTERLINE OF NEW SPAN
SECTION A-A
(See Note 3) and fascia
Bridge rail
See "PLAN AND ELEVATION" sheet for Section A-A.4.
of the existing connection.
superstructure is required to match or exceed the capacity
The connection of the base of the bridge rails to the according to Subsection 556.08.
bridge rail remove and reset to the CO for approval
Submit detailed drawings and design calculations of 3.
Use ultra high performance concrete in all closure pours.2.
Verify all dimensions prior to any work.1.
Note:
inspection (Typ.)
Opening for
2'-6" x 2'-6" curb (Typ.)
granite
Reset
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
X05
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
Sidewalk
30'-0"
87'-5"
"2 113'-8
CL Structure
Travel lanes
30'-0"
Travel lanesSidewalk
"2 113'-8
2.0% deck panel
10" Precast overlay
2" Concrete
2.0% Varies Varies
4'-0"4 Spa. @ 8'-0" = 32'-0" 4'-0" sidewalk
CIP concrete
KEY
A C
T U
A L F I L E T
Y P
X S .D
G N cabin
Existing
TYPICAL SECTIONS - 2
" = 1'4
1LW/BK
5 Spa. @ 8'-0" = 40'-0"
4 Spa. @ 8'-0" = 32'-0" 4'-0" 4'-0" 4 Spa. @ 8'-0" = 32'-0" 7'-0"
30'-0"
87'-5"
30'-0"
Travel lanes
"2 113'-8
Sidewalk
113'-8
Travel lanesSidewalk
CL Structure
2.0%2.0% deck panel
10" Precast overlay
2" Concrete VariesVaries
6" Closure pour
6" Closure pour
(See Note 4) to remain rooms under
Existing cabin and height (Typ.)
3" Revealed
Note 5) room (See of existing
New roof
Existing wall
GRANITE TORUS RESET CONCEPT
(See Note 3) and granite torus
Reset bridge rail
(See Note 3) and granite torus
Reset bridge rail
(See Note 3) and granite torus
Reset bridge rail deck panel
Precast
CIP sidewalk
PROPOSED CROSS SECTION AT CENTERLINE ABUTMENT
SECTION B-B
PROPOSED CROSS SECTION AT ABUTMENT BACK SPAN WALL
SECTION C-C
7'-0" back girder northwest
Northeast or
Section C-C.
See "PLAN AND ELEVATION" sheet for Section B-B and6.
roof to the CO for approval.
Submit detailed drawings and calculations of the new 5.
design and repair for approval.
condition if there are damages. Submit to the CO detailed construction duration. Restore the rooms to their original
Avoid damages to the existing rooms/wall during the 4.
rail and granite torus reset to the CO for approval.
Submit detailed drawings and design calculations of bridge 3.
Use ultra high performance concrete in all closure pours.2.
Verify all dimensions prior to any work.1.
Note:
(See Note 3)
Granite torus
(See Note 3) steel angle
Stainless curb (Typ.)
granite
Reset inspection (Typ.)
Opening for
2'-6" x 2'-6" inspection (Typ.)
Opening for
2'-6" x 2'-6"
(Typ.)
curb granite
Reset
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X06
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
NP-GWMP 11(4),11(7)
January 2017
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
BRIDGE CONSTRUCTION STAGING - 1
13'-3 "2
113'-8 30'-0" 30'-0" "2 113'-8 "2
13'-3
94'-0"
CL Structure
Travel lanesTravel lanesSidewalk Sidewalk
Work zone
EXISTING BRIDGE SECTION
STAGE 1
28'-3" (Three 9'-5" travel lanes)45'-9" barrier
Temporary concrete
CL Structure
1'-6"
LW
A C
T U
A L F I L E C
O N
S T
R S
T A
G I N
G .D
G N existing granite curb Remove and reset granite step reset existing Remove and rail granite bridge reset existing Remove and
" = 1'4
1LW/BK
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
X07 e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
NP-GWMP 11(4),11(7)
January 2017
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
BRIDGE CONSTRUCTION STAGING - 2
30'-0" (Three 10'-0" travel lanes) 30'-0" (Three 10'-0" travel lanes)"2 113'-8 "2
113'-8
SidewalkSidewalk
COMPLETED BRIDGE DECK REPLACEMENT
LW
A C
T U
A L F I L E C
O N
S T
R S
T A
G I N
G .D
G N
28'-3" (Three 9'-5" travel lanes) barrier
Temporary concrete
1'-6" 45'-9" CL Structure existing granite curb Remove and reset
Work zone granite step reset existing Remove and bridge rail reset granite Remove and pour
Closure
" = 1'4
1LW/BK
6" Closure pour
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
X08
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
To Virginia To Washington
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
LW 1" = 10'
CL
CLAbutment 3 CL Abutment 2
Structure
FOUNDATION LAYOUT
PLAN
wall (Typ.)
abutment
Main span
CL
ELEVATION
Span 6 Span 4
(Typ.)
machinery room
Existing operating
(Typ.)
machinery room
Existing operating wall (Typ.)
abutment
Back span CL bearings (Typ.)
Back span bearings (Typ.)
Main span
LW
Submit shop drawings and design calculations to the CO for approval.
Design the new abutment walls and their foundation. 2.
Verify all dimension prior to design work.1.
Notes:
2'-9"
A C
T U
A L F I L E B
S F
O U
N D
A T I O
N
L A
Y O
U T .D
G N wall (Typ.)
buttress
Existing
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X09
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
Up
ABUTMENT - 1
stairs relocate existing
Refurbish and
AbutmentCL
CLStructure
PLAN
(See Note 3) below cabins
Existing room
A A
(See Note 3) inside abutment
Existing room abutment wall
Main span abutment wall
Back span
6"
(See Note 3) machinery room
Existing operating
2" (See Note 3) side wall (Typ.)
Existing abutment 6"
(Typ.)
4"
3'-0"
(Min.)
" = 1'8
LW/BK
(Abutment 2 shown, Abutment 3 similar)
B B
Submit to the CO detailed design and repair for approval.
Restore the rooms to their original condition if there are damages.
Avoid damages to the existing rooms/wall during the construction duration.3.
See "ABUTMENT - 2" sheet for Sections A-A and Section B-B.2.
Verify all dimensions prior to design work.1.
Notes:
A C
T U
A L F I L E B
S
A B
U T
M E
N T
W A
L L .D
G N wall (Typ.)
Existing buttress
ELEVATION - MAIN SPAN ABUTMENT WALL
(See Note 3) side wall (Typ.)
Existing abutment
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X10
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
ABUTMENT - 2
SECTION A-A
CLStructure
(See Note 3) side wall (Typ.)
Existing abutment
" = 1'8
LW/BK
(See Note 3) inside abutment
Existing room
Submit to the CO detailed design and repair for approval.
Restore the rooms to their original condition if there are damages.
Avoid damages to the existing rooms/wall during the construction duration.3.
See "ABUTMENT - 1" sheet for Section A-A and Section B-B.2.
Verify all dimension prior to design work.1.
Notes:
SECTION B-B
A C
T U
A L F I L E B
S
A B
U T
M E
N T
W A
L L .D
G N
(See Note 3) rooms below
Existing cabin and
Min.
4'-0"
6"6"
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X11
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
To Virginia To Washington
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
CLAbutment 3 CL Abutment 2
CL
FRAMING PLAN
Existing bascule span
CL New span back girder
Northwest back girder
Northeast
(Typ.)
Diaphragm
North exterior girder interior girder
South first interior girder
North first girder
South exterior (Typ.)
Interior girder
BRIDGE DECK AND FRAMING PLAN
North fascia
South fascia link slab
Limit of UHPC link slab
Limit of UHPC
StructureCL
LW/BK
Verify all dimension prior to design work.
Notes:
A C
T U
A L F I L E B
S
D E
C K F
R A
M I N
G .D
G N
225'-0"
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X12
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
LW As Shown
New span
Existing bascule span
CL
CL Abutment 3 CL Abutment 2
Exp. Exp.
TYPICAL INTERIOR GIRDER
To Virginia
216'-0" 30'-7"
(See Detail A) with crack control
UHPC link slab (See Detail B) with crack control
UHPC link slab
225'-0"
To Washington
DETAIL B - SAW CUT AT LINK SLAB
li n k s la b
U
H P
C
End of girder
(See Note 2) Saw cut in concrete o v e r la y C o n c r e te
2'-0"
V a r ie s d e c k p a n e l
P r e c a s t
(Typ.)
Diaphragm
Main span girder girder
Back span
"4
"4
AT CENTER SPAN
GIRDER CROSS SECTION
C le a r girder
Back span
(See Note 3) movement longitudinal controlled
Exp. with
(See Note 3) movement longitudinal controlled
Exp. with
(Typ.)
machinery room
Existing operating
(See Note 5)
Expansion joint (Typ.)
Scale: 5" = 1'" = 1'2 1Scale: 1
TYPICAL CROSS SECTION
DETAIL A - I-SHAPED MEMBER
2'-0"
2'-0"
2"
(See Detail A)
I-shaped member (Typ.)
Scale: 1" = 1'
TYPICAL INTERIOR GIRDER - SOUTH FACE
(See Note 3) movement longitudinal controlled
Exp. with
(See Note 3) movement longitudinal controlled
Exp. with
A A
B B
(See Note 7)
Web splice (Typ.)
expansion and contraction.
the back span girder to move together due to thermal
Design the web splice to allow the main span girder and 7.
sheet for details.
For View B-B, see "ELEVATION VIEW BELOW BRIDGE DECK" 6.
For View A-A, see "UNDERSIDE VIEW" sheet for details.5.
joint details.
See "MISCELLANEOUS DETAILS" sheet for expansion 4.
thermal expansion/contraction at both ends of the span.
Provide bearing system with stopper to allow equal3.
ends of girders.
Line up both saw cuts and center them between the2.
Verify all dimension prior to design work.1.
Notes:
Scale: 1" = 10'
LW/BK
A C
T U
A L F I L E B
S I N
T
G I R
D E
R .D
G N
30'-7"
±38'-0" ±38'-0" within this section of the bottom flange) (Match the curvature of the exterior girder ±76'-0"
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X13
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
SOUTH EXTERIOR GIRDER
To Virginia To Washington
CL
New span
Existing bascule span
CL
CL Abutment 3 CL Abutment 2
225'-0"
216'-0"
Exp. Exp.
sidewalk
CIP concrete
KEY
30'-7" 30'-7"
(See Detail B) with crack control
UHPC link slab
(See Detail A) with crack control
UHPC link slab
DETAIL B - SAW CUT AT LINK SLAB
C I P s id e w a lk li n k s la b
U
H P
C
End of girder
(See Note 3) Saw cut in concrete
(Typ.)
Diaphragm
Main span girder girder
Back span
V a r ie s d e c k p a n e l
P r e c a s t
(See Note 2) metal fascia
Limit of existing fascia
Existing metal
(See Detail A)
I-shaped member (Typ.)
S e e N o te
AT CENTER OF SPAN
GIRDER CROSS SECTION
Scale: 1" = 10'
Scale: 5" = 1'
" = 1'4 3Scale:
" = 1'2 1Scale: 1
2'-0"
2"
TYPICAL CROSS SECTION
DETAIL A - I-SHAPED MEMBER
2'-0"
"4
"4 girder
Back span
(See Note 5)
Expansion joint (Typ.)
(See Note 4) movement longitudinal controlled
Exp. with
(See Note 4) movement longitudinal controlled
Exp. with
SOUTH EXTERIOR GIRDER - SOUTH FACE
LW/BK
2'-0"
A
B B
A sheet for details.
For View B-B, see "ELEVATION VIEW BELOW BRIDGE DECK"7.
For View A-A, see "UNDERSIDE VIEW" sheet for details.6.
See "MISCELLANEOUS DETAILS" sheet for expansion joint details.5.
expansion/contraction at both ends of the span.
Provide bearing system with stopper to allow equal thermal4.
ends of girders.
Line up both saw cuts and center them between the3.
as shown on the plans.
Erect girder with bottom plate 1 inch above fascia curvature of the existing metal fascia.
Fabricate bottom of girder to follow the same vertical 2.
Verify all dimension prior to design work.1.
Notes:
A C
T U
A L F I L E B
S S
O U
T H
E
X T
G I R
D E
R .D
G N
±76'-0"
±38'-0" ±38'-0"
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X14
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
NORTH EXTERIOR GIRDER
To Virginia To Washington
CL
New span
Existing bascule span
CL
CL Abutment 3 CL Abutment 2
225'-0"
194'-10"
Exp.
sidewalk
CIP concrete
KEY
(Typ.)
Diaphragm
Main span girder
V a r ie s d e c k p a n e l
P r e c a s t
(See Note 2) metal fascia
Limit of existing fascia
Existing metal
(See Detail A)
I-shaped member (Typ.)
S e e N o te
AT CENTER OF SPAN
GIRDER CROSS SECTION
Scale: 1" = 10'
" = 1'4 3Scale:
" = 1'2 1Scale: 1
2'-0"
2"
TYPICAL CROSS SECTION
DETAIL A - I-SHAPED MEMBER
2'-0"
(See Note 4)
Expansion joint (Typ.)
Exp.
back girder
Northeast back girder
Northwest
NORTH EXTERIOR GIRDER - SOUTH FACE
LW/BK
sheet for details.
For View B-B, see "ELEVATION VIEW BELOW BRIDGE DECK"6.
For View A-A, see "UNDERSIDE VIEW" sheet for details.5.
See "MISCELLANEOUS DETAILS" sheet for expansion joint details.4.
expansion/contraction at both ends of the span.
Provide bearing system with stopper to allow equal thermal3.
as shown on the plans.
Erect girder with bottom plate 1 inch above fascia curvature of the existing metal fascia.
Fabricate bottom of girder to follow the same vertical 2.
Verify all dimension prior to design work.1.
Notes:
2'-0"
A
B
A
B
A C
T U
A L F I L E B
S
N O
R T
H
E X
T
G I R
D E
R .D
G N
(See Note 3) longitudinal movement
Exp. with controlled
(See Note 3) longitudinal movement
Exp. with controlled
1'-5" 1'-5"
±76'-0"
±38'-0" ±38'-0"
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X15
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
CL Bascule
VIEW A-A
UNDERSIDE VIEW
" = 1'8
1LW/BK
(Typ.)
" Tieplate8 321"x21"x plate (Typ.)
" Connection8
(Typ.)
WT 4x14
(Typ.)
WT 4x14 exterior girder) between Metal Fascia and
I - Shopped bracing (Typ.
fascia
South metal
North metal fascia A
C T
U A
L F I L E U
N D
E R
S I D
E
V I E
W .D
G N
3. Use bolt connections and all locations.
2. See "TYPICAL INTERIOR GIRDER" sheet for Section A-A.
1. Verify all existing members and dimension prior to design work.
Notes:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X16
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
NP-GWMP 11(4),11(7)
January 2017
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
Face of bridge Face of bridge
LW HC
ELEVATION VIEW BELOW BRIDGE DECK
VIEW B-B - ELEVATION VIEW BELOW BRIDGE DECK
(See Note 3)
Metal fascia (See Note 3)
Metal fascia
LW/JG
A C
T U
A L F I L E E le v
V ie w
B e lo w .D
G N reattachedment of the existing fascias.
and "INSIDE ELEVATION OF FASCIA CONNECTING MEMBER" sheets for
See "FASCIA REMOVAL DETAILS - 1", "FASCIA REMOVAL DETAILS - 2", 3.
See "TYPICAL INTERIOR GIRDER" sheet for View B-B.2.
Verify all existing members and dimensions prior to any work.1.
Note:
members
Fascia connecting members
Fascia connecting
No scale
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
X17
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
-F e b -2
:3
DECK PANEL LAYOUT
Trans. key (Typ.)
C lo s u r e p o u r
CL Bascule span
(See Note 1)
Arch 6 Arch 4
N
CL
CL Abutment 2
Abutment 3 control with crack
UHPC link slab control with crack
UHPC link slab
9'-4" "2 18'-1 8'-6" "2
18'-0
"2 17'-11 8'-0" 8'-0" 8'-0"
5"
8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" "2 17'-11 "2
18'-0 8'-6" "2 18'-1 9'-4"
BA5 BA10 BA13 BA12 BA1
BD1 BS1
BS1 BD1 BD1 BD1BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BA5
BA15BA11BA14BA1
Structure
BA5 BA4 BA3 BA2 BA1
BD1 BS1 BS1 BD1BS1 BS1 BS1 BS1 BS1 BD1BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BS1 BD1BS1 BA7 BA8 BA9 BA4 BA5
PLAN
6'-0"6'-0"
LW/BK
(Typ.)
Face of bridge design done by the contractor.
For replacement details of catch basins, see2.
details.
transverse key and longitudinal closure pour
See "MISCELLANEOUS DETAILS" sheet for1.
Notes:
A C
T U
A L F I L E B
S
D E
C K P
A N
E L
L A
Y O
U T .D
G N
2'-1" 1'-4" 3'-2"
(Typ.)
Edge of curb step (Typ.)
Edge of granite basin (Typ.)
Opening for catch
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X18
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
NP-GWMP 11(4),11(7)
e b -2
:3
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
TYPICAL 1" SIDEWALK JOINT " SCORED JOINT4
1TYPICAL TYPICAL 1" SIDEWALK JOINT
WITH CONSTRUCTION JOINT
pattern (Typ.)
12 sq. Sidewalk grid pattern (Typ.)
3 sq. Sidewalk grid
SIDEWALK PLAN
Face of bridge granite step
Edge of joint (Typ.)
" Scored 4
Face of bridge granite step
Edge of
C u r b
C u r b
To Virginia To Washington
CL Bascule span
(Typ.)
Catch basin
CLStructure
CL Abutment 2CL Abutment 3
1"
" Radius (Typ.)4 joint sealer
Hot poured
" Radius (Typ.)4
1joint sealer
Hot poured
Constr. joint
"2
"2
"4
(Typ.)
1" Sidewalk joint
(Typ.)
Lamp post
A C
T U
A L F I L E B
S S I D
E W
A L
K .D
G N and joint on sidewalk.
Verify and match the existing concrete grid pattern3.
post-tension duct splice details.
sheet for post-tension end anchorage and
See "DECK PANEL MICELLANEOUS DETAILS - 2" 2.
sheet for details.
See "DECK PANEL MISCELLANEOUS DETAILS - 1"1.
Notes:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX NP-GWMP 11(4),11(7)
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
X19
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
NP-GWMP 11(4),11(7)
January 2017
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
HC LW/BK/CC -- No Scale
20 0 2 4 4 6 6 8 8 10
"8 3" x 2
11 - Web 14
"8 33 - L 3" x 3" x
'8 31 - Web 20" x
"8 32 - L 3" x 3" x
Near web
Far web
"8 32 - L 3" x 3" x
"8 32 - L 3" x 3" x
"8 32 - L 4" x 3" x
" Sides2 1D.L. 2
" Top2 1D.L. 2
" Top8 3Tie Pls 24 x
1 - L 3" x 3" x 3#8" N.S.
" F.S.8 31 - L 3" x 3" x
" Top8 32 - L 3" x 3" x
Bottom chord
" Sides2 1D.L. 2
" Top2 1D.L. 2
" Top8 3Tie Pls 24 x
1 - L 3" x 3" x 3#8" N.S.
" F.S.8 31 - L 3" x 3" x
" Top8 32 - L 3" x 3" x
3'-1"
"8 3P.L.S. x
"8 3Tie Pls -
"8 32 - Bars 6 x
C
C
18'-4" 8 Spa. @ 9'-4" = 74'-8"
B
B
A
A
SECTION A-A
EXISTING AFTER DISCONNECTION
To remove
(Typ.)
angle Connection truss Fascia
Not to scale truss Fascia
FASCIA REMOVAL DETAILS - 1
INSIDE ELEVATION OF EXISTING FASCIA TRUSS
A C
T U
A L F I L E F
A S
C I A
R E
M O
V A
L
D E
T .D
G N
To clean, refurbish, and reset its appurtenances
Metal fascia and its appurtenances
Metal fascia and
Base of ballustradeBase of ballustrade starting any work.
Verify all existing members & dimensions before5.
for sections B-B and C-C.
See "FASCIA REMOVAL DETAILS - 2" sheet4.
for approval prior to removal.
Submit removal plan and installation plan to the CO 3.
to the exterior girders of the new span.
Reset metal fascias and their appurtenances3.
Refurbish the metal fascia and their appurtenances.2.
Remove the metal fascias and their appurtenances.1.
Notes:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
X20
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
NP-GWMP 11(4),11(7)
January 2017
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d
HC LW/BK/CC -- No Scale
VIEW C-C
SECTION B-B
To remove
(Typ.)
Bracing
(Typ.)
angle
Connect
(Typ.)
Bracing
EXISTING AFTER DISCONNECTION
EXISTING AFTER DISCONNECTION
To remove
(Typ.)
angle
Connect
FASCIA REMOVAL DETAILS - 2
A C
T U
A L F I L E F
A S
C I A
R E
M O
V A
L
D E
T .D
G N
To clean, To clean, refurbish, and reset its appurtenances
Metal fascia and its appurtenances
Metal fascia and refurbish, and reset its appurtenances
Metal fascia and its appurtenances
Metal fascia and starting any work.
Verify all existing members & dimensions before5.
for sections B-B and C-C.
See "FASCIA REMOVAL DETAILS - 2" sheet4.
for approval prior to removal.
Submit removal plan and installation plan to the CO 3.
to the exterior girders of the new span.
Reset metal fascias and their appurtenances3.
Refurbish the metal fascia and their appurtenances.2.
Remove the metal fascias and their appurtenances.1.
Notes:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
X21
-F e b -2
:3
P
M M
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
NOT
FOR
CO
NST
RUCTI
ON
PRE
ARLINGTON MEMORIAL BRIDGE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
XXXXXX
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
e b -2
:3
P R
O J E
C T
S g w m p (4
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s B a s c u le
S p a n
R e p la c e m e n t\
P
R O J E
C T
S .d g n
LW LW/BK
MISCELLANEOUS DETAILS
A C
T U
A L F I L E M
I S
C .D
G N
"8 3"8
" Shear connectors4 1" x 34 reinforcement
Design transverse
UHPC
(Typ.)
1" Radius finish
Exposed aggregate holes at 24" max.
2" Formed vent/grout
Scale: 2" = 1'
" 4
" 4
(Typ.)
Precast concrete panel
UHPC fill
Scale: 2" = 1'BLOCK OUT IN DECK PANEL
Flange width
Closure pourCL deck panel (Typ.)
Precast concrete system
Drainage trough
Beam
Wall
" = 1'2 1Scale: 1
"4
"4
CLOSURE POUR
TRANSVERSE AND LONGITUDINAL
UNDER EXPANSION JOINT
DRAINAGE TROUGH SYSTEM
and compressible sealer
Cold-formed steel angle dam
(Typ.)
with HPC blockout filled
Full depth joint pipe
Rail supporting
Metal ballustrade
Granite step Torus molding
METAL RAIL SYSTEM
Scale: 1" = 1'
Top rail
Bottom rail
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
DC 000
000000
U.S. DEPARTMENT OF TRANSPORTATION
ARLINGTON MEMORIAL BRIDGE
BRIDGE PLAN SHEET
BRP-1160
Structure Number 3300-016P
BASCULE SPAN REPLACEMENT
January 2017
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
GEORGE WASHINGTON MEMORIAL PARKWAY
File details come from the government source that posted it. Updated .