16_Emergency_Repairs_-_W_set.pdf

PDF 4 MB Posted

Attached to
Arlington Memorial Bridge Federal contract opportunity
Solicitation number
DTFH71-17-R-00006
Issued by
Department of Transportation Federal Highway Administration

About this file

16_Emergency Repairs - W_set

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W01

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

PROJECT TEAM LEADER

of

DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY

George Choubah

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

GEORGE WASHINGTON MEMORIAL PARKWAY

BRP NO.

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NP-GWMP 11(4),11(7)

A C

T U

A L F I L E G

N

D G

N -J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NO. DATE BY REVISIONS NO. DATE BY REVISIONS

GENERAL NOTES AND INDEX

LW

Structural Steel:

Utilities:

GENERAL NOTES

CL Bascule span

West Leaf East Leaf

BASCULE SPAN KEY

Reinforcing Steel:

Miscellaneous:

Verify locations of utilities in field prior to any work.

Verify all dimensions and locations in the field prior to ordering materials.

(East abutment)

Abutment 2

(West abutment)

Abutment 3

Furnish Paint System 1.

Paint all structural steel #26420 from the Federal 595B Colors.

to ASTM A490.

Provide high-strength anchor, nuts, and washers comforming

Galvanize all bolts and nuts in accordance with ASTM A153.

Furnish welds conforming to AASHTO/AWS D1.5 Bridge Welding Code.

unless otherwise noted on the plans.

with fasteners conforming to AASHTO M 164, Type 1 (ASTM A325)

All field connections are slip critical, friction type, Class A, made the longitudinal Charpy V-Notch test specified in Section 555.

Provide main load carrying beam members that meet

(ASTM A709, Grade 50) unless otherwise noted on the plans.

Furnish structural steel conforming to AASHTO M 270, Grade 50

Provide 2-in cover for reinforcing steel unless otherwise noted.

Lap splices 32 bar diameters unless otherwise shown.

epoxy-coated.

Furnish reinforcing steel conforming to AASHTO M 31, Grade 60, f'c = 5,000 psi at 3 days

Grout f'c = 4,500 psi at 28 days

Class HES

All dimensions are nominal.

Provide pressure treated Douglas Fir No. 1 or No. 2.

Timber:

Material:

HS20 Loading

Live Loads:

Design Loads:

Design: AASHTO LRFD Bridge Design Specifications, Seventh Edition, 2014 and Bridges on Federal Highway Projects, FP-14.

Construction: Standard Specifications for Construction of Roads

Specifications:

HCLW

and conduits that contain cables.

in close proximity to exposed cables existing under the bridge

Provide protection and exercise extreme caution when working

INDEX OF BRIDGE PLAN SHEETS

SHEET TITTLESHEET NO.

Full Depth Concrete Deck Repairs - Pier 6 and Arch 910

Full Depth Concrete Deck Repairs - Arch 8 9

Full Depth Concrete Deck Repairs - Arch 7 8

Full Depth Concrete Deck Repairs - Arch 4 7

Full Depth Concrete Deck Repairs - Pier 1 and Arch 2 6

Channel Side Abutment 1 and Arch 1

Full Depth Concrete Deck Repairs - 5

Gusset Plate Replacement 4

East Leaf Upper Framing Plan 3

West Leaf Upper Framing Plan 2

General Notes and Index 1

FOR INFORMATION ONLY

W02

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NP-GWMP 11(4),11(7)

To Virginia

N

10 8 6 4 2 0

TrunnionCL

CLBascule span

CL

Fascia truss

Fascia truss

Curb stringer

BASCULE SPAN WEST LEAF UPPER FRAMING PLAN

18'-8" 18'-8" 18'-8" 18'-8" 18'-4"

(Typ.)

Sidewalk stringers

To Washington, DC

CL

(Typ.)

Floor beams

WEST LEAF UPPER FRAMING PLAN

-J a n -2

:1

P

M

LW LW

M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

A C

T U

A L F I L E W

E S

T L

E A

F U

P P

E R F

R A

M I N

G P

L A

N .D

G N

ColumnsCL

11'-11"

StructureCL

Curb stringer

(Typ.)

Roadway stringer

CL

CLTrunnion (See Note 9)

North bascule truss

South bascule truss

(See Notes 1 and 2) prevent water intrusion

Remove debris and seal to

(See Note 1 and 2) to prevent water intrusion

Remove debris and seal

(See Note 4) abutment pooling in

Remove water

(See Note 3)

Repair curb stringer

No Scale

(See Note 5) stringer

Repair curb

(See Note 5) stringer

Repair curb

HC

Repair curb stringers in the fixed portion.5.

Remove contaminated water pooling behind the machinery room.4.

Repair curb stringer between panel points 8 & 10. 3.

to prevent water intrusion.

Seal around the trunnion posts and along the curbs of the bascule span2.

plans for locations of all truss members.

and their gusset plates according to Subsection 203.04A. See as-built

Remove debris on bascule span members including all truss members 1.

Notes:

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

DATE

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

ARLINGTON MEMORIAL BRIDGE

W03

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NP-GWMP 11(4),11(7)

To Virginia

N

BASCULE SPAN EAST LEAF UPPER FRAMING PLAN

To Washington, DC

EAST LEAF UPPER FRAMING PLAN

-J a n -2

:1

P

M

AF/CV LW LW

M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

CL

18'-8"18'-8"18'-8"18'-8"18'-4"

86 10420

CL

Fascia truss

CL

(Typ.)

Floor beams

Curb stringer

CL

(Typ.)

Sidewalk stringers

Fascia truss

A C

T U

A L F I L E E

A S

T L

E A

F U

P P

E R F

R A

M I N

G P

L A

N .D

G N

CL

CL Columns11'-11"

(Typ.)

Roadway stringer

Curb stringer

Bacule span

CL

Structure truss bascule

North

Trunnion truss bascule

South

(See Note 1 and 2) to prevent water intrusion

Remove debris and seal

(See Notes 1 and 2) prevent water intrusion

Remove debris and seal to

(See Note 3)

Repair curb stringers

(See Note 4)

Repair curb stringer

No Scale

(See Note 4)

Repair curb stringer

Repair curb stringers in the fixed portion.4.

points 2 & 4.

Repair curb stringer between panel points 0 & 2 and between panel3.

to prevent water intrusion.

Seal around the trunnion posts and along the curbs of the bascule span2.

plans for locations of all truss members.

and their gusset plates according to Subsection 203.04A. See as-built

Remove debris on bascule span members including all truss members 1.

Notes:

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

W04

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NP-GWMP 11(4),11(7)

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d

GUSSET PLATE REPLACEMENT

U0 U1 U2 U4 U6 U7 U8

L8L7L5L3L1L0

CL

CL South Inner Trunnion Post

North Bascule TrussCL

North Inner Trunnion PostCL

A C

T U

A L F I L E G

U S

S E

T P

L A

T E

M O

D .D

G N

LOWER TRUNNION POST BRACING TRUSS ELEVATION - WEST BASCULE LEAF

LW LW 4

South Bascule Truss

U8 U7 U6 U4 U2 U1 U0

CL

CL North Inner Trunnion Post

South Bascule TrussCL

South Inner Trunnion PostCL

North Bascule Truss

L0L1L3L5L7L8

LOWER TRUNNION POST BRACING TRUSS ELEVATION - EAST BASCULE LEAF

connection plates

Replace east and west connection plates

Replace east and west

North Bascule TrussCLCL South Bascule Truss

U6U4U2U0

L6L5L3L1L0

T-11 TRUSS ELEVATION - WEST BASCULE LEAF

South Bascule TrussCLCL North Bascule Truss

U0U2U4U6

L0L1L3L5L6

T-11 TRUSS ELEVATION - EAST BASCULE LEAF

plates connection and west

Replace east connection plates

Replace east connection plates

Replace west connection plates

Replace east and west connection plates

Replace east and west connection plates

Replace west

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

GEORGE WASHINGTON MEMORIAL PARKWAY

W05

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NP-GWMP 11(4),11(7)

To WashingtonTo Virginia

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d

1" = 10' LW

A C

T U

A L F I L E C

O N

C R

E P

A I R C

H A

N N

E L S I D

E A

B U

T .D

G N

KEY

N

CHANNEL SIDE ABUTMENT 1 AND ARCH 1

FULL DEPTH CONCRETE DECK REPAIRS

BK

987654321515253545556575859

StructureCL

96"L x 24"W

24"L x 24"W

W = Wide

L = Long

ARCH 1 PLAN CHANNEL SIDE ABUTMENT 1 PLAN

Concrete deterioration

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

W06

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d

NO. DATE BY

REVISIONS NO. DATE BY REVISIONS

N

KEY

96"L x 20"W

W = Wide

L = Long

StructureCL

96"L x 60"W

987654325253545556575859 51 1 126"L x 42"W

48"L x 24"W 36"L x 12"W

A C

T U

A L F I L E D

E C

K R

E P

A I R

S P I E

R A

R C

H .D

G N

BK 1" = 10'

ARCH 2 PLAN PIER 1 PLAN

Concrete deterioration

PIER 1 AND ARCH 2

FULL DEPTH CONCRETE DECK REPAIRS

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

W07

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

To Washington

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d

CL Structure

KEY

W = Wide

L = Long

987654325253545556575859 51 1

To Virginia

ARCH 4 PLAN

ARCH 4

FULL DEPTH CONCRETE DECK REPAIRS

A C

T U

A L F I L E D

E C

K R

E P

A I R

S A

R C

H .D

G N

72"L x 42"W 96"L x 36"W

1" = 10'BK

Concrete deterioration

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

W08

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

To Washington

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d

KEY

StructureCL

ARCH 7 PLAN

W = Wide

L = Long

BK 1" = 10'

9 8 7 6 5 4 3 2 1 51 52 53 54 55 56 57 58 59

To Virginia

ARCH 7

FULL DEPTH CONCRETE DECK REPAIRS

A C

T U

A L F I L E D

E C

K R

E P

A I R

S A

R C

H .D

G N

49"L x 25"W

96"L x 41"W

Concrete deterioration

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

W09

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d

StructureCL

KEY

ARCH 8 PLAN

W = Wide

L = Long

BK 1" = 10'

A C

T U

A L F I L E D

E C

K R

E P

A I R

S A

R C

H .D

G N

ARCH 8

FULL DEPTH CONCRETE DECK REPAIRS

9 8 7 6 5 4 3 2 1 51 52 53 54 55 56 57 58 59

96"L X 96"W 96"L x 56"W 96"L x 70"W

Concrete deterioration

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

W10

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d g n

NOT

FOR

CO

NST

RUCTI

ON

PRE

ARLINGTON MEMORIAL BRIDGE

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

-J a n -2

:1

P

M M

P R

O J E

C T

S g w m p (4

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s E m e r g e n c y

R e p a ir s P

R O J E

C T

S .d

A C

T U

A L F I L E D

E C

K R

E P

A I R

S P I E

R A

R C

H .D

G N

N

KEY

StructureCL

W = Wide

L = Long

PIER 6 AND ARCH 9

FULL DEPTH CONCRETE DECK REPAIRS

BK 1" = 10'

ARCH 9 PLAN PIER 6 PLAN

9 8 7 6 5 4 3 2 1 51 52 53 54 55 56 57 58 59

StructureCL

96"L x 30"W 126"L x 36"W

Concrete deterioration

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

DC 000

000000

XXXXXX NP-GWMP 11(4),11(7)

U.S. DEPARTMENT OF TRANSPORTATION

ARLINGTON MEMORIAL BRIDGE

BRIDGE PLAN SHEET

BRP-1160

Structure Number 3300-016P

4 January 2017

EMERGENCY REPAIRS

NOT

FOR

CO

NST

RUCTI

ON

PRE

LIM

INARY

File details come from the government source that posted it. Updated .