Revise the Plans to modify the temporary construction sign support requirements and to clarify stream diversion option details. The Bid Opening date of June 18 2013 at 2 00 pm EST will remain the same.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VA_ERFO_COLO_2011-1(1)_Amendment_003.pdf | ||
| Amendment_001.pdf | ||
| Synopsis_FAR_66_(additional_info).doc | DOC document | |
| VETS-100A_Form.pdf | ||
| BIP_4290-024P_Mill_Creek_Bridge.pdf | ||
| BIP_4290-023P_College_Creek_Bridge.pdf | ||
| Plans_VA_ERFO_COLO_2011-1(1).pdf | ||
| IFB_Solicitation_VA_ERFO_COLO_2011-1(1).pdf | ||
| FP03_Eng_.pdf | ||
| Cert_Program_for_Bridge_Temp_Works.pdf | ||
| FP03_Errata.pdf | ||
| BIP_4290-026P_Isthmus_Bridge.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 002
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 002 Project VA ERFO COLO 2011-1(1)
Colonial National Historical Park - Bridge Repairs Solicitation: DTFH71-13-B-00033
The purpose of this Amendment is to:
1) Revise the Plans to modify the temporary construction sign support requirements and to clarify stream diversion option details.
The Bid Opening date of June 18, 2013 at 2:00 pm EST will remain the same.
Plan Sheet Changes
Delete Plan Sheets C03, C04, and S02, and substitute amended Plan Sheets C03, C04, and S02.
a) Sheet C03 (Construction Sign Schedule) replaced the single 4”x4” post with portable sign supports.
b) Sheet C04 (Construction Sign Schedule) replaced the single 4”x4” post with portable sign supports.
c) Sheet S02 (Temporary In-Stream Diversion Methods) updated NOTE 1, TABLE 1, and all diversion option details.
No.
Sign
No.
Text Sign Text Remarks
Station Side Series Combination
Color Quantity
LOCATION PANEL SIZE TEXT SIZE
(in.)
Width
(sq ft)
Area
(in.)
Radii
Corner
(in.)
Width
Border
(in.)
Width
Margin
(in.)
Numbers
(in.)
Case
Upper
(in.)
Case
Lower
(sq ft)
Total Area
(ft)
Support (in.)
Height (No Pay)
1 See Note 2
Note 3
See
SIGN SCHEDULE
CONSTRUCTION
ROAD WORK
END
G20-2 36 18 4.5
Orange on
Black
SHEET 1 OF 2
2 9
W20-1 WORK
AHEAD
ROAD
Note 3
See 36 36 9 See Note 2
Orange on
Black
2 18
SHOULDER
WORK
W21-5 Note 3
See 36 36 9 See Note 2
Orange on
Black
1 9
MPH
W13-1P 35 Note 3
See 18 18 2.25 1 2.25 -
Mount under sign W21-5See Note 2
Orange on
Black
47.25
C03
5 W20-7a Note 3
See
See Note 2
Orange on
Black
1 936 36 9
NOTES:
2.
and "Standard Highway Signs" for dimensions.
See "Manual on Uniform Traffic Control Devices, 2009 Edition"
1. Install supports in accordance with Detail E635-01.
Subtotal
3. Locate proposed signs in accordance with Detail ET635-10.
Portable sign support
Portable sign support
Portable sign support
Portable sign support
AMENDMENT #002
Revision to remark notes L.CANO
DESCRIPTION BY DATE
REVISIONS
NO.
1 05/21/13
Eliminated support quantity 2 L.CANO 05/21/13
M
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D C
C O
L O -1 (1
S ig n S c h e d u le s .d g n
T
IM
E
-M a y -2
:2
A
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
2011-1(1)
VA ERFO COLO
Rounded Total
Total 11
No.
Sign
No.
Text Sign Text Remarks
Station Side Series Combination
Color Quantity
LOCATION PANEL SIZE TEXT SIZE
(in.)
Width
(sq ft)
Area
(in.)
Radii
Corner
(in.)
Width
Border
(in.)
Width
Margin
(in.)
Numbers
(in.)
Case
Upper
(in.)
Case
Lower
(sq ft)
Total Area
(ft)
Support (in.)
Height (No Pay)
See Note 2
SIGN SCHEDULE
CONSTRUCTION
W11-V2 36 36
Orange on
Black
SHEET 2 OF 2
4 36
NOTES:
2.
1. Install supports in accordance with Detail E635-01.
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D C
L O -1 (1
S ig n S c h e d u le s .d g n
T
IM
E
-M a y -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
COLONIAL NATIONAL HISTORICAL PARK
CONSTRUCTION
ENTRANCE
Note 3
See
See "Virginia Standard Highway Signs, 2011 Edition" for dimensions.
Subtotal 36 56
83.25
3. Locate W11-V2 as directed by the CO
C04
Portable sign support
AMENDMENT #002
Revision to remark notes L.CANO
DESCRIPTION BY DATE
REVISIONS
NO.
1 05/21/13
2 Eliminated support quantity L.CANO 05/21/13
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D C
L O -1 (1
S ig n S c h e d u le s .d g n
T
IM
E
-M a y -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
U.S. CUSTOMARY DETAIL
DETAIL
DIVERSION METHODS
TEMPORARY IN-STREAM
E157-A
OPTION B
24"
OPTION C
OPTION D
12"
OPTION A
Existing Abutment or Pier min.
NOTES:
Limit of work zone
Limit of work zone
Limit of work zone
Min. Top Berm Elev
Min. Top Berm Elev
Min. Top Berm Elev
NO SCALE
6" min.
min.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
(anchoring method to be approved by CO)
Waterproof membrane
Existing ground
Concrete barrier
Sandbag (Typ.)
min.
4’- 6"
Concrete barrier
Sandbag (Typ.)
Waterproof membrane
Existing ground
Concrete barrier
Sandbag (Typ.)
Waterproof membrane
Waterproof membrane
Sandbag (Typ.)
Existing ground a t ti m e o f c o n ts r u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l
(cfs)
Q
TABLE 1
of Diversion Berm
Approx. Height
DETAIL APPROVED FOR USE
4.
3.
2.
1.
n/a n/a
S02
APPROVED :
12"
0.5’ (min.)
0.5’ (min.)
0.5’ (min.)
0.5’ (min.)
AMENDMENT #002
Place a maximum of one diversion in the stream at any given time.
as needed after rainfall events or as directed by the CO.
While in use, inspect and maintain the temporary diversion berm daily. Repair
Construct temporary diversion according to Subsection 157.09.
for approval prior to installation.
of 0.5 ft of freeboard. Submit plans for temporary stream diversion to the CO minimum height equivalent to the Mean High Water elevation (MHW) with a minimun berms, dams, etc.). As a minimum, provide a temporary diversion berm with a diverting the stream (including any approved prefabricated or portable diversion construction operations. The Contractor may choose an alternate means of
The options shown are suggested configurations for diverting the stream during
MHW elevation
MHW elevation
MHW elevation
MHW elevation
Existing ground
Varies
Varies
1.21College Creek Bridge
Mill Creek Bridge
Isthmus Bridge Varies
1.21
1.21n/a
(ft)
MHW
Site Location
REVISIONS
DESCRIPTION
Revision to Note 1
NO. BY DATE
L.CANO1
05/21/13
L.CANO 05/21/13Additional diversion detail
05/21/13L.CANORevision to Table 1 3
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S -s t1 d e ta il -A m e n d m e n t.
d g n
T
IM
E
-M a y -2
:0
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
64004
| Amendment 2 info.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 002 |
| Project VA ERFO COLO 2011-1(1) |
| Solicitation: DTFH71-13-B-00033 |
| Plans_Amendment 2.pdf |
| C03 |
| C04 |
| S02 |
File details come from the government source that posted it. Updated .