Plans_VA_ERFO_COLO_2011-1(1).pdf
PDF 9 MB Posted
- Attached to
- Colonial National Historical Park Federal contract opportunity
- Solicitation number
- DTFH71-13-B-00033
About this file
Plans_VA ERFO COLO 2011-1(1)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VA_ERFO_COLO_2011-1(1)_Amendment_003.pdf | ||
| VA_ERFO_COLO_2011-1(1)_Amendment_002.pdf | ||
| Amendment_001.pdf | ||
| Cert_Program_for_Bridge_Temp_Works.pdf | ||
| FP03_Errata.pdf | ||
| BIP_4290-026P_Isthmus_Bridge.pdf | ||
| IFB_Solicitation_VA_ERFO_COLO_2011-1(1).pdf | ||
| FP03_Eng_.pdf | ||
| Synopsis_FAR_66_(additional_info).doc | DOC document | |
| VETS-100A_Form.pdf | ||
| BIP_4290-024P_Mill_Creek_Bridge.pdf | ||
| BIP_4290-023P_College_Creek_Bridge.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF THE INTERIOR
M
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D A 1-
C O
L O -1 (1 tt l.
d g n
T
IM
E
-A p r -2
:2
A
Title Sheet
Symbols And Abbreviations
Location Map
SHEET
NO
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
REG STATE PROJECT
SHEET
NO.
TOTAL
SHEETS
NE VA
NATIONAL PARK SERVICE
NPS
NO.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
DESCRIPTION OF PROJECT
IMPROVEMENT:
ROAD:
WIDTH TYPE
SURFACE:
BASE
ROADBED
30’ +
30’ +
SPECIFICATIONS:
FP-03 U.S.Customary Units.
Roads and Bridges on Federal Highway Projects", "Standard Specifications for Construction of
BRIDGE:
30’ +/-
Existing
Existing
0 2 5
SCALE IN MILES
Project Manager
INTERSTATE
Yorktown
Williamsburg
To RichmondTo Richmond
Cheatham Annex
N
To Wash. D.C.
Jamestown
JAMES RIVER
Y O
R K
IV
E R
C o lo n ia l
P a rk w a y
Colonial Pa rkway
To Newport News and Norfolk
N
0 4040
SCALE IN MILES
Richmond
Arlington
Charlottesville
Front
Royal
KEY MAP
STATE OF VIRGINIA
COLONIAL NATIONAL HISTORICAL PARK
Lead Designer
30’ Concrete Pavement
MILL CREEK BRIDGE
COLLEGE CREEK BRIDGE
STRUCTURE NO 4290-026P
ISTHMUS BRIDGE
Concrete
WIDTH
College Creek Bridge:
Mill Creek Bridge:
Isthmus Bridge:
Steel
Steel
Steel
32’ curb to curb
32’ curb to curb
24’ curb to curb
TYPE LENGTH
0.016 Miles
0.010 Miles
0.010 Miles
MILEPOST 22.37
STRUCTURE NO 4290-024P
MILEPOST 19.09
STRUCTURE NO 4290-023P
MILEPOST 16.04
SELAM HAILEGIORGIS
A01
Survey Control Data
LUCERO CANO
Total = 0.036 Miles
A02
A03
A01
R01-R05
Bridge Details
S01-S07 Standard Details Sheets
Erosion Control Plan and Narrative
Summaries and Schedules
APRIL 2013
JAMES CITY COUNTY, VIRGINIA
64004
DISASTER NO. VA2011-1-NPS
C01 Tabulation of Quantity
M01
D01-D03 Construction Plan
C02-C04
PROJECT LENGTH: 0.0 miles
ADT (2013)
ADT (2033)
DHV
%Truck
D
V (MPH)
65/35
2% e(max) 8%
C/A None
DESIGN DESIGNATION: COLONIAL PARKWAY
2,480 vpd
3,110 vpd
PROJECT VA ERFO COLO 2011-1(1)
2011-1(1)
VA ERFO COLO
PROJECT VA ERFO COLO 2011-1(1)
MILL CREEK BRIDGE, & ISTHMUS BRIDGE
EROSION REPAIRS AT COLLEGE CREEK BRIDGE,
BRIDGE STRUCTURES
4290-023P, 4290-024P, 4290-026P miscellaneous work.
Grading, riprap, and other
C
B
A
SCHEDULE
Erosion repairs Isthmus Bridge
Erosion repairs at Mill Creek Bridge
Erosion repairs at College Creek Bridge
DESCRIPTION
4290-026P
4290-024P
4290-023P
BRIDGE STRUCTURE
22.37
19.09
16.04
MILEPOST
A04 - A06
R/W R/W
R/W R/W
P/E C/E
No Symbol
TB or TP
P P or
UD UD
W W
P/E C/E
No Symbol
TB or TP
P P or or
UD UD
W W
FOUND
36 31
6 1
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
26 25 69426 25 694 c
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Bench mark BM
Begining beg.
Bearing brg.
Balance point BP
Back BK
Footing ftg.
Flange flg.
Finish fin.
Inside diameter ID
West W
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve centeral angle
Culvert culv.
Corrugated metal pipe CMP
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
Expansion joint exp. jt.
Excavation exc.
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
Gage(gauge) ga.
Galvanized galv.
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
Low water LW
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transision)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original groung OG
North N
Normal crown NC or NCR
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Range R.
Radius R
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
Section Sec.
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transision)
Tangent distance Ts
(tangent length)
Tangent distance T
Vertical point of intersection VPI
Vehicle per hour vph
PAVEMENT REMOVAL/ROADWAY OBLITERATION
LAKE, POND or RESERVOIR; MARSHLAND
SLOPE STAKE
PROPOSEDEXISTING
PROJECTED
INTERSTATE U.S. STATE
AREA PATTERN
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
CULVERT with DROP INLET
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
PORTABLE
POST MOUNTED
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MATERIAL SOURCE
NORTH ARROW
EXISTING PROPOSED
wall facewall face
TB or TP or
P/LP/L
MEDIAN & SIDE (CONCRETE) BARRIER
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
TOWNSHIP or RANGE LINE
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SILT FENCE
MILL AND OVERLAY
SIDEWALK ASPHALT/CONCRETE
FULL DEPTH PAVEMENT
OVERLAY
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
INTERMITTENT DRAINAGE/ SMALL CREEK
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
N
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
E=electrical, FO=fibre optics SS=storm sewer, T=telephone, W=water G=gas, O=oil, P=power, SA=sanitary sewer, UNDERGROUND UTILITIES
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
EOP
EOG
embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Point of compound curve PCC
Plate pl.
PHTPhoto monument
Pavement pvmt.
SYMBOLS AND
ABBREVIATIONS
A02
ENTRANCE
STABILIZED CONSTRUCTION
TURBIDITY BARRIER
SOIL EROSION CONTROL,
Mean High Water MHW
Mean Low Water MLW
BERM
TEMPORARY DIVERSION
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D A -C
O L
O -1 (1 s y m .d g n
T
IM
E
-A p r -2
:0
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
2011-1(1)
VA ERFO COLO
CENTER
VISITOR
Y O
R K
T O
W N
C R
E E
Yorktown
Williamsburg
Y O
IV
E
To Richmond
To Richmond
Cheatham
Annex
Jamestown
Colonial Parkw ay
P a rk w a y
Colonial
A R
R A
C
S
O
A D
B
D A
I
ROOSEVELT
RD.
IN
D
IA
N
F
IE
L D
C
F E
L G
A T
K
IN
G
CR.
J O
N
S
P
Q U
E E
N
CREEK
Hog
Island
JAMES RIVER
N
Jamestown Tour Roads
Tour Roads
Yorktown
LOCATION MAP
NO SCALE
Milepost 16.04
Schedule A
College Creek Bridge
A03
Milepost 19.09
Schedule B
Mill Creek Bridge
Milepost 22.37
Schedule C
Isthmus Bridge
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D A -C
O L
O -1 (1 lo c .d g n
T
IM
E
-A p r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
SURVEY CONTROL DATA
REBAR
US DOI NPS
TBAR
30359
REBAR
NO DIVING
NO FISHING
NO DIVING
NO FISHING
HAZARD
3611088.027
3610863.328
3611047.319
3611018.711
NORTHING
PROJECT CONTROL POINTS
N O D
I V I N
G
N O F I S
H I N
G
CONTROL POINTS REFERENCE
REBAR
TBAR
R E
B A
R
Scale in Feet
40’20’0
Geoid Model : GEIOD09 (Conus)
Ellipsoid Name : Geodetic Ref System 1980
Vert Datum : NAVD 1988
Hor. Datum : NAD 1983 (Conus)
Zone : Virginia South 4502
Coordinate System : US State Plane 1983
PROJECT COORDINATE SYSTEM
N
A04
COLLEGE CREEK BRIDGE
30359
NAME
12008472.107
12008452.078
12008480.768
12008521.127
EASTING
15.126
12.501
13.150
15.027
ELEV.
REBAR
TBAR
REBAR
MON;US DOI NPS
TYPE
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D A -C
O L
O -1 (1 s u r .d g n
T
IM
E
-A p r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
Scale in Feet
40’20’0
US DOI NPS BC
TBAR
TBAR MILL CREEK
MILL CREEK
Geoid Model : GEIOD09 (Conus)
Ellipsoid Name : Geodetic Ref System 1980
Vert Datum : NAVD 1988
Hor. Datum : NAD 1983 (Conus)
Zone : Virginia South 4502
Coordinate System : US State Plane 1983
PROJECT COORDINATE SYSTEM
NAME
3606538.811
3606564.061
3606563.522
NORTHING
11994339.917
11994108.965
11994240.120
EASTING
13.006
12.210
14.039
ELEV.
TBAR
TBAR
MON;US DOI NPS BC
TYPE
PROJECT CONTROL POINTS
M I L L C
R E
E K B
R I D
G E S
P1002
TBAR
TBAR
4301 MILL CREEK
US DOI
35.92’295°
.2 4’
9°
66.71’ 107°
16.73’ 103°
.1
CONTROL POINTS REFERENCE
N
A05
MILL CREEK BRIDGE
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D A -C
O L
O -1 (1 s u r .d g n
T
IM
E
-A p r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
TBAR
TBAR
1001 BC BMCEPOW-1 BLPT-2 1975
HAZARD
HAZARD
ABANDON UE
WALL
GABION
NAME
3606274.473
3606028.625
3606174.660
NORTHING
11982709.270
11982863.404
11982809.972
EASTING
13.808
15.240
16.081
ELEV.
TBAR
TBAR
MON;COR BC BMCEPOW-1 BLPT-2 1975
TYPE
PROJECT CONTROL POINTS
Geoid Model : GEIOD09 (Conus)
Ellipsoid Name : Geodetic Ref System 1980
Vert Datum : NAVD 1988
Hor. Datum : NAD 1983 (Conus)
Zone : Virginia South 4502
Coordinate System : US State Plane 1983
PROJECT COORDINATE SYSTEM
W A L L
G A
B
IO
N
MON
TBAR
TBAR
.1
94°
47.29’
.8
308°
31.36’
°11
.2 3’
CONTROL POINTS REFERENCE
N
A06
ISTHMUS BRIDGE
Scale in Feet
40’20’0
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D A -C
O L
O -1 (1 s u r .d g n
T
IM
E
-A p r -2
:1
A M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
TABULATION OF QUANTITIES
C01
Schedule A, B & C
Schedule A - College Creek Bridge
Schedule B - Mill Creek Bridge
Schedule C - Isthmus Bridge
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D C 1-
C
C O
L O -1 (1
T
Q .d g n
T
IM
E
-A p r -2
:3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
C02
EROSION CONTROL SUMMARIES
Schedule A
Schedule B
Schedule C
QUANTITY SUMMARIES
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D C
C O
L O -1 (1
S u m m a r ie s .d g n
T
IM
E
-A p r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
No.
Sign
No.
Text Sign Text Remarks
Station Side Series Combination
Color Quantity
LOCATION PANEL SIZE TEXT SIZE
(in.)
Width
(sq ft)
Area
(in.)
Radii
Corner
(in.)
Width
Border
(in.)
Width
Margin
(in.)
Numbers
(in.)
Case
Upper
(in.)
Case
Lower
(sq ft)
Total Area
(ft)
Support (in.)
Height (No Pay)
1 See Note 2
Note 3
See
SIGN SCHEDULE
CONSTRUCTION
ROAD WORK
END
G20-2 36 18 4.5
Orange on
Black
Single 4" x 4" post
SHEET 1 OF 2
2 9
2(11)=
W20-1 WORK
AHEAD
ROAD
Note 3
See 36 36 9 See Note 2
Orange on
Black
= 28
2(14) Single 4" x 4" post18
SHOULDER
WORK
W21-5 Note 3
See 36 36 9 See Note 2
Orange on
Black
1 9 14 Single 4" x 4" post
7 78
MPH
W13-1P 35 Note 3
See 18 18 2.25 1 2.25 -
Mount under sign W21-5See Note 2
Orange on
Black
47.25
C03
5 W20-7a Note 3
See
See Note 2
Orange on
Black
1 9 14 Single 4" x 4" post36 36 9
NOTES:
2.
and "Standard Highway Signs" for dimensions.
See "Manual on Uniform Traffic Control Devices, 2009 Edition"
1. Install supports in accordance with Detail E635-01.
Subtotal
3. Locate proposed signs in accordance with Detail ET635-10.
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D C
L O -1 (1
S ig n S c h e d u le s .d g n
T
IM
E
-A p r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
Rounded Total
Total 11
No.
Sign
No.
Text Sign Text Remarks
Station Side Series Combination
Color Quantity
LOCATION PANEL SIZE TEXT SIZE
(in.)
Width
(sq ft)
Area
(in.)
Radii
Corner
(in.)
Width
Border
(in.)
Width
Margin
(in.)
Numbers
(in.)
Case
Upper
(in.)
Case
Lower
(sq ft)
Total Area
(ft)
Support (in.)
Height (No Pay)
See Note 2
SIGN SCHEDULE
CONSTRUCTION
W11-V2 36 36
Orange on
Black
Single 4" x 4" post
SHEET 2 OF 2
4 36
4(14)=
NOTES:
2.
1. Install supports in accordance with Detail E635-01.
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D C
L O -1 (1
S ig n S c h e d u le s .d g n
T
IM
E
-A p r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
COLONIAL NATIONAL HISTORICAL PARK
CONSTRUCTION
ENTRANCE
Note 3
See
See "Virginia Standard Highway Signs, 2011 Edition" for dimensions.
Subtotal 36 56
83.25
903. Locate W11-V2 as directed by the CO
C04
M
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D C
L O -1 (1
S ig n S c h e d u le s .d g n
T
IM
E
-A p r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
-5
(max.)
2’
15’ & varies access
Construction
Varies
Riprap
Lateral limits of clearing & grubbing
SECTION A-A
(See Detail E157-A)
Construction Entrance
Construct Stabilized
(max.)
2’
15’ & varies access
Construction
Varies
Riprap
Lateral limits of clearing & grubbing
Install silt fence
(See Bridge Details)
Place riprap
SECTION A-A
NO SCALE
A A
A
A
A
A
AA
A
A
A
A
A A
A
AA
A
A
AA
A
A
A
A
A
A
A
A A A
A
A
A
B
B B
B B
B
BB
BB
BB
D01
535 SQFT
Wetland area
MHW Elev. 1.21
MLW Elev. -1.22 temporary silt fence
Install 90 LNFT of
Total area: 280 SQYD
Stabilized Construction Entrance
90 LNFT of guardrail
Remove and reset
COLLEGE CREEK BRIDGE
CONSTRUCTION PLAN
70 LNFT
.5 L
N F T
15 LNFT
15 LNFT
Diospyros virginia
Ilex opaca
Cornus florida
Pinus taeda
Quercus shumardii
Myrica cerifera
4’-5’
4’-5’
4’-5’
4’-5’
4’-5’
4’-5’
QuantitySizeCommon NameBotanical Name
ZONE A - TREES AND SHRUBS - Legend
ZONE B - PLANTINGS (2 gallon pots at 18" O.C.) - Legend
QuantitySizeCommon NameBotanical Name
Panicum virgatum Native Switchgrass 162
SCALE IN FEET
0 10 20 of riprap (refer to Bridge Details) geotextile, type IV-B, and 440 CUYD
Install 330 SQYD of earthwork
TBAR
4202REBAR
1013 US
DOI NPS
Persimmon
American Holly
American Dogwood
Loblolly Pine
Shumard Oak
Wax Myrtle turbidity barrier, type III
Install 115 LNFT of
5. Do not disturb survey monuments.
Subsection 201.06.
4. Dispose of clearing and grubbing debris according to
3. Location of the plants will be approved by the CO.
except at new riprap area, as directed by the CO.
2. Apply turf establishment to all disturbed areas, approved by the CO.
1. Grade stabilized construction entrance as
Notes:
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D D 1_
C O
L O
-1 (1
C o ll e g e
C r e e k p .D
G N
T
IM
E
-A p r -2
:4
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
20’ & varies
Construction access
30’ approx.2’
(max.)
Lateral limits of clearing and grubbing
SECTION A-A
Existing roadway
D02
Install 55 LNFT of temporary silt fence
Remove and reset
65 LNFT guardrail
A A
NO SCALE
10 SQFT
Wetland area of riprap (refert to Brige Details) geotextile, type IV-B, and 90 CUYD Install 55 SQYD of earthwork
Stabilized Construction
Entrance
Area: 90 SQYD
MILL CREEK BRIDGE
CONSTRUCTION PLAN
L
N F T
53 LNFT
MHW Elev. 1.21
MLW Elev. -1.22
MLW Elev. -1.22 except at new riprap area, as directed by the CO.
2. Apply turf establishment to all disturbed areas, approved by the CO.
1. Grade stabilized construction entrance as
Notes:
SCALE IN FEET
0 10 20
NPS BC
1002 US DOI 4301
TBAR
turbidity barrier, type III Install 35 LNFT of
Construct stabilized construction entrance
(see Detail E157-A)
Remove and reset guardrail
Install silt fence
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D D
C O
L O
-1 (1
M il l
C r e e k p .D
G N
T
IM
E
-A p r -2
:4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004 line (Typ.), see Note 3.
Underground power
10’ & varies access
Construction
Varies
Riprap
Lateral limits of clearing
& grubbing
Roadway
2’ max.
(see Detail E157-A) construction entrance
Construct stabilized
Install silt fence
(refer to Bridge details)
Place riprap type IV-B (refer to bridge details) 134 SQYD of earthwork geotextile Install 218 CUYD of riprap and
D03 silt fence Install 50 LNFT ofsilt fence
Install 20 LNFT of
Area: 27 SQFT
Wetland surface
A
AAAAAAAA
A A
AA
A A
A A AA A A A
A
A A
A A
ISTHMUS BRIDGE
CONSTRUCTION PLAN
L
N F T
50 LNFT
50 LNFT
L
N F T
SCALE IN FEET
0 10 20
Install 30 LNFT of silt fence
MHW Elev. 1.21
BLPT-2 1975
1001 BC BMCEPOW-1
TBAR
turbidity barrier, type III Install 40 LNFT of
MLW Elev. -1.22
MHW Elev. 1.21 entrance (68 SQYD) Stabilized construction turbidity barrier, type III Install 70 LNFT of type IV-B (refer to Bridge Details) 126 SQYD of earthwork geotextile Install 182 CUYD of riprap and
MLW Elev. -1.22
Area: 168 SQFT Wetland surface entrance (87 SQYD) Stabilized construction silt fence Install 35 LNFT of at 5’ O.C.
Quantity: 24 trees approximately
Zone A - Wax Myrtle (Myrica cerifera)
Legend:
Subsection 201.06.
4. Dispose of clearing and grubbing debris according to
3. Location of the plants will be approved by the CO.
riprap area, as directed by the CO.
2. Apply turf establishment to all disturbed areas, except at new
1. Grade stabilized construction entrance as approved by the CO.
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D D
C O
L O
-1 (1 Is th m u s p .D
G N
T
IM
E
-A p r -2
:4
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
CONTROL NARRATIVE
EROSION & SEDIMENT
construction limits.
does not leave the project site. Perimeter controls include silt fence and other approved measures outside the
Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting
Requirements.
for Construction of Roads and Bridges on Federal Highway Projects, FP-03, (English) and the Special Contract measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous water materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Regularly inspect and maintain all mechanized equipment used in or near surface water to prevent
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
Mill Creek Bridge, and 415 SQYD for Isthmus Bridge .
The total disturbed area for the project is approximately: 610 SQYD for College Creek Bridge, 145 SQYD for
Soil disturbing activities will include clearing and grubbing.
miscellaneous work.
This work includes the placement of riprap, earthwork geotextile IV-B , and other
This project consists of riprap repairs at College Creek Bridge, Mill Creek Bridge, and Isthmus Bridge.
Project Description
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
their rated capacity.
and for capacity. Immediately cease pumping and replace damaged filter bags, or bags that have reached
Filter bags - check the filter bags daily during dewatering operations for punctures, tears, or other damage, it becomes 0.5 ft deep at the fence.
becomes damaged, repair or replace as necessary. Remove sediment from behind the silt fence when
Silt fence - inspect for buildup of excess sediment, undercutting, sags, and other failures. If the fabric end of the day.
0.25 inches or more, and daily during wet weather. Repair and replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
Remove all other perimeter controls when directed by the CO.
Remove silt fence only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas
Finish grading, and apply permanent turf establishment to any remaining disturbed areas.
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging stockpiles remaining in place longer than 14 days within 7 days of stockpiling.
Provide silt fence around all stockpiled excavated roadway material. Apply temporary turf establishment to culverts.
and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed
Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade runoff.
At the end of each day�s grading operations, shape earthwork to minimize and control erosion from storm within 7 days. Apply permanent turf establishment to the finished slopes according to Section 624 and 625.
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days roadway.
culverts as called out in the Erosion and Sediment Control plans. Install filter berms in ditches along the
Apply intermediate controls during rough grading operations. Install silt fence in areas surrounding the
Phase II Intermediate Controls
M01
M
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D M 1-
C O
L O -1 (1
E
S n a r .d g n
T
IM
E
-A p r -2
:5
A
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
Structure Number
-A p r -2
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
STATE PROJECT
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NPS
NO.
JJO JJO/JEG BAO As shown B. Oltmann 5
COLONIAL NATIONAL HISTORICAL PARK
NE VA
64004 VA ERFO COLO 2011-1(1)
April 2013
-A p r -2
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
NO. DATE REVISIONS NO. DATE BY REVISIONS
Structure Number: 4290-023P5
-5
Elev. 8.5 +/-
Top riprap
Elev. 6.2 +/-
Top riprap
Elev. 6.1 +/-
Top riprap
Elev. 10.1 +/-
Top riprap
17’-6"
Elev. 11.5 +/-
Top riprap
Elev. 12.8 +/-
Top riprap
A
A
Begin bridgeL BridgeC
(Typ.)
Abutment
Face of
PLAN
CL Parkway
A C
T U
A L F I L E R
C O
L O
C o ll e g e C r e e k
P .D
G N
R01
1As shownJJO
"=10’-0"1Scale:
p p r o x
Approx.
End bridge
RIPRAP LAYOUT
B
C
C
B
SCHEDULE A
COLLEGE CREEK BRIDGE
Riprap
Existing riprap
Existing diversion berm
Temporary riprap
Existing
Elev. -1.2 +/-
Top riprap
Elev. -1.2 +/-
Top riprap
Elev. -1.2 +/-
Top riprap
Elev. -1.2 +/-
Top riprap
Elev. -1.2 +/-
Top riprap
4’-0"
Existing ditch
See Note 4 as needed or as directed by the CO.
5. Do not remove existing riprap. Add riprap in this area riprap elevation to existing grade.
4. Maintain positive drainage in ditch. Match top of temporary diversion details.
3. See "COLLEGE CREEK RIPRAP DETAILS", for see "COLLEGE CREEK RIPRAP DETAILS".
2. For SECTION A-A, SECTION B-B and SECTION C-C, verify the actual limits in the field.
1. All limits of riprap are approximate. The CO will
NO.
REGION
NPS
NO.
NE VA
64004 VA ERFO COLO 2011-1(1)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
JJO JJO/JEG BAO As shown B. Oltmann
BRIDGE DRAWING
DATE
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
April 2013
-A p r -2
:1
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NE VA
64004 VA ERFO COLO 2011-1(1)
April 2013
-A p r -2
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
Structure Number: 4290-023P
3’-0" to fit field conditions
Elevation to be determined
Riprap class 5
"6’-0"
A C
T U
A L F I L E R
C O
L O
C C R I P D
E T
A I L
P .D
G N
R02
2As shownJJO
Varies
"=1’-0"16 3Scale:
TYPICAL SECTION
groundline
Existing
1V:2.1H
Elev. 6.2 +/-
Top riprap
Riprap class 5
6’-0"
"=1’-0"16 3Scale:
SECTION A-A
"=1’-0"16 3Scale:
SECTION C-C
6’-0"
3’-0"
Riprap class 5 groundline
Existing
Elev. -1.2+/-
Top riprap
6’-0"
"=1’-0"16 3Scale:
SECTION B-B
Elev. 12.3 +/-
Top riprap
3’-0" groundline
Existing
Riprap class 5
1V: 1.5H
1V: 3.2H
RIPRAP DETAILS
1V: 1.5 max.
SCHEDULE A
COLLEGE CREEK BRIDGE
rainfall events or as directed by the CO.
mantain while in use; repairing as needed after
3. Inspect the temporary diversion berm daily and
Special Contract Requirement 157.09.
to the CO for approval prior to installation per
2. Submit plans for temporary diversion berm the CO to fit the field conditions.
1. Location of riprap toe will be determined by
Notes:
work zone
Limit of work zone
Limit of Limit of work zone
4’-0" diversion berm
Place temporary
4’-0" diversion berm
Place temporaryPlace temporary diversion berm
4’-0" type IV-B
Geotextile type IV-B
Geotextile type IV-B
Geotextile type IV-B
Geotextile
Elev. -1.2 +/-
Top riprap
Elev. -1.2 +/-
Top riprap
Elev. 10.1 +/-
Top riprap
NO.
REGION
NPS
NO.
NE VA
BRIDGE DRAWING
-A p r -2
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NE VA
64004 VA ERFO COLO 2011-1(1)
April 2013
-A p r -2
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
Structure Number: 4290-024P
Elev. 0.5 +/-
Top Riprap
Elev. 11.0 +/-
Top Riprap
Elev. 11.0 +/-
Top Riprap
3’-0"
Riprap class 5
"6’-0"
A
A
PLAN
CL ParkwayL BridgeC Begin bridge End bridge
(Typ.)
Abutment
Face of
Elev. 0.5 +/-
Top Riprap
14’-0"
(Typ.)
Existing guardrail
"=1’-0"16 3Scale:
"=10’-0"1Scale:
R03
3 JJO As shown
A C
T U
A L F I L E R
C O
L O
M il l
C r e e k
P .D
G N p p r o x
Approx.
Varies
BAO
TYPICAL SECTION
Existing groundline
Top Riprap
Elev. 0.5 +/-
1V: 1.6H
"=1’-0"16 3Scale:
SECTION A-A
Elev. 11.0 +/-
Top Riprap
6’ -0
3’-0"
N
RIPRAP LAYOUT & DETAILS
1V: 1.5H max.
SCHEDULE B
MILL CREEK BRIDGE
to fit field conditions
Elevation to be determined riprap
Existing riprap
Existing riprap
Existing
Elev. 0.5 +/-
Top Riprap diversion berm
Temporary riprap
Existing existing riprap
Approximate
’-0
4’-0" work zone Limit of diversion berm
Place temporary type IV-B
Geotextile type IV-B
Geotextile rainfall events or as directed by the CO.
maintain while in use; repairing as need after
4. Inspect the temporary diversion berm daily and per Special Control Requirement 157.09.
to the CO for approval prior to installation per
3. Submit plans for a temporary diversion berm the CO to fit the field conditions.
2. Location of riprap toe will be determined by will verify the actual limits in the field.
1. All limits of riprap are approximate. The CO
NO.
REGION
NPS
NO.
NE VA
BRIDGE DRAWING
-A p r -2
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NE VA
64004 VA ERFO COLO 2011-1(1)
April 2013
-A p r -2
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
Structure Number: 4290-026P
Abutment
Face of
B
B
PLAN
Scale: 1" = 10’-0"
Begin bridge End bridge
JJO As shown 4
R04
Approx.
13’-6"
A p p r o x
(Typ.)
riprap
Limit of
Elev. 13.5 +/-
Top riprap
Elev. 13.5 +/-
Top of riprap
L ParkwayC
L StructureC
A C
T U
A L F I L E R
C O
L O
I s th m u s
P .D
G N
BAO
Elev. 13.5 +/-
Top of riprap
Elev. 2.3 +/-
Top of riprap
Elev. 2.0 +/-
Top of riprap Elev. 13.5 +/-
Top of riprap
Elev. 5.4 +/-
Top of riprap
Elev. 0.8 +/-
Top of riprap
Elev. 5.0 +/-
Top of riprap
"020’-
Approx.
A p p r o x
A
A
C
C
Elev. -1.2 +/-
Top of riprap
Elev. 0.0 +/-
Top of riprap
D
D
RIPRAP LAYOUT
SCHEDULE C
ISTHMUS BRIDGE
4’ -0 berm
Temporary diversion line (Typ.), see Note 3.
Underground power diversion berm
Temporary this location.
3. Underground power line attached to bridge at
RIPRAP DETAILS".
and SECTION D-D, see "ISTHMUS BRIDGE
2. For SECTION A-A, SECTION B-B, SECTION C-C will verify the actual limits in the field.
1. All limits of riprap are approximate. The CO
Notes:
’-0 riprap
Existing riprap
Existing riprap
Existing
NO.
REGION
NPS
NO.
NE VA
BRIDGE DRAWING
April 2013
-A p r -2
:1
A M
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
REGION
BRP NO.
NE VA
64004 VA ERFO COLO 2011-1(1)
April 2013
-A p r -2
:1
A M
M
P R
O J E
C T
S c o lo -1 (1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
Structure Number: 4290-026P
3’-0"
Riprap class 5
"6’-0"
(See Plan View) to fit field conditions
Elevation to be determined
" = 1’-0"16 3Scale:
Varies
JJO As shown 5
R05
BAO
TYPICAL SECTION
SECTION B-B
Riprap class 5
6’-0"
3’-0"
Elev. 0.8 +/-
Top of riprap
Elev. 13.5 +/-
Top of riprap
1V:1.9H groundline
Existing
"= 1’-0"16 3Scale:
Elev. 13.5 +/-
Top of riprap
Riprap class 5
3’-0"
1V:2.0H groundline
Existing
Elev. 0.0 +/-
Top of riprap
"= 1’-0"16 3Scale:
6’-0"
SECTION D-D
"= 1’-0"16
3Scale:
SECTION C-C
"= 1’-0"16 3Scale:
SECTION A-A
Elev. 13.5 +/-
Top of riprap
Elev. 13.5 +/-
Top of riprap
6’-0"
6’-0"
Elev. -1.2 +/-
Top of riprap
Elev. 2.3 +/-
Top of riprap groundline
Existing groundline
Existing
1V:1.8H
1V:2.2H
Riprap class 5
3’-0"
3’-0"
1V:1.5 max.
RIPRAP DETAILS
A C
T U
A L F I L E R
C O
L O
I R I P D
E T
A I L
P .D
G N
SCHEDULE C
ISTHMUS BRIDGE
class 5
Riprap work zone
Limit of diversion berm
Place temporary
4’-0" 4’-0" work zone
Limit of
4’-0" work zone
Limit of
4’-0" work zone
Limit of diversion berm
Place temporary diversion berm
Place temporary diversion berm
Place temporary rainfall events or as directed by the CO.
maintain while in use; repairing as need after
3. Inspect the temporary diversion berm daily and per Special Control Requirement 157.09.
to the CO for approval prior to installation per
2. Submit plans for a temporary diversion berm the CO to fit the field conditions.
1. Location of riprap toe will be determined by
Notes:
type IV-B
Geotextile type IV-B
Geotextile type IV-B
Geotextile type IV-B
Geotextile type IV-B
Geotextile
NO.
REGION
NPS
NO.
NE VA
BRIDGE DRAWING
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S 1_ d e ta il -S il t_
F e n c e .d g n
T
IM
E
-A p r -2
:5
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
64004
E157-02
NO SCALE
DETAIL
g r o u n d m in
P o s t f t a b o v e
7.
6.
5.
4.
3.
2.
1.
6"
8" trench
6" in to g r o u n d m in
S te e l p o s t d r iv e n
W o o d p o s t d r iv e n
NOTES:
WIRE-BACKED SILT FENCE
DETAIL APPROVED FOR USE
24"
B
B
(See note 2)
Section A Section B
A A
WIRE-BACKED SILT FENCE CHECK DAM
JOINING TWO ADJACENT SILT FENCE SECTIONS
ELEVATION
PLAN
m a x
S ta p le s p a c in g
Flow
Staple
Section B
Posts Staple
Section A
INSTALLATION AT TOE OF FILL
WIRE-BACKED SILT FENCE
A A
INSTALLATION AT TOE OF FILL
WIRE-BACKED SILT FENCE
T o e o f s lo p e
Flow
Varies
Fi ll slo pe
SECTION A-A
PLAN
Varies
Flow
ELEVATION
with wire 10 ft max.
Spacing
Flow m in
Flow
SECTION B-B
Backfilled and compacted soil m a x im u m
S p a c in g f t
APPROVED : MAY 2011
around the end of the silt fence.
to prevent water from flowing
Provide sufficient length
Filter fabric
Spacing 4 ft max. with wire
6 ft long post (max.)
Wire Mesh fence check dam) installation of silt (Use only with Riprap, Class I fabric
Filter
(undisturbed)
Existing ground
Limits of clearing of the silt fence water from flowing around the end
Provide sufficient length to prevent bottom strand
" dia. top and8 1Min.
vertical wires
" dia. middle and32 3Min.
vertical wires
" dia. middle and32 3Min.
bottom strand
" dia. top and8 1Min.
Extend wire and fabric into trench.
wood posts.
Use 70 inch minimum height x 3 inch diameter self-fastener angle steel type.
Use 60 inch minimum height steel posts, of the directed by the CO.
in width and fasten adequately to the wire as
Use filter fabric that is a minimum of 45 inches
12 inch stay spacing.
in width and has a minimum of 6 line wires with
Use wire mesh that is a minimum of 32 inches information for installation procedures.
are satisfied. Follow manufacturer’s will be allowed as long as specified minimums
Alternate pre-assembled silt fence options
Control Plan.
flow conditions only when specified on Erosion
Use silt fence check dam installation for low
Filter Fabric
U.S. CUSTOMARY DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
S01
U.S. CUSTOMARY DETAIL
DETAIL
DIVERSION METHODS
TEMPORARY IN-STREAM
E157-08
OPTION B
24"
OPTION C
OPTION D
12" 12"
OPTION A
Existing Abutment or Pier min.
NOTES:
Limit of work zone
Limit of work zone
Limit of work zone
2-year water surface elev
2-year water surface elev
2-year water surface elev
2-year water surface elev
Min. Top Berm Elev
Min. Top Berm Elev
Min. Top Berm Elev
NO SCALE
6" min.
min.
(anchoring method to be approved by CO)
Waterproof membrane
Existing ground
Concrete barrier
Sandbag (Typ.)
min.
4’- 6"
Concrete barrier
Sandbag (Typ.)
Waterproof membrane
Existing ground
Concrete barrier
Sandbag (Typ.)
Waterproof membrane
Existing ground
Waterproof membrane
Sandbag (Typ.)
Existing ground a t ti m e o f c o n ts r u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l a t ti m e o f c o n s tr u c ti o n
D iv e r te d w a te r l e v e l
TABLE 1
of Diversion Berm
Approx. Height w.s.e
2 yr.
DETAIL APPROVED FOR USE
4. Place a maximum of one diversion in the stream at any given time.
Repair as needed after rainfall events or as directed by the CO.
3. While in use, inspect and maintain the temporary diversion berm daily.
2. Construct temporary diversion according to Subsection 157.09.
temporary stream diversion to the CO for approval prior to installation.
with a minimum height equivalent to the 2-year flow elevation. Submit plans for diversion berms, dams, etc.). As a minimum, provide a temporary diversion berm diverting the stream (including any approved prefabricated or portable during construction operations. The Contractor may choose an alternate means of
1. The options shown are suggested configurations for diverting the stream
APPROVED : FEBRUARY 2013
(cfs)
Q
106.00
97.8
19.8
52.1
64.5
81.4
21.39
19.31
26.16
0.00
16.09
9.11
(Rt#)
Site
1 (152 MP 0.63)
2 (152 MP 4.0)
4 (121-2 MP 3.9)
5 (121D)
6 (128)
7 (206)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
S02
M
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t1 d e ta il -T e m p S tr e a m
D iv e r s io n .d g n
T
IM
E
-A p r -2
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
64004
Clamp
Clamp
Pump
Intake hose
Discharge hose straps
Heavy duty lifting is required only when leveling aggregate to be used
AASHTO No. 57 course metal clamps and securely fastened with specified by manufacturer
Hose to be inserted as
Discharge hose
Clamp
Clamp
Pump Intake hose
AREA
VEGETATED
WELL
AREA
VEGETATED
WELL
AREA
VEGETATED
WELL
AREA
VEGETATED
WELL
FLOW
TOP VIEW
SIDE VIEW
area
Well vegetated
Sewn in spout prior to placing aggegate
Place geotextile, type II
7.
6.
5.
4.
3.
2.
1.
NOTES
work or access areas of the project.
Do not permit discharge from the bag to drain back into
157.06. Do not cut filter bag or distribute and seed sediment.
bags. Restore the area in accordance with Subsection
Remove and properly dispose of the pumped water filter site for replacement.
filled and/or when there is a failure. Have spare bags on
Replace the bag when 50% of the sediment capacity has been
Insert only one hose into a bag at a time.
maintenance and removal purposes.
Locate bag in an area accessible by equipment for stable, erosion resistant area.
Locate bag in an area approved by the CO. Discharge onto a aggregate to level the bag.
areas are not available, place geotextile and coarse
Locate bag in level areas (less than 5% grade). When level
WATER FILTRATION BAG
DETAIL
M
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t1 d e ta il -F il te r b a g .d g n
T
IM
E
-A p r -2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
E157-10
NO SCALE
DETAIL APPROVED FOR USE
(PENDING) APPROVED : AUGUST 2012
COLONIAL NATIONAL HISTORICAL PARK
U.S. CUSTOMARY DETAIL
S03
STERLING, VIRGINIA
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t1 d e ta il -F il te r b a g .d g n
T
IM
E
-A p r -2
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
64004
NOTES:
ENTRANCE
STABILIZED CONSTRUCTION
NO SCALE
DETAIL APPROVED FOR USE
U.S. CUSTOMARY DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
S04
1.
Va r.
Place geotextile, type IIB width as shown in plans
SECTION A-A
ACCESS DETAIL
TEMPORARY CONSTRUCTION
New riprap
Existing ground construction entrance
Limits of temporary stabilized
New riprap s n al p ni n w o h s s a ht di
W
)’07 ot ’05( seiraV
Existing Roadway
Bridge railing where shown in plans
Remove and reset guardrail entrance
Stabilized construction
Existing shoulder
A A
E157-A the aggregate.
the entire area prior to placing
Place Geotextile, Type IIB, over size #3 (3" to 8" depth)
AASHTO M 43,
Aggregate, grading
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t1 1_ d e ta il -S ta b il iz e d -e n tr a n c e .d g n
T
IM
E
-A p r -2
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
64004
A
A
Stake
D
TURBIDITY BARRIER
flotation (6-inch equivalent)
Closed cell solid plastic foam
Synthetic fabric skirt
FLOATING TURBIDITY BARRIERS
STAKED TURBIDITY BARRIER
TYPE I
TYPE II
TYPE III
PLAN VIEW - INSTALLATION FOR SHORE WORK
SECTION A-A
PLAN VIEW - INSTALLATION FOR PILE WORK
USAGE CHART
DETAIL
S05
1/4-inch galvanized chain (typ.)
and grommits connection
5/8-inch polypropylene rope rope and grommet connection
Slotted connector pipe or plypropylene flotation (8-inch eqivalent)
Closed cell solid plastic foam galvanized connectors
(9800 lbs. breaking strength) with
5/16-inch vinyl sheathed EAW steel cable
Synthetic fabric skirt
5/16-inch galvanized chain (typ.)
(metal collar reinforced)
Slotted PVC connector pipe flotation (12-inch equivalent)
Closed cell solid plastic foam
Synthetic fabric skirt disconnect) with galvanized connectors (tool free cables (18,400 lbs. breaking strength)
2 each 5/16 vinyl sheathed EAW steel
3/8-inch galvanized chain (typ.)
No Tidal Action
No Wave\Wind\Tidal Action
CONDTIONS
ADDITIONAL
5.0
3.5
0.0
(FPS)
CURRENT
MAXIMUM
Flow m in
80" max.
Top load line chain (typ.)
1/4-inch galvanized
Clear water
Bottom load line
Turbid water equally spaced
Fastened at 4 places
Top load line
3"
Existing shoreline (typ.)
Stake
Construction area
Turbid waterAnchor (typ.)
50’ panel (typ.)
Clear water flotation (typ.)
Mooring line with
Anchor (typ.)
Construction area
50’ panel (typ.)
Turbid water Clear water
Flow flotation (typ.)
Mooring line with
E157-B water quality requirements.
conditions and meet erosion control and staked types or a combination to suit site tidal creeks may either be floating or
Turbidity barriers for flowing streams and3.
water.
the skirt and the river bottom at mean low provide a one foot gap between the end of
Vary the length "D" of synthetic fabric to 2.
directed by the CO.
in vertical position unless otherwise
Install posts for staked turbidity barriers1.
Notes:
III
II
I
TYPE
BARRIER
TURBIDITY
FLOATING
M
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S d t1 -B tu r b id it y .d g n
T
IM
E
-A p r -2
:4
P
M
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
COLONIAL NATIONAL HISTORICAL PARK
64004
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S -s t6
1_ d e ta il .d g n
T
IM
E
-A p r -2
1:
P
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
REG STATE PROJECT SHEET NO.
U.S. CUSTOMARY DETAIL
DETAIL APPROVED FOR USE DETAIL
E635-01
CONSTRUCTION TRAFFIC
CONTROL SIGN MOUNTING
NO SCALE
NOTES:
All lumber dimensions are nominal.
PORTABLE SIGNS
FIXED ROADWAY SIGNS
RURAL AREA
URBAN AREA BREAKAWAY SUPPORT DETAIL
Post Size
4’’ x 4’’
4’’ x 6’’
6’’ x 6’’
6’’ x 8’’
1.5’’
3’’
2’’
None Required
D
4’
4’
5’
5’
Diameter
Hole
10 20
1 Post 2 Post 3 Post 4 Post
Maximum Sign Area (Sq. ft.)
165125
FIXED SIGNS 4’’ X 6’’ AND GREATER POSTS)(
Sign panel
Traffic
Wood post (fixed)
Holes (See table)
M in
M in
Note:
Roadway
M in
Roadway
2’-0’’
M in
M
2’-0’’
Roadway
Sidewalk
M
6’ to 12’
6’-0’’
M
APPROVED : MAY 2011
utility poles may be used for sign mounting.
When approved by the CO and the Utility Company, non-breakaway sign.
or be shielded by barrier. Do not place holes in posts of spacing, the sign should be placed outside the clearzone
Detail. If breakaway design cannot be used due to post
For posts 6’’ x 6’’ and greater, see the Breakaway Support a minimum of 7 feet apart.
required and the posts cannot be spaced non-breakaway if multiple posts are greater, signs are considered to be
For signs requiring 6’’ x 6’’ posts and surface.
mount the sign a minimum of 7 feet above the pavement
When parking is permitted within 200 feet of the sign, of NCHRP-350 for crashworthiness.
all portable sign supports meet the requirements lower than fixed signs when approved by the CO. Ensure face in a vertical plane. Portable signs may be mounted portable signs, however, sign mounts shall hold the sign
The Contractor may submit alternate details for than 10 square feet on double posts.
Mount signs that are wider than 3-feet or larger
(See notes 3 and 4)
6.
5.
4.
3.
2.
1.
2011-1(1)
VA ERFO COLO
VANE S06
ROAD
AHEAD
WORK
DETOUR
AHEAD
M PH.. .
M PH.. .
ROAD
CLOSED
DETOUR 35
M PH.. .
M PH.. .
CLOSED
RIGHT LANE
AHEAD
Numerical value of posted speed
Width of offset in feet for S = 40 MPH for S = 45 MPH
MPH
SPACING IN FEET
FEET
FEET
SHOULDER CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
STANDARD APPROVED FOR USE 6/2005
to work in miles per hour
See Note 2
10’ min.
REVISED:
U.S. CUSTOMARY DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
S07
ADVANCE WARNING AREA (See Sign Spacing Table)
C
SHOULDER
WORK
W21-5
See Note 3
W20-1
(optional)
W13-1P
MPH
XX
WORK
AHEAD
ROAD
XXX
FEET
BUFFER SPACE
(optional)
W20-7a
ET635-10
limit or 85 percentile speed prior
Traffic flow
Traffic flow
Shoulder taper formula:
Where:
L =
L =
Minimum length of taper
Lengthen taper as needed to provide minimum of three channelizing devices in taper at required spacing.**
Approach speed based on the regulatory posted speed, not the advisory speed.*
S =
W =
L =
See Note 3
G20-2
See Note 3
W20-1
See Note 3
G20-2
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
Spacing Table)
(See Length and
WS
WS†
(optional) TERMINATION AREA
4.
3.
2.
1.
NOTE:
NO SCALE
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
Expressway / Freeway
A parked or stored in the buffer space.
Do not allow equipment, materials, or vehicles to be
ROAD WORK" (G20-2) signs.
eliminate the "ROAD WORK AHEAD" (W20-1) and "END
If shoulder closure is completely within the project limits, Contract Requirements, Section 156.
For project specific minimum width, refer to Special changed to fit field conditions as approved by the CO.
Final location and spacing of signs and devices may be
ROAD WORK
END
ROAD WORK
END
WORK
AHEAD
ROAD
Channelizing devices
MINIMUM TAPER LENGTH**
LENGTH
BUFFER SPACE
AVARIABLE WORK SPACEBUFFER SPACETAPER AREAAB
Device spacing
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table)
W
P R
O J E
C T
S c o lo -1 (1
P r o j
D e v C
A D
D S td -D e t\
S s t6 a -S h o u ld e r
C lo s u r e .d g n
T
IM
E
-A p r -2
REG STATE PROJECT SHEET NO.
NE VA
NPS
NO.
64004
| a02 |
| A03 |
| A04 |
| A05 |
| A06 |
| C01 |
| C02 |
| C03 |
| D01 |
| d02 |
| d03 |
| S01 |
| S02 |
| S03 |
| S04 |
| S05 |
| S06 |
File details come from the government source that posted it. Updated .