BRIDGE INSPECTION REPORT
WINDY RUN BRIDGE
GWMP OVER WINDY RUN
GEORGE WASHINGTON MEMORIAL PARKWAY
LN
STRUCTURE NO. 3300-009P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 4/18/11
Federal Highway Administration
Report prepared by: ED
MILE POINT:
KILOMETER POINT:
6.95 11.19
Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 3300-009P
WINDY RUN BRIDGE INSPECTION DATE: 4/18/11
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... GIRDER & FLOOR BEAM SYSTEM NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 2 STRUCT. TOTAL LENGTH: .. 388.0 FT (118.3 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 106.0 FT (32.3 M)
WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 68.0 FT (20.7 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 62.5 FT (19.1 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1982
PROJ./PLAN REF. NO: ......... 1A1,2,35,47, / 21 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 7 - URBAN PARKWAY FRACTURE CRITICAL: ........ YES
STRUCTURE HISTORY: ...... 1982-MAJOR RECONSTRUCTION OF SUPERSTRUCTURE; 1996-RAILINGS AND STRUCTURAL
STEEL REPAINTED.
LOCATION
GEORGE WASHINGTON MEMORIAL PARKWAY MILE POINT: ..................... 6.95 (KM PT 11.19)
STATE: ................................. VIRGINIA LOCATION: 7.1 MILES SOUTH OF I-495.
FACILITY CARRIED: ............ GWMP
FEATURE INTERSECTED: .. WINDY RUN
STRUCTURE EVALUATION SUMMARY
This fracture-critical steel girder bridge is in fair condition overall. The main problems are minor to moderate cracking of the deck surface with evidence of leakage through the deck (corrosion of the metal stay-in-place forms and leakage through cracks in the overhangs), moderate to severe deterioration of the deck expansion joint compression seals with some areas of loose joint armor, and minor to moderate concrete deterioration at the abutments and pier bearing seats. The concrete deck should be sealed in order to prevent further water intrusion, the expansion joints should be replaced to halt the water leakage onto the bearings and girder ends below, and the deteriorated concrete at the abutments and pier bearing seats should be repaired.
Other problems include minor to moderate edge spalling of the deck surface and top of backwalls along the expansion joints, moderate slope erosion adjacent to the west column of the center pier, and an area of channel bank erosion adjacent to the west column of the center pier. Since the previous inspection, the lane markings have been repainted and an erosion hole in the north approach embankment has been filled. Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: D.K. JOHNSON, E.A. JARRELL (CLARK NEXSEN)
CONDITION ASSESSMENT:
D. KEITH JOHNSON, FIELD TEAM LEADER
REPORT REVIEW:
GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253
REPORT APPROVAL: DATE: 8/17/11
MARCUS MILLER, P.E., LEAD STRUCTURAL ENGINEER 703-404-6252
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-009P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
60.17 PLACE ENGINEERED RIPRAP AT WEST COLUMN OF CENTER PIER TO PREVENT
ADDITIONAL EROSION.
10 CY
60.12 RESEAL JOINT BETWEEN DRAINAGE TROUGH AND BREASTWALL AT BOTH
ABUTMENTS.
136 LF
58.1, 60.4 REPAIR SPALLS AND FILL CORE HOLES IN DECK SURFACE AND TOP OF
BACKWALLS AS NECESSARY.
20 SF
59.11, 60.13
REMOVE VEGETATION GROWTH ON PIER COLUMNS AND EAST GIRDER. 1 LS
222.4 PATCH POTHOLES IN NORTH APPROACH PAVEMENT, SOUTHBOUND LANE. 10 SF
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
60.1,3,4,6,1
REMOVE UNSOUND CONCRETE FROM PIER BEARING SEATS AND
ABUTMENTS, CLEAN REBAR, AND PLACE NEW CONCRETE TO
ORIGINAL DIMENSIONS.
750 SF
58.1 CLEAN AND SEAL DECK TO PREVENT WATER INTRUSION
THROUGH CRACKS.
25,096 SF
58.2 REPLACE BOTH DECK COMPRESSION SEAL EXPANSION JOINTS.
REPLACE JOINT ARMOR OVER SOUTH ABUTMENT IN
NORTHBOUND LANE. SEAL LONGITUDINAL PORTION OF
228 LF
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 3300-009P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK
ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
F F N G N G F N G
P G
(VEGETATION)
F N F F N F G N G G N
F(DRAINAGE TROUGHS)
G N G N F G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
(BURIED)
(BURIED)
58.1 MINOR TO MODERATE TRANSVERSE CRACKING OF DECK SURFACE
THROUGHOUT; MINOR LONGITUDINAL CRACKING. LOSS OF
ROUGHENED DECK SURFACE DUE TO TRAFFIC WEAR
THROUGHOUT. MODERATE SPALL ON DECK SURFACE IN RIGHT
SOUTHBOUND LANE OF SPAN #2 NEAR CENTER PIER. SEVERAL
CORES TAKEN IN SOUTHBOUND LANES; THREE CORES NOT FULLY
FILLED. LANE MARKINGS RESTRIPED SINCE PREVIOUS
INSPECTION.
MINOR EDGE SPALLING OF DECK SURFACE ALONG EXPANSION
JOINTS. MODERATE EDGE SPALLING ALONG SOUTH EXPANSION
JOINT IN SOUTHBOUND LANE; SPALL IN LEFT LANE PARTIALLY
PATCHED WITH ASPHALT.
MINOR RUSTING OF STAY-IN-PLACE FORMS WITH EFFLORESCENCE
ON DECK UNDERSIDE, PRIMARILY ALONG CENTERLINE OF BRIDGE
IN BAY #4; MINOR LOSS OF SECTION AT SPOT LOCATIONS. MINOR
TO MODERATE TRANSVERSE CRACKING WITH EFFLORESCENCE
ON UNDERSIDE OF OVERHANGS; MINOR SPALLS AND POPOUTS
WITH EXPOSED REBAR AT ISOLATED LOCATIONS. MINOR
DELAMINATION OF UNDERSIDE OF WEST OVERHANG IN SPAN #1
ADJACENT TO DECK DRAIN AND SPAN #4 ADJACENT TO NORTH
PIER. ACTIVE WATER LEAKAGE THROUGH CRACK ON UNDERSIDE
OF WEST OVERHANG AT MIDSPAN OF SPAN #3; MOISTURE DRIPS
ONTO BOTTOM FLANGE COVER PLATE.
58.2 MINOR DEBRIS ACCUMULATION IN EXPANSION JOINTS. MODERATE
TO SEVERE DETERIORATION OF COMPRESSION SEALS. MINOR
SNOW PLOW DAMAGE TO ARMORED JOINT OVER SOUTH
ABUTMENT IN NORTHBOUND LANES; ARMOR APPEARS LOOSE IN
LEFT LANE. LONGITUDINAL PORTIONS OF EXPANSION JOINTS
UNSEALED.
58.5 MINOR TRANSVERSE CRACKING OF CURBS. MINOR SPALLING OF
MEDIAN CURB IN SOUTHBOUND LANES.
58.6 MINOR SPOT RUSTING OF RAIL POST BASE PLATES. VEHICLE
SCRAPES THROUGHOUT RAILINGS. RUST STAINING ON MEDIAN
PARAPET AT WEATHERING STEEL APPROACH GUARDRAIL
ATTACHMENTS.
N G G G F N
N
F
G
F
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
G F N G N
MED
SUFF
50 FT.
SAND, ROCK
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1. N
N G F G G N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 1
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
58.7 MODERATE RUSTING OF DECK DRAINS. MINOR ACCUMULATION OF
DEBRIS ALONG CURBLINES.
59, 60 GRAFFITI THROUGHOUT BOTH ABUTMENTS AND FLOOR BEAMS #1
AND #19.
59.1 MINOR RUSTING OF BEARINGS THROUGHOUT; MINOR RUST SCALE
AT ABUTMENT BEARINGS. MINOR PACK RUST BETWEEN ROCKER
AND MASONRY PLATE AT ABUTMENT BEARINGS; PITTING UP TO
1/16"D ON MASONRY PLATES PREDATING PAINT. NORTH
ABUTMENT BEARINGS ROTATED NORTH 15º (EXPANDED) AT 65º
FAHRENHEIT; SOUTH ABUTMENT ROTATED SOUTH 5º TO 10º
(EXPANDED).
59.2,4,6,7 MODERATE SECTION LOSS TO GIRDER BOTTOM FLANGES AND
COVER PLATES BEHIND BEARINGS AT SOUTH ABUTMENT
PREDATING PAINT (3/8" SECTION REMAINING, 3/4" ORIGINAL
SECTION); MINOR SURFACE RUST BEGINNING TO REFORM. TACK
WELDS NOT GROUND FLUSH THROUGHOUT; WELDS CRACKED
FULL LENGTH AT ISOLATED LOCATIONS. MINOR RUSTING
BETWEEN GIRDER BOTTOM FLANGE COVER PLATES AT SEVERAL
AREAS AND ALONG TOP OF FLOOR BEAM #1.
100% LOSS OF SECTION (4"W X 1"H) TO VERTICAL STIFFENER AT
SOUTH END OF BOTH GIRDERS PREDATING PAINT.
NUMEROUS BOLTS AND/OR WASHERS MISSING AT
STRINGER-FLOOR BEAM CONNECTIONS. ENDS OF STRINGERS
RIVETED SECURELY, HOWEVER.
ISOLATED LOCATIONS OF CRACKING AND PEELING PAINT; LESS
THAN 1% OF TOTAL LENGTH OF STRINGERS, FLOOR BEAMS, AND
GIRDERS. MINOR PEELING OF PAINT ON SEVERAL RIVETS
THROUGHOUT. BOTTOM BRACING MISSING TOP COAT AT ONE
AREA BETWEEN FLOOR BEAMS #11 AND #12 IN SPAN #3.
59.11 MODERATE VINE GROWTH ON EXTERIOR FACE OF EAST GIRDER AT
NORTH PIER AND WEST GIRDER AT SOUTH PIER.
60.1 MODERATE HORIZONTAL CRACKING OF ABUTMENT BREASTWALLS
THROUGHOUT. MINOR SPALL IN SOUTH ABUTMENT BREASTWALL
AT EAST END. MODERATE TO SEVERE CRACKING AND SPALLING
WITH EXPOSED REBAR ON EAST FACE OF NORTH ABUTMENT
BREASTWALL; SEVERAL CRACKS EPOXY INJECTED. AREAS OF
DELAMINATION ON NORTH ABUTMENT BREASTWALL; 4'L X 4'W
NEAR CENTER AND 2'L X 4'W AT WEST END. SPALL WITH EXPOSED
REBAR AT EAST SIDE OF NORTH ABUTMENT BREASTWALL.
60.3 SEVERE CRACKING AND SPALLING OF FLUME CONCRETE ON TOP
OF SOUTH ABUTMENT BREASTWALL, PRIMARILY AT WEST END.
ADDITIONAL ITEM REFERENCE AND REMARKS
60.4 MINOR TO MODERATE MAP CRACKING OF ABUTMENT BACKWALLS. MINOR EFFLORESCENCE AND DELAMINATION OF SOUTH ABUTMENT BACKWALL. MODERATE VERTICAL CRACKING WITH EFFLORESCENCE ON
SOUTH ABUTMENT BACKWALL.
MODERATE EDGE SPALLING ON TOP OF ABUTMENT BACKWALLS IN NORTHBOUND LANES; MINOR IN
SOUTHBOUND LANES.
60.6 MODERATE MAP CRACKING WITH EFFLORESCENCE ON WINGWALLS ADJACENT TO BEARING SEATS. SPALL 12"L X 12"H X 2"D ON FRONT OF SOUTHEAST WINGWALL ADJACENT TO DECK. MINOR SPALLING WITH EXPOSED
REBAR ON NORTHWEST AND SOUTHWEST WINGWALLS. MINOR VEGETATION GROWTH ON NORTHWEST
WINGWALL.
60.12 CONCRETE DRAINAGE TROUGHS HAVE SETTLED UP TO 3" AT NORTH ABUTMENT AND 2" AT SOUTH ABUTMENT;
SEAL FAILED AT BOTH ABUTMENTS WITH 1-1/2" OF SEPARATION BETWEEN TROUGH AND BREASTWALL AT
SOUTH ABUTMENT.
60.13,15 MINOR TO MODERATE VEGETATION GROWTH ON COLUMNS. MINOR SPALLING WITH EXPOSED AND RUSTED
REBAR AT TOP OF COLUMNS THROUGHOUT. MINOR CRACKING OF PIER COLUMNS AT TOP; MINOR
DELAMINATION OF WEST COLUMN AT TOP, CENTER PIER. MINOR RUST STAINING FROM REBAR CHAIRS AT TOP
OF PIER COLUMNS AND ON UNDERSIDE OF STRUT WALLS BETWEEN COLUMNS.
60.17 MODERATE EROSION OF SLOPE AT WEST COLUMN, CENTER PIER. SEE ALSO 61.2.
61.2 MINOR TO MODERATE EROSION OF CHANNEL BANKS WITH SEVERAL UNDERMINED TREES; BANK IS SLUMPING
NEAR WEST COLUMN OF CENTER PIER.
61.4 MODERATE ACCUMULATION OF DEBRIS ON NORTH EMBANKMENT; MINOR IN CHANNEL.
222.3 MINOR COLLISION DAMAGE TO WEST GUARDWALL, NORTH APPROACH.
222.4 MINOR MAP CRACKING OF APPROACH PAVEMENT; MODERATE MAP AND LONGITUDINAL CRACKING OF SOUTH APPROACH PAVEMENT AT CENTERLINE OF NORTHBOUND LANES. MODERATE TRANSVERSE CRACKING OF NORTH APPROACH PAVEMENT IN NORTHBOUND LANES. MINOR POTHOLES IN NORTH APPROACH PAVEMENT IN
SOUTHBOUND LANES.
222.5 PREVIOUSLY NOTED EROSION HOLE IN NORTH APPROACH ON ROADWAY SIDE OF NORTHWEST WINGWALL HAS
BEEN FILLED IN SINCE LAST INSPECTION.
36.B,C,D APPROACH GUARDWALL HEIGHT OF 1'-5" DOES NOT MEET AASHTO MINIMUM HEIGHT SPECIFICATION OF 2'-3" FOR TRAFFIC BARRIERS. MASONRY APPROACH PARAPETS NOT ATTACHED TO BRIDGE RAILINGS. END
TREATMENTS DO NOT MEET CURRENT AASHTO SPECIFICATIONS.
STRUCTURE LOAD RATING STRUCTURE NO. 3300-009P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 33 30
HS 30 27 51 46
TYPE 3 29 26 49 44
TYPE 3S2 34 31 57 52
TYPE 3-3 38 34 63 57
DESIGN LOADING: H20 (M18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-009P
STRUCTURE IDENTIFICATION
(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY
(202) STRUCTURE NAME: .......... WINDY RUN BRIDGE
(203) STRUCTURE KIND: ............ 1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 3300-009P
(205) NPS REGION: .................... 2 - NATIONAL CAPITAL
(206) ROUTE CODE NUMBER: ... 1
(207) ROAD SECTION NO: .......... 009P
(208) NPS ROAD CLASS: ............ 7 - URBAN PARKWAY
(209) WITHIN NPS BNDRY?: ....... YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................ 1A1,2,35,47,
(212) DRAWING NUMBERS:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
513 - VIRGINIA (VA)
013 - ARLINGTON
161000010
WINDY RUN
GWMP
3300009P0000000
7.1 MILES SOUTH OF I-495.
99.99 FT (99.99 M)
6.95 (KM PT 11.19)
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
4 - STEEL CONTINUOUS
03 - GIRDER & FLOOR BEAM SYSTEM
106.0 FT (32.3 M)
388.0 FT (118.3 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 4 - H20 (M18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 30.0 TONS (27.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 51.0 TONS (46.3 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 4/11 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... YES
INSP. EVERY: 24 MONTHS - LAST INSP. : 4/11 (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-009P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 38°54'19.20"
(17) LONGITUDE: ......................... 77°05'41.40"
(19) DETOUR LENGTH: ............... 9 MI (14 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH: ........... 62.5 FT (19.1 M)
(52) DECK WIDTH: ............................ 68.0 FT (20.7 M)
(32) APPR. ROADWAY WIDTH: ........ 54.0 FT (16.5 M)
(213) APPR. PAVEMENT WIDTH: ..... 54.0 FT (16.5 M)
LEFT SHOULDER: .................. 0.0 FT (0.0 M)
RIGHT SHOULDER: ................ 0.0 FT (0.0 M)
(33) BRIDGE MEDIAN: ....................... 3 - CLOSED MEDIAN (non-moun
(34) SKEW ANGLE: ............................ 0 °
(35) DECK FLARE?: ........................... NO
(47) TOTAL HORIZ. CLEARANCE: .... 31.3 FT (9.5 M)
(50) SIDEWALKS:
LEFT : ...................................... 0.0 FT (0.0 M)
RIGHT : ................................... 0.0 FT (0.0 M)
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
MATERIAL: .............................. 4 - STEEL
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
(215) BRIDGE RAIL HEIGHT: ............ 3.50 FT (1.07 M)
(53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1000
(75A) TYPE OF WORK: .............. 35 - GENERAL REHAB
(75B) WORK DONE BY: ............. 1 - CONTRACT
(76) IMPROVEMENT LENGTH: .. 387.0 FT (118.0 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
4 - Stable; action required to pro
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1982-MAJOR RECONSTRUCTION OF SUPERSTRUCTURE; 1996-RAILINGS AND STRUCTURAL STEEL REPAINTED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:77�05'41.40 http:38�54'19.20
APPENDIX STRUCTURE NO. 3300-009P
PHOTOGRAPHS STRUCTURE NO. 3300-009P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD MT. VERNON
FLOW
PHOTO #2 - WEST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING SOUTH
PHOTO #4 - TYPICAL LONGITUDINAL
CRACKING OF DECK SURFACE; SOUTHBOUND
LANES IN SPAN #2 SHOWN
PHOTO #5 - TYPICAL TRANSVERSE CRACKING
OF DECK SURFACE; SOUTHBOUND LANES
OVER SOUTH PIER SHOWN
PHOTO #6 - CLOSE UP VIEW OF PREVIOUS
PHOTO
PHOTO #7 - SPALL IN RIGHT SOUTHBOUND
LANE IN SPAN #2 NEAR CENTER PIER
PHOTO #8 - DETERIORATION OF
COMPRESSION SEAL EXPANSION JOINT OVER
NORTH ABUTMENT, SOUTHBOUND LANES;
ALSO NOTE TRANSVERSE CRACKING AND
POTHOLES IN APPROACH PAVEMENT
PHOTO #9 - DETERIORATION OF
COMPRESSION SEAL EXPANSION JOINT OVER
SOUTH ABUTMENT, SOUTHBOUND LANES;
ALSO NOTE EDGE SPALLING OF DECK AND
BACKWALL ALONG JOINT
PHOTO #10 - CLOSE UP VIEW OF PREVIOUS
PHOTO
PHOTO #11 - TYPICAL TRANSVERSE CRACKING OF CURBS; WEST
CURB IN SPAN #1 SHOWN; ALSO NOTE TYPICAL SPOT RUSTING OF
RAIL POST BASE PLATES
PHOTO #12 - SPALLING OF MEDIAN CURB IN SOUTHBOUND LANES
PHOTO #13 - COLLISION DAMAGE TO WEST
GUARDWALL, NORTH APPROACH
PHOTO #14 - GENERAL UNDERSIDE VIEW
LOOKING SOUTH, SPAN #2
PHOTO #15 - ACTIVE WATER LEAKAGE
THROUGH CRACK ON UNDERSIDE OF WEST
OVERHANG AT MIDSPAN OF SPAN #2; ALSO
NOTE TYPICAL TRANSVERSE CRACKING
PHOTO #16 - MOISTURE LEAKAGE ONTO
BOTTOM FLANGE COVER PLATE FROM CRACK
AT MIDSPAN OF WEST OVERHANG IN SPAN #2
PHOTO #17 - TYPICAL RUSTING OF
STAY-IN-PLACE FORMS WITH
EFFLORESCENCE; BAY #4 IN SPAN #2 SHOWN
PHOTO #18 - TYPICAL CONDITION OF
BEARINGS AT ABUTMENTS; WEST GIRDER
BEARING AT SOUTH ABUTMENT SHOWN;
NOTE RUSTING, PACK RUST, PITTING, AND
ROTATION
PHOTO #19 - TYPICAL CRACKING AND PEELING PAINT; WEST GIRDER
BOTTOM FLANGE IN SPAN #3 NEAR NORTH PIER SHOWN
PHOTO #20 - SECTION LOSS TO WEST GIRDER BEHIND BEARING AT
SOUTH ABUTMENT PREDATING PAINT; NOTE 100% LOSS OF SECTION
TO VERTICAL STIFFENER AND RUST BEGINNING TO REFORM
PHOTO #21 - TYPICAL TACK WELDS NOT GROUND FLUSH; EAST
GIRDER IN SPAN #3 SHOWN; ALSO NOTE TYPICAL RUSTING BETWEEN
BOTTOM FLANGE AND COVER PLATES
PHOTO #22 - CLOSE UP VIEW OF PREVIOUS PHOTO; NOTE WELDS
CRACKED FULL LENGTH AT ISOLATED LOCATIONS
PHOTO #23 - TYPICAL MISSING BOLTS AT
STRINGER-FLOOR BEAM CONNECTIONS;
STRINGER #6 AT FLOOR BEAM OVER NORTH
PIER SHOWN
PHOTO #24 - GENERAL VIEW OF SOUTH
ABUTMENT
PHOTO #25 - DETERIORATION OF CONCRETE FLUME ON TOP OF
SOUTH ABUTMENT BREASTWALL AT WEST END
PHOTO #26 - CRACKING AND SPALLING WITH EXPOSED REBAR ON
EAST FACE OF NORTH ABUTMENT BREASTWALL; NOTE CRACKS
EPOXY INJECTED (PHOTO FROM 4/22/09 INSPECTION)
PHOTO #27 - DETERIORATION OF SOUTH
FACE OF NORTHEAST WINGWALL (PHOTO
FROM 4/22/09 INSPECTION)
PHOTO #28 - SOUTH ABUTMENT DRAINAGE
TROUGH SEPARATED FROM BREASTWALL
AND SETTLED
PHOTO #29 - GENERAL VIEW OF CENTER
PIER, NORTH SIDE
PHOTO #30 - VEGETATION GROWTH ON EAST
COLUMN OF NORTH PIER AND EAST GIRDER
PHOTO #31 - TYPICAL SPALLING WITH
EXPOSED AND RUSTED REBAR AT TOP OF
COLUMNS; EAST COLUMN AT NORTH PIER
SHOWN; ALSO NOTE VEGETATION GROWTH
ON COLUMN
PHOTO #32 - TYPICAL EROSION OF CHANNEL
BANKS WITH SEVERAL UNDERMINED TREES;
NORTH BANK NEAR WEST COLUMN OF
CENTER PIER SHOWN; ALSO NOTE BANK
SLUMPING
PHOTO #33 - LOOKING UPSTREAM THROUGH STRUCTURE
PHOTO #34 - LOOKING DOWNSTREAM THROUGH STRUCTURE