BRIDGE INSPECTION REPORT

WINDY RUN BRIDGE

GWMP OVER WINDY RUN

GEORGE WASHINGTON MEMORIAL PARKWAY

LN

STRUCTURE NO. 3300-009P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 4/18/11

Federal Highway Administration

Report prepared by: ED

MILE POINT:

KILOMETER POINT:

6.95 11.19

Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP

STRUCTURE SUMMARY STRUCTURE NO. 3300-009P

WINDY RUN BRIDGE INSPECTION DATE: 4/18/11

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... STEEL CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... GIRDER & FLOOR BEAM SYSTEM NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 2 STRUCT. TOTAL LENGTH: .. 388.0 FT (118.3 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 106.0 FT (32.3 M)

WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 68.0 FT (20.7 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 62.5 FT (19.1 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1982

PROJ./PLAN REF. NO: ......... 1A1,2,35,47, / 21 SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 7 - URBAN PARKWAY FRACTURE CRITICAL: ........ YES

STRUCTURE HISTORY: ...... 1982-MAJOR RECONSTRUCTION OF SUPERSTRUCTURE; 1996-RAILINGS AND STRUCTURAL

STEEL REPAINTED.

LOCATION

GEORGE WASHINGTON MEMORIAL PARKWAY MILE POINT: ..................... 6.95 (KM PT 11.19)

STATE: ................................. VIRGINIA LOCATION: 7.1 MILES SOUTH OF I-495.

FACILITY CARRIED: ............ GWMP

FEATURE INTERSECTED: .. WINDY RUN

STRUCTURE EVALUATION SUMMARY

This fracture-critical steel girder bridge is in fair condition overall. The main problems are minor to moderate cracking of the deck surface with evidence of leakage through the deck (corrosion of the metal stay-in-place forms and leakage through cracks in the overhangs), moderate to severe deterioration of the deck expansion joint compression seals with some areas of loose joint armor, and minor to moderate concrete deterioration at the abutments and pier bearing seats. The concrete deck should be sealed in order to prevent further water intrusion, the expansion joints should be replaced to halt the water leakage onto the bearings and girder ends below, and the deteriorated concrete at the abutments and pier bearing seats should be repaired.

Other problems include minor to moderate edge spalling of the deck surface and top of backwalls along the expansion joints, moderate slope erosion adjacent to the west column of the center pier, and an area of channel bank erosion adjacent to the west column of the center pier. Since the previous inspection, the lane markings have been repainted and an erosion hole in the north approach embankment has been filled. Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: D.K. JOHNSON, E.A. JARRELL (CLARK NEXSEN)

CONDITION ASSESSMENT:

D. KEITH JOHNSON, FIELD TEAM LEADER

REPORT REVIEW:

GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253

REPORT APPROVAL: DATE: 8/17/11

MARCUS MILLER, P.E., LEAD STRUCTURAL ENGINEER 703-404-6252

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-009P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

60.17 PLACE ENGINEERED RIPRAP AT WEST COLUMN OF CENTER PIER TO PREVENT

ADDITIONAL EROSION.

10 CY

60.12 RESEAL JOINT BETWEEN DRAINAGE TROUGH AND BREASTWALL AT BOTH

ABUTMENTS.

136 LF

58.1, 60.4 REPAIR SPALLS AND FILL CORE HOLES IN DECK SURFACE AND TOP OF

BACKWALLS AS NECESSARY.

20 SF

59.11, 60.13

REMOVE VEGETATION GROWTH ON PIER COLUMNS AND EAST GIRDER. 1 LS

222.4 PATCH POTHOLES IN NORTH APPROACH PAVEMENT, SOUTHBOUND LANE. 10 SF

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

60.1,3,4,6,1

REMOVE UNSOUND CONCRETE FROM PIER BEARING SEATS AND

ABUTMENTS, CLEAN REBAR, AND PLACE NEW CONCRETE TO

ORIGINAL DIMENSIONS.

750 SF

58.1 CLEAN AND SEAL DECK TO PREVENT WATER INTRUSION

THROUGH CRACKS.

25,096 SF

58.2 REPLACE BOTH DECK COMPRESSION SEAL EXPANSION JOINTS.

REPLACE JOINT ARMOR OVER SOUTH ABUTMENT IN

NORTHBOUND LANE. SEAL LONGITUDINAL PORTION OF

228 LF

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL: ..

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 3300-009P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK

ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

F F N G N G F N G

P G

(VEGETATION)

F N F F N F G N G G N

F(DRAINAGE TROUGHS)

G N G N F G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

(BURIED)

(BURIED)

58.1 MINOR TO MODERATE TRANSVERSE CRACKING OF DECK SURFACE

THROUGHOUT; MINOR LONGITUDINAL CRACKING. LOSS OF

ROUGHENED DECK SURFACE DUE TO TRAFFIC WEAR

THROUGHOUT. MODERATE SPALL ON DECK SURFACE IN RIGHT

SOUTHBOUND LANE OF SPAN #2 NEAR CENTER PIER. SEVERAL

CORES TAKEN IN SOUTHBOUND LANES; THREE CORES NOT FULLY

FILLED. LANE MARKINGS RESTRIPED SINCE PREVIOUS

INSPECTION.

MINOR EDGE SPALLING OF DECK SURFACE ALONG EXPANSION

JOINTS. MODERATE EDGE SPALLING ALONG SOUTH EXPANSION

JOINT IN SOUTHBOUND LANE; SPALL IN LEFT LANE PARTIALLY

PATCHED WITH ASPHALT.

MINOR RUSTING OF STAY-IN-PLACE FORMS WITH EFFLORESCENCE

ON DECK UNDERSIDE, PRIMARILY ALONG CENTERLINE OF BRIDGE

IN BAY #4; MINOR LOSS OF SECTION AT SPOT LOCATIONS. MINOR

TO MODERATE TRANSVERSE CRACKING WITH EFFLORESCENCE

ON UNDERSIDE OF OVERHANGS; MINOR SPALLS AND POPOUTS

WITH EXPOSED REBAR AT ISOLATED LOCATIONS. MINOR

DELAMINATION OF UNDERSIDE OF WEST OVERHANG IN SPAN #1

ADJACENT TO DECK DRAIN AND SPAN #4 ADJACENT TO NORTH

PIER. ACTIVE WATER LEAKAGE THROUGH CRACK ON UNDERSIDE

OF WEST OVERHANG AT MIDSPAN OF SPAN #3; MOISTURE DRIPS

ONTO BOTTOM FLANGE COVER PLATE.

58.2 MINOR DEBRIS ACCUMULATION IN EXPANSION JOINTS. MODERATE

TO SEVERE DETERIORATION OF COMPRESSION SEALS. MINOR

SNOW PLOW DAMAGE TO ARMORED JOINT OVER SOUTH

ABUTMENT IN NORTHBOUND LANES; ARMOR APPEARS LOOSE IN

LEFT LANE. LONGITUDINAL PORTIONS OF EXPANSION JOINTS

UNSEALED.

58.5 MINOR TRANSVERSE CRACKING OF CURBS. MINOR SPALLING OF

MEDIAN CURB IN SOUTHBOUND LANES.

58.6 MINOR SPOT RUSTING OF RAIL POST BASE PLATES. VEHICLE

SCRAPES THROUGHOUT RAILINGS. RUST STAINING ON MEDIAN

PARAPET AT WEATHERING STEEL APPROACH GUARDRAIL

ATTACHMENTS.

N G G G F N

N

F

G

F

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION3.

EROSION AND/OR SCOUR2.

ALIGNMENT1.

61. CHANNEL 6

G F N G N

MED

SUFF

50 FT.

SAND, ROCK

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT 6.

EROSION5.

SURFACING4.

APPROACH GUARDRAIL 3.

2. RELIEF JOINTS

APPROACH SLABS1. N

N G F G G N G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR4.

FOUNDATION3.

WEEP HOLES2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

58.7 MODERATE RUSTING OF DECK DRAINS. MINOR ACCUMULATION OF

DEBRIS ALONG CURBLINES.

59, 60 GRAFFITI THROUGHOUT BOTH ABUTMENTS AND FLOOR BEAMS #1

AND #19.

59.1 MINOR RUSTING OF BEARINGS THROUGHOUT; MINOR RUST SCALE

AT ABUTMENT BEARINGS. MINOR PACK RUST BETWEEN ROCKER

AND MASONRY PLATE AT ABUTMENT BEARINGS; PITTING UP TO

1/16"D ON MASONRY PLATES PREDATING PAINT. NORTH

ABUTMENT BEARINGS ROTATED NORTH 15º (EXPANDED) AT 65º

FAHRENHEIT; SOUTH ABUTMENT ROTATED SOUTH 5º TO 10º

(EXPANDED).

59.2,4,6,7 MODERATE SECTION LOSS TO GIRDER BOTTOM FLANGES AND

COVER PLATES BEHIND BEARINGS AT SOUTH ABUTMENT

PREDATING PAINT (3/8" SECTION REMAINING, 3/4" ORIGINAL

SECTION); MINOR SURFACE RUST BEGINNING TO REFORM. TACK

WELDS NOT GROUND FLUSH THROUGHOUT; WELDS CRACKED

FULL LENGTH AT ISOLATED LOCATIONS. MINOR RUSTING

BETWEEN GIRDER BOTTOM FLANGE COVER PLATES AT SEVERAL

AREAS AND ALONG TOP OF FLOOR BEAM #1.

100% LOSS OF SECTION (4"W X 1"H) TO VERTICAL STIFFENER AT

SOUTH END OF BOTH GIRDERS PREDATING PAINT.

NUMEROUS BOLTS AND/OR WASHERS MISSING AT

STRINGER-FLOOR BEAM CONNECTIONS. ENDS OF STRINGERS

RIVETED SECURELY, HOWEVER.

ISOLATED LOCATIONS OF CRACKING AND PEELING PAINT; LESS

THAN 1% OF TOTAL LENGTH OF STRINGERS, FLOOR BEAMS, AND

GIRDERS. MINOR PEELING OF PAINT ON SEVERAL RIVETS

THROUGHOUT. BOTTOM BRACING MISSING TOP COAT AT ONE

AREA BETWEEN FLOOR BEAMS #11 AND #12 IN SPAN #3.

59.11 MODERATE VINE GROWTH ON EXTERIOR FACE OF EAST GIRDER AT

NORTH PIER AND WEST GIRDER AT SOUTH PIER.

60.1 MODERATE HORIZONTAL CRACKING OF ABUTMENT BREASTWALLS

THROUGHOUT. MINOR SPALL IN SOUTH ABUTMENT BREASTWALL

AT EAST END. MODERATE TO SEVERE CRACKING AND SPALLING

WITH EXPOSED REBAR ON EAST FACE OF NORTH ABUTMENT

BREASTWALL; SEVERAL CRACKS EPOXY INJECTED. AREAS OF

DELAMINATION ON NORTH ABUTMENT BREASTWALL; 4'L X 4'W

NEAR CENTER AND 2'L X 4'W AT WEST END. SPALL WITH EXPOSED

REBAR AT EAST SIDE OF NORTH ABUTMENT BREASTWALL.

60.3 SEVERE CRACKING AND SPALLING OF FLUME CONCRETE ON TOP

OF SOUTH ABUTMENT BREASTWALL, PRIMARILY AT WEST END.

ADDITIONAL ITEM REFERENCE AND REMARKS

60.4 MINOR TO MODERATE MAP CRACKING OF ABUTMENT BACKWALLS. MINOR EFFLORESCENCE AND DELAMINATION OF SOUTH ABUTMENT BACKWALL. MODERATE VERTICAL CRACKING WITH EFFLORESCENCE ON

SOUTH ABUTMENT BACKWALL.

MODERATE EDGE SPALLING ON TOP OF ABUTMENT BACKWALLS IN NORTHBOUND LANES; MINOR IN

SOUTHBOUND LANES.

60.6 MODERATE MAP CRACKING WITH EFFLORESCENCE ON WINGWALLS ADJACENT TO BEARING SEATS. SPALL 12"L X 12"H X 2"D ON FRONT OF SOUTHEAST WINGWALL ADJACENT TO DECK. MINOR SPALLING WITH EXPOSED

REBAR ON NORTHWEST AND SOUTHWEST WINGWALLS. MINOR VEGETATION GROWTH ON NORTHWEST

WINGWALL.

60.12 CONCRETE DRAINAGE TROUGHS HAVE SETTLED UP TO 3" AT NORTH ABUTMENT AND 2" AT SOUTH ABUTMENT;

SEAL FAILED AT BOTH ABUTMENTS WITH 1-1/2" OF SEPARATION BETWEEN TROUGH AND BREASTWALL AT

SOUTH ABUTMENT.

60.13,15 MINOR TO MODERATE VEGETATION GROWTH ON COLUMNS. MINOR SPALLING WITH EXPOSED AND RUSTED

REBAR AT TOP OF COLUMNS THROUGHOUT. MINOR CRACKING OF PIER COLUMNS AT TOP; MINOR

DELAMINATION OF WEST COLUMN AT TOP, CENTER PIER. MINOR RUST STAINING FROM REBAR CHAIRS AT TOP

OF PIER COLUMNS AND ON UNDERSIDE OF STRUT WALLS BETWEEN COLUMNS.

60.17 MODERATE EROSION OF SLOPE AT WEST COLUMN, CENTER PIER. SEE ALSO 61.2.

61.2 MINOR TO MODERATE EROSION OF CHANNEL BANKS WITH SEVERAL UNDERMINED TREES; BANK IS SLUMPING

NEAR WEST COLUMN OF CENTER PIER.

61.4 MODERATE ACCUMULATION OF DEBRIS ON NORTH EMBANKMENT; MINOR IN CHANNEL.

222.3 MINOR COLLISION DAMAGE TO WEST GUARDWALL, NORTH APPROACH.

222.4 MINOR MAP CRACKING OF APPROACH PAVEMENT; MODERATE MAP AND LONGITUDINAL CRACKING OF SOUTH APPROACH PAVEMENT AT CENTERLINE OF NORTHBOUND LANES. MODERATE TRANSVERSE CRACKING OF NORTH APPROACH PAVEMENT IN NORTHBOUND LANES. MINOR POTHOLES IN NORTH APPROACH PAVEMENT IN

SOUTHBOUND LANES.

222.5 PREVIOUSLY NOTED EROSION HOLE IN NORTH APPROACH ON ROADWAY SIDE OF NORTHWEST WINGWALL HAS

BEEN FILLED IN SINCE LAST INSPECTION.

36.B,C,D APPROACH GUARDWALL HEIGHT OF 1'-5" DOES NOT MEET AASHTO MINIMUM HEIGHT SPECIFICATION OF 2'-3" FOR TRAFFIC BARRIERS. MASONRY APPROACH PARAPETS NOT ATTACHED TO BRIDGE RAILINGS. END

TREATMENTS DO NOT MEET CURRENT AASHTO SPECIFICATIONS.

STRUCTURE LOAD RATING STRUCTURE NO. 3300-009P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 20 18 33 30

HS 30 27 51 46

TYPE 3 29 26 49 44

TYPE 3S2 34 31 57 52

TYPE 3-3 38 34 63 57

DESIGN LOADING: H20 (M18)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-009P

STRUCTURE IDENTIFICATION

(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY

(202) STRUCTURE NAME: .......... WINDY RUN BRIDGE

(203) STRUCTURE KIND: ............ 1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 3300-009P

(205) NPS REGION: .................... 2 - NATIONAL CAPITAL

(206) ROUTE CODE NUMBER: ... 1

(207) ROAD SECTION NO: .......... 009P

(208) NPS ROAD CLASS: ............ 7 - URBAN PARKWAY

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. PARK

(211) PROJECT NO(S): ................ 1A1,2,35,47,

(212) DRAWING NUMBERS:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

513 - VIRGINIA (VA)

013 - ARLINGTON

161000010

WINDY RUN

GWMP

3300009P0000000

7.1 MILES SOUTH OF I-495.

99.99 FT (99.99 M)

6.95 (KM PT 11.19)

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

4 - STEEL CONTINUOUS

03 - GIRDER & FLOOR BEAM SYSTEM

106.0 FT (32.3 M)

388.0 FT (118.3 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 4 - H20 (M18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 30.0 TONS (27.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 51.0 TONS (46.3 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 4/11 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... YES

INSP. EVERY: 24 MONTHS - LAST INSP. : 4/11 (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-009P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 38°54'19.20"

(17) LONGITUDE: ......................... 77°05'41.40"

(19) DETOUR LENGTH: ............... 9 MI (14 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH: ........... 62.5 FT (19.1 M)

(52) DECK WIDTH: ............................ 68.0 FT (20.7 M)

(32) APPR. ROADWAY WIDTH: ........ 54.0 FT (16.5 M)

(213) APPR. PAVEMENT WIDTH: ..... 54.0 FT (16.5 M)

LEFT SHOULDER: .................. 0.0 FT (0.0 M)

RIGHT SHOULDER: ................ 0.0 FT (0.0 M)

(33) BRIDGE MEDIAN: ....................... 3 - CLOSED MEDIAN (non-moun

(34) SKEW ANGLE: ............................ 0 °

(35) DECK FLARE?: ........................... NO

(47) TOTAL HORIZ. CLEARANCE: .... 31.3 FT (9.5 M)

(50) SIDEWALKS:

LEFT : ...................................... 0.0 FT (0.0 M)

RIGHT : ................................... 0.0 FT (0.0 M)

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

MATERIAL: .............................. 4 - STEEL

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

(215) BRIDGE RAIL HEIGHT: ............ 3.50 FT (1.07 M)

(53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1000

(75A) TYPE OF WORK: .............. 35 - GENERAL REHAB

(75B) WORK DONE BY: ............. 1 - CONTRACT

(76) IMPROVEMENT LENGTH: .. 387.0 FT (118.0 M)

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

4 - Stable; action required to pro

2 - REHAB/RECONSTRUCTION

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-MAJOR RECONSTRUCTION OF SUPERSTRUCTURE; 1996-RAILINGS AND STRUCTURAL STEEL REPAINTED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:77�05'41.40 http:38�54'19.20

APPENDIX STRUCTURE NO. 3300-009P

PHOTOGRAPHS STRUCTURE NO. 3300-009P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD MT. VERNON

FLOW

PHOTO #2 - WEST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW

LOOKING SOUTH

PHOTO #4 - TYPICAL LONGITUDINAL

CRACKING OF DECK SURFACE; SOUTHBOUND

LANES IN SPAN #2 SHOWN

PHOTO #5 - TYPICAL TRANSVERSE CRACKING

OF DECK SURFACE; SOUTHBOUND LANES

OVER SOUTH PIER SHOWN

PHOTO #6 - CLOSE UP VIEW OF PREVIOUS

PHOTO

PHOTO #7 - SPALL IN RIGHT SOUTHBOUND

LANE IN SPAN #2 NEAR CENTER PIER

PHOTO #8 - DETERIORATION OF

COMPRESSION SEAL EXPANSION JOINT OVER

NORTH ABUTMENT, SOUTHBOUND LANES;

ALSO NOTE TRANSVERSE CRACKING AND

POTHOLES IN APPROACH PAVEMENT

PHOTO #9 - DETERIORATION OF

COMPRESSION SEAL EXPANSION JOINT OVER

SOUTH ABUTMENT, SOUTHBOUND LANES;

ALSO NOTE EDGE SPALLING OF DECK AND

BACKWALL ALONG JOINT

PHOTO #10 - CLOSE UP VIEW OF PREVIOUS

PHOTO

PHOTO #11 - TYPICAL TRANSVERSE CRACKING OF CURBS; WEST

CURB IN SPAN #1 SHOWN; ALSO NOTE TYPICAL SPOT RUSTING OF

RAIL POST BASE PLATES

PHOTO #12 - SPALLING OF MEDIAN CURB IN SOUTHBOUND LANES

PHOTO #13 - COLLISION DAMAGE TO WEST

GUARDWALL, NORTH APPROACH

PHOTO #14 - GENERAL UNDERSIDE VIEW

LOOKING SOUTH, SPAN #2

PHOTO #15 - ACTIVE WATER LEAKAGE

THROUGH CRACK ON UNDERSIDE OF WEST

OVERHANG AT MIDSPAN OF SPAN #2; ALSO

NOTE TYPICAL TRANSVERSE CRACKING

PHOTO #16 - MOISTURE LEAKAGE ONTO

BOTTOM FLANGE COVER PLATE FROM CRACK

AT MIDSPAN OF WEST OVERHANG IN SPAN #2

PHOTO #17 - TYPICAL RUSTING OF

STAY-IN-PLACE FORMS WITH

EFFLORESCENCE; BAY #4 IN SPAN #2 SHOWN

PHOTO #18 - TYPICAL CONDITION OF

BEARINGS AT ABUTMENTS; WEST GIRDER

BEARING AT SOUTH ABUTMENT SHOWN;

NOTE RUSTING, PACK RUST, PITTING, AND

ROTATION

PHOTO #19 - TYPICAL CRACKING AND PEELING PAINT; WEST GIRDER

BOTTOM FLANGE IN SPAN #3 NEAR NORTH PIER SHOWN

PHOTO #20 - SECTION LOSS TO WEST GIRDER BEHIND BEARING AT

SOUTH ABUTMENT PREDATING PAINT; NOTE 100% LOSS OF SECTION

TO VERTICAL STIFFENER AND RUST BEGINNING TO REFORM

PHOTO #21 - TYPICAL TACK WELDS NOT GROUND FLUSH; EAST

GIRDER IN SPAN #3 SHOWN; ALSO NOTE TYPICAL RUSTING BETWEEN

BOTTOM FLANGE AND COVER PLATES

PHOTO #22 - CLOSE UP VIEW OF PREVIOUS PHOTO; NOTE WELDS

CRACKED FULL LENGTH AT ISOLATED LOCATIONS

PHOTO #23 - TYPICAL MISSING BOLTS AT

STRINGER-FLOOR BEAM CONNECTIONS;

STRINGER #6 AT FLOOR BEAM OVER NORTH

PIER SHOWN

PHOTO #24 - GENERAL VIEW OF SOUTH

ABUTMENT

PHOTO #25 - DETERIORATION OF CONCRETE FLUME ON TOP OF

SOUTH ABUTMENT BREASTWALL AT WEST END

PHOTO #26 - CRACKING AND SPALLING WITH EXPOSED REBAR ON

EAST FACE OF NORTH ABUTMENT BREASTWALL; NOTE CRACKS

EPOXY INJECTED (PHOTO FROM 4/22/09 INSPECTION)

PHOTO #27 - DETERIORATION OF SOUTH

FACE OF NORTHEAST WINGWALL (PHOTO

FROM 4/22/09 INSPECTION)

PHOTO #28 - SOUTH ABUTMENT DRAINAGE

TROUGH SEPARATED FROM BREASTWALL

AND SETTLED

PHOTO #29 - GENERAL VIEW OF CENTER

PIER, NORTH SIDE

PHOTO #30 - VEGETATION GROWTH ON EAST

COLUMN OF NORTH PIER AND EAST GIRDER

PHOTO #31 - TYPICAL SPALLING WITH

EXPOSED AND RUSTED REBAR AT TOP OF

COLUMNS; EAST COLUMN AT NORTH PIER

SHOWN; ALSO NOTE VEGETATION GROWTH

ON COLUMN

PHOTO #32 - TYPICAL EROSION OF CHANNEL

BANKS WITH SEVERAL UNDERMINED TREES;

NORTH BANK NEAR WEST COLUMN OF

CENTER PIER SHOWN; ALSO NOTE BANK

SLUMPING

PHOTO #33 - LOOKING UPSTREAM THROUGH STRUCTURE

PHOTO #34 - LOOKING DOWNSTREAM THROUGH STRUCTURE