BRIDGE INSPECTION REPORT
DEAD RUN BRIDGE
GWMP OVER DEAD RUN
GEORGE WASHINGTON MEMORIAL PARKWAY
LN
STRUCTURE NO. 3300-001P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 4/13/11
Federal Highway Administration
Report prepared by: ED
MILE POINT:
KILOMETER POINT:
0.43 0.69
Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 3300-001P
DEAD RUN BRIDGE INSPECTION DATE: 4/13/11
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... GIRDER & FLOOR BEAM SYSTEM NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 307.8 FT (93.8 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 113.0 FT (34.4 M)
WEARING SURFACE: .......... MODIFIED CONCRETE DECK WIDTH: ...................... 73.0 FT (22.3 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 60.3 FT (18.4 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1998
PROJ./PLAN REF. NO: ......... 1A18,41,39,2 / 41901 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 7 - URBAN PARKWAY FRACTURE CRITICAL: ........ YES
STRUCTURE HISTORY: ...... 1975-northbound bridge deck replaced with membrane added. 1983, 2001-structural steel repainted. 1998-southbound deck replaced with precast panels. 2010-approaches repaved.
LOCATION
GEORGE WASHINGTON MEMORIAL PARKWAY MILE POINT: ..................... 0.43 (KM PT 0.69)
STATE: ................................. VIRGINIA LOCATION: 0.5 MILES SOUTH OF I-495.
FACILITY CARRIED: ............ GWMP
FEATURE INTERSECTED: .. DEAD RUN
STRUCTURE EVALUATION SUMMARY
This fracture-critical steel girder bridge, which consists of both northbound and southbound structures, is in fair condition overall. The main problems are minor to moderate deterioration of the substructure concrete and the retaining walls which has progressed since the last inspection and widespread minor cracking and isolated delamination and spalling of the concrete wearing surface. The substructure and retaining walls should be repaired in order to prevent further concrete deterioration, and the wearing surface should be repaired and sealed to halt water intrusion.
Another issue at this time is the reformation of surface rust on the girder and stringer ends at the abutments, which is exacerbated by the leaking expansion joints. These joints should be resealed as necessary, and the girder and stringer ends should be repainted.
Other problems include clogged deck drains and isolated loose stones in the masonry guardwalls. Also, minor section loss on the structural steel superstructure occurred prior to repainting with a few locations rusted through;
however, the section loss does not affect the structural integrity. Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future.
It should be noted that the approaches have been repaved and the lane markings have been repainted since the last inspection.
INSPECTION TEAM: M.D. HARLAN, R.E. ESTES (CLARK NEXSEN)
CONDITION ASSESSMENT:
MATTHEW D. HARLAN, P.E., FIELD TEAM LEADER
REPORT REVIEW:
GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253
REPORT APPROVAL: DATE: 8/17/11
MARCUS MILLER, P.E., LEAD STRUCTURAL ENGINEER 703-404-6252
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3300-001P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.3 REPAIR CONCRETE WEARING SURFACE AT EXPANSION JOINTS OF
NORTHBOUND STRUCTURE.
112 SF $
59.2,4,7 CLEAN AND PAINT GIRDER AND STRINGER ENDS AT ABUTMENTS. 620 SF
58.2,7 CLEAN DEBRIS FROM DECK DRAINS AND EXPANSION JOINTS. RESEAL DECK
EXPANSION JOINTS AS NECESSARY.
1 LS
222.3 RESET LOOSE STONES IN MASONRY GUARDWALLS. 1 CY
223.1 REMOVE VEGETATION GROWTH FROM NORTH ABUTMENT RETAINING WALL. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58.3 CLEAN AND SEAL MODIFIED CONCRETE WEARING SURFACE 17,248 SF
60.1,3,4,6,1 5, 223.1
REPAIR DETERIORATED AREAS OF ABUTMENTS, PIERS, AND
RETAINING WALLS. CLEAN EXPOSED REBAR AT SHALLOW SPALLS
AND COAT WITH APPROVED SEALANT.
100 SF
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 3300-001P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK
ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
G F N G N F F N G
N G
F N F F N F G N G G N N
G N F N G G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1 WIDESPREAD MINOR RANDOM CRACKING OF DECK UNDERSIDE.
GROUT HAUNCHES BETWEEN DECK AND STRINGERS OR GIRDERS
INCOMPLETELY POURED IN SEVERAL LOCATIONS WITH
WIDESPREAD SHRINKAGE CRACKING. MINOR CRACKING OF
UNDERSIDE OF OVERHANGS WITH EFFLORESCENCE, SOME
EXTENDING INTO CURBS.
NORTHBOUND STRUCTURE: MINOR HONEYCOMBING OF DECK
UNDERSIDE AT ISOLATED LOCATIONS. MINOR DELAMINATION AND
SPALLING OF DECK UNDERSIDE ADJACENT TO WEST GIRDER AT
SOUTH ABUTMENT. MINOR EFFLORESCENCE ON DECK UNDERSIDE
ALONG CONSTRUCTION JOINT AT SOUTH ABUTMENT. ISOLATED
CONCRETE PATCHING ON DECK UNDERSIDE BETWEEN FLOOR
BEAMS #8 AND #9 IN CENTER SPAN. MODERATE SPALLING (10'L X
18"W X 3"D) OF DECK UNDERSIDE AND WEST OVERHANG AT NORTH
ABUTMENT DUE TO UP TO 3/4" OF PACK RUST OVER TOP FLANGE
OF WEST GIRDER PREDATING PAINT.
SOUTHBOUND STRUCTURE: MINOR LONGITUDINAL CRACKING OF
DECK UNDERSIDE WITH EFFLORESCENCE IN PREVIOUS REPAIRS
AT SOUTH ABUTMENT. MINOR SPALL ON UNDERSIDE OF WEST
OVERHANG AT NORTH ABUTMENT.
58.2 MINOR TO MODERATE ACCUMULATION OF DEBRIS IN EXPANSION
JOINTS, PRIMARILY IN SHOULDERS. ACTIVE LEAKAGE THROUGH
EXPANSION JOINTS AT TIME OF INSPECTION.
SOUTHBOUND STRUCTURE: SEAL LOOSE (3'L) AT SOUTH
EXPANSION JOINT DUE TO MINOR EDGE SPALLING.
58.3 LATEX MODIFIED CONCRETE WEARING SURFACE. LANE MARKINGS
RESTRIPED SINCE LAST INSPECTION
NORTHBOUND STRUCTURE: WIDESPREAD MINOR MAP CRACKING
OF WEARING SURFACE, ESPECIALLY NORTH END AND CENTER
SPAN. MINOR TO MODERATE CRACKING AND BREAKING UP OF
WEARING SURFACE AT BOTH ENDS; SOME AREAS OF SPALLING
PATCHED WITH ASPHALT; MINOR SETTLEMENT OF PATCHES.
SOUTHBOUND STRUCTURE: WIDESPREAD MINOR MAP CRACKING
OF SOUTH HALF OF WEARING SURFACE AND MINOR TRANSVERSE
CRACKING AT JOINTS BETWEEN DECK PANELS.
F G G G F N
N
F
G
F
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
F F F G N
LOW
SUFF
36 FT.
SILT, ROCK
222. APPROACHES 7
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1. N
N G G G G G G N
223. RETAINING WALL 6
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL F
G N G G N
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 1
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
58.5 WIDESPREAD MINOR CRACKING OF CURBS AND SIDEWALK.
NORTHBOUND STRUCTURE: DETERIORATION OF JOINT FILLER IN
CURB AND SIDEWALK FASCIAE. MINOR DELAMINATION AND
SPALLING OF CURB AND SIDEWALK ALONG FASCIA AT ISOLATED
LOCATIONS. MINOR EDGE SPALLING OF EAST CURB AT NORTH
APPROACH.
58.6 MINOR SCRAPES ON RAILS WITH MINOR RUSTING AND PEELING OF
PAINT; MINOR RUSTING AND PEELING OF PAINT ON RAIL POST
BASE PLATES.
SOUTHBOUND STRUCTURE: PREVIOUSLY NOTED VEGETATION
GROWTH OVER WEST RAILING NEAR SOUTH PIER HAS BEEN
CLEARED SINCE LAST INSPECTION.
58.7 NORTHBOUND STRUCTURE: DECK DRAINS COVERED TO PREVENT
DRAINAGE ONTO STRUCTURAL STEEL SUPERSTRUCTURE.
SOUTHBOUND STRUCTURE: BOTH DECK DRAINS CLOGGED IN
CENTER SPAN. LOOSE AND MISSING ANGLES ON DRAIN
EXTENSION SUPPORTS AT ISOLATED LOCATIONS.
59.1 MINOR RUSTING OF BEARINGS; UP TO 1/2" PACK RUST BENEATH
ROCKERS PREDATING PAINT.
SOUTHBOUND STRUCTURE: RUST SCALE BENEATH EXTERIOR
ANCHOR BOLT WASHERS OF EAST BEARING AT SOUTH PIER WITH
ANCHOR BOLT NUTS NOT FULLY SEATED.
59.2,4,6,7 MINOR SECTION LOSS (UP TO 1/8") ON STRUCTURAL STEEL
PREDATING PAINT; MINOR RUST REFORMING ON GIRDER AND
STRINGER ENDS AT ABUTMENTS. MINOR RUSTING ALONG EDGES
OF GIRDER BOTTOM FLANGES AT ISOLATED LOCATIONS. LATERAL
BRACING MEMBERS AND GUSSET PLATES DOWN TO KNIFE EDGE
PREDATING PAINT AT ISOLATED LOCATIONS.
SOUTHBOUND STRUCTURE: PEELING OF PAINT WITH RUST SCALE
ON WEST GIRDER FIELD SPLICE AT FLOOR BEAM #4 IN SOUTH
SPAN. GAP (UP TO 1/8"W X 9"L) BETWEEN BOTTOM FLANGE OF
WEST GIRDER AND SPLICE PLATE AT SPLICE NEAR SOUTH PIER IN
CENTER SPAN; BOLTS FULLY TIGHT. MINOR SECTION LOSS ON
BOTTOM FLANGE (1" SECTION REMAINING, 1-1/4" ORIGINAL
SECTION) OF WEST GIRDER BETWEEN FLOOR BEAMS #8 AND #9 IN
CENTER SPAN PREDATING PAINT. SURFACE RUST WITH RUST
SCALE ON TOP FLANGE OF WEST GIRDER AT NORTH ABUTMENT.
SOUTHBOUND STRUCTURE: LATERAL BRACING AND GUSSET
PLATE RUSTED THROUGH IN END 4' AT FLOOR BEAM #4 TO WEST
GIRDER CONNECTION IN SOUTH SPAN PREDATING PAINT. TWO
HOLES (1/2" DIAMETER) RUSTED THROUGH LATERAL BRACING
GUSSET PLATE AT FLOOR BEAM #12 TO EAST GIRDER
CONNECTION PREDATING PAINT.
60, 223 WIDESPREAD GRAFFITI ON LOWER PORTIONS OF SUBSTRUCTURE
AND RETAINING WALLS.
ADDITIONAL ITEM REFERENCE AND REMARKS
60.1,3 MINOR TO MODERATE DELAMINATION AND SPALLING OF ABUTMENT BREASTWALLS WITH UP TO 10% SECTION
LOSS ON EXPOSED REBAR. MINOR ACCUMULATION OF DEBRIS ON ABUTMENT BEARING SEATS.
NORTHBOUND STRUCTURE: MODERATE DELAMINATION AND SPALLING OF CONCRETE PATCH AT WEST GIRDER BEARING SEAT AT SOUTH ABUTMENT. MINOR PONDING ON TOP OF SOUTH ABUTMENT BREASTWALL.
60.4 MINOR VERTICAL CRACKING OF ABUTMENT BACKWALLS WITH CHEMICAL STAINS; CRACKS EXTEND ACROSS
TOP. MINOR EDGE SPALLING ON TOP OF BACKWALLS.
NORTHBOUND STRUCTURE: MINOR DELAMINATION OF PREVIOUS REPAIRS IN FACE OF NORTH ABUTMENT BACKWALL. MINOR TO MODERATE RANDOM CRACKING AND MINOR DELAMINATION OF PREVIOUS REPAIRS IN
FACE OF SOUTH ABUTMENT BACKWALL.
SOUTHBOUND STRUCTURE: MINOR TO MODERATE DELAMINATION AND SPALLING OF SOUTH ABUTMENT
BACKWALL; MINOR RANDOM CRACKING THROUGHOUT PREVIOUS REPAIRS.
60.6 MINOR CRACKING OF WINGWALLS WITH EFFLORESCENCE AND POPOUTS. EXPOSED REBAR ON NORTH AND
SOUTHEAST WINGWALLS DUE TO INADEQUATE CONCRETE COVER.
60.7 MINOR RUST STAINING FROM WEEP HOLES; MODERATE CORROSION OF SLEEVES WITH RUST SCALE.
60.13 MINOR VEGETATION GROWTH ON PIER STEMS.
60.15 MINOR TO MODERATE DELAMINATION AND SPALLING WITH EXPOSED REBAR AT TOP AND ENDS OF PIER CAPS.
NORTHBOUND STRUCTURE: MINOR VERTICAL CRACK ON BOTH SIDES OF SOUTH PIER.
SOUTHBOUND STRUCTURE: MINOR DELAMINATION ON NORTH FACE OF EAST GIRDER BEARING SEAT AT
NORTH PIER.
60.17, 61.1,2,3
STREAM HAS MIGRATED TOWARD SOUTH PIERS CAUSING MINOR TO MODERATE CHANNEL BANK EROSION;
PLACEMENT OF ADDITIONAL RIPRAP AT SOUTH PIER OF NORTHBOUND STRUCTURE IN THE PAST. SCARCE
CHANNEL PROTECTION AT SOUTH PIERS.
222.3 MINOR DETERIORATION OF MORTAR WITH SEVERAL STONES LOOSE IN GUARDWALLS; MINOR WEATHERING OF
MASONRY STONES. UNSEALED ENDS OF MEDIAN RAILS RUST SCALED WITHIN.
222.4,6 APPROACHES REPAVED SINCE LAST INSPECTION.
222.7 "DEAD RUN" SIGNS AT WEST SIDE OF NORTH APPROACH AND EAST SIDE OF SOUTH APPROACH.
223.1 MINOR CRACKING WITH CHEMICAL STAINS, DELAMINATION, AND SPALLING OF CONCRETE RETAINING WALLS WITH EXPOSED REBAR; DETERIORATION OCCURS PRIMARILY ALONG ABUTMENT BREASTWALLS; POPOUTS IN
SEVERAL LOCATIONS. HEAVY VEGETATION ON NORTH ABUTMENT RETAINING WALL.
36.B,C,D MASONRY APPROACH GUARDWALLS IN MEDIAN AND AT EITHER SIDE OF ROADWAY. MASONRY APPROACH GUARDWALLS NOT ATTACHED TO BRIDGE RAILINGS. END TREATMENTS DO NOT MEET CURRENT AASHTO
SPECIFICATIONS.
STRUCTURE LOAD RATING STRUCTURE NO. 3300-001P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 23 21 38 35
HS 36 33 60 55
TYPE 3 35 32 58 53
TYPE 3S2 40 36 67 60
TYPE 3-3 44 40 73 67
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-001P
STRUCTURE IDENTIFICATION
(201) PARK: GEORGE WASHINGTON MEMORIAL PARKWAY
(202) STRUCTURE NAME: .......... DEAD RUN BRIDGE
(203) STRUCTURE KIND: ............ 1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 3300-001P
(205) NPS REGION: .................... 2 - NATIONAL CAPITAL
(206) ROUTE CODE NUMBER: ... 1
(207) ROAD SECTION NO: .......... 001P
(208) NPS ROAD CLASS: ............ 7 - URBAN PARKWAY
(209) WITHIN NPS BNDRY?: ....... YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................ 1A18,41,39,2
(212) DRAWING NUMBERS:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
513 - VIRGINIA (VA)
059 - FAIRFAX
161000010
DEAD RUN
GWMP
3300001P0000000
0.5 MILES SOUTH OF I-495.
99.99 FT (99.99 M)
0.43 (KM PT 0.69)
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
4 - STEEL CONTINUOUS
03 - GIRDER & FLOOR BEAM SYSTEM
113.0 FT (34.4 M)
307.8 FT (93.8 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 3 - MODIFIED CONCRETE
B) TYPE MEMBRANE: ................. 9 - OTHER
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 36.0 TONS (33.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 60.0 TONS (55.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 4/11 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... YES
INSP. EVERY: 24 MONTHS - LAST INSP. : 4/11 (220) SPECIAL STUDY TYPE: 5 - SCOUR
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: 8/04 INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
o
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3300-001P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 38°58'50.40"
(17) LONGITUDE: ......................... 77°10'26.70"
(19) DETOUR LENGTH: ............... 1 MI (2 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH: ........... 60.3 FT (18.4 M)
(52) DECK WIDTH: ............................ 73.0 FT (22.3 M)
(32) APPR. ROADWAY WIDTH: ........ 48.0 FT (14.6 M)
(213) APPR. PAVEMENT WIDTH: ..... 48.0 FT (14.6 M)
LEFT SHOULDER: .................. 0.0 FT (0.0 M)
RIGHT SHOULDER: ................ 0.0 FT (0.0 M)
(33) BRIDGE MEDIAN: ....................... 1 - OPEN MEDIAN
(34) SKEW ANGLE: ............................ 0 °
(35) DECK FLARE?: ........................... NO
(47) TOTAL HORIZ. CLEARANCE: .... 32.2 FT (9.8 M)
(50) SIDEWALKS:
LEFT : ...................................... 0.0 FT (0.0 M)
RIGHT : ................................... 3.5 FT (1.1 M)
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
MATERIAL: .............................. 4 - STEEL
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
(215) BRIDGE RAIL HEIGHT: ............ 2.92 FT (0.89 M)
(53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL:
(36) TRAFFIC SAFETY FEAT: ... 1010
(75A) TYPE OF WORK: .............. 35 - GENERAL REHAB
(75B) WORK DONE BY: ............. 1 - CONTRACT
(76) IMPROVEMENT LENGTH: .. 308.0 FT (93.9 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
8 - Stable; scour above top of fo
3 - CONSTRUCTION
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1975-northbound bridge deck replaced with membrane added. 1983, 2001-structural steel repainted. 1998-southbound deck replaced with precast panels. 2010-approaches repaved.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
1999, 2001, 2006 - SNOOPER INSPECTION. 2003-U/T ON CAT. D DETAILS.
http:77�10'26.70 http:38�58'50.40
APPENDIX STRUCTURE NO. 3300-001P
PHOTOGRAPHS STRUCTURE NO. 3300-001P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD MT. VERNON
FLOW
PHOTO #2 - WEST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING NORTH, SOUTHBOUND STRUCTURE
PHOTO #4 - LOOSE SEAL AT SOUTH
EXPANSION JOINT, SOUTHBOUND
STRUCTURE; NOTE EDGE SPALLING ON TOP
OF ABUTMENT BACKWALL
PHOTO #5 - TYPICAL TRANSVERSE CRACKING
OF WEARING SURFACE, SOUTHBOUND
STRUCTURE; SOUTH SPAN SHOWN
PHOTO #6 - CRACKING AND BREAKING UP OF
WEARING SURFACE AT SOUTH END,
NORTHBOUND STRUCTURE; NOTE ASPHALT
PATCHING AND SETTLEMENT OF PATCHING
PHOTO #7 - TYPICAL DETERIORATION OF
APPROACH GUARDWALLS; SOUTHWEST
GUARDWALL, SOUTHBOUND STRUCTURE
SHOWN; NOTE MASONRY STONES LOOSE
PHOTO #8 - TYPICAL WEATHERING OF
MASONRY STONES IN GUARDWALLS;
SOUTHEAST GUARDWALL, NORTHBOUND
STRUCTURE SHOWN
PHOTO #9 - GENERAL UNDERSIDE VIEW LOOKING SOUTH, CENTER
SPAN, NORTHBOUND STRUCTURE
PHOTO #10 - TYPICAL INCOMPLETELY POURED GROUT HAUNCH
BETWEEN GIRDER AND DECK; WEST GIRDER AT NORTH ABUTMENT,
NORTHBOUND STRUCTURE SHOWN
PHOTO #11 - CONCRETE PATCHING ON DECK
UNDERSIDE BETWEEN FLOOR BEAMS #8 AND
#9 IN CENTER SPAN, NORTHBOUND
STRUCTURE; ALSO NOTE TYPICAL
HONEYCOMBING
PHOTO #12 - SPALLING OF DECK UNDERSIDE
AT NORTH ABUTMENT, NORTHBOUND
STRUCTURE ALONG WEST GIRDER
PHOTO #13 - TYPICAL CLOGGED DRAIN; WEST SIDE OF CENTER SPAN,
SOUTHBOUND STRUCTURE SHOWN; ALSO NOTE TYPICAL SECTION
LOSS ON GIRDERS PREDATING PAINT
PHOTO #14 - TYPICAL RUSTING OF BEARINGS; EAST BEARING AT
SOUTH ABUTMENT, NORTHBOUND STRUCTURE SHOWN; NOTE
TYPICAL PACK RUST BENEATH ROCKER PREDATING PAINT
PHOTO #15 - SURFACE RUST WITH RUST SCALE ON TOP FLANGE OF
WEST GIRDER AT NORTH ABUTMENT, SOUTHBOUND STRUCTURE
PHOTO #16 - TYPICAL RUST REFORMING ON STRINGER ENDS AT
ABUTMENTS; WEST STRINGER AT SOUTH ABUTMENT, NORTHBOUND
STRUCTURE SHOWN
PHOTO #17 - LATERAL BRACING AND GUSSET PLATE RUSTED
THROUGH AT FLOOR BEAM #4 TO WEST GIRDER CONNECTION IN
SOUTH SPAN PREDATING PAINT, SOUTHBOUND STRUCTURE
PHOTO #18 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #19 - TYPICAL DELAMINATION AND
SPALLING OF ABUTMENT BREASTWALLS
WITH SECTION LOSS TO EXPOSED REBAR;
WEST END OF NORTH ABUTMENT,
NORTHBOUND STRUCTURE SHOWN
PHOTO #20 - PONDING ON TOP OF SOUTH
ABUTMENT BREASTWALL, NORTHBOUND
STRUCTURE
PHOTO #21 - CRACKING AND DELAMINATION OF PREVIOUS REPAIRS
IN SOUTH ABUTMENT BACKWALL, NORTHBOUND STRUCTURE; ALSO
NOTE EVIDENCE OF JOINT LEAKAGE
PHOTO #22 - EXPOSED REBAR ON SOUTHEAST WINGWALL
PHOTO #23 - GENERAL VIEW OF SOUTH PIER
OF NORTHBOUND STRUCTURE, SOUTH FACE;
NOTE VEGETATION GROWTH
PHOTO #24 - TYPICAL DETERIORATION OF
RETAINING WALLS ALONG ABUTMENT
BREASTWALLS; NORTH RETAINING WALL
SHOWN; NOTE VEGETATION GROWTH
PHOTO #25 - LOOKING UPSTREAM THROUGH
STRUCTURE, CENTER SPAN
PHOTO #26 - LOOKING DOWNSTREAM
THROUGH STRUCTURE, CENTER SPAN
PHOTO #27 - EROSION OF SOUTH CHANNEL BANK