Question: Can I speak with regarding how much survey has been completed, etc?
Answer: LiDAR data collection and aerial photographing conducted April 15, 2004. The datum utilized is U.S. State Plane 1983 (NAD83) Tennessee & NAVD 88 in U.S. Survey foot. Mapping is compiled at a scale of 1-inch = 50-foot, 2 contour interval (Microstation V8 & Geopak DTM Triangle files). Project is fully controlled with primary and secondary control points staked in the ground. Construction baseline alignment of the entire missing link has been staked in the ground with T-bar every alignment points and spikes every 50-foot.