FOOTHILS D-B Questions and Answers to date Correction.pdf

PDF 11 KB Posted

Attached to
Recovery, Foothills Parkway Design-Build(D/B)
Solicitation number
DTFH71-10-R-00006
Issued by

About this file

Question and Answer Correction

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: Can I speak with regarding how much survey has been completed, etc?

Answer: LiDAR data collection and aerial photographing conducted April 15, 2004. The datum utilized is U.S. State Plane 1983 (NAD83) Tennessee & NAVD 88 in U.S. Survey foot. Mapping is compiled at a scale of 1-inch = 50-foot, 2 contour interval (Microstation V8 & Geopak DTM Triangle files). Project is fully controlled with primary and secondary control points staked in the ground. Construction baseline alignment of the entire missing link has been staked in the ground with T-bar every alignment points and spikes every 50-foot.

File details come from the government source that posted it. Updated .