Clarification to the questions and answers.
Question: Is the cover letter included in the 40 page count?
Answer: No, it is not counted as a page.
Question: The evaluation criteria provided in the RFQ lists references as a requirement in two sections (Construction Capability and Quality Control Plan); is it acceptable to include our references in one of these proposal sections and have a “see References included in Section X of this proposal” line in the other?
Answer: Only if you will be using the same references for both section.
Question: Should the SF 330 be separate from the SOQ, considering the organization of the 330 does not match the evaluation criteria in the RFQ? If so, is one combined SF 330 acceptable for the team, or are complete, separate 330s required for each team member, including sub-consultants?
Answer: Although the SF 330’s is formatted for Architect-Engineer and Related Services, the construction elements of the Offeror’s SOQ may also be included on the SF 330. Alternate forms and formats will not be accepted. SF330’s should be provided per individual team (this includes prime and any sub-consultants but not per individual member).