Bridge Inspection Report 6160-018P1906
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 003.pdf | ||
| Amendment 002.pdf | ||
| SF 30 - Amend A01.pdf | ||
| Report_Geotech_Final.pdf | ||
| Geocell Wall Pictures.pdf | ||
| Asbuilts_existing bridges.pdf | ||
| CUVA Solicitation.pdf | ||
| REV__SB subcontract plan revised.doc | DOC document | |
| FP03_Eng .pdf | ||
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| Report_Site Assessment Survey For Wilson Property.pdf | ||
| FP03 Errata.pdf | ||
| Plans.pdf | ||
| Report_Bridge Insp_6160-019P1694.pdf | ||
| Report_Hydraulics.pdf | ||
| Soils and Foundation Report.pdf | ||
| FBO Ready - Synopsis.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
FITZWATER TRUSS BRIDGE
FITZWATER ROAD OVER CUYAHOGA RIVER
CUYAHOGA VALLEY NATIONAL PARK
LW
STRUCTURE NO. 6160-018P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 10/17/06
ND
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166
STRUCTURE SUMMARY STRUCTURE NO. 6160-018P
FITZWATER TRUSS BRIDGE INSPECTION DATE: 10/17/06
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... TRUSS - THRU NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 2 STRUCT. TOTAL LENGTH: .. 202.0 FT (61.6 M)
DECK TYPE: ......................... WOOD OR TIMBER MAX. SPAN LENGTH: .......... 200.0 FT (61.0 M)
WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 27.7 FT (8.4 M)
ABUT. #1 FOUNDATION: ..... SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 26.0 FT (7.9 M)
ABUT. #2 FOUNDATION: ..... SPREAD FTG ON BEARING MAT'L YEAR BUILT:
PIER FOUNDATION: ............ N/A YEAR RECONSTRUCTED: .. N/A
ABUTMENT / PIER MAT'L: ... CONCRETE / N/A SKEW ANGLE: ..................... 0 °
PROJ./PLAN REF. NO: ......... 1027 / WB99S200 FRACTURE CRITICAL? ....... YES
STRUCTURE HISTORY:
LOCATION
CUYAHOGA VALLEY NATIONAL PARK MILE POINT: ..................... 0.00 (KM PT 0.00)
STATE: ................................. OHIO LOCATION: 0.1 MILES FROM CANAL ROAD.
FACILITY CARRIED: ............ FITZWATER ROAD
FEATURE INTERSECTED: .. CUYAHOGA RIVER
STRUCTURE EVALUATION SUMMARY
This steel through truss bridge is critically deficient, and needs to be replaced or rehabilitated as soon as practicable.
The structure is currently scheduled for replacement in FY 09 under Project PRA-CUVA 18(1), 164(1). The main problems include widespread rusting of the underside structural steel with severe section loss on the truss lower chord members, gusset plates, floor beams, and stringers, with especially accelerated corrosion noted on the exterior stringers; moderate decay of the timber sleepers; spalling of the west abutment with exposed rebar; severe deterioration of the southwest wingwall; and moderate to severe channel bank erosion. In addition, the superstructure deflects significantly under truck loading, and extensive scour is present along the west abutment. It should be noted that the lower chords were retrofitted with post tensioning rods in 1995. This retrofit has now exceeded its design life, and is of highly questionable effectiveness given the deterioration of the steel in which the system is anchored. If corrective action is not taken, the ongoing deterioration of the structural steel may soon make this bridge unsafe for vehicle traffic.
Given the fracture critical nature of this structure, the severity and progressive nature of the deterioration, and the prohibitive cost of complete rehabilitation, replacement should be given a very high priority. Due to the hydraulic problems created by the meandering channel in this location, consideration should be given to replacing this bridge with a longer structure that can accommodate the full range of channel movement. It should also be noted that the structure is currently posted for “Weight Restrictions on Bridge - Authorized Vehicles Only.” In view of the advanced deterioration, it is recommended that the bridge now be posted for a 10-ton load limit.
INSPECTION TEAM: R. PARKER, R. TAYLOR (VOLKERT & ASSOCIATES, INC.)
CONDITION ASSESSMENT:
RICHARD PARKER, FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, LEAD STRUCTURAL ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 2/7/07
JOHN THIEL, PROGRAM COORDINATOR 703-404-6251
STRUCTURE SUMMARY STRUCTURE NO. 6160-018P
STRUCTURE EVALUATION SUMMARY CONTINUED
It should be noted that rehabilitation or replacement of this structure is currently being considered under Project No.
PRA-CUVA 18(1), 164(1). This structure is adjacent to Structure No. 6160-019P; for maximum economy and efficiency, both structures should be replaced under the same contract.
Due to the hydraulic problems created by the meandering channel in this location, consideration should be given to replacing this bridge with a longer structure that can accommodate the full width of the channel's footprint.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 6160-018P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is critically deficient or presents a safety hazard, but can remain in service at reduced loads with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a critical deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
B226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT
COST
UNIT
ESTIMATE
COST
PRELIM.
222.7 POST STRUCTURE FOR A 10-TON LOAD LIMIT. $0
PRELIMINARY MAINTENANCE TOTAL : $0
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. CONSTR.
58, 59, 60 REPLACE STRUCTURE (SEE REMARKS). 1 LS $1,250,000 $0 $1,250,000
PRELIMINARY REHABILITATION/RECONSTRUCTION TOTAL : $0 $1,250,000
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL: ...
PRELIM. CONSTRUCTION TOTAL:
TOTAL ITEMIZED COSTS:
$ 0 $ 0 $ 1,250,000
$ 1,250,000
PRELIMINARY ESTIMATE TOTAL* : ..................................... $ 2,500,000
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimate for bridge replacement assumes replacement with a longer steel truss structure. Total contract cost for replacement with a prestressed concrete alternative is estimated at $2,600,000.
Total Contract estimates include costs for mobilization and traffic control, but do not include costs for design or construction engineering, demolition, or any work beyond the bridge limits.
FIELD INSPECTION REPORT STRUCTURE NO. 6160-018P
INSPECTION DATE: 10/17/06
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal
5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 5
ABUTMENTS
ITEM REFERENCE AND REMARKS
F1. DECK SLAB
P2. EXPANSION JOINTS
P3. WEARING SURFACE
F4. RIDEABILITY
P5. CURBS, SIDEWALKS, AND MEDIAN
P6. PARAPETS AND/OR RAILINGS
F7. DRAINS AND DRAINAGE
G8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 3
P1. BEARING DEVICES
N2. GIRDERS OR BEAMS
N3. ARCH(ES) OR SLAB(S)
P4. FLOOR BEAMS AND STRINGERS
P5. TRUSSES
P6. DIAPHRAGMS AND BRACING
P7. PAINT
N8. FASCIA(E)
P9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
60. SUBSTRUCTURE 5
58.1 TIMBER DECK PLANKS. UNDERSIDES OF PLANKS ARE WET AND
MODERATELY CHECKED. MODERATE DECAY OF SEVERAL TIMBER
SLEEPERS ATOP STRINGERS.
58.2,3,4 DECK JOINTS ARE PAVED OVER; ASPHALT IS SEVERELY CRACKED
OVER JOINTS. JOINTS ARE FILLED WITH SOIL AND VEGETATION
GROWTH. WEARING SURFACE CONSISTS OF TIMBER BLOCKS
WITH 1"-2" ASPHALT TOPPING. APPROXIMATELY 8' X 8' AREA OF
ASPHALT PATCH TOPPING NEAR EAST ABUTMENT. MODERATE
CRACKING OF ASPHALT OVERLAY WITH PATCHES THROUGHOUT
DECK; VEGETATION GROWTH FROM SOME CRACKS, ESPECIALLY IN
SHOULDERS. TWO POTHOLES (36" X 18" X 2" DEEP AND 24" X 18" X
2" DEEP) AT EAST END PATCHED, BUT CRACKED. ROUGH RIDE DUE
TO ASPHALT DETERIORATION.
58.5,6 SEVERE DECAY OF TIMBER CURBS. PEELING PAINT AND MINOR TO
MODERATE RUSTING OF RAILINGS WITH SEVERE SECTION LOSS;
ESPECIALLY AT VERTICAL CONNECTION PLATES, SEVERAL
BROKEN.
58.7,8 MODERATE ACCUMULATION OF SOIL AND GRAVEL ALONG CURBS.
MINOR RUSTING OF UTILITY PIPE ALONG LOWER CHORD, SOUTH
TRUSS.
59.1, 60.3 MODERATE TO SEVERE RUSTING OF STEEL BEARING DEVICES;
MODERATE DEBRIS ACCUMULATION ON BEARINGS AND BEARING
SEATS. ROLLER ON NORTH BEARING AT WEST ABUTMENT IS
DISPLACED. GUSSET PLATES AT BEARINGS HAVE MISSING RIVETS.
59.4,6 WIDESPREAD RUSTING OF STEEL FLOOR BEAMS, STRINGERS, AND
BRACING WITH MODERATE TO SEVERE SECTION LOSS. UP TO
100% SECTION LOSS ON GUSSET PLATES IN SOME LOCATIONS,
PARTICULARLY AT LOWER CHORD CONNECTIONS. LATERAL
CROSS-BRACING MEMBER IS HANGING BELOW BRIDGE NEAR EAST
ABUTMENT. OTHER CROSS-BRACING MEMBER AT THAT LOCATION
HAS 100% SECTION LOSS AT CONNECTION AND IS HANGING FREE.
59.5,9 WIDESPREAD DETERIORATION OF LOWER CHORD MEMBERS AND
TIE PLATES WITH SEVERE SECTION LOSS. MINOR RUSTING OF
POST-TENSIONING ROD SYSTEM INSTALLED ON LOWER CHORD OF
BOTH TRUSSES. SUPERSTRUCTURE DEFLECTS SIGNIFICANTLY
UNDER TRUCK LOADING,( UNABLE TO VERIFY DURING THIS
INSPECTION).
1. BREASTWALLS OR COLUMNS F
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS F
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS N
6. WINGWALLS P
7. WEEP HOLES F
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR P
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
WALLS AND/OR COLUMNS 13. N
PILE BENTS14. N
CAPS AND/OR BEARING SEATS15. N
FOUNDATIONS16. N
EROSION AND/OR SCOUR17. N
SETTLEMENT OR DEFLECTION18. N
OTHER 19. N
STRUCTURE NO. 6160-018PFIELD INSPECTION REPORT
ITEM REFERENCE AND REMARKS
AVERAGE CLEAR OPENING 8.
7. NORMAL VELOCITY
ADEQUACY OF OPENING 6.
5. OTHER
4. WATERWAY OBSTRUCTIONS
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 4
F P N P N
MED
SUFF
15 FT.
9. STREAM BED COMPOSITION :
SILT
222. APPROACHES 6
N1. APPROACH SLABS
N2. RELIEF JOINTS
P3. APPROACH GUARDRAIL
F4. SURFACING
G5. EROSION
F6. SETTLEMENT
G7. SIGNS
G8. ALIGNMENT
N9. OTHER
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
0A. BRIDGE RAILINGS
0B. TRANSITIONS
0C. APPROACH GUARDRAILS
0D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.7 WIDESPREAD DETERIORATION OF PAINT ON BRIDGE UNDERSIDE.
PEELING OF TOP COAT ON UPPER CHORD MEMBERS; PRIMER
COAT IS LARGELY INTACT.
60.1 WIDESPREAD RANDOM CRACKING OF BREASTWALLS WITH
MODERATE EFFLORESCENCE. 48" X 24" X 4" SPALL ON WEST
ABUTMENT BREASTWALL WITH EXPOSED REBAR. MINOR TO
MODERATE SPALLING WITH EXPOSED REBAR ON SOUTH BEARING
COLUMN AT WEST ABUTMENT.
60.6 SEVERE SPALLING (UP TO 6" DEEP) AND SCALING OF SOUTHWEST
WINGWALL WITH MANY REBARS EXPOSED. MODERATE CRACKING
OF OTHER WINGWALLS. SOUTHEAST WINGWALL SOUNDS
HOLLOW WHEN STRUCK WITH SOUNDING HAMMER.
60.7 MODERATE RUSTING OF ABUTMENT WEEP HOLE PIPES.
60.9 MODERATE UNDERMINING AT SOUTH CORNER OF EAST
ABUTMENT; SEVERE EROSION BEHIND NORTHWEST WINGWALL
AND ALONG SOUTHWEST WINGWALL. ( UNDERMINING AND
EROSION AT THESE LOCATIONS COULD NOT BE VERIFIED DUE TO
HIGH WATER VELOCITY). 2' OF ADDITIONAL SCOUR AT UPSTREAM
SIDE OF WEST ABUTMENT SINCE PREVIOUS INSPECTION.
61.1 LARGE SILT DEPOSIT NEAR EAST ABUTMENT; STREAM FLOWS
AGAINST WEST ABUTMENT AND SOUTHWEST WINGWALL.
61.2 SEVERE EROSION OF WEST CHANNEL BANK UPSTREAM AND
DOWNSTREAM OF STRUCTURE. SEVERE EROSION OF EAST
CHANNEL BANK DOWNSTREAM OF STRUCTURE DUE TO STREAM
DIVERSION AT NORTHWEST WINGWALL.
61.4 HEAVY ACCUMULATION OF DEBRIS UPSTREAM IS DIRECTING FLOW
TO SOUTHWEST WINGWALL.
222.3 STEEL PIPE GUARDRAILS AT EAST AND WEST APPROACHES;
MODERATE RUSTING WITH SECTION LOSS. SPALL WITH EXPOSED
REBAR ON SOUTHEAST APPROACH RAILING POST. CABLE
GUARDRAIL SYSTEM AT WEST APPROACH; CABLES DOWN AT
SOUTH SIDE. HOLE EXISTS IN ONE PIPE RAIL AT NORTHEAST
APPROACH RAILING.
222.4,6 MODERATE SETTLEMENT AND CRACKING OF ASPHALT PAVEMENT
AT APPROACHES. MODERATE HEAVING AT ABUTMENT JOINTS.
222.7 "WEIGHT RESTRICTIONS ON BRIDGE - AUTHORIZED VEHICLES
ONLY" SIGN AT EAST APPROACH. "SERVICE ROAD - EMPLOYEES
ONLY" STILL IN PLACE. OBJECT MARKERS ARE NOT PROVIDED.
VERTICAL CLEARANCE SIGNS ARE NOT PROVIDED.
FIELD INSPECTION REPORT STRUCTURE NO. 6160-018P
ADDITIONAL ITEM REFERENCE AND REMARKS
36.A STEEL RAILING IS ATTACHED TO TRUSS MEMBERS; RAILING IS OF INSUFFICIENT STRENGTH AND STIFFNESS TO
SAFELY REDIRECT AN ERRANT VEHICLE.
36.B,C,D APPROACH RAILING SYSTEM DOES NOT MEET CURRENT AASHTO SPECIFICATIONS, IS NOT CONNECTED TO STRUCTURE, AND IS NOT TERMINATED SAFELY. SECTION LOSS ON STEEL RAILINGS IN SEVERAL LOCATIONS.
STRUCTURE LOAD RATING STRUCTURE NO. 6160-018P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 6 5 10 9
HS 11 10 18 16
TYPE 3 13 12 22 20
TYPE 3S2 14 13 24 21
TYPE 3-3 15 13 25 22
DESIGN LOADING: OTHER OR UNKNOWN
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
X ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 11/94
LOAD RATING CONTROLLED BY: CAPACITY OF LOWER CHORD
REMARKS: STRUCTURE SHOULD BE POSTED FOR 10-TON LOAD LIMIT DUE TO ONGOING DETERIORATION OF
STRUCTURAL STEEL.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 6160-018P
STRUCTURE IDENTIFICATION
(201) PARK: CUYAHOGA VALLEY NATIONAL PARK (1) STATE: ....................................... 395 - OHIO (OH)
(202) STRUCTURE NAME: .......... FITZWATER TRUSS BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 153 - SUMMIT
(204) STRUCTURE NUMBER: ..... 6160-018P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 5 - MIDWEST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 0 (6) FEATURES INTERSECTED:....... CUYAHOGA RIVER
(207) ROAD SECTION NO: .......... 018P (7) FACILITY CARRIED: .................. FITZWATER ROAD
(208) NPS ROAD CLASS: ............ 5 - ADMINISTRATIVE (8) STATE STRUCTURE NO: .......... 6160018P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.1 MILES FROM CANAL ROA
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 23.50 FT (7.16 M)
(211) PROJECT NO(S): ................ 1027 (11) MILE POINT: ............................. 0.00 (KM PT 0.00)
(212) DRAWING NUMBERS: ....... WB99S200 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR REBUILT:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
10 - TRUSS - THRU
200.0 FT (61.0 M)
202.0 FT (61.6 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
8 - WOOD OR TIMBER
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - OTHER OR UNKNOWN (41) LOAD RESTRICTION: ......... P - POSTED FOR LOAD
(66) INVENTORY RATING: ...... 10.8 TONS (9.8 METRIC TONS) (70) BRIDGE POSTING: .............. 2 - POSTING REQUIRED
(64) OPERATING RATING: ...... 18.0 TONS (16.3 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 10/06 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: (A) FRACTURE CRITICAL: ... YES
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY: 24 MONTHS - LAST INSP. : 10/06
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: 0 MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: 0 MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 6160-018P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 41°21'24.30"
(17) LONGITUDE: ......................... 81°35'52.10"
(19) DETOUR LENGTH: ............... 0 MI (0 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 99.9 FT (99.9 M)
(56) LEFT: ......................... 99.9 FT (99.9 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
27.7 FT (8.4 M)
26.0 FT (7.9 M)
26.0 FT (7.9 M)
0.0 FT (0.0 M)
0 - NO MEDIAN
0 °
NO
26.0 FT (7.9 M)
0 - N/A
0 - N/A
0 - N/A
0.00 FT (0.00 M)
23.50 FT (7.16 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT:
(222) APPROACHES:
(223) RETAINING WALL:
(224) EST. REMAINING LIFE:
(36) TRAFFIC SAFETY FEAT: ...
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
N
N
3 YEARS
(67) STRUCTURAL EVALUATION: ...
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
4 - 4
3 - CONSTRUCTION
B - MAJOR
$0
$1,250,000
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL DATA:
APPENDIX STRUCTURE NO. 6160-018P
PHOTOGRAPHS STRUCTURE NO. 6160-018P
PHOTO #1 - LOOKING WEST
FLOW
PHOTO #2 - SOUTH (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING EAST
PHOTO #4 - GENERAL TOP SIDE VIEW LOOKING EAST; NOTE MAP
CRACKING IN WEARING SURFACE
PHOTO #5 - CRACKING OF WEST APPROACH PAVEMENT
PHOTO #6 - TYPICAL CURB DECAY, NORTH CURB SHOWN
PHOTO #7 - TYPICAL RAILING DETERIORATION AND CORROSION
PHOTO #8 - INADEQUATE CABLE AND PIPE RAILING TRANSITION
PHOTO #9 - INADEQUATE RAIL AND RAIL TRANSITION
PHOTO #10 - SECTION LOSS IN RAIL POST STRUT AT SOUTHWEST
CORNER
PHOTO #11 - EXPOSED LEAD PRIMER ON WEST FACE OF DIAGONAL
MEMBERS ON SOUTH SIDE OF TRUSS
PHOTO #12 - CORROSION IN EAST END OF SOUTH LOWER CHORD;
NOTE POST-TENSIONING ROD FROM PREVIOUS LOWER CHORD
RETROFIT
PHOTO #13 - UTILITY LINE ATTACHED TO LOWER CHORD OF SOUTH
TRUSS
PHOTO #14 - GENERAL DECK UNDERSIDE VIEW LOOKING WEST
PHOTO #15 - EAST ABUTMENT ELEVATION; NOTE CRACKS WITH
EFFLORESCENCE
PHOTO #16 - DEBRIS AND CORROSION WITH PITTING AT NORTH
BEARING OF EAST ABUTMENT; NOTE BROKEN CONCRETE IN TOP OF
ABUTMENT CAP
PHOTO #17 - MISSING RIVETS IN GUSSET PLATE IN NORTH BEARING
OF EAST ABUTMENT
PHOTO #18 - CORROSION AND SECTION LOSS AT SOUTH BEARING OF
EAST ABUTMENT
PHOTO #19 - CORROSION AND SECTION LOSS AT SOUTH BEARING OF
EAST ABUTMENT
PHOTO #20 - CORROSION OF CROSS BRACING IN LOWER CHORD
NEAR EAST ABUTMENT
PHOTO #21 - CORROSION AT EAST END OF SOUTH STRINGER
PHOTO #22 - CORROSION AND SECTION LOSS IN WEST END OF
NORTH STRINGER
PHOTO #23 - WEST ABUTMENT ELEVATION; NOTE SPALLS WITH
EXPOSED REBAR AND CRACKS WITH EFFLORESCENCE
PHOTO #24 - TREE GROWING FROM ROLLER NEST OF NORTH
BEARING AT WEST ABUTMENT; NOTE DISLODGED ROLLER
PHOTO #25 - DISLODGED ROLLER FROM ROLLER NEST OF NORTH
BEARING AT WEST ABUTMENT
PHOTO #26 - VEGETATION AND TAR ACCUMULATION AROUND SOUTH
BEARING OF WEST ABUTMENT
PHOTO #27 - SPALLING WITH EXPOSED REBAR ON SOUTHWEST
WINGWALL
PHOTO #28 - SPALL AND SCALING WITH EXPOSED REBAR AT
SOUTHWEST WINGWALL
PHOTO #29 - WEIGHT RESTRICTION POSTING AT SOUTHEAST
CORNER OF BRIDGE
PHOTO #30 - OVERTOPPING OF EAST UPSTREAM CHANNEL BANK;
NOTE DEBRIS AND VEGETATION
PHOTO #31 - UPSTREAM CHANNEL; NOTE FLOOD DEBRIS ALONG EAST
BANK
File details come from the government source that posted it. Updated .