Plans.pdf

PDF 33 MB Posted

Attached to
Cuyahoga Valley National Park - Bridge
Solicitation number
DTFH71-09-B-00014
Issued by

About this file

Plans for CUVA 18(1) 164(1)

View the file

Other files

File Type Posted
Amendment 003.pdf PDF
Amendment 002.pdf PDF
SF 30 - Amend A01.pdf PDF
Report_Geotech_Final.pdf PDF
Geocell Wall Pictures.pdf PDF
Asbuilts_existing bridges.pdf PDF
CUVA Solicitation.pdf PDF
REV__SB subcontract plan revised.doc DOC document
FP03_Eng .pdf PDF
ADV_Bidder's Qualifications Form.doc DOC document
Report_Site Assessment Survey For Wilson Property.pdf PDF
Report_Bridge Insp_6160-018P1906.pdf PDF
FP03 Errata.pdf PDF
Report_Bridge Insp_6160-019P1694.pdf PDF
Report_Hydraulics.pdf PDF
Soils and Foundation Report.pdf PDF
FBO Ready - Synopsis.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

NO.

A01 Tittle Sheet A02-A03 Conventional Plan Symbols and Abbreviations A04-A05 Site Plan A06-A09 Survey Control

A10 Staked Centerline Data B01 - B02 Typical Sections

C01 Summary of Quantities C02-C04 Tabulation of Quantities D01-D03 Mainline Plan and Profile

D04 Towpath Parking Area Plan D05-D06 Fitzwater Road Intersection Signal Plan D07-D08 Fitzwater Road Intersection Signal Special Provisions

D09 Fitzwater Road / Canal Road Intersection Paving Plan D10 Removal Plan D11 Grading Plan D12 Construction Sequencing Plan D13 Temporary Traffic Control Plan Phase I E01 Towpath Trail Plan and Profile E02 Towpath Trail Wall Profiles E03 Towpath Trail Bikeway Railing Layout Plan M01 Erosion Control Narrative M02 Erosion Control Plan P01 Signing and Striping Plan

R00.1 - R00.5 Temporary Bridge over Culvert on Fitzwater Road R01-R31 Fitzwater Road over Canal Flume Bridge

R32 - R64 Fitzwater Road over Cuyahoga River Bridge S01-S02 157 Erosion Control Standards - 157-1 and 157-5

S03 E204-02 Detail - Benching Detail S04 E251-50 Detail - Placed Riprap at Culverts S05 E251-51 Detail - Placed Riprap Abutment / Bank Protection S06 601 Concrete Headwall Standard - 601-4 S07 602 Pipe Culvert Standard - 602-7 S08 E609-02 Detail - Concrete Wheelstop

S09-S12 617 Guardrail Standards/Details - 617-10, 617-25, 617-60 and 617-61 S13 619 Detail - Wooden Gate Detail

S14 - S15 E619-1 Detail - Bollard Post Details S16 E629 Detail - Cellular Confinement System

S17 - S19 E633A Detail - Sign Post Installation (U-Channel and Wooden Post) S20-S25 635 Temporary Traffic Control Standards

S26 - S36 E636A Detail - Traffic Signal Installation Details S37 E646 Detail - Bikeway Railing

T01-T07 Fitzwater Road Cross Sections T08-T15 Towpath Trail Cross Sections

Z1 Culvert Cross Section

INDEX TO SHEETS

DESCRIPTION

C02 - C04 R01 - R31 R32 - R64

15101-0000 MOBILIZATION LPSM ALL ALL

15201-1000 CONSTRUCTION SURVEY AND STAKING LPSM ALL ALL

15401-0000 CONTRACTOR TESTING LPSM ALL ALL

15501-0000 CONSTRUCTION SCHEDULE LPSM ALL ALL

15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 2,502 2,502 2,600

15705-0500 SOIL EROSION CONTROL, TEMPORARY CULVERT PIPE LNFT 40 40 43

20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LPSM ALL ALL

20420-0000 EMBANKMENT CONSTRUCTION CUYD 4,498 4,498 4,700

20801-0000 STRUCTURE EXCAVATION CUYD 546 1,837 2,383 2,383

20801-0000 STRUCTURE EXCAVATION (REMOVAL OF CONTAMINATED MATERIAL) CUYD 350 350 350

20815-0000 COFFERDAMS LPSM ALL ALL

25101-3000 PLACED RIPRAP, CLASS 3 CUYD 1,880 1,880 2,200

30101-4000 AGGREGATE BASE GRADING C OR D TON 2,049 2,049 2,150

40101-0100 TON 338 338 350

40101-0500 TON 538 538 565

40910-0400 SURFACE TREATMENT, DESIGNATION 1D SQYD 256 256 270

55101-0200 CONCRETE FILLED STEEL PIPE PILES, IN PLACE (24-INCH) LNFT 2,096 3,196 5,292 5,292

55105-1000 DYNAMIC PILE LOAD TEST LPSM ALL ALL

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 410 540 950 950

55201-1200 STRUCTURAL CONCRETE, CLASS SEAL CUYD 430 430 430

55302-2000 PRECAST, PRESTRESSED CONCRETE BULB TEE GIRDERS, 72" LNFT 1,070 1,070 1,070

55302-3300 PRECAST, PRESTRESSED CONCRETE AASHTO GIRDERS LNFT 648 648 648

55401-1000 REINFORCING STEEL LB 58,000 96,700 154,700 154,700

55401-2000 REINFORCING STEEL, EPOXY COATED LB 65,000 99,600 164,600 164,600

55503-0000 BRIDGE EXPANSION JOINTS LNFT 72 75 147 147

55601-0400 BRIDGE RAILING, ALUMINUM, THREE RAIL LNFT 332 540 872 872

56202-0000 TEMPORARY SUPPORT STRUCTURE (TEMPORARY BRIDGE) LPSM ALL ALL

56401-1000 BEARING DEVICE, ELASTOMERIC EACH 16 24 40 40

57801-0000 HIGH PERFORMANCE CONCRETE CUYD 248 420 668 670

57802-1000 HIGH PERFORMANCE CONCRETE, FOR APPROACH SLABS, TYPE 1 SQYD 80 165 245 245

60103-0160 CONCRETE, HEADWALL FOR 30-INCH PIPE CULVERT EACH 2 2 2

60201-0900 30-INCH PIPE CULVERT LNFT 43 43 45

60504-0000 GEOCOMPOSITE SHEET DRAIN SYSTEM SQYD 95 100 195 195

60915-1000 WHEELSTOP, CONCRETE EACH 20

61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B WOOD POSTS LNFT 190 190 200

61701-4000 GUARDRAIL SYSTEM SBTB LNFT 140 140 150

61702-0510 TERMINAL SECTION, TYPE SBT-FAT EACH 2 2 2

61707-1000 STRUCTURE TRANSITION RAILING, G4 SYSTEM LNFT 38 38 38

61902-0800 GATE, WOOD, 28 FEET WIDTH EACH 1

61904-0000 BOLLARD POST EACH 12 12

62301-0000 GENERAL LABOR HOUR 40

62407-0000 PLACING CONSERVED TOPSOIL CUYD 597 597 620

62501-0000 TURF ESTABLISHMENT ACRE 0.634 0.634 0.7

62635-2000 CUTTINGS, WILLOW STAKING EACH 369 369 385

62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B SQYD 1,621 1,621 1,700

62903-0000 CELLULAR CONFINEMENT SYSTEM SQYD 257 257 270

63301-0000 SIGN SYSTEM EACH 23 23 23

63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN EACH 1 1 1

63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 13,570 13,570 14,200

63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM LPSM ALL ALL

63502-0400 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 1 EACH 6 6 6

63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4 4

63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 40 40 40

63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A EACH 4 4 4

63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 6 6 6

63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C EACH 15 15 15

63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 500 500 500

63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 1,000 1,000 1,000

63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 430 430 430

63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,000 1,000 1,000

63506-0500 TEMPORARY TRAFFIC CONTROL, (RAILROAD FLAGGER) HOUR 80 80 80

63601-1000 SYSTEM INSTALLATION, TRAFFIC SIGNAL LPSM ALL ALL

63701-0000 FIELD OFFICE EACH 1

64604-1000 FIXTURE, HANDRAIL LNFT 510

PRA-CUVA 18(1), 164(1)

Estimated at 145.1 lb/cf Estimated at 145.1 lb/cf

Estimated at 20 lb/sy

ITEM DESCRIPTION UNIT

ESTIMATED

QUANTITIES

PLAN BID

Sheet Number and Description

Tabulation of Quantities

Bridge Plans - Fitzwater over Cuyahoga River

Bridge

The following quantities are approximate unless noted as a contract quantity. Payment will be made for the actual quantities of work performed and accepted or for materials furnished according to the contract.

ITEM NO.

/4

/2

:5

SUPERPAVE PAVEMENT, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL

SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL

Bridge Plans - Fitzwater over Canal Flume

Bridge

PROJECT

REMARKS AND/OR DETERMINATION OF ESTIMATED

QUANTITY

REG

MW OH C01

SHEET NO.STATE

Estimated at 138.9 lb/cf

SUMMARY OF QUANTITIES

Towpath Trail

Fitzwater Road / Canal Road Intersection

REGIONSTATE PROJECT

SHEET

BRIDGE DRAWING DATE DRAWING NO.DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADERNO. DATE BY REVISIONS NO. DATE BY REVISIONS

CUYAHOGA VALLEY NATIONAL PARK

FITZWATER ROAD OVER CANAL FLUME

/3

/2

:3

:1

A

M M

P ro je c ts

\c u v a \1

(1 b ri d g e \M ic ro s ta

\W a s te

W ie r\ p ro je c ts

.d g n

Hratch Pakhchanian of 31 November 2008

MW OH CUVA 18(1), 164(1)

REGIONSTATE PROJECT

SHEET

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

BRIDGE DRAWING DATE DRAWING NO.

EASTERN FEDERAL LANDS HIGHWAY DIVISION

DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER

NO. DATE BY REVISIONS NO. DATE BY REVISIONS

/3

/2

:3

:1

A

M M

P ro je c ts

\c u v a \1

(1 b ri d g e \M ic ro s ta

\W a s te

W ie r\ p ro je c ts

.d g n

1" = 10’-0" DL JEG YM

of 2

R02

N

SITE PLAN

SITE PLAN

CUVA_100%_plans-bridge.pdf
X001.pdf
X002.pdf
X003.pdf
X004.pdf
X005.pdf
X006.pdf
X007.pdf
X008.pdf
X009.pdf
X010.pdf
X011.pdf
X012.pdf
X013.pdf
X014.pdf
X015.pdf
X016.pdf
X017.pdf
X018.pdf
X019.pdf
X020.pdf
X021.pdf
X022.pdf
X023.pdf
X024.pdf
X025.pdf
X026.pdf
X027.pdf
X028.pdf
X029.pdf
X030.pdf
X031.pdf
X032.pdf
X033.pdf
X034.pdf
X035.pdf
X036.pdf
X037.pdf
X038.pdf
X039.pdf
X040.pdf
X041.pdf
X042.pdf
X043.pdf
X044.pdf
X045.pdf
X046.pdf
X047.pdf
X048.pdf
X049.pdf
X050.pdf
X051.pdf
X052.pdf
X053.pdf
X054.pdf
X055.pdf
X056.pdf
X057.pdf
X058.pdf
X059.pdf
X060.pdf
X061.pdf
X062.pdf
X063.pdf
X064.pdf
X065.pdf
X066.pdf
X067.pdf
X068.pdf
X069.pdf
X070.pdf
X071.pdf
X072.pdf
X073.pdf
X074.pdf
X075.pdf
X076.pdf
X077.pdf
X078.pdf
X079.pdf
X080.pdf
X081.pdf
X082.pdf
X083.pdf
X084.pdf
X085.pdf
X086.pdf
X087.pdf
X088.pdf
X089.pdf
X090.pdf
X091.pdf
X092.pdf
X093.pdf
X094.pdf
X095.pdf
X096.pdf
X097.pdf
X098.pdf
X099.pdf
X100.pdf
X101.pdf
X102.pdf
X103.pdf
X104.pdf
X105.pdf
X106.pdf
XS.pdf
X001.pdf
X002.pdf
X003.pdf
X004.pdf
X005.pdf
X006.pdf
X007.pdf
X008.pdf
X009.pdf
X010.pdf
X011.pdf
X012.pdf
X013.pdf
X014.pdf
X015.pdf
X016.pdf
X017.pdf
X018.pdf
X019.pdf
CUVA 18(1)_Bridge_Plans.pdf
R00.1-CUVA-temp_gni
R00.2-CUVA-temp_pe
R00.3-CUVA-temp_typx
R00.4-CUVA-temp_slabLayout
R00.5-CUVA-temp_slabDetails
R01-CUVA 18(1)-WWier_gni
R02-CUVA 18(1)-Wwier_site
R03-CUVA 18(1)-wwier_pe
R04-CUVA 18(1)-Wwier_fl
R05-CUVA 18(1)-Wwier_abut1Layout
R06-CUVA 18(1)-wwier_abut1Reinf
R07-CUVA 18(1)-Wwier_wwA
R08-CUVA 18(1)-wwier_wwB
R09-CUVA 18(1)-Wwier_abut2Layout
R10-CUVA 18(1)-Wwier_abut2Reinf
R11-CUVA 18(1)-Wwier_wwCD
R12-CUVA 18(1)-Wwier_pier
R13-CUVA 18(1)-Wwier_fp
R14-CUVA 18(1)-Wwier_gird1
R15-CUVA 18(1)-Wwier_gird2
R16-CUVA 18(1)-Wwier_typx
R17-CUVA 18(1)-Wwier_deck
R18-CUVA 18(1)-wwier_sidewalk
R19-CUVA 18(1)-Wwier_rail1
R20-CUVA 18(1)-Wwier_rail2
R21-CUVA-18(1)-Wwier-rail3
R22-CUVA 18(1)-Wwier_parapet_wwA
R23-CUVA 18(1)_Wwier_parapet_wwB
R24-CUVA 18(1)-Wwier_expjt
R25-CUVA 18(1)-Wwier_misc
R26-CUVA 18(1)-Wwier_apprslab
R27-CUVA 18(1)-Wwier_barlist1
R28-CUVA 18(10-Wwier_barlist2
R29-CUVA 18(1)-Wwier_barlist3
R30-CUVA 18(1)-Wwier_epoxy
R31-CUVA 18(1)-Wwier_borings
R32-CUVA 18(1)-Fitz_gni
R33-CUVA 18(1)-fitz_site
R34-CUVA 18(1)-Fitz_pe
R35-CUVA 18(1)-Fitz_fl
R36-CUVA 18(1)-Fitz_abut1Layout
R37-CUVA 18(1)-Fitz_abut1Reinf
R38-CUVA 18(1)-Fitz_abut1Reinf2
R39-CUVA 18(1)-Fitz_abut2Layout
R40-CUVA 18(1)-Fitz_abut2Reinf11
R41-CUVA 18(1)-Fitz_abut2Reinf2
R42-CUVA 18(10)-Fitz_pier
R43-CUVA 18(1)-Fitz_fp
R44-CUVA 18(1)-Fitz_girder1_3
R45-CUVA 18(1)-Fitz_girder2
R46-CUVA 18(1)-Fitz_girderDetails
R47-CUVA 18(1)-Fitz_typxs
R48-CUVA 18(1)-Fitz_slabReinf
R49-CUVA 18(1)-Fitz_deckElv
R50-CUVA 18(1)-Fitz_sidewalk
R51-CUVA 18(1)-Fitz_rail1
R52-CUVA 18(1)-Fitz_rail2
R53-CUVA 18(1)-Fitz_rail3
R54-CUVA 18(1)-Fitz_parapet_wwC
R55-CUVA 18(1)-Fitz_parapet_wwD
R56-CUVA 18(1)-Fitz_expjt
R57-CUVA 18(1)-Fitz_misc
R58-CUVA 18(1)-Fitz_connectorslab
R59-CUVA 18(1)-Fitz_apprslab
R60-CUVA 18(1)-Fitz_barlist 1
R61-CUVA 18(1)-Fitz_barlist 2
R62-CUVA 18(1)-Fitz_barlist 3
R63-CUVA 18(1)-Fitz_epoxy
R64-CUVA 18(1)-Fitz_boring

File details come from the government source that posted it. Updated .