Report_Bridge Insp_6160-019P1694.pdf
PDF 5 MB Posted
- Attached to
- Cuyahoga Valley National Park - Bridge
- Solicitation number
- DTFH71-09-B-00014
About this file
Bridge Inspection Report 6160-019P1694
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 003.pdf | ||
| Amendment 002.pdf | ||
| SF 30 - Amend A01.pdf | ||
| Report_Geotech_Final.pdf | ||
| Geocell Wall Pictures.pdf | ||
| Asbuilts_existing bridges.pdf | ||
| CUVA Solicitation.pdf | ||
| REV__SB subcontract plan revised.doc | DOC document | |
| FP03_Eng .pdf | ||
| ADV_Bidder's Qualifications Form.doc | DOC document | |
| Report_Site Assessment Survey For Wilson Property.pdf | ||
| Report_Bridge Insp_6160-018P1906.pdf | ||
| FP03 Errata.pdf | ||
| Plans.pdf | ||
| Report_Hydraulics.pdf | ||
| Soils and Foundation Report.pdf | ||
| FBO Ready - Synopsis.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
WASTE WIER BRIDGE
FITZWATER ROAD OVER CANAL FLUME
CUYAHOGA VALLEY NATIONAL PARK
LW
STRUCTURE NO. 6160-019P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 10/23/08
Report prepared by: ND
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 6160-019P
WASTE WIER BRIDGE INSPECTION DATE: 10/23/08
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... TEE BEAM NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 6 STRUCT. TOTAL LENGTH: .. 76.0 FT (23.2 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 26.0 FT (7.9 M)
WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 29.0 FT (8.8 M)
ABUT. FOUNDATIONS: ........ PILE BENT CURB TO CURB WIDTH: ..... 26.0 FT (7.9 M)
PIER FOUNDATION(S): ........ PILE BENT YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 000000000000 / NONE SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY:
LOCATION
CUYAHOGA VALLEY NATIONAL PARK MILE POINT: ..................... 0.00 (KM PT 0.00)
STATE: ................................. OHIO LOCATION: 100 FEET FROM CANAL ROAD.
ADJACENT TO STRUCTURE NO. 6160-018P. FACILITY CARRIED: ............ FITZWATER ROAD
FEATURE INTERSECTED: .. CANAL FLUME
STRUCTURE EVALUATION SUMMARY
This concrete tee beam bridge is in poor condition. The main problem with this bridge is the widespread moderate to severe deterioration of structural concrete, more specifically the tee beams (which includes the deck underside), bent cap ends, and the bent piles, with numerous exposed and rusted rebars exhibiting loss of section. In addition, the railing system is functionally obsolete and has moderate to severe deterioration.
Other problems include widespread moderate cracking of the wearing surface and deterioration of the approach pavement.
It should be noted that rehabilitation or replacement of this structure is currently being considered under Project No.
PRA-CUVA 18(1), 164(1). This structure is adjacent to Structure No. 6160-018P; for maximum economy and efficiency, both structures are scheduled to be replaced under the same contract.
INSPECTION TEAM: M.R. PUTALLAZ, L.M. MUELLER (CLARK NEXSEN)
CONDITION ASSESSMENT:
MICHAEL R. PUTALLAZ, FIELD TEAM LEADER
REPORT REVIEW:
SAMANTHA LUBKIN, FIELD TEAM LEADER 703-404-6256
REPORT APPROVAL: DATE: 2/23/09
MARCUS MILLER, P.E., LEAD STRUCTURAL ENGINEER 703-404-6252
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 6160-019P
226 PRIORITY OF IMPROVEMENT B
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT
COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58, 59, 60 REPLACE STRUCTURE. 2,204 SF $270 $0 $600,000
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $0 $600,000
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL:
TOTAL ITEMIZED COSTS:
$600,000 $0 $0
$600,000
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$1,200,000
REMARKS: Replacement is recommended due to the high cost of rehabilitation and maintenance, functional obsolescence, insufficient load carrying capacity, scour susceptibility, and/or substandard geometry of the existing structure.
FIELD INSPECTION REPORT STRUCTURE NO. 6160-019P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal
5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 4
ABUTMENTS
ITEM REFERENCE AND REMARKS
P1. DECK SLAB
N2. EXPANSION JOINTS
F3. WEARING SURFACE
F4. RIDEABILITY
P5. CURBS, SIDEWALKS, AND MEDIAN
P6. PARAPETS AND/OR RAILINGS
P7. DRAINS AND DRAINAGE
P8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 3
N1. BEARING DEVICES
P2. GIRDERS OR BEAMS
N3. ARCH(ES) OR SLAB(S)
N4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
N6. DIAPHRAGMS AND BRACING
N7. PAINT
N8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
60. SUBSTRUCTURE 4
58, 59, 60 STRUCTURE NOT CURRENTLY OPEN TO THRU TRAFFIC DUE TO
ADJACENT BRIDGE CLOSURE. VEHICLES PARK ON STRUCTURE
ALTHOUGH "NO PARKING" SIGNS EXIST.
58.1 WIDESPREAD DELAMINATION AND SPALLING OF DECK UNDERSIDE
WITH EXPOSED AND RUSTED REBAR DUE TO INSUFFICIENT COVER;
WIDESPREAD MINOR CRACKING WITH EFFLORESCENCE AND
HONEYCOMBING ALSO PRESENT.
58.3,4 WIDESPREAD MODERATE CRACKING OF ASPHALT WEARING
SURFACE; ATTEMPTS HAVE BEEN MADE TO SEAL SOME CRACKS IN
THE PAST. SOME PATCHING ALSO PRESENT, CAUSING A
MODERATELY ROUGH RIDE.
58.5 MODERATE TO SEVERE DETERIORATION OF CURBS WITH
EXPOSED REBAR.
58.6 MODERATE CRACKING AND DETERIORATION OF SEVERAL
CONCRETE POSTS WITH EXPOSED REBAR; SEE ALSO 36.A.
3 POSTS AT EAST END OF NORTH RAILING HAVE BEEN REPAIRED
(ENCASED) IN THE PAST.
MINOR PEELING OF PAINT ON RAILS.
RAILING IS LEANING OUTWARD FROM BRIDGE UP TO 3" ON BOTH
SIDES.
58.7 PVC EXTENSIONS HAVE BEEN ADDED TO DECK DRAINS TO HELP
DIRECT RUNOFF AWAY FROM EXTERIOR BEAMS IN THE PAST;
DECK DRAINS ARE BLOCKED DUE TO ASPHALT WEARING
SURFACE.
58.8 UTILITY PIPE ALONG SOUTH EXTERIOR BEAM. SUPPORT
BRACKETS FOR UTILITY PIPE NOT ATTACHED TO BEAM #6 DUE TO
SPALLS; PIPE BROKEN AND ABANDONED.
58.9, 59.9 STRUCTURE IS NO LONGER OPEN TO THRU TRAFFIC.
1. BREASTWALLS OR COLUMNS N
2. PILE BENTS G
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER (Vegetation) P
PIER(S)
WALLS AND/OR COLUMNS 13. N
PILE BENTS14. F
CAPS AND/OR BEARING SEATS15. P
FOUNDATIONS16. N
EROSION AND/OR SCOUR17. G
SETTLEMENT OR DEFLECTION18. G
OTHER 19. N
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 7
G G N G N
HIGH
SUFF
4 FT.
SILT, ROCK
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1. N
N P F G F N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 0
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.2 CONCRETE TEE BEAM SUPERSTRUCTURE.
SEVERE DELAMINATION, SPALLING (UP TO 2" DEEP ON BOTTOM
AND 4" DEEP ON SIDES), AND SCALING OF EXTERIOR BEAMS IN ALL
SPANS AND BEAMS #4 AND #5 IN EAST SPAN; NUMEROUS EXPOSED
AND RUSTED REBARS WITH 25% LOSS OF SECTION TYPICAL OF
MAIN REINFORCING. STIRRUPS ARE ALSO BROKEN; THREE AT
BEAM #6 IN CENTER SPAN AND TWO AT BEAM #1 IN WEST SPAN.
MODERATE CRACKING AND SPALLING OF OTHER BEAMS WITH
SOME EXPOSED REBAR AND EFFLORESCENCE. MODERATE
SCALING OF BEAM BOTTOM FACES IN CENTER SPAN.
EAST CHANNEL BANK ON SOUTH SIDE OF STRUCTURE IS FILLED
AGAINST BEAM #6.
60.3 MINOR VERTICAL CRACKS EXTENDING FROM BOTTOM OF BEAMS.
BOTTOM OF WEST ABUTMENT BENT CAP EXPOSED UP TO 8"
VERTICAL X FULL LENGTH X 27" UNDER WITH PILES EXPOSED.
60.6 MINOR CRACKING OF NORTHEAST WINGWALL.
60.12 HEAVY VEGETATION GROWTH AROUND ENDS OF STRUCTURE.
60.14 MINOR VERTICAL CRACKING OF INTERIOR PILES AND MODERATE
VERTICAL CRACKING OF EXTERIOR PILES WITH DELAMINATION,
RUST STAINING, AND EFFLORESCENCE. PILE #2, #7, AND #9 OF
EAST BENT HAVE CONDITION SIMILAR TO EXTERIOR PILES.
SEVERE DETERIORATION OF PILE #1 OF EAST BENT. MODERATE
SPALLING OF PILE #2 OF EAST BENT.
MODERATE SCALING IN WATER ZONE AT EAST BENT.
60.15 SEVERE SPALLING WITH EXPOSED REBAR OF BENT CAP ENDS.
MINOR VERTICAL CRACK BETWEEN BEAMS #2 AND #3 AT EAST
BENT. MINOR HORIZONTAL CRACK BETWEEN PILES #5 AND #6 ON
WEST SIDE OF EAST BENT.
61.2 MINOR SCOUR UPSTREAM OF WEST BENT.
222.3 SEVERE CRACK IN RAIL POST ON NORTH SIDE OF WEST
APPROACH.
222.4,6 MINOR TO MODERATE CRACKING AND SPALLING OF CONCRETE
APPROACH PAVEMENT AT EAST END.
MODERATE CRACKING OF ASPHALT APPROACH PAVEMENT AT
WEST END; PAVEMENT SETTLED UP TO 2" AT BACK OF BACKWALL.
36.A BRIDGE RAILING IS FUNCTIONALLY OBSOLETE AND NOT CAPABLE
OF SAFELY REDIRECTING ERRANT VEHICLES.
ADDITIONAL ITEM REFERENCE AND REMARKS
36.B,C,D APPROACH RAILS ARE NOT ATTACHED TO BRIDGE RAIL.
SOUTHWEST APPROACH RAIL MISSING.
APPROACH RAILING IS FUNCTIONALLY OBSOLETE AND NOT CAPABLE OF SAFELY REDIRECTING ERRANT
VEHICLES.
STRUCTURE LOAD RATING STRUCTURE NO. 6160-019P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 20 18
HS 25 23 34 31
TYPE 3 20 18 28 25
TYPE 3S2 31 28 42 38
TYPE 3-3 40 36 54 49
DESIGN LOADING: OTHER OR UNKNOWN
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: H20 EQUIVALENT DESIGN LOADING IS ASSUMED; ASSUMPTION IS BASED ON TYPE, LOCATION, AGE, AND
CONDITION OF STRUCTURE. LOAD CAPACITY REDUCED BY DETERIORATION OF CONCRETE
SUPERSTRUCTURE.
D
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 6160-019P
STRUCTURE IDENTIFICATION
(201) PARK: CUYAHOGA VALLEY NATIONAL PARK (1) STATE: ....................................... 395 - OHIO (OH)
(202) STRUCTURE NAME: .......... WASTE WIER BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 153 - SUMMIT
(204) STRUCTURE NUMBER: ..... 6160-019P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 5 - MIDWEST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 0 (6) FEATURES INTERSECTED:....... CANAL FLUME
(207) ROAD SECTION NO: .......... 019P (7) FACILITY CARRIED: .................. FITZWATER ROAD
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 6160019P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 100 FEET FROM CANAL ROA
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 000000000000 (11) MILE POINT: ............................. 0.00 (KM PT 0.00)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
04 - TEE BEAM
26.0 FT (7.9 M)
76.0 FT (23.2 M)
4 - PILE BENT
4 - PILE BENT
4 - PILE BENT
4 - PILE BENT
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - OTHER OR UNKNOWN (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 25.0 TONS (23.0 METRIC TONS) (70) BRIDGE POSTING: .............. 4 - POSTING REQUIRED
(64) OPERATING RATING: ...... 34.0 TONS (31.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 10/08 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 6160-019P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 41°21'25.30" (51) CURB TO CURB WIDTH: ........... 26.0 FT (7.9 M)
(17) LONGITUDE: ......................... 81°35'49.20" (52) DECK WIDTH: ............................ 29.0 FT (8.8 M)
(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 26.0 FT (7.9 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 26.0 FT (7.9 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 0.0 FT (0.0 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 0.0 FT (0.0 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 40 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2002 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 50 (47) TOTAL HORIZ. CLEARANCE: .... 26.0 FT (7.9 M)
(115) YEAR OF FUTURE ADT: ..... 2022 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 3 - PARAPET ONLY
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 1.00 FT (0.30 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(224) EST. REMAINING LIFE: .... 8 YEARS
(36) TRAFFIC SAFETY FEAT: ... 0000
(75A) TYPE OF WORK: .............. 31 - REPLACE
(75B) WORK DONE BY: ............. 1 - CONTRACT
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
8 - Stable. Calculated scour abov
3 - CONSTRUCTION
B - MAJOR
$0
$0
$600,000
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 6160-019P
PHOTOGRAPHS STRUCTURE NO. 6160-019P
PHOTO #1 - LOOKING EAST
FLOW
PHOTO #2 - SOUTH (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING WEST
PHOTO #4 - TYPICAL "NO PARKING" SIGN DISPLAYED ON RAIL POST;
NORTH RAIL POST AT WEST END SHOWN
PHOTO #5 - TYPICAL CRACKING OF ASPHALT
WEARING SURFACE; EAST SPAN SHOWN
PHOTO #6 - TYPICAL DETERIORATION OF
CURB WITH EXPOSED REBAR; SOUTH SIDE IN
CENTER SPAN SHOWN
PHOTO #7 - TYPICAL DETERIORATION OF RAIL
POSTS WITH EXPOSED REBAR; SOUTH SIDE
IN CENTER SPAN SHOWN
PHOTO #8 - TYPICAL PEELING OF PAINT ON
RAILS AND DETERIORATION OF RAIL POSTS;
NORTH SIDE OVER EAST PIER SHOWN
PHOTO #9 - TYPICAL RAILING LEANING
OUTWARD FROM BRIDGE; NORTH SIDE OVER
EAST PIER SHOWN
PHOTO #10 - FALLEN AND ABANDONED
UTILITY ALONG SOUTH SIDE OF STRUCTURE
PHOTO #11 - TYPICAL CRACKING AND
SPALLING OF EAST APPROACH PAVEMENT
PHOTO #12 - TYPICAL CRACKING OF WEST
APPROACH PAVEMENT
PHOTO #13 - SETTLEMENT OF WEST APPROACH PAVEMENT
PHOTO #14 - GENERAL UNDERSIDE VIEW LOOKING EAST, CENTER
SPAN
PHOTO #15 - TYPICAL DETERIORATION OF
DECK UNDERSIDE WITH EXPOSED AND
RUSTED REBAR; BAY #3 IN CENTER SPAN
SHOWN
PHOTO #16 - TYPICAL DETERIORATION OF
INTERIOR BEAMS; BEAM #5 IN CENTER SPAN
SHOWN
PHOTO #17 - TYPICAL DETERIORATION OF EXTERIOR BEAMS;
EXTERIOR SIDE OF BEAM #1 IN WEST AND CENTER SPANS SHOWN
PHOTO #18 - CLOSE-UP OF PREVIOUS PHOTO IN CENTER SPAN
PHOTO #19 - SPALLING OF BEAM #1 IN WEST
SPAN WITH TWO BROKEN STIRRUPS
PHOTO #20 - TYPICAL DETERIORATION OF
EXTERIOR BEAMS; EXTERIOR SIDE OF BEAM
#6 IN CENTER SPAN SHOWN
PHOTO #21 - DETERIORATION OF BEAM #4 IN
EAST SPAN
PHOTO #22 - DETERIORATION OF BEAM #5 IN
EAST SPAN
PHOTO #23 - GENERAL VIEW OF WEST ABUTMENT BENT
PHOTO #24 - EXPOSURE OF PILES AT WEST ABUTMENT BENT
PHOTO #25 - TYPICAL VERTICAL CRACKING
OF ABUTMENT BENT CAPS FROM BOTTOM OF
BEAMS; WEST ABUTMENT BETWEEN BEAMS
#2 AND #3 SHOWN
PHOTO #26 - GENERAL VIEW OF EAST PIER
BENT, WEST FACE
PHOTO #27 - TYPICAL SPALLING OF END OF
PIER BENT CAP; SOUTH END OF WEST BENT
SHOWN
PHOTO #28 - TYPICAL SPALLING OF END OF
PIER BENT CAP; NORTH END OF WEST BENT
PHOTO #29 - TYPICAL CRACKING AND
DETERIORATION OF EXTERIOR PILES; NORTH
PILE AT EAST PIER SHOWN
PHOTO #30 - DETERIORATION OF PILES #1
AND #2 OF EAST PIER BENT
PHOTO #31 - UPSTREAM CHANNEL
PHOTO #32 - DOWNSTREAM CHANNEL