PROJECT_DESCRIPTION.pdf
PDF 32 KB Posted
- Attached to
- WA FS ERFO 2015(1)-20(1), Wells Creek Repairs
- Solicitation number
- DTFH7017B00032
About this file
Project Description
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FS ERFO 2015(1), Wells Creek Repairs
This project consists of Grading, Aggregate, Drainage, Bridge Abutment, permanent streambank stabilization for 2 ERFO damaged sites and other small items of work.
Project length: .18 Miles
Tentative Fixed Completion Date: Fall 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $500,000 to $1,000,000
Location: 13 Miles SE of Glacier, WA
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
A_
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 15702-1000 Soil Erosion Control, Temporary Diversion Channel LPSM 15702-2000 Soil Erosion Control, Turbidity Monitoring LPSM 15705-0100 Soil Erosion Control, Silt Fence 830 LNFT 15705-1400 Soil Erosion Control, Fiber Roll 630 LNFT 15706-1600 Soil Erosion Control, Stabilized Construction Exit 1 EACH 15705-1800 Soil Erosion Control, Temporary
Diversion Berm 200 LNFT DIVISION 200 – Earthwork 20102-0000 Clearing & Grubbing LPSM 20301-1900 Removal of Pipe Culvert 2 EACH 20301-2800 Removal of Structures and Obstructions (Concrete Barrier) 20 Each 20304-9000 Removal of Stream Debris LPSM
20401-0000 Roadway Excavation 800 CUYD 20401-0000 Unclassified Borrow 4445 CUYD 20411-0000 Select Borrow (GRS-IBS) 447 TON
On e S ch ed ul e
Sc h
Na m e
A_
DIVISION 250 – Slope Reinforcement and Retaining Walls 25101-0500 Placed Riprap, Method A, Class 5 167 CUYD
DIVISION 300 – Aggregate and Base Courses 30202-2000 Roadway Aggregate, Method 2 135 TON 30302-1000 Ditch Reconditioning 350 LNFT
DIVISION 550 – Bridge Construction 55202-1000 Structural Concrete, Class D (AE) For Approach Slabs, Type 1 25 SQYD 57401-0000 GRS-IBS Geosynthetic Reinforcement 2739 SQYD 57402-0000 GRS-IBS Open-Graded Backfill 855 TON 57403-0000 GRS-IBS Concrete Masonry Units (Blocks) 166 SQYD
DIVISION 600 – Incidental Construction 62630-0200 Plantings Seedlings, Balled ,and Burlapped (Alder, Cotton Wood, Willow) 1042 EACH 62901-0000 Rolled Erosion Control Product 1042 SQYD 63601-0000 Temporary Traffic Control LPSM 64702-0500 Mitigation, Log Barrier (Wood Buffer) 277 LNFT
| DIVISION 200 – Earthwork |
| DIVISION 250 – Slope Reinforcement and Retaining Walls |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 550 – Bridge Construction |
File details come from the government source that posted it. Updated .