Preliminary-Plans-Wells_Creek_ERFO.pdf
PDF 9 MB Posted
- Attached to
- WA FS ERFO 2015(1)-20(1), Wells Creek Repairs
- Solicitation number
- DTFH7017B00032
About this file
Preliminary plans
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B A
R C
R E
E K keerC e sr oh ec a R
G la ci e r, W
A
Fo ur m ile C re ek
Tenm ile
C reek m ile s
A p p ro x im a te ly
Padden Lake
Valley Happy
Sunnyside
Bay Agate
Mt. Baker
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
Project Location
APPROVED:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
INDEX TO SHEETS
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
PLANS FOR PROPOSED PROJECT
Western Federal Lands Highway Division
Chief of Engineering, R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
Bellingham
Glacier
Nor th
Fork Nooks ack
River
Nooksack
Van Zandt
Warmick
Maple Falls
Kendall
C a n y o n
Creek
SCALE IN MILES
NATIONAL RECREATION AREA
MT. BAKER
W E L L S C
R E E
K
Slide
M ountain
Squalicum
Mountain
Lynden
R iv e r
BRITISH COLUMBIA
I D
A H
O
OREGON
UNITED STATES
CANADA
P A
C I F I C
O C
A E
N tS rait ofJuan deFuca
OC
LU
MBIA R
IV
ER
A
SN
KE
R
VERI
M
COLU B
I A
V R I
E R
Lakes
Banks
Lakes
Moses
Reservoir
Potholes
OLYMPIC
NATIONAL
PARK
MOUNT
RAINIER
N.P.
MOUNT
ST. HELENS
NAT'L VOLC.
MON.
NORTH
CASCADES
NATIONAL
PARK
BELLINGHAM
Forks
Aberdeen
Chehalis
Longview
OLYMPIA
TACOMA
SEATTLE
EVERETT
Wenatchee
Lake
Moses
SPOKANE
Pullman
Pasco
RICHLAND
Kennewick Walla Walla
ANGELES
PORT
Townsend
Port Vernon
Mt.
VANCOUVER
WASHINGTON KEY MAP
YAKIMA
u n d o S t e g u
P on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
WA FS ERFO 2015(1)-20(1)
F O
R E
S T
B O
U N
D R
Y
N A
T
IO
N
L
M T B
A K
E R
Mountain
Church
RESEARCH NATURAL
NOOKSACK
NORTH FORK
FR
Olsen Cree k
C H
IC
A G
O
M
IL
W A
U K
IE
S T P A U L
A N
D P
A C
IF
IC
B U
R L I N
G T
O N
NORTHERN
OLD R
A
ILR
O A D
GRADE
END PROJECT
0 5.05.0 10.0
Lake
Wiser
Lake
Green
N
Lake
W hatcom
MOUNTAINS
SUMAS
WELLS CREEK REPAIRS
LENGTH 0.185 MILES
B. CHON
R E
R E
0.038
20 MPH
e (max)
V
ADT (2038) <100
ADT (2018) <100
WASHINGTON
WHATCOM COUNTY
MT. BAKER-SNOQUALMIE NATIONAL FOREST
A.1
STATE PROJECT
NUMBER
SHEET
S u r F t
D c m y fi le s p w p r o d u c ti o n d w a e f1 a a .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
BEGIN PROJECT
streambank stabilization
Bridge abutment, and permanent
Grading, aggregate, drainage, MP 5.1
MP 6.1
H. TEMPORARY TRAFFIC CONTROL
G. GRS-IBS
F. DRAINAGE
E. EROSION CONTROL
D. PLAN-PROFILE
C. TYPICAL SECTIONS
B. SUMMARIES
A. GENERAL INFORMATION
H.2
H.1
G.2
G.1
F.4
F.3
F.2
F.1
E.3-6
E.2
E.1
D.3
D.2
D.1
C.1
B.1
A.3
A.2
A.1
POSTS
STD. DWG 635-14 - SIGN INSTALLATION, WOOD
SIGNING
TEMPORARY TRAFFIC CONTROL ROAD CLOSURE
GRS-IBS DETAILS
GRS-IBS PLAN AND ELEVATION
DETAILS
MP 6.1 PERMANENT STREAMBANK STABILIZATION
PLAN AND PROFILE
MP 6.1 PERMANENT STREAMBANK STABILIZATION
DETAILS
MP. 5.1 PERMANENT STREAMBANK STABILIZATION
PLAN AND PROFILE
MP 5.1 PERMANENT STREAM BANK STABILIZATION
EROSION CONTROL STANDARD DRAWINGS
MP 6.1 DIVERSION & EROSION CONTROL PLAN
MP 5.1 DIVERSION & EROSION CONTROL PLAN
FSR 33 MP 6.1 PLAN AND PROFILE
FSR 33 MP 5.1 PLAN AND PROFILE
TABULATION OF PLAN AND PROFILE QUANTITIES
TYPICAL SECTIONS
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
Prel im ina ry
Not For
Con str uc tio
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material P
F e b r u a r y
U
S m y fi le s p w p r o d u c ti o n d w a e f1 a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 FS ERFO 2015(1)-20(1)WA
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
Fiber Roll or Wattle
Prel im ina ry
Not For
Con str uc
RESEARCH NATURAL AREA
NORTH FORK NOOKSACK
FR 33Glacier
North
Fork Nooks ack
River
W e lls
C re e k W h ilie a lm o n
Creek
W e t rn e ll
C re e k
C o rn e ll
C re e k
G la c ie r
C re e k
T h o m p s o n
C re e k
D e a d h o rs e
C re e k
Mountain
Goat
Table Mtn.
Tomyhai Lake
Peak
Tomyhai
Mountain Bald
Q u a r tz
C re ek
MT.
Baker Hwy.
SCALE IN MILES
0 1 21
S w a m p
Cr ee k
C a n y o n
Creek
VICINITY MAP
To Bellingham , W
A
Approx. 36 m iles
Herman
Mt.
Dome
Mazama
Mine
Lone Jack
Flow Lakes kr o
F ts e W
Mtn.
Bearpaw
Mtn. Lake Bearpaw
Lake Church
N R E
R E
R E
R E
R E
R E
Mt Baker Wilderness
A.3
STATE PROJECT
NUMBER
SHEET
S u r F t m y fi le s p w p r o d u c ti o n d w a e f1 a c .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
Mount Baker National Forest
Mount Baker National Forest
Mount Baker-Snoqualmie
National Forest
Mount Baker-Snoqualmie
National Forest
FR 33 MP 5.1
FR 33 MP 5.1
FR 33 MP 6.1
ERFO SITE WORK
BEGIN ERFO SITE WORK
END ERFO SITE WORK
C re e k
B a r
W e lls
C reek
Prel im ina ry
Not For
Con str uc
1:
1:2 limits
Turf establishment limits
Turf establishment
3% crown + 1%
14' typical
Roadway width
1:2 limits
Turf establishment
3% crown + 1%
12' typical
Roadway width
1V:
1.
5H
1V:10H
TYPICAL SECTIONS
where applicable
Roadway reconditioning
6" compacted depth method 2
Roadway aggregate, Unclassified borrow
Unclassified borrow
6" compacted depth method 2
Roadway aggregate, where applicable
Roadway reconditioning
[3]3% crown + 1%
[1]1' (min.)
[2
Va ria bl e
[3]3% crown + 1%
[1]1' (min.)
[2
Va ria bl e
Original ground
Original ground
LC
LC
FSR 33 - MP 5.1
Streambank Stabilization Details
See Sheet F.2 for Permanent
Profile grade
FSR 33 - MP. 6.1
303+10 to 303+50
Profile grade
Streambank Stabilization Details
See Sheet F.2 for Permanent
1V:
1.
5H
205+25 to 206+72
Placed riprap method A, class 7
Placed riprap method A, class 7
Unclassified borrow limits establishment
Turf
4'
203+74 to 205+25
202+32 to 203+33
FSR 33 - MP. 5.1
Original ground
Existing road
Distance varies
LC
C.1
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a e fl c a .d g n
WA FS ERFO 2015(1)-20(1)
S e p te m b e r
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
Prel im ina ry
Not For
Con str uc
QUANTITIES
PLAN AND PROFILE
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fa .d g n
WA FS ERFO 2015(1)-20(1)
e p te m b e r
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
Prel im ina ry
Not For
Con str uc
24952495
,5
.9
-7.8800%
,4
.5
5.
340' VC
,5
.4
+3.4
6%
,5
.4
.3
K = 17
230' VC
24952495
G P S
G P S
S tr e a m P r o file
2485 2485
2515 2520 2525
P O
T
.0
P C
.5
P T
.7
P C
.0
P T
.6
P C
.0
P T
.3
P C
.1
P T
.4
P C
.8
P T
.1
P C
.5
P T
.3
P O
T
.2
W el ls C re ek
Ex is ti ng
Exis ting Wells
Cre ek
Wells Cre ek
Existing Bar Creek
Existing Bar Creek
GPS
33501
GPS
33502
Profile grade
Existing ground
202+30.00
WA FS ERFO 2015(1)-20(1)
207+00.00
WA FS ERFO 2015(1)-20(1)
Curve= C5
D
R= 1,600.00'
T= 69.72'
Curve= C4
R= 560.00'
T= 21.69'
DCurve= C3
D
R= 360.00'
T= 112.64'
N
Limits of construction
FSR 33 MP 5.1
BEGIN
FSR 33 MP 5.1
END
Centerline to roadway e = 0.02
L= 43.36' e = 0.02
L= 139.35' e = 0.02
L= 218.34'
El=2513.91
E=1415743.260
N=652500.315
El=2516.49
E=1415880.983
N=682932.283
Limits of construction
OHW
OHW
OHW
OHW
F.2 for details
See Sheet F.1 &
F.2 for details
See Sheets F.1 &
CUYD
EXC.
CUYD
EMB.
210+00207+50205+00202+50200+00
2480 2480
2485 2485
2490 2490
2495 2495
2500 2500
2505 2505
2510 2510
2515 2515
2520 2520
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fc .d g n
WA FS ERFO 2015(1)-20(1)
e p te m b e r
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
Prel im ina ry
Not For
Con str uc
PT
.9
PC
.9
P T
.3
P
C
.5
P T
.3
P C
.6
PT
+16 .3
263026
B ar C reek
Curve= 335
D
R= 200.00'
T= 47.25'
L= 92.79'
D
R= 110.00'
T= 44.55'
L= 84.67'
Curve= 336
D
R= 180.00'
T= 69.95'
L= 133.43'
Curve= 333
T= 47.25' R= 200.00'
DD
Curve= 335Curve= 335
L= 133.43' T= 69.95'
R= 180.00'R= 180.00'R= 180.00'
D Curve= 333
T= 44.55'
R= 110.00'
Curve= 336
GPS
33601
CP
DEA2
GPS
33602
P
33603
CP
33604
303+00.00
WA FS ERFO 2015(1)-20(1)
303+55.00
WA FS ERFO 2015(1)-20(1)
N
Existing ground
Profile grade e = 0.038
L= 133.43' e 0.038 L= 92.79'
Existing bridge
Line to be constructed
F.3 for details
See Sheet
GPS
D
Curve= 334
R= 130.00'
T= 54.03'
CUYD
EXC.
CUYD
EMB.
306+00303+00
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
EL 2609
e= 0.038
L= 102.41' e= 0.038
L= 84.67'
E=1413392.138
N=679214.848 E=1413419.321
N=679167.080
FSR 33 MP 6.1
BEGIN
FSR 33 MP 6.1
END
Existing bridge pier
302+00301+00 304+00 305+00
2630 2630
GRS-IBS wall
OHW
OHW
OHW
OHW
OHW
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 ff .d g n
WA FS ERFO 2015(1)-20(1)
u g u s t
Prel im ina ry
Not For
Con str uc
24952495
W el ls C re ek
Ex is ti ng
Exis ting Wells
Cre ek
Wells Cre ek
Existing Bar Creek
Existing Bar Creek
N
Silt fence
Water Flow Direction
Limits of construction Existing channel
Limits of construction
Existing contours
Centerline to roadway
Conserved streambed material
Riprap
Rootwads and logs
OHW
OHW
OHW
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d a .d g n
WA FR ERFO 2015()1)-20(1)
A u g u s t
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
OHW
NOTES:
Proposed diversion
EROSION CONTROL PLAN
DIVERSION &
MP 5.1
1. Construct diversion with streambed material. Obiviate diversion after use.
Remove non-streambed material from project after use.
2. Obliviate areas used for construction access and replant according to planting scheme shown in sheet F.2.
3. Remove fish trapped in the diversion area and release downstream.
-135.00 LT
201+65.00
-187.00 LT
202+25.00
-105.00 LT
209+05.00
-71.00 LT
209+70.00
Diversion Dam 2 - Temporary 5' Ø culverts seedling planting area
Erosion control mat &
LEGEND:
Fiber roll
Prel im ina ry
Not For
Con str uc
B ar C
ELEVATION
Q Vel. SLOPE PROTECTIONWS ELEV.
SCALE IN FEET
40200
SLOPE: 1(v):2(h)
TYPE: Riprap
Flow
TOP EL.: 2617 ft
TOTAL SCOUR EL:
CLASS: 7 (FP-14)
BOTTOM EL.: 2606 ft
100Q
50Q
2Q
DEPTH: 5 ft (min)
REMARKS:
OHW1
13'-10
Roadway finish grade
Existing ground surface
LC
2630 2630
25902590
Existing road
Water flow direction
Silt fence
Erosion mat diversion berm
Temporary
LEGEND:
Temporary diversion berm bridge pier
Existing Existing bridge
Construction limits roadway centerline
Construct
Elev. 2612 ft (approx.)
Existing pier footing.
Elev. 2609 ft (approx.)
Existing channel thalweg.
OHW
OHW
OHW
OHW
Riprap
Logs and rootwads
Construction limits
EROSION CONTROL PLAN
DIVERSION &
MP 6.1
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d d .d g n
WA FS ERFO 2015(1)-20(1)
S e p te m b e r
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
Prel im ina ry
Not For
Con str uc
NO SCALE
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
REVISED: 10/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2015(1)-20(1)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e l1 d e .d g n
J u ly
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
Prel im ina ry
Not For
Con str uc
Existing ground
Water surface elevation
OPTION B
OPTION A
OPTION C
OPTION D
Existing ground
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Sandbag (typ.)
Concrete barrier
Concrete barrier
Concrete barrier
Water surface elevation membrane
Waterproof
Water surface elevation membrane
Waterproof
Water surface elevation
Existing abutment or pier elevation (min.)
Top of berm
Existing ground at time of construction
Diverted water level at time of construction
Diverted water level
Existing ground at time of construction
Diverted water level
Limit of work zone
Limit of work zone
Limit of work zone elevation (min.)
Top of berm elevation (min.)
Top of berm at time of construction
Diverted water level
(anchoring method to be approved)
Waterproof membrane
REVISED: 7/2016
WESTERN FEDERAL LANDS HIGHWAY DIVISION
m in
4'-6"
W157-17
METHODS
TEMPORARY DIVERSION BERM
m in m in
6" (min.) freeboard. Submit temporary stream diversion m in
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FE ERFO 2015(1)-20(1)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e l1 d f.
d g n
J u ly
NOTE:
1 4.
3.
2.
1.
membrane
Waterproof height of the sandbag barrier.
directed. Remove sediment when deposits reach half the berm daily. Repair as needed after rainfall events or as
While in use, inspect and maintain the temporary diversion given time.
Place a maximum of one diversion in the stream at any upper rows of sandbags above the joints in lower rows.
of bottom rows as there are vertical course. Overlap the
Place sandbags to form a pyramid by laying equal numbers plans for approval prior to installation.
minimum height equal to the water surface elevation with
As a minimum, provide a temporary diversion berm with a prefabricated or portable diversion berms, dams, etc.).
methods may be chosen (including any approved during construction operations. Alternate stream diversion
These options suggest configurations for diverting a stream
Prel im ina ry
Not For
Con str uc
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2015(1)-20(1)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e l1 d g .d g n u g u s t
NOTE:
Prel im ina ry
Not For
Con str uc
Erosion control blanket
Flow edge overlap see N ote 1
S tap le sp acin g
Staples @
Staples @
Se e
Not e
Pr ev ai lin g wi nd
REVISED: 7/2016
WESTERN FEDERAL LANDS HIGHWAY DIVISION
W629-1
6"
PRODUCT ON SLOPES
ROLLED EROSION CONTROL
12" spacing
6" overlap
6" (m in.)
4" (min.)
' (m ax.) c-c
3'
12" (max.) c-c
12" (max.) c-c
12" (max.) c-c
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2015(1)-20(1)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 d h .d g n
J u ly
Overlap in the direction of the prevailing wind.
recommendations.
Install staples according to the manufacturer's
2.
1.
Staple (typ.)
Shingle splice, see Detail C of slope, see Detail A
Anchor trench at top
Staple
Staple
Compacted native soil control blanket
Erosion
Compacted native soil
Toe of slope
PERSPECTIVE VIEW
SHINGLE SPLICE
DETAIL C
AT TOE OF SLOPE
ANCHOR TRENCH
DETAIL B
Blanket edge
Blanket ends
Slope stake
AT TOP OF SLOPE
ANCHOR TRENCH
DETAIL A
NOTE:
of slope, see Detail B
Anchor trench at toe
Erosion control blanket
6 x 6" Trench
6 x 6" Trench
12" spacing
Prel im ina ry
Not For
Con str uc
52495
W el ls C re ek
Ex is tin g
Exis ting Wells
Cree k
Wells Cree k
Existing B ar C
Existing Bar Creek
CUYD
EXC.
CUYD
EMB.
N
Repaired roadway elevation 25202520 22' x 13' (approx)
Structural plate culvert
Location approximate
205+00 206+00 207+00204+00203+00 proposed thalweg location
Existing ground at elev. 2473
Top of riprap elev. 2460
Bottom of riprap elev. 2480
Top of riprap elev. 2467
Bottom of riprap elev. 2482
Top of riprap proposed toe of embankment
Existing ground at
Scour elevation profile from edge of culvert culvert, offset 5 feet logs at same angle as
Place deflector toe into existing riprap
Tie placed riprap slope (approx.)
Toe of embankment upstream rootwads angled
Place flank logs with thalweg
Proposed channel
Tie riprap into existing barb elev. 2485
Top of riprap elevation
Match opposite bank floodplain streambed material
Backfill with conserved
OHW
OHW
channel thalweg
Proposed elev. 2472 of riprap
Bottom elev. 2469 of riprap
Bottom
PLAN AND PROFILE
STREAMBANK STABILIZATION
MP 5.1 PERMANENT
stabilization. See Sheet F.2 permanent streambank
Place riprap and logs for
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e a .d g n
WA FS ERFO 2015(1)-20(1)
e p te m b e r
M e a d o
S o u r e k
C h e c k e d b y
D e s ig n e d b y
Proposed contours
Existing contours
Existing contours
Proposed contours
Limits of construction
OHW elev. 2480
OHW elev. 2477 OHW elev. 2475 OHW elev. 2468
Limits of construction
Prel im ina ry
Not For
Con str uc
Deflector toe log bundle Reconstructed top of embankment
Reconstructed toe of embankment
Deflector toe logs, 6
Reconstructed top of embankment
Reconstructed toe of embankment
Wood buffer unit limits
Wood buffer unit limits
Deflector logs
Log pile
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e b .d g n
WA ERFO 2015(1)-20(1)
J u ly
M e a d o
S o u r
C h e c k e d b y
D e s ig n e d b y
8.
7.
6.
5.
4.
3.
2.
1.
Emergent willow pole plantings - plant two per square yard.
Plant Zone B:
Alder pole planting - Plant one per 10 square yards.
Cotton wood pole planting - Plant one per 10 square yards
Willow pole plantings - Plant one pole per square yard
Plant Zone A :
Tightly pack woody debris into void space between deflector logs.
rootwads upstream. Backfill with conserved streambed material.
rootwads. Brace against Bottom Layer elements and orient
Top Layer; Randomly place six deflector logs with or without rootwad on log piles.
orientated 45° from embankment slope toe upstream and brace set of two pile logs. Place six deflector logs with rootwads
Place riprap per plan. Brace two deflector toe logs against each
Bottom Layer; Drive six log piles per 75-foot length as shown.
rootwads. Place per plan.
Flank logs; 20-foot min. trunk, 40-inch minimum diameter with vegetation, 1-inch to 8-inch diameter.
Coarse woody debris; even mixture of branches, limbs, trunks, attached rootwad, 6 per log jam unit.
Log pile; 13 to 15-foot trunk, 12-inch to 18-inch diameter without
6 per unit.
attached rootwads, 6 per unit. With or without attached rootwads, Deflector logs; 20-foot min. trunk, 18 to 36-inch diameter. With without attached rootwad, 6 per unit.
Deflector toe log; 20-foot min. trunk, 18 to 36-inch diameter
DETAILS
STREAMBANK STABILIZATION
MP 5.1 PERMANENT
NO SCALE
Flow
Flow
10' to 12' (typ.)
° 2
75'-0" to ty p
Scour Elev. per plan
Top of riprap per plan
50 yr WSE
OHW Elev. per plan
Deflector log10'
Placed riprap class 7, 5' depth m in
Existing channel bottom
A
Road grade to be constructed
PLAN
BOTTOM LAYER
PLAN
TOP LAYER
Reconstructed embankment
Existing bank TYPICAL SECTION
Log pile
1.5
NOTE:
Plant Zone B (see notes)Plant Zone A (see notes)
Rolled erosion control product class 1, type B, (non-woven)
Geotextile filter, woody debris elevation. Cover with coarse of rootwads to OHW3 2over back
Place conserved streambed material
Prel im ina ry
Not For
Con str uc
B
ELEVATION
Q Vel. SLOPE PROTECTIONWS ELEV.
SCALE IN FEET
40200
SLOPE: 1(v):2(h)
TYPE: Riprap
TOP EL.: 2617 ft
TOTAL SCOUR EL:
CLASS: 7 (FP-14)
BOTTOM EL.: 2606 ft
100Q
50Q
2Q
DEPTH: 5 ft (min)
REMARKS:
OHW1
13'-10
Roadway finish grade
See Wall Detail sheet
GRS-IBS Wall
Existing ground surface
See Wall Detail sheet foundation.
Grouted riprap
2) Grouted riprap, class 5
OR
1) Placed riprap, class 7 existing pier face
Extend riprap to
LC
2630 2630
25902590
Existing road location approximate
Existing riprap (typ.)
riprap width
Match existing bridge pier
Existing
Existing bridge
Construction limits
5' min. depth class 7, Placed riprap, See Detail sheet with rootwads.
Deflector logs existing riprap conserve
Remove and
See Detail sheetsteambed material.
Backfill will conserved roadway centerline
Construct
Planted area
Elev. 2609 ft (approx.)
Existing channel thalweg.
Elev. 2606 ft (approx.)
pier, top of footing
Extend riprap to existing
Elev. 2612 ft (approx.)
Existing pier footing.
PLAN AND PROFILE
STREAMBANK STABILIZATION
MP 6.1 PERMANENT
Construction limits
OHW
OHW
OHW
OHW F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e c .d g n
WA FS ERFO 2015(1)-20(1)
S e p te m b e r
M e a d o
S o u r
C h e c k e d b y
D e s ig n e d b y
Prel im ina ry
Not For
Con str uc
B
PLAN
OHW
Existing ground surface
SECTION A-A
NOTE:
Deflector log
Deflector log
5.
4.
3.
2.
1.
Rolled erosion control product
(See notes)
Plant Zone A
(See notes)
Plant Zone B
Plant Zone B: Emergent willow pole plantings - Plant two per squard yard.
Alder pole plantings - Plant one pole per 10 square yards.
Cotton wood pole plantings - Plant one pole per 10 square yards
Plant Zone A: Willow pole plantings - Plant one pole per square yard void space between deflector logs.
Backfill with conserved streambed material. Tightly pack woody debris into
Brace against Bottom Layer elements and orient rootwads upstream.
Top Layer; Randomly place six deflector logs with or without rootwads.
10 to 45° from bank line.
Bottom Layer; Place deflector logs with rootwads orientated upstream at
1-inch to 8-inch diameter.
Coarse woody debris; even mixture of branches, limbs, trunks, vegetation, rootwads.
Deflector logs; 20-foot min. trunk, 18 to 36-inch diameter. With attached
(see notes)
Plantings area woody debris. Plant with native vegetation
OHW elevation at face. Cover with coarse
3 ft depth above floodplain. Slope to of rootwads, at a min.3 2over back
Place conserved streambed material
Elev. = 2609 ft (approx.)
Existing channel thalweg.
DETAILS
STREAMBANK STABILIZATION
MP 6.1 PERMANENT
OHW OHW
OHW
OHW
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e d .d g n
WA FS ERFO 2015(1)-20(1)
S e p te m b e r
M e a d o
S o u r
C h e c k e d b y
D e s ig n e d b y
A
A
Prel im ina ry
Not For
Con str uc
PLAN AND ELEVATION
GRS-IBS
LC
LC
°0
2'-9"17' 21' - 6"
27' - 0"
2'-9"
2'-6" of riprap foundation
EL. 2609 - bottom
18'-6" of riprap foundation
EL. 2613.5 - top
.5
30.5'
2'-0"
LC
1'-0"
[2] [1]
Motar coping Motar coping
225°
GRS-IBS, segmental retaining wall unit (SRWU) leveling pad
6" Concrete leveling pad
6" Concrete
Existing bridge deck of abutment abutment wall
Face of GRS
6'
2'-6" riprap foundation
Extend grouted
EL. = 2630.00
Motar coping top EL. = 2629.11
Bridge edge
EL. = 2629.00
Motar coping top bridge deck
Existing
CL Station 303+52.66 0.69 LT
EL. Bridge = 2629.47 at
EL. = 2629.00
Motor coping top riprap foundation
Extend grouted of Abutment
'-0
°531
17'
EL. = 2629.93
Bridge edge
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 r a .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
A
A
ELEVATION VIEW
Facing Block Schedule
GRS-IBS ABUTMENT
PLAN VIEW
FOOTNOTE:
W in g w a ll
Wingwall (folded out) Wingwall (folded out)
See Sheet D.3 abutment wall
Face of GRS
LEGEND:
Approach slab
3.8%
W in g w a ll
GRS-IBS ABUTMENT
Grouted riprap foundation
NOTE:
DETAIL
TOP OF RIPRAP FOUNDATION
1.
2.
3.
Field verify bridge elevations and measurements before begining
GRS abutment work.
Stagger segmental retaining wall blocks at 12 block width, including corners.
On the top row of segmental retaining blocks create a mortar coping 1-inch to 3 -inch sloped to face to drain.
Riprap armor not shown. See Riprap Layout plans.[2]
Wingwalls folded out for elevation view.[1]
Geosynthetic reinforcement
Prel im ina ry
Not For
Con str uc
LEGEND:
FOOTNOTE:
1V
1H4
NO SCALE
(min.)
3'-0"
Roadway aggregate
Open-graded backfill
Select borrow
GRS-IBS DETAILS
reinforcement
Geosynthetic backfill all courses
Open-graded
Open-graded backfill all courses
Select borrow
6" compacted depth
Roadway aggregate, method 2, 7H
SECTION A-A
Grouted riprap
2V
1H
G.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d w a e f1 r b .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
El. 2614
El. 2609
Native soil
Existing ground
G R
S P a y L im it s
6" concrete leveling pad
Grouted riprap, method A, class 5
3' 3'
2V
1H bridge bottom.
one half the height of the block above the bottom of the
Segmented retaining block must extend at least more than[4] of the integrated approach.
Extend top layer wrapped tail longitudinally for the full length [3] cannot be obtained.
30 days or if the required short term back slope ratio specified required if the short term back slope will be open more than
(29CFR, Part 1926, Subpart P, excavation). Shoring may be
Short term back slope ratio per OSHA Safety Regulations [2]
Vertical wall face batter = 7° (max.).[1]
Top longitudinal reinforcement tail [3]
[2]Excavation limits
[4][1]GRS-IBS SRWU
(max.)
100V
10'-0" deck at centerline
EL. 2629.50 - top of bridge joint filler fill with flexible cellular
" Expansion joint2 1 #6 at 12" (top)
#6 at 6" (bott.)
slab concrete approach
12" Reinforced
NOTE:
1.
2.
3.
ASTM A706, Grade 60. Provide 2" min. concrete cover.
Provide uncoated reinforcing steel according to
Provide approach slab concrete according to Section 601.
existing concrete bridge deck
Match the top slope of the concrete approach slab to the top of the
-inch sloped toward face to drain.4 3coping 1-inch to
On the top row of segmental retaining wall blocks create a mortar
Prel im ina ry
Not For
Con str uc
QUANTITIES AND DETAILS
TRAFFIC CONTROL
TEMPORARY
FOOTNOTE:
NOTE:
ROAD CLOSED AHEAD
FOR RECONSTRUCTION
XXX XX TO XXX XX
3.
2.
1.
DETAIL 1
Use standard alphabet sizes, letter series C.
Sign colors are orange backround with black letters and border.[1]
Provide additional signs as required to meet field conditions.
Mount sign on wooden posts. See Sheet F.2 for details.
Traffic Control Devices (MUTCD)".
Conform to the current edition of the "Manual On Uniform
[1]
96"
13"
6"
6"
6"
6"
6"
13"
H.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 n a .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
Prel im ina ry
Not For
Con str uc
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 9/2014
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)
1.5
1.5
1.5
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
200' m in m in
6' - 12'
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
NUMBER
SHEET
H.2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2015(1)-20(1)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 n b .d g n
J u ly
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
Prel im ina ry
Not For
Con str uc
File details come from the government source that posted it. Updated .