Text version
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
A
M p r il
U
S C c m y fi le s p w p r o d u c ti o n d w a e f1 a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 FS ERFO 2015(1)-20(1)WA
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
Mount Baker
Wilderness
MOUNT BAKER SNOQUALMIE
NATIONAL FOREST
VICINITY MAP
FSR 33
A.3
STATE PROJECT
NUMBER
SHEET
S u r F t
D
U s e r s c li n to n .c h o y D e s k to p O
T H
E R
W e ll s C r k w a e f1 a c .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
RESEARCH NATURAL AREA
NORTH FORK NOOKSACK
FSR 33
Glacier
North
Fork Nooks ack
River
W e lls
C reek
W h ilie a lm o n
Creek
W e t rn e ll
C re e k
C o rn e ll
C re e k G la c ie r
C re e k
T h o m p s o n
C re e k
D e a d h o r s e
C re e k
Mountain
Goat
Table Mtn.
Tomyhai Lake
Peak
Tomyhai
Mountain Bald
Q u a r tz
C re ek
MT.
Baker Hwy.
SCALE IN MILES
0 1 21
S w a m p
Cr ee k
C a n y o n
Creek
To Bellingham , W
A
Approx. 36 m iles
Mine
Lone Jack
Flow Lakes kr o
F ts e W
Mtn.
Bearpaw
Mtn. Lake Bearpaw
Lake Church
N
R E
R E
R E
R E
R E
R E
ERFO SITE WORK
BEGIN ERFO SITE WORK
END ERFO SITE WORK
C re e k
B a r
W e lls
C reek
FSR 33 MP 5.1 STA. 207+00
FSR 33 MP 5.1 STA. 202+30
STA. 303+00 to 303+53
FSR 33 MP 6.1
STA. 392+10 to 393+10
FSR 39 MP 2.27
ERFO SITE WORK
ERFO SITE WORK
FSR 39 MP 5.01
F S
R
Miners Quarry - FSR 37
Service Center Glacier Public
Sheet and Description
Section C Section E Section F Section G Section H
Typical Section
Erosion Control
Permanent Streambank Stabilization
GRS-IBS
Temporary
Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM ALL ALL
A0140 15702-2000 SOIL EROSION CONTROL,
TURBIDITY MONITORING LPSM ALL ALL
A0160 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 180 20 200
A0180 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 500 50 550
A0200 15705-2000 SOIL EROSION CONTROL,
FLOATING TURBIDITY CURTAIN LNFT 40 10 50
A0220 20101-0000 CLEARING AND GRUBBING ACRE 0.7 0.3 1.0
A0240 20301-0700 REMOVAL OF DELINEATOR EACH 15 15
A0260 20304-9000 REMOVAL OF STREAM DEBRIS LPSM ALL ALL
A0280 20401-0000 ROADWAY EXCAVATION CUYD 1,087 113 1,200
A0300 20403-0000 UNCLASSIFIED BORROW CUYD 1,497 703 2,200
A0320 20410-0000 SELECT BORROW CUYD 192 18 210
A0340 20702-0100 GEOTEXTILE FILTER, CLASS 1,
TYPE A(WOVEN) SQYD 1,328 122 1,450
A0360 20702-0200 GEOTEXTILE FILTER, CLASS 1,
TYPE B(NON-WOVEN) SQYD 1,170 130 1,300
A0380 20820-0000 DEWATERING LPSM ALL ALL
A0400 25101-0400 PLACED RIPRAP, METHOD A,
CLASS 4 CUYD 16 4 20
A0420 25101-2500 PLACED RIPRAP, METHOD B,
CLASS 5 CUYD 237 23 260
A0440 25101-2700 PLACED RIPRAP, METHOD B,
CLASS 7 CUYD 2,106 214 2,320
A0460 25105-2500 KEYED RIPRAP, METHOD B, CLASS
5(GROUTED) CUYD 353 27 380
A0480 25201-1000 SPECIAL ROCK EMBANKMENT,
MECHANICALLY-PLACED CUYD 160 10 170
A0500 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 183 17 200
A0520 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 27 13 40
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J ul -2
3:
P M
C
U se rs \c lin to n.
ch oy \D es kt op \O
TH
ER
\W el ls C rk
\0
8\
[E ng in ee rs _E st im at e-
-F
S R
3_ W el ls
G la ci er _C re ek s_ R
.x ls x] Sh ee t
STATE PROJECT
B.1FS ERFO 2015(1)-20(1)WA
SHEET
NUMBER
Typical Section
Erosion Control
Permanent Streambank Stabilization
GRS-IBS
Temporary
Traffic Control
ALLOWANCE Bid Schedule
A0540 55102-2400 UNTREATED TIMBER PILE, IN
PLACE EACH 30 6 36
A0560 55506-0000 MISCELLANEOUS STEEL(10-FEET
LENGTH X 8-INCH X 8-INCH X
5/8-INCH STRUCTURAL ANGLE) EACH 1 1
A0580 57401-0000 GRS-IBS, GEOSYNTHETIC
REINFORCEMENT SQYD 1,328 122 1,450
A0600 57402-0000 GRS-IBS, OPEN-GRADED BACKFILL TON 471 49 520
A0620 57403-1000 GRS-IBS, SEGMENTAL RETAINING
WALL UNIT (SRWU) SQYD 104 16 120
A0640 60101-0000 CONCRETE(LEVELING PAD) CUYD 4 1 5
A0660 60102-0000 CONCRETE(APPROACH SLAB) SQYD 21 9 30
A0680 60706-0000 CLEANING DRAINAGE STRUCTURE EACH 2 2
A0700 60711-0000 REPAIRING DRAINAGE
STRUCTURE(36-INCH DIAMETER
CMP END) LPSM ALL ALL
A0720 61805-0000 RESET BARRIER LNFT 70 10 80
A0740 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40 40
A0760 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40 40
A0780 62201-2750 MOTOR GRADER HOUR 40 40
A0800 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD
MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 40 40
A0820 62201-3750 CHAIN SAW HOUR 40 40
A0840 62301-0000 GENERAL LABOR HOUR 40 40
A0860 62402-0500 FURNISHING AND PLACING
TOPSOIL, 8-INCH DEPTH ACRE 0.6 0.1 0.7
A0880 62501-0000 TURF ESTABLISHMENT ACRE 0.7 0.1 0.8
A0900 62630-0100 PLANTINGS, SEEDLINGS, BARE
ROOT(WESTERN RED CEDAR) EACH 26 4 30
A0920 62630-0100 PLANTINGS, SEEDLINGS, BARE
ROOT(RED ALDER) EACH 142 18 160
A0940 62630-0100 PLANTINGS, SEEDLINGS, BARE
ROOT(SALMONBERRY) EACH 437 43 480
A0960 62630-0100 PLANTINGS, SEEDLINGS, BARE
ROOT(SITKA WILLOW) EACH 59 6 65
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J ul -2
3:
P M
C
U se rs \c lin to n.
ch oy \D es kt op \O
TH
ER
\W el ls C rk
\0
8\
[E ng in ee rs _E st im at e-
-F
S R
3_ W el ls
G la ci er _C re ek s_ R
.x ls x] Sh ee t
(2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2FS ERFO 2015(1)-20(1)WA
Typical Section
Erosion Control
Permanent Streambank Stabilization
GRS-IBS
Temporary
Traffic Control
ALLOWANCE Bid Schedule
A0980 62901-0000 ROLLED EROSION CONTROL
PRODUCT(TYPE 3B) SQYD 2,157 243 2,400
A1000 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
A1020 63309-0900 DELINEATOR, TYPE FLEXIBLE EACH 53 7 60
A1040 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL ALL
A1060 63701-0000 FIELD OFFICE EACH 1 1
A1080 63704-0000 VEHICLE EACH 2 2
A1100 64703-2000 MITIGATION, LOG DEFLECTOR EACH 30 10 40
A1120 64703-5000 MITIGATION, ROOT WAD EACH 69 11 80
A1140 64704-1000 MITIGATION, STREAMBED
MATERIAL(CONSERVED) CUYD 576 49 625
A1160 65001-1000 CONSTRUCT AND MAINTAIN
DIVERSION LPSM ALL ALL
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-J ul -2
3:
P M
C
U se rs \c lin to n.
ch oy \D es kt op \O
TH
ER
\W el ls C rk
\0
8\
[E ng in ee rs _E st im at e-
-F
S R
3_ W el ls
G la ci er _C re ek s_ R
.x ls x] Sh ee t
(3
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3FS ERFO 2015(1)-20(1)WA
QUANTITIES
TYPICAL SECTION
TABULATION OF
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
U s e r s c li n to n .c h o y D e s k to p O
T H
E R
W e ll s C r k w a e f1 c a
R .d g n
WA FS ERFO 2015(1)-20(1)
P
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y be used as unclassified borrow.
Roadway excavation and structural excavation may
Use structrual excavation as embankment.[1]
[2]
FOOTNOTE:
1V:10H
1V:2H
V :1
H V :1
H
[2
Va ria bl e
TYPICAL SECTIONS
FSR 33 MP 5.1
C.2
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d w a e f1 c b .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
[4
1V :1 .5
H m ax
Sl op e Va rie s
[4
Va rie s 1V:
3H to
V:
1.
5H
[3]3% [3]3%
1V:
2H
Conserve minimum of 2" of topsoil where available.
See Sheet C.8 for Typical Section Details.
See Sheet F.3 for Permanent Streambank Stabilization Details.
3.
2.
1.
Embankment
FOOTNOTE:
205+25 to 207+00
203+74 to 205+25
202+30 to 203+32
FSR 33 - MP. 5.1
[1]1' (min.)
FSR 33 - MP. 5.1
NOTE:
LC
LC
C le a r in g l im it s
C le a r in g l im it
Distance varies
Turf establishment limits
Plant Zone A
Plant Zone B le a r in g l im it s
Existing ground
Profile grade
Existing ground
Existing ground
Existing ground class 1, type B (non-woven)
Geotextile filter, class 1, type B (non-woven)
Geotextile filter, material (conserved)
Mitigation, streambed
(conserved) material streambed
Mitigation, Placed topsoil 8"
Rootwads and timber piles
Rootwads and timber piles
Log deflectors and chain topsoil 8"
Placed excavation line varies Structural
1:V
1.5:H
Turf
C le a r in g l im it s
6" compacted depth method 2
Roadway aggregate, (See sheet C.8 for dimensions)
Placed riprap method B, class 7
(See sheet C.8 for dimensions)
Placed riprap method B, class 7
[4]
Turf establishment limits
Plant Zone B Plant Zone A 4' Roadway width
12' typical establishment limits
[1] Match adjacent ditch geometry.
[2] Adjust to match adjacent slopes.
[3] Adjust to meet field conditions. Match existing superelevation on curves.
[4] See cross sections.
Embankment
Log deflectors and chain
303+35.00 TO 303+40
303+00 TO 303+35
1V:
1.
5H
1V:
1.
5H
1V:1.5H
1V:
2.5
H
4%
FSR 33-MP 6.1
FSR 33-MP 6.1
Slope varies
4%
NOTE:
Slope varies
C.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c c .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
Slope varies Slope varies
See Sheet C.8 for Typical Section Details.
See Sheet F.3 for Permanent Streambank Stabilization Details.
See Sheet D.2 for proposed flood plain contours.
Cover top of riprap, with 8" topsoil. Riprap is in plant, Zone A.
4.
3.
2.
1.
SHEET 1 of 2
TYPICAL SECTIONS
FSR 33 MP 6.1
LC
LC
Turf establishment
Turf establishment
Profile grade
Profile grade
Existing ground
Existing ground
Existing ground method 2, 6" compacted depth
Roadway aggregate, method 2, 6" compacted depth
Roadway aggregate, Placed riprap, method B, class 5
Placed riprap, method B, class 5
Existing ground
(See Sheet D.2 for Grading Plan)
Flood plain area
Place topsoil, 8"
Place topsoil, 8"
Place topsoil, 8"
Place topsoil, 8" sti mil g ni r a el C sti mil g ni r a el C
C le a r in g l im it s
C le a r in g l im it s
Embankment
Embankment
Varies 10' - 12'
Turf establishment
Varies 6' to 12"
Turf establishment Varies 15'-17'
Varies 17'-17'-6"
Varies 22'-28'
Varies 28'-24'
Varies 8' to 44'
Varies 44' to 62'
NOTE:
FSR 33-MP 6.1
FSR 33-MP 6.1
FOOTNOTE:
V :1
H
1V:
1.
5H
1V:2H
1V:5H
4%
SHEET 2 of 2
TYPICAL SECTIONS
FSR 33 MP 6.1
C.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c d .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
1V:
2H
1V:
2H
Varies 10' to 8'
Varies
8' to 6'
LC
LC
4%
303+45 TO 303+52
303+40 TO 303+45
NO SCALE
[1]Concrete approach slab
Drainage swale class 1, type B, (non-woven)
Geotextile filter, method B, class 5
Placed riprap, El 2617
El 2617
Existing ground
Existing ground reinforcement geosynthetic
GRS-IBS
wall unit (SRWU)
GRS-IBS segmented retaining method B, class 5, grouted, (typ.)
Keyed riprap, method B, class 5, grouted, (typ.)
Keyed riprap, method B, class 5, grouted, (typ.)
Keyed riprap, method B, class 5, grouted, (typ.)
Keyed riprap, retaining wall unit (SRWU)
GRS-IBS segmented
GRS-IBS open-graded backfill
6" compacted depth method 2, Roadway aggregate, class 1, type B, (non-woven)
Geotextile filter, Drainage swale method B, class 5
Placed riprap, method B, class 5
Placed riprap, method B, class 5
Placed riprap, grade Profile open-graded backfill
GRS-IBS
grade Profile
Existing ground
Plant Zone A Plant Zone B Plant Zone A
Plant Zone A Plant Zone A
Varies
(17'-6" - 19'-0")
Zone B
Plant
See Sheet F.4 for Plant Zone information.[2]
[2] [2] [2]
[2] [2] [2] retaining wall unit (SRWU)
GRS-IBS segmented type B, (non-woven) class 1, Geotextile filter, ground
Existing
Establishment
Turf9'-6"9'-6"
Turf establishment Turf
Placed topsoil, 8"
Placed topsoil, 8"
Placed topsoil, 8"
Flood plain area
Placed topsoil, 8"
Placed topsoil, 8"
Flood plain area
5.
4.
3.
2.
1.
material (conserved)
Mitigation streambed material (conserved)
Mitigation, streambed establishment reinforcement geosynthetic
GRS-IBS
Varies 9' to 6'
6' to 5'
Varies
See Sheet F.4 for Streambank material details.
See Sheet D.2 for flood plain contours.
geometry. See Sheets G.2 & G.3.
Placed riprap, method A, class 5. Slopes vary based on
Cover top, riprap with 8" topsoil. Riprap is in Plant Zone A.
approach slab details.
See Sheets G.2 & G.3 for GRS IBS abutment and concrete
C le a r in g l im it s
C le a r in g l im it s
C le a r in g l im it s
Turf
Establishment
12' to 14'
Varies
C le a r in g l im it s
24' to 14'
Varies
15' 15' to 18' 15' to 20'
Varies 20' to 35'
5' to 15'
Varies 12' to 15'
See Sheet D.2 for details.[1]
Construct slopes and ditches as shown in the Staking Report.[1]
2%
2%
392+10 to 393+10
FSR 39 MP 2.27
C.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c e .d g n
WA FS ERFO 2015(1)-20(1)
J u n e
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
TYPICAL SECTION
FSR 39 MP 2.27
[1
Va ria bl e
[1
Sl op e va rie s, 1V:
1H
(m ax
1V:
2H
1V:2H
NOTE:
NO SCALE
8" compacted depth method 2
Roadway aggregate, type 1, 3" compacted depth
Asphalt concrete pavement, Existing ground
Profile grade
Roadway width 14' (typ.)
limits
Turf establishment m in except on special rock embankment
Turf establishment limits
C le a r in g l im it s C le a r in g l im it s
Special rock embankment
392+21 to 392+36
Conserve minimum 2" topsoil.
See Sheet C.8 for Typical Section Details.
See Sheet D.4 for Special Rock Embankment Detail.
3.
2.
1.
Riprap
N
AND PLAN
TYPICAL SECTION
FSR 39 MP 5.01
C.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c f.
d g n
WA FS ERFO 2015(1)-20(1)
J u n e
K
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
APPROXIMATE SCALE IN FEET
250 50
Turbidity Barrier
NO SCALE
NOTE:
Existing vented concrete ford along ford edges
Placed riprap, method A, class 4
Existing concrete fordExisting natural material
LEGEND:
Place riprap along ford edges (See Section A-A)
Falls Cre ek
Fa lls
Cre ek
OHW
Existing ditch
Existing ditch
Existing top of bank
Existing top of bank
Existing top of bank
Existing top of bank
Thalweg
Thalweg
Flow direction
Existing road shoulder
Removal of stream debris
(See Section A-A) along ford edges
Place riprap
SECTION A-A
PLAN
OHW
OHW
Cleaning drainage structure with delineator, type flexible
Remove existing delineators and replace
Turbidity barrier
See Sheet E.6 for Turbidity Barrier Detail.
See Sheet C.7 for Washington Delineator Details.
Geometry of ford is approximate: site conditions may vary.
3.
2.
Delineator
NO SCALE
(t yp
(t yp
DETAILS
WASHINGTON DELINEATOR
Get CO approval before ordering and installing
C.7
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c g .d g n
WA FS ERFO 2015(1)-20(1)
M a y
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
GROUND MOUNTED
E d g e o f s h o u ld e r
Top edge of reflective sheeting
FACING TRAFFIC BACK SIDE
PLACEMENT ON HORIZONTAL CURVES
P T
P C
PLACEMENT AT BRIDGE APPROACHES
sheeting retroreflective
White
25'
25' outside of curve at spacing 25'
Install delineators on
25' 25'
25'25'
Line to be constructed
Line to be constructed
3.5" to 4"
Steel grating Road edge
Traffic direction
CONCRETE & GROUND MOUNTED
FLEXIBLE DELINEATOR
FSR 39 MP 5.01
REFLECTIVE SHEETING DETAIL
FSR 33 MP 6.1 & FSR 39 MP 2.27
White color
(turn towards oncoming traffic) surface mount delineators
12" White reflective sheeting on ground mounted delineators, 12" Yellow reflective sheeting on
3" 3"
8' max.
2' min.
A b o v e n e a r t r a v e l la n e e d g e m in t o m a x
Manufacturer's bury depth
FLEXIBLE DELINEATOR
FSR 33 MP 6.1
Ground mount (4 each) on road edge Surface mount (4 each) on conc. ford
Depth per manufacturers recommendation max.
10' 10' max.
DETAILS
C.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 c h .d g n
WA FS ERFO 2015(1)-20(1)
J u n e
C h e c k e d b y
D e s ig n e d b y
1V:
1.
5H
ASPHALT TRANSITION DETAIL
pavement
Asphalt
Aggregate
Aggregatesurface
Existing p r o fi le
M a tc h
S lo p e s ta k e
C le a r in g l im it
C le a r in g l im it
0.25 D
0.25 D
Existing ground
Slope stake
Existing ground
[2]
Va ria ble
10'
5'5'
5'5'
ROUNDING DETAIL
FILL SLOPE
ROUNDING DETAIL
CUT SLOPE
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
5'
5'
V :1
H5
DETAIL
RIPRAP DIMENSIONS
9'12'10'
Saw cut
Tack coat
AGGREGATE TRANSITION DETAIL
p r o fi le
M a tc h
GPS
33502
24952495
,5
.9
-7.8800%
,4
.5
5.
340' VC
,5
.4
+3.4
6%
,5
.4
.3
K = 17
230' VC
2485 2485
2515 2520 2525
Curve= C5
D
R= 1,600.00'
T= 69.72' Curve= C4
R= 560.00'
T= 21.69'
D
Curve= C3
D
R= 360.00'
T= 112.64'
N
P C
.0
P T
.3
P C
.1
P T
.4
P C
.8
P T
.6 e = 0.03
L= 43.36' e = 0.03
L= 139.35' e = 0.03
L= 218.34'
PLAN AND PROFILE
FSR 33 MP 5.1
T= 37.36' R= 500.00' D
Curve= C2 e= existing L= 74.58'
CUYD
EXC.
CUYD
EMB.
210+00205+00200+00
2480 2480
2485 2485
2490 2490
2495 2495
2500 2500
2505 2505
2510 2510
2515 2515
2520 2520
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fa .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
201+0 202+00 203+00 204+00 206+00 207+00 208+00 209+00
Profile grade
Existing ground
202+32.00
WA FS ERFO 2015(1)-20(1)
207+00.00
WA FS ERFO 2015(1)-20(1)
Limits of construction
Line to be constructed
Limits of construction
El=2496.838
E=1415743.260
N=652500.315
El=2505.727
E=1415880.983
N=682932.283
END FSR 33 MP 5.1
Proposed aggregate edge
205+25.00
AGGREGATE
ROADWAY
BEGIN
streambank stabilization
See sheet F.2 for permanent
STREAMBANK STABILIZATION
BEGIN PERMANENT
BEGIN FSR 33 MP 5.1 NOTE:
Contour interval is 1 foot.
Stabilization Details.
See Sheet F.2 for Permanent Streambank
2.
1.
3313 (for information only)
591 (Includes 493 cuyds of conserved streambed material)
GPS
33601
CP
DEA2
P
CP
33604
P
B ar C reek
263026
GPS
33602
33603
GPS
P T
.3
P C
.5
P T
.3
PC
.9
CUYD
EXC.
CUYD
EMB.
306+00303+00
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y e= 0.04
L= 102.41'
302+00301+00 304+00 305+00
2630 2630
PLAN AND PROFILE
FSR 33 MP 6.1
Curve= 335
D
R= 200.00'
T= 47.25'
L= 92.79'
D
Curve= 334
R= 130.00'
T= 54.03'
N
Drainage swale
+2.9
K = 19
160' VC
,6
.5
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
U s e r s c li n to n .c h o y D e s k to p O
T H
E R
W e ll s C r k w a e f1 fb .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
C h e c k e d b y
D e s ig n e d b y
T= 47.25'
R= 200.00'
DD
Curve= 335Curve= 335
303+00.00
WA FS ERFO 2015(1)-20(1)
Existing ground e 0.04
L= 92.79'
FSR 33 MP 6.1
BEGIN
Existing bridge pier
Existing bridge
NO SCALE
-0.690 LT
303+52.66
-0.459 LT
304+30.66
Abutment
Bridge
EL= 2631.27
E=1413406.16
N=679185.82 EL= 2629.50
E=1413417.95
N=679168.84
Edge of existing road
303+53.00
WA FS ERFO 2015(1)-20(1)
FSR 33 MP 6.1
END
Line to be constructed
Profile grade constructed
Line to be bridge
Existing construction
Limits of construction
Limits of construction
Limits of method B, class 5
Placed riprap, NOTE:
bridge
Existing for details
See Sheets G.2-3 grading plan flood plain
Proposed
Placed riprap method B, class 5
Swale
GRS-IBS Abutment approach slab
Concrete
GRS-IBS abutment
Swale
Keyed riprap method B, class 5 (grouted)
CL bridge abutment aggregate
Edge of
43.185 RT
302+73.23
Abutment
Bridge
LC
LC
method B, class 5
Placed riprap type flexible
Delineator, GRS-IBS wall
Contour interval is 5 feet.
wall Details.
See Sheets G.2 and G.3 for GRS-IBS
Delineator Details.
See Sheet C.7 for Washingtion riprap (see Sheet G.3).
Placed riprap extends on top of keyed
4.
3.
2.
1.
14 (For information only)
375 (Includes 83 conserved streambed)
39232
CP
39231
CP
1680 1685
1700 1705
1745 1745
P R
C
.0
P T
.4
,7
.3
60' VC
K = 45
Curve= GLACR-2
R= 280.00'
T= 126.98' e= N/A
L= 238.43'
El=1700.52
E=34972.563
N=14940.275
EL=1700.716
E=34944.830
N=14844.729
CUYD
EXC.
CUYD
EMB.
394+00393+00392+00391+00
1690 1690
1692 1692
1694 1694
1696 1696
1698 1698
1700 1700
1702 1702
1704 1704
1706 1706
D.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 fc .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
PLAN AND PROFILE
FSR 39 MP 2.27
Replacing drainage structure (36-Inch Diameter CMP End)
Cleaning dranage structure
392+50
Profile grade
Line to be constructed
392+10.00 393+10.00
LEGEND:
Silt fence
Special rock embankment area
END WORKBEGIN WORK
Slope stake limits edge of pavement
Existing edge of pavement
Proposed
Reset barrier
Existing ground
Existing 36" Ø culvert delineator, type flexible and replace with
Remove delineator
NOTE:
1. Contour interval is 1 foot.
0 (Information only)
Provide 10-inch setback from finished face.
flatter than 1V:1.25H.
Welded wire reinforcment not required for finished slope faces
See Staking Notes and Cross Sections.
NO SCALE
WELDED WIRE REINFORCEMENT
MECHANICALLY PLACED
SPECIAL ROCK EMBANKMENT
12"
EMBANKMENT DETAIL
SPECIAL ROCK
FSR 39 MP 2.27
V aries
D.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
U s e r s c li n to n .c h o y D e s k to p O
T H
E R
W e ll s C r k w a e f1 fd .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
C h e c k e d b y
D e s ig n e d b y
[1]
[2]
[3]
[1]
[1
PLAN VIEW
LC
F a c e o f
S lo p e
Longitudinal direction
Existing ground
4'
Bench Width
2V
LC
xxxxxxxx xxxxxxxx xxxx
Finished face
1H
W9.4 wires on 12" C-C type A (non-woven)
Geotextile filter, class 1, pavement structure
See Sheet C.5 for class 1, type A (non-woven)
Geotextile filter, B e n c h h e ig h ts m a x y i te m l im it s
H for special rock embankment Mechanically placed rock
2V
1H
W9.4 wires on 12" C-C
[2] [3]at 3' vertical spacing
Welded wire reinforcement
[1
V :1
H m a x
GPK FILE DATED 10/5/2016
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
33501 683150.553 1415857.923 2514.903 48°52'08.376763"N 121°45'58.663853"W 2455.602 0.99991107 5/8" IR W/FHWA ALUM CAP 1.
33502 682542.424 1415767.326 2492.659 48°52'02.366118"N 121°45'59.908442"W 2433.3513 0.99991175 5/8" IR W/FHWA ALUM CAP
33601 679139.517 1413650.707 2634.526 48°51'28.538531"N 121°46'30.939048"W 2575.1528 0.99990284 5/8" IR W/FHWA ALUM CAP
33602 679089.132 1413495.179 2629.145 48°51'28.022642"N 121°46'33.255272"W 2569.7685 0.99990306 5/8" IR W/FHWA ALUM CAP
33603 679168.024 1413392.338 2628.711 48°51'28.788563"N 121°46'34.807399"W 2569.3279 0.99990313 5/8" IR W/FHWA ALUM CAP 2. Point numbers 39231 & 39232 coordinate system is
33604 679363.729 1413401.501 2640.693 48°51'30.720502"N 121°46'34.706251"W 2581.3099 0.99990268 5/8" IR W/FHWA ALUM CAP assumed.
DEA1 679165.592 1413803.848 2634.440 48°51'28.814275"N 121°46'28.654056"W 2575.0733 0.99990286 1/2" IR W/YPC
DEA2 679101.360 1413573.083 2631.941 48°51'28.152697"N 121°46'32.092695"W 2572.5678 0.99990294 1/2" IR W/YPC
39231 15000.000 35000.000 1700.000 See note 2 See note 2 5/8" IR W/FHWA ALUM CAP
39232 14789.201 34931.507 1701.084 See note 2 See note 2 5/8" IR W/FHWA ALUM CAP
PROJECT : Mt Baker-Snoqualmie 2016 ERFO 33rd mp5.1 and 6.1 DATE OF FIELD WORK :September 2016 DATE OF FINAL ADJUSTMENT :September 2016
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM :Washington North SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM :Orthometric Elevations based on the NAVD88 GEOID 12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
W el ls
C re ek R ep ai rs _c on tr ol sh ee t.
xl sx
]S he et
-M ay
-2
9:
ur ve y
D av ie s
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.5
SHEET
NUMBER
FS ERFO 2015(1)-20(1)WA
SURVEY CONTROL
QUANTITIES
EROSION CONTROL
TABULATION OF
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d a .d g n
WA FR ERFO 2015(1)-20(1)
J u n e
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
SWPPP ALUMINUM SIGN PANEL
specific project information)
(adjust text as needed for
White Background
Black Foreground
(adjust text as needed for specific project information)
White Background
Black Foreground
3"
4"C
3"
2"C
2"
2"C
14"
"2
"B2
3'-6"
"8
3IN =
"8
5TH =
"8 1R = 1
BORDER
3.
24952495
N
EROSION CONTROL PLAN
DIVERSION &
MP 5.1
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d b .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
Silt fence
Water Flow Direction
Riprap seedling planting area
Erosion control mat &
LEGEND:
Fiber roll
NOTE:
streambed material
Conserved deflectors
Root wads and log
BAR CREEK
W
ELL
S C
R
EEK
WELLS CREEK
embankment channel and
Proposed diversion
Limits of construction
Limits of construction
Existing contours
Line to be constructed
Construction access road
Existing channel
NO SCALE
Edge of water
Diversion channel and embankment
See sheets E.4-5 for details sheet E.5 for details)
Diversion Dam (see
Contour interval is 1 foot.
to planting scheme shown in Sheet F.3.
Obliterate areas used for construction access and replant according streambank stabilization.
accordance with Subsection 201.03 for use with permanent part of the access road as root wads and deflector logs in channel after use. Salvage and conserve trees cut down as material is used, remove after use. Remove embankment and leave material acquired from construction diversion channel. If other
Construct diversion embankment with conserved streambed
1. Contour interval is 1 foot.
N
EROSION CONTROL PLAN
DIVERSION AND
MP 6.1
E.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d c .d g n
WA FS ERFO 2015(1)-20(1)
J u n e
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
Water flow direction
Erosion mat
LEGEND:
bridge pier
Existing Existing bridge
Riprap
Bar Creek Flow
Construction limits edge of shoulder
Existing road edge of shoulder
Existing road
Existing road
Construction limits
Fiber roll streambed material
Conserved
Line to be constructed
Root wads
NO SCALE
See sheet E.5 for details Diversion Dam for details) dam (See sheet E.5
Temporary diversion
E.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d d .d g n
WA FS ERFO 2015(1)-20(1)
J u n e
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
SEQUENCE
DIVERSION CONSTRUCTION
MP 5.1
Silt fence
Diversion Dam
LEGEND:
Fiber roll
BAR CREEK
W
ELL
S C
R
EEK
WELLS CREEK
NO SCALE
A
A
1.
NOTE:
embankmentchannel and
Areas, Proposed diversion
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
DIVERSION CONSTRUCTION:
SEQUENCE OF ACCESS ROAD/
Line to be constructed
Limits of construction
Construction access road
Existing channel Limits of construction silt fences, etc. and access road.
Obliterate creek embankments/remove diversion dams, Construct Area 4 .
and South end at Bar Creek).
Construct Diversion Dams (Southeast side of Wells Creek
Construct diversion channel and embankment in Area 3 .
(equipment crossings are limited - see SCR Subsection 107.10 (d)(2).)
Cross Bar Creek from the road, beyond station 203+00
Construct Area 2 Riprap, embankment, and road.
culvert & downstream of access road).
Construct Diversion Dams (Northwest side Wells Creek by the
Construct Area 1 diversion channel and embankment.
are limited - see SCR Subsection 107.10 (d)(2).)
Cross Wells Creek with construction equipment (equipment crossings
Construct access road.
See Sheet E.5 for details.
Slope_Stake_Cut_L
Ditch_Back_L Ditch_Front_L
Slope_Stake_Fill_R
Exterior Boundary
Exterior Boundary
E.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d e .d g n
WA FS ERFO 2015(1)-20(1)
J u n e
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
OHW
OHW
SECTION A-A
NOTE:
1V:2H
1V:
2H
1V:2H
SECTION AND DETAILS
DIVERSION TYPICAL
MP 5.1
Report and are approved by the CO.
conform to the water flows in the Bank Stabilization channel and embankment dimensions may vary if they channel and embankment dimensions required. Diversion
Typical diversion section shows the estimated diversion
NO SCALE
DIVERSION DAM DETAILS
SANDBAG DETAIL
LARGE MACHINE PLACED
3' 0" ±
Lifting straps recommendation
Install per manufacturers
Streambed sandbags (as required)
Hand placed sandbags (as required)
Hand placed placed sandbags
Large machine
Existing ground
Diversion channel
Embankment 12'
22' (min.)
Plastic lining m in
Plastic lining and riprap
(if required to prevent seepage into work site) w a te r d e p th m a x m in
TYPICAL DIVERSION SECTION
TURBIDITY BARRIER
NOTE:
E.6
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 d f.
d g n
WA FS ERFO 2015(1)-20(1)
J u n e
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
Substitutions require the approval of the CO.
of the designer will be the sole responsiblity of the contractor.
proprietary designs. Any infringement on the proprietary rights
Components of this barrier may be similar or identical to
D e p th v a r ie s
100' Standard length
" Tie rope4
Min. 6.6 LB Nylon reinforced vinyl
Galvanized #24 safety hook
All seams heat sealed Stream bottom and load line
" Chain ballast 16
Flotation - 8" Ø equivalent
" galv. cable16
Top load line" Polypropylene rope8 safety hook and ring
Galvanized #24
Safety hook and ring Loop connection with 2 clamps
Water line Water line
).xam( 3:1
).x am(
3:1
Eye bolt with 2 clamps
Loop connection
Stream bottom
Turbidity barrier
" Cable4 anchor or equivalent
75 LB (min.) Concrete
(min.)
12"
(min.)
10'
Riprap
SEDIMENT BARRIER FLOATING
SIDE VIEW
ANCHOR ASSEMBLY
TURBIDITY BARRIER
REVISED: 10/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.7
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2015(1)-20(1)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 d e .d g n
J u n e
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.8
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2015(1)-20(1)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 d h .d g n
J u n e
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
REVISED: 10/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
W629-1
PRODUCT ON SLOPES
ROLLED EROSION CONTROL
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.9
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FS ERFO 2015(1)-20(1)WA
U S
C c m y fi le s p w p r o d u c ti o n d w a e f1 d i.
d g n
J u n e
Erosion control blanket
Flow edge overlap see N ote 1
S tap le sp acin g
Staples @
Staples @
Se e
Not e
Pr ev ai lin g wi nd
6"
12" spacing
6" overlap
6" (m in.)
4" (min.)
' (m ax.) c-c
3'
12" (max.) c-c
12" (max.) c-c
12" (max.) c-c
Overlap in the direction of the prevailing wind.
recommendations.
Install staples according to the manufacturer's
2.
1.
Staple (typ.)
Shingle splice, see Detail C of slope, see Detail A
Anchor trench at top
Staple
Staple
Compacted native soil control blanket
Erosion
Compacted native soil
Toe of slope
PERSPECTIVE VIEW
SHINGLE SPLICE
DETAIL C
AT TOE OF SLOPE
ANCHOR TRENCH
DETAIL B
Blanket edge
Blanket ends
Slope stake
AT TOP OF SLOPE
ANCHOR TRENCH
DETAIL A
NOTE:
of slope, see Detail B
Anchor trench at toe
Erosion control blanket
6 x 6" Trench
6 x 6" Trench
12" spacing
STABILIZATION QUANTITIES
PERMANENT STREAMBANK
TABULATION OF
F.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e a .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
2520 2535
52495
N
25202520
205+00 206+00 207+00204+00203+00
PLAN AND PROFILE
STREAMBANK STABILIZATION
MP 5.1 PERMANENT
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e b .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
M e a d o
S o u r e k
C h e c k e d b y
D e s ig n e d b y
3. Contour interval is 1 foot.
and the trunk is oriented downstream root wads so the root ball is facing upstream existing structural plate culvert. Orient to deflect Wells Creek flow coming from the them at the upstream end of the repair length to act as flank logs on Wells Creek. Embed
Select two of the largest diameter root wads 2.
riprap toe, after riprap construction.
construction of riprap toe. Place over
1. Conserve streambed material excavated from proposed thalweg location
Existing ground at elev. 2473
Top of riprap elev. 2460
Bottom of riprap elev. 2480
Top of riprap elev. 2467
Bottom of riprap elev. 2482
Top of riprap proposed toe of embankment
Existing ground at
Scour elevation profile into existing riprap
Tie placed riprap slope (approx.)
Toe of embankment
Tie riprap into existing barb elev. 2485
Top of riprap
OHW
OHW
elev. 2472 of riprap
Bottom elev. 2469 of riprap
Bottom
22' x 13' (approx)
Existing structural plate culvert location approximate
Proposed channel thalweg to existing contours
Match proposed contours contours to existing contours
Match proposed stabilization. See Sheet F.3 permanent streambank
Place riprap and logs for
NOTE:
root balls angled upstream
Place flank logs with streambed material to OHW elevation
Backfill raised area with conserved
[5]See Sheet F.3 - footnote root balls angled upstream
Place flank logs with
Elev. 2480
Sta. 202+00
Elev. 2470
Sta. 204+89
Elev. 2465
Sta. 206+58
Elev. 2473.1
Sta. 203+74
Bar Creek Profile
BAR CREEK
WELLS CREEK
WELLS
CREEK
W
ELL
S
CREEK
Note 2 to nearest channel. See
Place log deflectors parallel
Proposed contours
Existing contours
Existing contours
Proposed contours
Limits of construction
OHW elev. 2480
OHW elev. 2477 OHW elev. 2475 OHW elev. 2468
Limits of construction
DETAILS
STREAMBANK STABILIZATION
MP 5.1 PERMANENT
1.5V:1H
V :1
H
F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e c .d g n
WA ERFO 2015(1)-20(1)
J u ly
M e a d o
S o u r
C h e c k e d b y
D e s ig n e d b y
Chain
Channel width variesReconstructed top of embankment
Reconstructed toe of embankment
Reconstructed top of embankment
Reconstructed toe of embankment
Wood buffer unit limits
3.
2.
1.
m in
Root wads [2]
Root wads [2]
Sitka Willow
Red Alder
Plant Zone B:
Salmonberry
Red Alder
Western Red Cedar
Plant Zone A :
Plant Zones - See Subsections 626 and 713.06 between deflector logs.
streambed material. Tightly pack woody debris into void space elements and orient rootballs upstream. Backfill with conserved with or without rootballs attached. Brace against bottom layer
Top Layer; Randomly place six root wads rootballs attached on log piles.
from embankment slope toe upstream and brace rootwad each set of two. Place six with rootwads orientated 45° length as shown. Place riprap per plan. Brace two against
Bottom Layer; Drive six untreated timber piles per 75-foot
Vertical pile
Angled pile with chain and root wad trunk
Wrap log deflectors
Log deflectors [1] m in
[3]Untreated timber piles
[1]Log deflectors
Timber piles (typ.)
Pile top a p p r o x rootballs attached. Place per plan.
Flank logs; 20-foot min. trunk, 40-inch minimum diameter with[5] vegetation, 1-inch to 8-inch diameter.
Coarse woody debris; even mixture of branches, limbs, trunks,[4]
6 per log jam unit. Cut conical pile shoe into log pile if required.
Untreated timber pile; 15-foot pile, 12-inch to 18-inch diameter,[3]
6 per unit.
attached rootwads, 6 per unit. With or without attached rootwads, Root wads; 20-foot min. trunk, 18 to 36-inch diameter. With[2] without attached rootwad, 6 per wood buffer, 2 per placement.
Log deflector; 20-foot min. trunk, 18 to 36-inch diameter[1]
10' Width varies with channel
Edge of water
NO SCALE
Flow
Flow
10' to 12' (typ.)
75'-0" to ty p
Scour Elev. per plan
Top of riprap per plan
50 yr WSE
OHW Elev. per plan
Root wad [2]
3' (min.)
m in
Placed riprap class 7, method B, 5' depth
Chain (typ.)
Existing channel bottom
A
Road grade to be constructed
PLAN
BOTTOM LAYER
PLAN
TOP LAYER
Reconstructed embankment
Existing bank
TYPICAL SECTION
NOTE:
class 1, type B, (non-woven)
Geotextile filter, FOOTNOTE:
DETAIL
TYPICAL BUNDLE
[3]Untreated timber pile
Cover with coarse woody debris over root wads to OHW elevation.
Place conserved streambed material
DETAIL
TYPICAL TIMBER PILE
Plant Zone A (see notes) Plant Zone B (see notes)
8" Placed topsoil layer and temporary turf establishment beneath rolled erosion control product
Q Vel. SLOPE PROTECTIONWS ELEV.
SLOPE: 1(v):5(h)
TYPE: Riprap
TOP EL.: 2617 ft
TOTAL SCOUR EL:
CLASS: 5 (FP-14)
BOTTOM EL.: 2606 ft
100Q
50Q
2Q
DEPTH: 5 ft (min)
REMARKS:
OHW
2630 2630
25902590
PLAN AND PROFILE
STREAMBANK STABILIZATION
MP 6.1 PERMANENT
OHW
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 e d .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
M e a d o
S o u r
C h e c k e d b y
D e s ig n e d b y
ELEVATION
Existing ground surface
LC
Existing road location approximate
Existing riprap (typ.)
bridge pier
Existing
Elev. 2609 FT (approx.)
Existing channel thalweg.
Elev. 2612 FT (approx.)
Existing pier footing.
SCALE IN FEET
20 0 20 40
Bar Creek
Placed riprap, method A, class 5
Line to be constructed bridge
Existing
Profile grade
A
A
Construction limits
NOTE:
SECTION A-A
(See notes)
Plant Zone A
(See notes)
Plant Zone B
Root wad
8" topsoil layer and temporary turf establishment beneath rolled erosion control product
See Sheet G.2 for detail foundation.
Grouted riprap
(See Sheet G.2 method A, class 5
Placed riprap, Elev. 2606 FT (approx.)
Existing top of pier footing.
riprap bank as part of existing north side
Remove and reuse existing riprap
Footnote 2
See Sheet F.3, Root wads.
Blend new riprap into exsiting riprap bank into existing riprap bank blend existing riprap
Remove and
(approx.) at Section A-A.
Elev. = 2609 ft
Existing channel thalweg.
Edge of road
Concrete approach slab coarse woody debris. Plant with native vegetation
Slope to OHW elevation at face. Cover with at a minimum 3' depth above floodplain.
of root wad trunk length, 3 2over back
Place conserved streambed material steambed material.
Backfill with conserved
Contour interval is 1 foot.
Sitka Willow
Plant Zone B: Red Alder
Salmonberry
Red Alder
Plant Zone A: Western Red Cedar rolled erosion control mat.
in Plant Zone A. Place 8" of topsoil without
Placed riprap, method A, class 5 is included
Plant Zones - See sections 626 and 713.06.
woody debris into void space between root wads.
with conserved streambed material. Tightly pack elements and orient rootwads upstream. Backfill without rootballs. Brace against Bottom Layer
Top Layer; Randomly place six root wads with or upstream at 10 to 45° from bank line.
Bottom Layer; Place root wads orientated limbs, trunks, vegetation, 1-inch to 8-inch diameter.
Coarse woody debris; even mixture of branches, diameter with attached rootballs.
Root wads; 20-foot min. trunk, 18 to 36-inch
6.
5.
4.
3.
2.
1.
See Sheet G.2 for detail
GRS-IBS Wall.
GRS-IBS QUANTITIES
TABULATION OF
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 r a .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
1. Structural excavation as unclassified borrow.
PLAN AND ELEVATION
GRS-IBS
G.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a e f1 r b .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
NO SCALE
LC
LC
225°
1H
1V
1H
1V
1V
1H
LC
foundation top of riprap
EL. 2613.5
2.
1.
3.
5.
4.
of riprap foundation
- bottom[5]EL. 2606
(see Sheet D.2) of abutment
1H
1V class 1, type A, (woven)
Geotextile filter, 1' (min.)
1' (min.)
EL. = 2628.96
Bridge edge
CL Station 303+52.66 0.69 LT
EL. Bridge = 2629.50 at
EL. = 2628.96
SRWU cap blocks
EL. = 2630.08
Bridge edge
Corner shield
Anchor boltsCorner shield
Existing bridge deck
Bridge end wing end wing
Bridge leveling pad
6" Concreteleveling pad
6" Concrete
(see Sheet D.2) of Abutment
El. 2617
'-0
2'-0"1'-0" end wing
Bridge
6'-0"
31'-6"
5°
'-0 class 5 (grouted) method B, Keyed riprap, Approach slab
Bridge end wing
[6]17'-0"
[6]3'-9"
[6]21'-6"
[6]2'-9"
[6]17'-0"
[7]
"2
[2]class 5 limit line method B, Placed riprap, [2]class 5 limit line method B, Placed riprap, [3]retaining wall unit (SRWU)
GRS-IBS, segmental
[3]EL. = 2630.08
SRWU cap blocks
[8]Match slope thick concrete leveling pad
Projected outline of 6"
14'-0" 14'-0"
[1]face geometry battered wall dependent upon
Exact location is
GRS-IBS abutment wall.
Bottom face of
[6]Varies [6]Varies
A
A
ELEVATION VIEW
Facing Block Schedule
GRS-IBS ABUTMENT
PLAN VIEW
FOOTNOTE:
Wingwall (folded out)
See Sheet G.3
LEGEND:
GRS-IBS ABUTMENT
DETAIL
BOTTOM OF RIPRAP FOUNDATION
Concrete
[2
W in g w a ll
W in g w ll
Riprap foundation
Wingwall (folded out)
Approach slab
[4]Geosynthetic reinforcement
Field verify bridge elevations and measurements before begining GRS-IBS abutment work.
Stagger segmental retaining wall units at 12 block width, including corners.
Corner shield - Provide 10-foot high, 8-inch x 8-inch x 5 -inch structural steel angle.
Furnish anchor bolts conforming to ASTM F3125 Grade A325, type 1, and galvanized according to ASTM 153 spaced vertically every 2-foot (max.) alternating each side.
Furnish epoxy adhesive for anchorages conforming to
ASTM C881, type 1.
abutment wall
Face of GRS-IBS
Match cross slope of existing bridge deck.[8] directed by CO.
Bottom of approach slab may be constructed level unless otherwise[7] geometry of battered wall face.
dimensions are shown. Top dimensions and wall angles vary by
Elevation and Plan Views do not show batter. Only bottom wall [6] verify elevations shown.
Do not excavate below top of existing bridge pier footing. Field[5] bridge edges.
Geosynthetic reinforcement continuous under approach slab and[4] dependent upon approved facing block.
Facing block schedule is representative. Final schedule[3]
See Sheet G.3 for Riprap Armor details.[2] the riprap foundation and is shown for dimension purposes.
Bottom of GRS-IBS abutment wall is projected to the bottom of[1]
EXPANSION JOINT
GRS-IBS DETAILS
G.3
STATE PROJECT
NUMBER
SHEET
I n t_ ft
U s e r s c li n to n .c h o y D e s k to p O
T H
E R
W e ll s C r k w a e f1 r c .d g n
WA FS ERFO 2015(1)-20(1)
J u ly
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
V :1
H
LEGEND:
FOOTNOTE:
Roadway aggregate
Open-graded backfill
Select borrow
SECTION A-A
Grouted riprap
NOTE:
1.
El. 2617
El. 2613.5
Concrete
Select borrow
Native soil
Top longitudinal reinforcement tail [2]
#6 at 6" (bottom)
GRS-IBS open-graded backfill all courses
GRS-IBS geosynthetic reinforcement method B, class 5
Placed riprap, bridge deck at centerline
EL. 2629.50 - top of method B, class 5, (grouted)
Keyed riprap, class 1, type A, (woven)
Geotextile filter, and foundation footing
Existing bridge pier
[4]El. 2606
Placed riprap
#6 at 12" (top)
[3]GRS-IBS SRWU
6" compacted depth method 2, Roadway aggregate, [1]Structural excavation limits
Provide 6" (min.) cover above riprap approach slab concrete
12" Reinforced
7'-0"
6'-6" ground
Existing
8° (max.)
1' Max. Setback
10'-0"
Existing ground beyond wall (both sides) pad. Extend 1' (min.)
6" Thick concrete leveling bottom and face of SRWU block end of bridge
" spacing between4 3Allow
S lo p e v a ri e s
V :1
H m a x
S lo p e v a rie s 1
V :1
H (m a x
Bottom of bridge deck bridge deck and the SRWU cap block top clearance between the bottom of the
SRWU cap block Provide a 3" min.
" ±4
Concrete approach slab corner beads and silicone band
Field-applied silicone impact angle
Existing steel anchor @ 1'-0"
" Ø stud4 1" x 4 adhesive both sides
Epoxy
Existing bridge deck see Expansion Joint Detail below fill with flexible cellular joint filler, " Expansion joint
3Steel angle and
")4 1( 2"x 2"x
Steel angle iron 21' L
Select SRWU face control point based upon geometry of selected batter
Field verify elevations shown.
Do not excavate below top of existing bridge pier footing.[4] block height above the bottom. 2 1 Extend SRWU blocks at least [3] the length of the GRS-IBS geosynthetic reinforcement.
Extend top two layers wrapped tail longitudinally to match[2] cannot be obtained.
30 days or if the required short term back slope ratio specified required if the short term back slope will be open more than
(29CFR, Part 1926, Subpart P, excavation). Shoring may be
Short term back slope ratio per OSHA Safety Regulations [1] between top of SRWU blocks and bottom of approach slab wrapped full length, 2 layers evenly spaced
GRS-IBS geosynthetic reinforcement, reinforcement
GRS-IBS geosynthetic
Top 2 layers of abutment
Integrated appr.
A p p r o a c h s e a t z o n e
GRS-IBS block thickness per manufacturer's recomemdations.
Wall face batter 8° (max.).
ASTM A706, Grade 60. Provide 2" min. concrete cover.
Provide uncoated reinforcing steel according to bridge deck surface.
Match approach slab cross-slope with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.