Physical Data_FSR_33_MP6.1_Earthworkr071618.pdf

PDF 80 KB Posted

Attached to
WA FS ERFO 2015(1)-20(1), Wells Creek Repairs
Solicitation number
DTFH7017B00032
Issued by

About this file

Physical Data_FSR_33_MP6.1_Earthworkr071618

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATION

Fill Roadway Aggregate (cy)

Embankment (cy)

Excavation (cy)

25101‐0500 Placed Left Class 5 Riprap (cy)

25105‐ Placed Right Class 5 Riprap (cy)

GRS Grouted Riprap (cy)

GRS

Foundation Excavation (cY)

Grouted Riprap Excavation cy

Placed Riprap Excavation cy

303+07.0 303+10.0 0.9 0.2 1.5 4.1 0.0 0.0 0.0 0.0 303+25.0 4.5 5.4 27.6 42.1 0.0 0.0 0.0 0.0 303+35.0 3.1 3.1 46.3 36.1 0.0 56.4 67.5 21.7 303+40.0 1.6 0.3 34.8 18.2 10.3 78.0 82.4 31.6 33.4 303+45.0 2.4 0.3 46.2 12.9 21.8 96.0 83.9 41.5 33.7 303+50.0 2.2 0.0 55.7 8.2 19.1 84.5 57.3 41.5 29.3 303+55.0 0.7 1.0 57.0 2.6 22.3 38.3 22.1 47.1 303+60.0 0.0 1.0 54.6 0.0 24.9 0.0 0.0 52.8 303+65.0 0.0 3.0 51.1 0.0 14.2 0.0 0.0 33.2

SUBTOTALS 15 14.3 374.8 124.1 112.6 353.2 313.1 269.3 96.4

TOTALS 15.0 14.0 375.0 353.0 313.0 269.3 96.0

GRS‐IBS Structural Excavation = 313 Grouted Riprap Structural Excavation = 269 Placed Riprap Structural Excavation = 96 Total Structural Excavation = 678

237.0

Physical Data ‐ Earthwork for FSR 33 MP 6.1

File details come from the government source that posted it.