WAFSERFO2016(1)-23(2)-Earthwork.pdf
PDF 22 KB Posted
- Solicitation number
- DTFH7017B00018
About this file
WAFSERFO2016(1)-23(2)-Earthwork
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Okanogan.pdf | ||
| Q&A_7-6-17.pdf | ||
| A004.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| IFB_Okanogan.pdf | ||
| WAFSERFO2016(1)-23(2)_CrossSections.pdf | ||
| WAFSERFO2016(1)-23(2)_Plans.pdf | ||
| SWPPP_WA_FS_ERF_2016(1)-23(2).pdf | ||
| Plan_Request_form_Okanogan.pdf | ||
| PROJECT_DESCRIPTION_WA_FS_ERFO_2016(1)-23(2).pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
WA FS ERFO 2016(1)-23(2)
OKANOGAN-WENATCHEE 2016 REPAIRS, PHASE 1
Road 4100 300 Road 5008 200
Road 5160 Road 5483
YAKIMA/KITTITAS/OKANOGAN COUNTY
File: c:\myfiles\pw_production\d0316571\FinleyMtnEarthwork.log 3/26/2017, 3:49:00 PM
COMPUTING EARTHWORKS FOR BASELINE = FINLEY
COMPUTING EARTHWORKS FOR JOB = 231
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Page: 1
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
100+40.00 RDWYEXC
Excavation 8.56 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.49 0 0 0.00 0 0
100+50.00 RDWYEXC
Excavation 10.79 3 3 1.00 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 3 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.69 1 0 0.00 3 1
100+60.00 RDWYEXC
Excavation 3.39 2 2 1.00 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.85 2 0 0.00 5 3
100+70.00 RDWYEXC
Excavation 7.67 3 3 1.00 8 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 8 0
LAYER3
Excavation 0.00 0 0 0.00 0
Page: 2
Subsoil Exc 0.00 0 0 0.00 0 Fill 4.96 2 0 0.00 8 5
100+80.00 RDWYEXC
Excavation 24.97 6 6 1.00 14 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 14 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.79 2 0 0.00 14 7
100+90.00 RDWYEXC
Excavation 27.78 10 10 1.00 24 Subsoil Exc 0.00 0 0 1.00 0 Fill 44.25 8 8 1.00 16 8
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.95 2 0 0.00 16 9
100+95.00 RDWYEXC
Excavation 29.06 6 6 1.00 30 Subsoil Exc 0.00 0 0 1.00 0 Fill 124.96 16 16 1.00 6 24
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.95 1 0 0.00 6 10
101+00.00 RDWYEXC
Excavation 29.25 6 6 1.00 36 Subsoil Exc 0.00 0 0 1.00 0 Fill 154.58 26 26 1.00 -14 50
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.91 1 0 0.00 -14 11
Page: 3
101+10.00 RDWYEXC
Excavation 14.81 8 8 1.00 44 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 29 29 1.00 -35 79
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.62 2 0 0.00 -35 13
101+20.00 RDWYEXC
Excavation 10.89 4 4 1.00 48 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -31 79
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.87 2 0 0.00 -31 15
Page: 4
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 48 48 1.00 Subsoil Exc 0 0 1.00 Fill 79 79 1.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 15 0 0.00
Page: 5
File: c:\myfiles\pw_production\d0316571\CougarCreekEarthwork.log 3/26/2017, 12:25:52 PM
COMPUTING EARTHWORKS FOR BASELINE = COGCR
COMPUTING EARTHWORKS FOR JOB = 231
FORMING LIST OF XSCELLS
Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
501+50.00 RDWYEXC
Excavation 6.54 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.16 0 0 1.00 0 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.58 0 0 0.00 0 0
501+60.00 RDWYEXC
Excavation 11.46 4 4 1.00 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.59 3 0 0.00 4 3
501+70.00 RDWYEXC
Excavation 14.19 5 5 1.00 9 Subsoil Exc 0.00 0 0 1.00 0 Fill 44.49 8 8 1.00 1 8
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.59 3 0 0.00 1 6
501+80.00 RDWYEXC
Excavation 0.00 2 2 1.00 11 Subsoil Exc 0.00 0 0 1.00 0 Fill 161.79 38 38 1.00 -35 46
LAYER3
Fill 7.59 3 0 0.00 -35 9
501+90.00 RDWYEXC
Excavation 0.00 0 0 1.00 11 Subsoil Exc 0.00 0 0 1.00 0 Fill 325.58 90 90 1.00 -125 136
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.60 3 0 0.00 -125 12
502+00.00 RDWYEXC
Excavation 0.00 0 0 1.00 11 Subsoil Exc 0.00 0 0 1.00 0 Fill 274.61 111 111 1.00 -236 247
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.60 3 0 0.00 -236 15
502+10.00 RDWYEXC
Excavation 4.11 0 0 1.00 11 Subsoil Exc 0.00 0 0 1.00 0 Fill 25.62 56 56 1.00 -292 303
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.66 3 0 0.00 -292 18
502+20.00 RDWYEXC
Excavation 13.49 4 4 1.00 15 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.83 7 7 1.00 -295 310
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 3 0 0.00 -295 21
502+30.00 RDWYEXC
Excavation 14.14 5 5 1.00 20 Subsoil Exc 0.00 0 0 1.00 0 Fill 20.12 6 6 1.00 -296 316
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.62 3 0 0.00 -296 24
502+40.00 RDWYEXC
Excavation 16.38 5 5 1.00 25 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.59 8 8 1.00 -299 324
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.42 3 0 0.00 -299 27
502+50.00 RDWYEXC
Excavation 19.43 7 7 1.00 32 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 4 4 1.00 -296 328
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.63 3 0 0.00 -296 30
Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 32 32 1.00 Subsoil Exc 0 0 1.00 Fill 328 328 1.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 30 0 0.00
File: c:\myfiles\pw_production\d0316571\ChewuchEarthwork.log 3/26/2017, 10:43:14 AM
COMPUTING EARTHWORKS FOR BASELINE = CHEW
COMPUTING EARTHWORKS FOR JOB = 231
FORMING LIST OF XSCELLS
Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
5160+80.00 RDWYEXC
Excavation 15.15 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.16 0 0 0.00 0 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.54 0 0 0.00 0 0
5160+90.00 RDWYEXC
Excavation 15.66 6 6 1.00 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.25 2 0 0.00 6 2
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.54 3 0 0.00 6 3
5161+00.00 RDWYEXC
Excavation 16.84 6 6 1.00 12 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 12 0
LAYER1
Excavation 0.00 0 0 0.00 0
Fill 5.15 2 0 0.00 12 4
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.54 3 0 0.00 12 6
5161+10.00 RDWYEXC
Excavation 20.56 7 7 1.00 19 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 19 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.15 2 0 0.00 19 6
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.54 3 0 0.00 19 9
5161+20.00 RDWYEXC
Excavation 20.95 8 8 1.00 27 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 27 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 2 0 0.00 27 8
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.50 3 0 0.00 27 12
5161+30.00 RDWYEXC
Excavation 14.62 7 7 1.00 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 34 0
LAYER1
Excavation 0.00 0 0 0.00 0
Fill 5.18 2 0 0.00 34 10
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.49 3 0 0.00 34 15
5161+40.00 RDWYEXC
Excavation 13.60 6 6 1.00 40 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 40 0
LAYER1
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.07 2 0 0.00 40 12
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.52 3 0 0.00 40 18
Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 40 40 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00
LAYER1
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 12 0 0.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 18 0 0.00
File: c:\myfiles\pw_production\d0316571\MeadowCreekEarthwork.log 3/27/2017, 4:02:26 PM
COMPUTING EARTHWORKS FOR BASELINE = MEDCR
COMPUTING EARTHWORKS FOR JOB = 231
FORMING LIST OF XSCELLS
Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 0+00.00 to 0+00.00
5485+00.00 RDWYEXC
Excavation 9.69 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.50 0 0 0.00 0 0
5485+10.00 RDWYEXC
Excavation 14.52 4 4 1.00 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 4 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.44 1 0 0.00 4 1
5485+20.00 RDWYEXC
Excavation 17.01 6 6 1.00 10 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 10 0
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.44 1 0 0.00 10 2
5485+30.00 RDWYEXC
Excavation 25.28 8 8 1.00 18 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 18 0
LAYER3
Fill 3.44 1 0 0.00 18 3
5485+40.00 RDWYEXC
Excavation 10.99 6 6 1.00 24 Subsoil Exc 0.00 0 0 1.00 0 Fill 49.29 9 9 1.00 15 9
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.44 1 0 0.00 15 4
5485+50.00 RDWYEXC
Excavation 6.11 3 3 1.00 27 Subsoil Exc 0.00 0 0 1.00 0 Fill 38.57 16 16 1.00 2 25
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.44 1 0 0.00 2 5
5485+60.00 RDWYEXC
Excavation 4.99 2 2 1.00 29 Subsoil Exc 0.00 0 0 1.00 0 Fill 11.02 9 9 1.00 -5 34
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.44 1 0 0.00 -5 6
5485+70.00 RDWYEXC
Excavation 5.04 2 2 1.00 31 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.38 4 4 1.00 -7 38
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.44 1 0 0.00 -7 7
5485+80.00 RDWYEXC
Excavation 8.92 3 3 1.00 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 2 2 1.00 -6 40
LAYER3
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.29 1 0 0.00 -6 8
Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 34 34 1.00 Subsoil Exc 0 0 1.00 Fill 40 40 1.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 8 0 0.00