PROJECT_DESCRIPTION_WA_FS_ERFO_2016(1)-23(2).pdf
PDF 12 KB Posted
- Solicitation number
- DTFH7017B00018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Okanogan.pdf | ||
| Q&A_7-6-17.pdf | ||
| A004.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| IFB_Okanogan.pdf | ||
| WAFSERFO2016(1)-23(2)-Earthwork.pdf | ||
| WAFSERFO2016(1)-23(2)_CrossSections.pdf | ||
| WAFSERFO2016(1)-23(2)_Plans.pdf | ||
| SWPPP_WA_FS_ERF_2016(1)-23(2).pdf | ||
| Plan_Request_form_Okanogan.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FS ERFO 2016(1)-23(2), Okanogan-Wenatchee 2016 Repairs, Phase 1, Yakima/Kittitas/Chelan and Okanogan Counties, Washington.
The work consists of reinforced soil slopes, roadway embankment, aggregate base and drainage, and other small items of work.
Project length: Various Miles north of Yakima, there are 8 sites:
Road 5160 – MP 1.3 – 48°43’56”,-120°08’18.2” Road 5008 200 – MP 2.0 – 48°28’54.4”,-120°04’49.3” Road 4100 300 – MP 4.0 – 48°19.194’,-120°57.355’ Road 4330 600 – MP 0.99 – 47°07’12.7”,-120°10’49” Road 4010 – MP 4.5 – 48°03’13.59”,-120°04’55” Road 4010 – MP 5.5 – 48°03’29”,-120°05’53” Road 5483 – MP 2.1 – 47°18’20.3”,-121°23’23.1” Road 1382 – MP – 46°39’6.1”,-121°14’47.5”
Tentative Fixed Completion Date: August – November 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $1,000,000 to $2,000,000 million
Location: Yakima, Kittitas, Chelan and Okanogan Counties, Washington within the Okanogan Wenatchee National Forest.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
Base Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control LPSM
DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (pipe culvert) 6 EACH 204 Embankment 460 CUYD 204 Excavation 1,300 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap 145 CUYD 257 Contactor-Designed Reinforced Soil Slope 1
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 250 CUYD 303 Ditch Reconditioning 380 LNFT
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 25 TON
DIVISION 600 – Incidental Construction 602 Culverts (24-Inch Pipe Culvert) 45 LNFT 602 Culverts (36-Inch Pipe Culvert) 190 LNFT 602 Culverts (48-Inch Pipe Culvert) 185 LNT 607 Cleaning Existing Drainage Structures 3 EACH 607 Repairing Existing Drainage Structures 1 EACH 622 Rental Equipment Yes 623 General Labor Yes 625 Turf Establishment ( seeding) 2,950 SQYD 635 Temporary Traffic Control LPSM