Amendment A004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Okanogan.pdf | ||
| Q&A_7-6-17.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| IFB_Okanogan.pdf | ||
| WAFSERFO2016(1)-23(2)-Earthwork.pdf | ||
| WAFSERFO2016(1)-23(2)_CrossSections.pdf | ||
| WAFSERFO2016(1)-23(2)_Plans.pdf | ||
| SWPPP_WA_FS_ERF_2016(1)-23(2).pdf | ||
| Plan_Request_form_Okanogan.pdf | ||
| PROJECT_DESCRIPTION_WA_FS_ERFO_2016(1)-23(2).pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A004 06/29/2017 N/A WA FS ERFO 2016(1)-23(2)
Okanogan-Wenatchee 2016
Repairs, Phase 1
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH7017B00018
9B. DATED (SEE ITEM 11)
06/02/2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA FS ERFO 2016(1)-23(2), Okanogan-Wenatchee 2016 Repairs, Phase 1
SPECIAL CONTRACT REQUIREMENTS (SCR)
Page E-36, Revises Subsection 156.04 Accommodating Traffic During Work. Changes the duration and dates Road 5160 may be closed.
ENCLOSURES
Page E-36
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
E-36 DIVISION 150
Special Contract Requirements Project: WA FS ERFO 2016(1)-23(2), Okanogan-Wenatchee 2016 Repairs, Phase 1
Section 156. —PUBLIC TRAFFIC
12/15/15– FP14
Construction Requirements
156.04 Accommodating Traffic During Work. Add the following:
Accommodate traffic at Road 4330 600, Road 4100 300, Road 5480, and Road 1382 according to the following:
(a) During periods of non-work such as time between shifts, weekends, or holidays, open the road to through traffic.
(b) During periods of work, 2-hour delays are permitted with 15-minute intervals for through traffic or until all queued traffic have proceeded through work zone.
Road 4010 and Road 5008 200 are closed to public traffic. Place a “ROAD CLOSED AHEAD” sign (R11-2) with three (3) Barricades, Type 3 at each end of the project as directed by the CO.
Install “ROAD CLOSED AHEAD” signs (W20-3) in advance of the closures as directed by the
CO.
Road 5160 may be closed for a maximum of 10 7 10 consecutive days during the month of October 2017 to repair the drainage structure. Coordinate closure dates with the CO. Provide proposed closure dates at least 7 days prior to the start of the closure.
156.07 Limitations on Construction Operations. Delete paragraph (g) and substitute the following:
(g) Provide two-way radio communications between Traffic Control Supervisor, flaggers, and pilot cars. Provide two-way radio communications between flaggers unless flaggers are able to see each other and communicate. Citizen band radios are not acceptable. Make radio equipment available to the CO as necessary.
156.09 Traffic Control Supervisor. Add the following:
(l) Transport personnel, construction signs, barricades, drums, cones, tubular markers, and other traffic control devices.
Revised by Amendment A004
| SF30amd_WORD |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A004 |
E-36