Q&A_7-6-17.pdf
PDF 73 KB Posted
- Solicitation number
- DTFH7017B00018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Okanogan.pdf | ||
| A004.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| IFB_Okanogan.pdf | ||
| WAFSERFO2016(1)-23(2)-Earthwork.pdf | ||
| WAFSERFO2016(1)-23(2)_CrossSections.pdf | ||
| WAFSERFO2016(1)-23(2)_Plans.pdf | ||
| SWPPP_WA_FS_ERF_2016(1)-23(2).pdf | ||
| Plan_Request_form_Okanogan.pdf | ||
| PROJECT_DESCRIPTION_WA_FS_ERFO_2016(1)-23(2).pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA FS ERFO 2016(2) ‐ 23(2)
Okanogan‐Wenatchee 2016 Repairs, Phase 1
# General Technical Question Answer Date 1 x Can the bid opening be delayed for 1‐2 days to allow more time to design the Reinforced Soil Slope?
The bid opening will not be postponed. 7/5/17
2 X Regarding the Road 4010 MP 4.5 site, can we move the roadway alignment, to the right, into the existing cut bank, to provide sufficient volume of fill material to build the “reinforced soil slope”?
Minor deviations in the alignment shown in the plans will be considered to accommodate the contractors RSS design.
However, Reinforced Soil Slopes are to be designed according to Section 257. See especially Subsection 257.05(f)(10). The government does not warrant the quantity or quality of materials present at this site.
Provide materials according to Section 105.
7/5/17