Q&A_7-6-17.pdf

PDF 73 KB Posted

Attached to
WA FS ERFO 2016(1)-23(2), Okanogan-Wenatchee 2016 Repairs, Phase 1
Solicitation number
DTFH7017B00018
Issued by

View the file

Other files

File Type Posted
BidSum_Okanogan.pdf PDF
A004.pdf PDF
A003.pdf PDF
A002.pdf PDF
A001.pdf PDF
IFB_Okanogan.pdf PDF
WAFSERFO2016(1)-23(2)-Earthwork.pdf PDF
WAFSERFO2016(1)-23(2)_CrossSections.pdf PDF
WAFSERFO2016(1)-23(2)_Plans.pdf PDF
SWPPP_WA_FS_ERF_2016(1)-23(2).pdf PDF
Plan_Request_form_Okanogan.pdf PDF
PROJECT_DESCRIPTION_WA_FS_ERFO_2016(1)-23(2).pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA FS ERFO 2016(2) ‐ 23(2)

Okanogan‐Wenatchee 2016 Repairs, Phase 1

# General Technical Question Answer Date 1 x Can the bid opening be delayed for 1‐2 days to allow more time to design the Reinforced Soil Slope?

The bid opening will not be postponed. 7/5/17

2 X Regarding the Road 4010 MP 4.5 site, can we move the roadway alignment, to the right, into the existing cut bank, to provide sufficient volume of fill material to build the “reinforced soil slope”?

Minor deviations in the alignment shown in the plans will be considered to accommodate the contractors RSS design.

However, Reinforced Soil Slopes are to be designed according to Section 257. See especially Subsection 257.05(f)(10). The government does not warrant the quantity or quality of materials present at this site.

Provide materials according to Section 105.

7/5/17

Check General or Technical

File details come from the government source that posted it. Updated .