AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 11/01/2016 N/A AK NPS DENA 10(44), Repave Denali Park Road MP 3.4 to 14.7, Phase II
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X DTFH70-16-B-00025
9B. DATED (SEE ITEM 11)
10/25/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(_x_ ) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK NPS DENA 10(44), Repave Denali Park Road MP 3.4 to 14.7, Phase II
See page 2 for revisions
ENCLOSURES:
Page C-87, Clause 52.244-6 Page E-2, Subsection 102.05A
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 11/01/2016 Solicitation No. DTFH70-16-B-00025 AK NPS DENA 10(44), Repave Denali Park Road MP 3.4 to 14.7, Phase II
REVISIONS ARE AS FOLLOWS:
SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)
Page A-3, Block 3. Corrects Date Issued from 10/24/2016 to 10/25/2016.
Page A-3, Block 13. Revises Bid Due Date from 11/29/2016 to 12/07/2016.
CONTRACT CLAUSES
Page C-87, Revises Clause 52.244-6, Subcontracts for Commercial Items (Nov 2016)
SPECIAL CRONTRACT REQUIREMENTS
Page E-2, Subsection 102.05A, Contract Award.
ENCLOSURES
Pages:
Pages C-87 Page E-2
Page(s) not included due to Pen and Ink change(s):
Page A-3
New bid opening date: 12/07/2016
C-87
Contract Clauses Project: AK NPS DENA 10(44), Repave Denali Park Road MP 3.4 TO 14.7, Phase II
52.244-6 Subcontracts for Commercial Items (Nov 2016)
(a) Definitions. As used in this clause— “Commercial item and commercially available off-the-shelf item have the meanings contained in
Federal Acquisition Regulation 2.101, Definitions.
“Subcontract” includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.
(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.
(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509), if the subcontract exceeds $5.5 million and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.
(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.
(iii) 52.204–21, Basic Safeguarding of Covered Contractor Information Systems (June, 2016), other than subcontracts for commercially available off-the-shelf items, if flow down is required in accordance with paragraph (c) of FAR clause 52.204–21.
(iv) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities.
(v) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vi) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(vii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212(a));
(viii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(ix) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
(x) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)
(E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.
(xi) (A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O.
13627).
(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xii) 52.222-55, Establishing a Minimum Wage for Contractors (E.O.
13658) (Dec 2015).
(xii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct
2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xiv) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec 2013), if flow down is required in accordance with paragraph (c) of FAR clause 52.232-40.
(xvii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64).
(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.
Revised by A001 52.246-12 Inspection of Construction (Aug 1996)
E-2 DIVISION 100
Special Contract Requirements Project: AK NPS DENA 10(44), Repave Denali Park Road MP 3.4 To 14.7, Phase II
Section 102. — BID, AWARD, AND
EXECUTION OF CONTRACT
03/31/16– FP-14
102.02 Preparation of Bids. Add the following:
Submit bids for construction of the project under three separate bid schedules designated A, B, and C. Complete Schedule A, Schedule B, and Schedule C. Schedules A, B, and C represent alternate amounts of work and not alternate methods of completing the work.
Schedule A consists of approximately 5.8 miles of discontinuous full depth reclamation, overlay paving, and striping from Station 473+30 to 777+53.
Schedule B consists of all work in Schedule A and approximately 2.3 miles of discontinuous full depth reclamation, overlay paving, and striping from Station 350+00 to 777+53.
Schedule C consists of all work in Schedule B and approximately 3.2 miles of discontinuous full depth reclamation, overlay paving, and striping from Station 180+00 to 777+53
102.05A Contract Award. (Added Subsection).
Follow the requirements of FAR Provision 52.214-19, Contract Award - Sealed Bidding - Construction.
The Government wishes to complete as much work as possible, and award only one (1) Schedule depending on available funding. If sufficient funds are available at the time of award, the Government will award Schedule “C” to the low responsible bidder of Schedule “C”. If sufficient funds are not available at the time of award to award Schedule “C”, the Government will award Schedule “B” to the low responsible bidder of Schedule “B”. If sufficient funds are not available at the time of award to award Schedule “B”, the Government will award Schedule “A” to the low responsible bidder of Schedule “A”. The successful bidder will be awarded all pay items in the bid schedule awarded.
The Government wishes to complete as much work as possible. If sufficient funds are available at the time of award, the Government will award Schedule “A” to the low responsible bidder of Schedule “A”. If additional funds are available at the time of award the Government will award Schedule “B” to the low responsible bidder of Schedule “B”. If additional funds are available at the time of award the Government will award Schedule “C” to the low responsible bidder of Schedule “C”. The successful bidder will be awarded all pay items in the bid schedule awarded.
Revised by A001
| SF30 |