Q A_MT_DOD_16(54).pdf
PDF 68 KB Posted
- Attached to
- MT DOD 16(54), Minuteman Missile Base Roads
- Solicitation number
- DTFH70-16-B-00013
About this file
Q A_MT DOD 16(54)
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DOD 16(54)
Minuteman Missile Base Roads
# General Technical Question Answer Date 1 x On Bid Schedule A, Page A-8, Line Item
15705-1300; what is the description, is it as on Bid Schedule B & C; i.e., SOIL
EROSION CONTROL, TEMPORARY
DIVERSION CHANNEL?
See Amendment A001 5/27/16
2 x
Are the roads to be reconstructed accessible to the contractors to travel and view or is a special permit to do said required?
yes; no permit required 5/26/16
Check General or Technical
File details come from the government source that posted it. Updated .