PROJECT_DESCRIPTION_MT_DOD_16(54).pdf
PDF 24 KB Posted
- Attached to
- MT DOD 16(54), Minuteman Missile Base Roads Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_for_DTFH70-16-B-00013_MT_DOD_16(54).pdf | ||
| Q A_MT_DOD_16(54).pdf | ||
| A002_MT_DOD_16(54)_Minuteman_Missile_Base_Roads.pdf | ||
| A001_MT_DOD_16(54)_Minuteman_Missile_Base_Roads.pdf | ||
| Q A_MT_DOD_16(54).pdf | ||
| MT_DOT_16(54)_PlanSet_Sign-Off_Signed.pdf | ||
| mt-d1654_XS_Signoff.pdf | ||
| IFB_Minuteman.pdf | ||
| SWPPP_Minutemen_Missile_Base_Road _MT_DOD_16(54)_Judith_Basin_and_Fergus_Counties _Montana.pdf | ||
| Plan_Request__Minuteman.pdf | ||
| mt-d1654_Earthwork_Data_Listing.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT DOD 16(54), Minuteman Missile Base Roads, Department of Defense, Fergus County, Montana
The work consists of roadway reconditioning, aggregate surfacing, aggregate stabilization, grading, drainage, fencing, cattle guard replacement, and other small items of work.
Project length:
Schedule A: 41.35 Miles Schedule B: 51.60 Schedule C: 53.71 Miles
Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $6 million to $8 million
Location: 105 Miles East of Great Falls
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
O ne
S ch ed ul e Sc h N am e
A
A dd iti on al S ch
Sc h
N am e
_B dd iti on al
N am e
_C
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes 157 Soil Erosion & Sediment Control (temporary diversion channel) 230 LNFT 300 LNFT 350 LNFT 157 Soil Erosion & Sediment Control (Fiber roll) 4,700 LNFT 4,850 LNFT 5,150 LNFT 158 Watering for Dust Control 5,000 MGAL 6,200 MGAL 6,500 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.6 ACRE 1.6 ACRE 1.6 ACRE 203 Removal of Structures & Obstructions (pipe removal) 2 EACH 2 EACH 2 EACH 203 Removal of Structures & Obstructions (fence removal) 2,350 LNFT 2,450 LNFT 2,450 LNFT
O ne
S ch ed ul e Sc h N am e
A dd iti on al
N am e
_B dd iti on al
N am e
_C
204 Roadway Excavation 655 CUYD 655 CUYD 655 CUYD 204 Subexcavation 2,000 CUYD 2,000 CUYD 2,000 CUYD 204 Unclassified Borrow 15,500 TON 15,500 TON 15,500 TON 204 Select Borrow 10,000 TON 10,000 TON 205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No No No 207 Earthwork Geosynthetics 6,500 SQYD 6,500 SQYD 6,500 SQYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 1,415 CUYD 1,460 CUYD 1,470 CUYD
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 2,500 TON 3,050 TON 3,275 TON 303 Road Reconditioning
216,480 LNFT
270,600
LNFT 281,741 LNFT
311 Stabilized Aggregate Surface Course 136, 000 TON 165,000 TON 172,000 TON 311 Calcium Chloride 2,325 TON 2,825 2,950 TON
DIVISION 600 – Incidental Construction 602 Culverts & Drains (Culverts) 1,110 LNFT 1,330 LNFT 1,495 LNFT 607 Cleaning, Relaying, & Repairing Existing Drainage Structures 24 EACH 28 EACH 30 EACH 619 Fences, Gates, Cattle Guards & Bollard Posts (Fence) 2,415 LNFT 2,500 LNFT 2,500 LNFT 619 Fences, Gates, Cattle Guards & Bollard Posts (Cattle guard) 4 EACH 4 EACH 4 EACH 619 Fences, Gates, Cattle Guards & Bollard Posts (Remove and reset fence) 75 LNFT 75 LNFT 75 LNFT 621 Monuments & Markers (construction survey & staking) (yes/no) No No No 622 Rental Equipment (yes/no) Yes Yes Yes 623 General Labor (yes/no) Yes Yes Yes 624 Topsoil (landscaping & related items) 1.6 ACRE 1.6 ACRE 1.6 ACRE 625 Turf Establishment (indicate seeding or mulching separately) 7 SLRY 7 SLRY 7 SLRY 635 Temporary Traffic Control – Flagger 3,420 FXHR 4,000 FXHR 4,380 635 Temporary Traffic Control LPSM LPSM LPSM
File details come from the government source that posted it. Updated .