mt-d1654_Earthwork_Data_Listing.pdf

PDF 53 KB Posted

Attached to
MT DOD 16(54), Minuteman Missile Base Roads Federal contract opportunity
Solicitation number
DTFH70-16-B-00013
Issued by
Department of Transportation Federal Highway Administration

About this file

Earthwork

View the file

Other files for this federal contract opportunity

Other files attached to MT DOD 16(54), Minuteman Missile Base Roads, newest first.
File Type Posted
Bid_Opening_Summary_for_DTFH70-16-B-00013_MT_DOD_16(54).pdf PDF
Q A_MT_DOD_16(54).pdf PDF
A002_MT_DOD_16(54)_Minuteman_Missile_Base_Roads.pdf PDF
A001_MT_DOD_16(54)_Minuteman_Missile_Base_Roads.pdf PDF
Q A_MT_DOD_16(54).pdf PDF
MT_DOT_16(54)_PlanSet_Sign-Off_Signed.pdf PDF
mt-d1654_XS_Signoff.pdf PDF
IFB_Minuteman.pdf PDF
Plan_Request__Minuteman.pdf PDF
SWPPP_Minutemen_Missile_Base_Road _MT_DOD_16(54)_Judith_Basin_and_Fergus_Counties _Montana.pdf PDF
PROJECT_DESCRIPTION_MT_DOD_16(54).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

MT DOD 16(54)

MINUTEMAN MISSILE BASE ROADS

GEOPAK EARTHWORK DATA LISTING

MARCH 1, 2016

COMPUTING EARTHWORKS FOR BASELINE = E-02

COMPUTING EARTHWORKS FOR JOB = 54

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

50+00.00 SUBEXCAVATION

Excavation 53.19 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.38 0 0 0.00 0 0

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 54.50 0 0 0.00 0 0

50+50.00 SUBEXCAVATION

Excavation 51.82 97 97 1.00 97 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 97

TOPSOIL

Excavation 1.74 2 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.43 16 0 0.00 0 16

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 56.77 103 0 0.00 0 103

51+00.00 SUBEXCAVATION

Excavation 45.51 90 90 1.00 187 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 187

TOPSOIL

Excavation 1.98 3 0 0.00 5 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 0 32

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.76 107 0 0.00 0 210

51+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0

Fill 9.81 9 9 1.00 -9 9

SUBEXCAVATION

Excavation 29.97 70 70 1.00 257 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -9 0 Mass ordinate for SUBEXCAVATION = 257

TOPSOIL

Excavation 3.58 5 0 0.00 10 Subsoil Exc 4.10 4 0 0.00 4 Fill 0.00 0 0 0.00 -9 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -9 48

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.82 116 0 0.00 -9 326

51+76.39 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 5 5 1.00 -14 14

SUBEXCAVATION

Excavation 15.38 22 22 1.00 279 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -14 0 Mass ordinate for SUBEXCAVATION = 279

TOPSOIL

Excavation 0.00 2 0 0.00 12 Subsoil Exc 0.00 2 0 0.00 6 Fill 0.00 0 0 0.00 -14 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 8 0 0.00 -14 56

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 64.45 64 0 0.00 -14 390

52+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.96 15 15 1.00 -29 29

SUBEXCAVATION

Excavation 0.17 7 7 1.00 286 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -29 0 Mass ordinate for SUBEXCAVATION = 286

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 9.08 4 0 0.00 10 Fill 0.00 0 0 0.00 -29 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 7 0 0.00 -29 63

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.82 57 0 0.00 -29 447

52+50.00 RDWYEXC

Subsoil Exc 0.00 0 0 1.00 0 Fill 115.08 139 139 1.00 -168 168

SUBEXCAVATION

Excavation 0.00 0 0 1.00 286 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -168 0 Mass ordinate for SUBEXCAVATION = 286

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 12.45 20 0 0.00 30 Fill 0.00 0 0 0.00 -168 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -168 79

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.86 120 0 0.00 -168 567

52+75.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 358.88 219 219 1.00 -387 387

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 24.42 17 0 0.00 47 Fill 0.00 0 0 0.00 -387 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 8 0 0.00 -387 87

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.86 58 0 0.00 -387 625

52+97.53 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 379.52 308 308 1.00 -695 695

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 27.12 22 0 0.00 69 Fill 0.00 0 0 0.00 -695 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.62 8 0 0.00 -695 95

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 70.14 55 0 0.00 -695 680

53+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 304.37 31 31 1.00 -726 726

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 19.93 2 0 0.00 71 Fill 0.00 0 0 0.00 -726 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 1 0 0.00 -726 96

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.86 6 0 0.00 -726 686

53+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 222.57 488 488 1.00 -1214 1214

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 16.71 34 0 0.00 105 Fill 0.00 0 0 0.00 -1214 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -1214 112

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 115 0 0.00 -1214 801

53+89.25 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 244.29 339 339 1.00 -1553 1553

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 19.78 27 0 0.00 132 Fill 0.00 0 0 0.00 -1553 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.46 12 0 0.00 -1553 124

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.04 90 0 0.00 -1553 891

54+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 198.81 88 88 1.00 -1641 1641

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 14.98 7 0 0.00 139 Fill 0.00 0 0 0.00 -1641 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 3 0 0.00 -1641 127

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0

Fill 61.59 25 0 0.00 -1641 916

54+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 176.48 347 347 1.00 -1988 1988

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 12.50 25 0 0.00 164 Fill 0.00 0 0 0.00 -1988 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -1988 143

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -1988 1030

55+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 164.63 316 316 1.00 -2304 2304

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 11.61 22 0 0.00 186 Fill 0.00 0 0 0.00 -2304 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -2304 159

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -2304 1144

55+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 161.39 302 302 1.00 -2606 2606

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 11.04 21 0 0.00 207 Fill 0.00 0 0 0.00 -2606 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -2606 175

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -2606 1258

56+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 153.21 291 291 1.00 -2897 2897

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 10.32 20 0 0.00 227 Fill 0.00 0 0 0.00 -2897 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -2897 191

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -2897 1372

56+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 171.05 300 300 1.00 -3197 3197

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 10.88 20 0 0.00 247 Fill 0.00 0 0 0.00 -3197 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -3197 207

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -3197 1486

57+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 224.70 366 366 1.00 -3563 3563

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 12.62 22 0 0.00 269 Fill 0.00 0 0 0.00 -3563 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -3563 223

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 64.21 116 0 0.00 -3563 1602

57+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 283.33 470 470 1.00 -4033 4033

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 15.82 26 0 0.00 295 Fill 0.00 0 0 0.00 -4033 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -4033 239

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 116 0 0.00 -4033 1718

57+60.76 RDWYEXC

Fill 313.18 119 119 1.00 -4152 4152

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 17.63 7 0 0.00 302 Fill 0.00 0 0 0.00 -4152 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.06 3 0 0.00 -4152 242

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.23 25 0 0.00 -4152 1743

58+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 269.67 424 424 1.00 -4576 4576

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 14.46 23 0 0.00 325 Fill 0.00 0 0 0.00 -4576 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 13 0 0.00 -4576 255

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 93 0 0.00 -4576 1836

58+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 281.99 511 511 1.00 -5087 5087

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 14.62 27 0 0.00 352 Fill 0.00 0 0 0.00 -5087 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -5087 271

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -5087 1950

59+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 331.16 568 568 1.00 -5655 5655

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 17.32 30 0 0.00 382 Fill 0.00 0 0 0.00 -5655 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0

Fill 8.39 16 0 0.00 -5655 287

SUBEXBACKFILL

Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -5655 2064

59+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 443.89 718 718 1.00 -6373 6373

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 21.52 36 0 0.00 418 Fill 0.00 0 0 0.00 -6373 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -6373 303

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -6373 2178

60+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 343.17 729 729 1.00 -7102 7102

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 21.46 40 0 0.00 458 Fill 0.00 0 0 0.00 -7102 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -7102 319

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -7102 2292

60+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 75.59 388 388 1.00 -7490 7490

TOPSOIL

Excavation 0.00 0 0 0.00 12 Subsoil Exc 10.42 30 0 0.00 488 Fill 0.00 0 0 0.00 -7490 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -7490 335

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.82 119 0 0.00 -7490 2411

61+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.89 71 71 1.00 -7561 7561

SUBEXCAVATION

Excavation 13.53 13 13 1.00 299

Fill 0.00 0 0 1.00 -7561 0 Mass ordinate for SUBEXCAVATION = 299

TOPSOIL

Excavation 4.40 4 0 0.00 16 Subsoil Exc 0.88 10 0 0.00 498 Fill 0.00 0 0 0.00 -7561 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -7561 351

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.17 123 0 0.00 -7561 2534

61+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 1 1 1.00 -7562 7562

SUBEXCAVATION

Excavation 45.48 55 55 1.00 354 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -7562 0 Mass ordinate for SUBEXCAVATION = 354

TOPSOIL

Excavation 2.10 6 0 0.00 22 Subsoil Exc 0.00 1 0 0.00 499 Fill 0.00 0 0 0.00 -7562 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -7562 367

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 57.82 115 0 0.00 -7562 2649

62+00.00 RDWYEXC

Excavation 1.91 2 2 0.85 2 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.16 0 0 1.00 -7560 7562

SUBEXCAVATION

Excavation 55.94 94 94 1.00 448 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -7560 0 Mass ordinate for SUBEXCAVATION = 448

TOPSOIL

Excavation 2.26 4 0 0.00 26 Subsoil Exc 0.16 0 0 0.00 499 Fill 0.00 0 0 0.00 -7560 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.36 16 0 0.00 -7560 383

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.41 108 0 0.00 -7560 2757

62+10.00 RDWYEXC

Excavation 1.92 0 0 0.85 2

Fill 0.16 0 0 1.00 -7560 7562

SUBEXCAVATION

Excavation 55.95 21 21 1.00 469 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -7560 0 Mass ordinate for SUBEXCAVATION = 469

TOPSOIL

Excavation 2.58 1 0 0.00 27 Subsoil Exc 0.16 0 0 0.00 499 Fill 0.00 0 0 0.00 -7560 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 3 0 0.00 -7560 386

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.43 22 0 0.00 -7560 2779 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 2 2 0.85 Subsoil Exc 0 0 1.00 Fill 7562 7562 1.00

SUBEXCAVATION

Excavation 469 469 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00

TOPSOIL

Excavation 27 0 0.00 Subsoil Exc 499 0 0.00 Fill 0 0 0.00

GRAVEL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 386 0 0.00

SUBEXBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 2779 0 0.00

** THE CALCULATED LAYERS FOR 'SUBEXCAVATION' AND 'SUBEXBACKFILL' ARE FOR THE SELECT BORROW LAYER AND NOT SUBEXCAVATION. IF THE 'SUBEXCAVATION' EXCAVATION VALUE IS SUBTRACTED FROM THE 'SUBEXBACKFILL' FILL VALUE, THE REMAINING VOLUME IS EQUIVALENT TO THE REQUIRED

SELECT BORROW FOR TYPICAL SECTION NO. 2.**

COMPUTING EARTHWORKS FOR BASELINE = E-05

COMPUTING EARTHWORKS FOR JOB = 54

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

9+50.00 RDWYEXC

Excavation 1.83 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.34 0 0 1.00 0 0

TOPSOIL

Excavation 0.94 0 0 0.00 0 Subsoil Exc 3.85 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.72 0 0 0.00 0 0

10+00.00 RDWYEXC

Excavation 1.49 3 3 0.85 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.60 8 8 1.00 -5 8

TOPSOIL

Excavation 1.03 2 0 0.00 2 Subsoil Exc 2.62 6 0 0.00 6 Fill 0.00 0 0 0.00 -5 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.93 14 0 0.00 -5 14

10+50.00 RDWYEXC

Excavation 0.00 1 1 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.00 14 14 1.00 -18 22

TOPSOIL

Excavation 0.00 1 0 0.00 3 Subsoil Exc 3.28 5 0 0.00 11 Fill 0.00 0 0 0.00 -18 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 15 0 0.00 -18 29

11+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.59 45 45 1.00 -63 67

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.71 9 0 0.00 20 Fill 0.00 0 0 0.00 -63 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0

Fill 7.73 14 0 0.00 -63 43

11+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 52.09 82 82 1.00 -145 149

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.97 13 0 0.00 33 Fill 0.00 0 0 0.00 -145 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -145 57

12+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 83.95 126 126 1.00 -271 275

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 8.90 15 0 0.00 48 Fill 0.00 0 0 0.00 -271 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -271 71

12+44.57 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 124.32 172 172 1.00 -443 447

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.31 16 0 0.00 64 Fill 0.00 0 0 0.00 -443 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.19 14 0 0.00 -443 85

12+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 92.51 22 22 1.00 -465 469

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 8.32 2 0 0.00 66 Fill 0.00 0 0 0.00 -465 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 2 0 0.00 -465 87

13+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 79.76 160 160 1.00 -625 629

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.45 14 0 0.00 80 Fill 0.00 0 0 0.00 -625 0

Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -625 101

13+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.76 124 124 1.00 -749 753

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 5.35 11 0 0.00 91 Fill 0.00 0 0 0.00 -749 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -749 115

13+71.02 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 49.66 40 40 1.00 -789 793

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.46 5 0 0.00 96 Fill 0.00 0 0 0.00 -789 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.51 6 0 0.00 -789 121

14+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.69 40 40 1.00 -829 833

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 4.99 6 0 0.00 102 Fill 0.00 0 0 0.00 -829 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 9 0 0.00 -829 130

14+50.00 RDWYEXC

Excavation 0.53 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.94 28 28 1.00 -857 861

TOPSOIL

Excavation 0.02 0 0 0.00 3 Subsoil Exc 2.16 7 0 0.00 109 Fill 0.00 0 0 0.00 -857 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -857 144

15+00.00 RDWYEXC

Excavation 0.27 1 1 0.85 5

Fill 8.22 13 13 1.00 -869 874

TOPSOIL

Excavation 0.01 0 0 0.00 3 Subsoil Exc 3.24 5 0 0.00 114 Fill 0.00 0 0 0.00 -869 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -869 158

15+42.37 RDWYEXC

Excavation 0.10 0 0 0.85 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.88 8 8 1.00 -877 882

TOPSOIL

Excavation 0.00 0 0 0.00 3 Subsoil Exc 0.00 3 0 0.00 117 Fill 0.00 0 0 0.00 -877 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.10 12 0 0.00 -877 170

15+50.00 RDWYEXC

Excavation 0.09 0 0 0.85 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.07 0 0 1.00 -877 882

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 2 0 0.00 -877 172

16+00.00 RDWYEXC

Excavation 1.68 1 1 0.85 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.67 2 2 1.00 -878 884

TOPSOIL

Excavation 1.34 1 0 0.00 4 Subsoil Exc 0.67 1 0 0.00 118 Fill 0.00 0 0 0.00 -878 0 Mass ordinate for TOPSOIL = 0

GRAVEL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.84 14 0 0.00 -878 186

� G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 6 6 0.85 Subsoil Exc 0 0 1.00 Fill 884 884 1.00

TOPSOIL

Excavation 4 0 0.00 Subsoil Exc 118 0 0.00 Fill 0 0 0.00

GRAVEL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 186 0 0.00

mt-d1654_Earthwork_Cover_Sheet
mt-d1654_E-2_MP2
mt-d1654_E-4_MP2