mt-d1654_Earthwork_Data_Listing.pdf
PDF 53 KB Posted
- Attached to
- MT DOD 16(54), Minuteman Missile Base Roads Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00013
About this file
Earthwork
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_for_DTFH70-16-B-00013_MT_DOD_16(54).pdf | ||
| Q A_MT_DOD_16(54).pdf | ||
| A002_MT_DOD_16(54)_Minuteman_Missile_Base_Roads.pdf | ||
| A001_MT_DOD_16(54)_Minuteman_Missile_Base_Roads.pdf | ||
| Q A_MT_DOD_16(54).pdf | ||
| MT_DOT_16(54)_PlanSet_Sign-Off_Signed.pdf | ||
| mt-d1654_XS_Signoff.pdf | ||
| IFB_Minuteman.pdf | ||
| Plan_Request__Minuteman.pdf | ||
| SWPPP_Minutemen_Missile_Base_Road _MT_DOD_16(54)_Judith_Basin_and_Fergus_Counties _Montana.pdf | ||
| PROJECT_DESCRIPTION_MT_DOD_16(54).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
MT DOD 16(54)
MINUTEMAN MISSILE BASE ROADS
GEOPAK EARTHWORK DATA LISTING
MARCH 1, 2016
COMPUTING EARTHWORKS FOR BASELINE = E-02
COMPUTING EARTHWORKS FOR JOB = 54
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
50+00.00 SUBEXCAVATION
Excavation 53.19 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.38 0 0 0.00 0 0
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 54.50 0 0 0.00 0 0
50+50.00 SUBEXCAVATION
Excavation 51.82 97 97 1.00 97 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 97
TOPSOIL
Excavation 1.74 2 0 0.00 2 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.43 16 0 0.00 0 16
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 56.77 103 0 0.00 0 103
51+00.00 SUBEXCAVATION
Excavation 45.51 90 90 1.00 187 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 187
TOPSOIL
Excavation 1.98 3 0 0.00 5 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 0 32
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.76 107 0 0.00 0 210
51+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0
Fill 9.81 9 9 1.00 -9 9
SUBEXCAVATION
Excavation 29.97 70 70 1.00 257 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -9 0 Mass ordinate for SUBEXCAVATION = 257
TOPSOIL
Excavation 3.58 5 0 0.00 10 Subsoil Exc 4.10 4 0 0.00 4 Fill 0.00 0 0 0.00 -9 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -9 48
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.82 116 0 0.00 -9 326
51+76.39 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 5 5 1.00 -14 14
SUBEXCAVATION
Excavation 15.38 22 22 1.00 279 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -14 0 Mass ordinate for SUBEXCAVATION = 279
TOPSOIL
Excavation 0.00 2 0 0.00 12 Subsoil Exc 0.00 2 0 0.00 6 Fill 0.00 0 0 0.00 -14 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 8 0 0.00 -14 56
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 64.45 64 0 0.00 -14 390
52+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.96 15 15 1.00 -29 29
SUBEXCAVATION
Excavation 0.17 7 7 1.00 286 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -29 0 Mass ordinate for SUBEXCAVATION = 286
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 9.08 4 0 0.00 10 Fill 0.00 0 0 0.00 -29 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 7 0 0.00 -29 63
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.82 57 0 0.00 -29 447
52+50.00 RDWYEXC
Subsoil Exc 0.00 0 0 1.00 0 Fill 115.08 139 139 1.00 -168 168
SUBEXCAVATION
Excavation 0.00 0 0 1.00 286 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -168 0 Mass ordinate for SUBEXCAVATION = 286
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 12.45 20 0 0.00 30 Fill 0.00 0 0 0.00 -168 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -168 79
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.86 120 0 0.00 -168 567
52+75.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 358.88 219 219 1.00 -387 387
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 24.42 17 0 0.00 47 Fill 0.00 0 0 0.00 -387 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 8 0 0.00 -387 87
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.86 58 0 0.00 -387 625
52+97.53 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 379.52 308 308 1.00 -695 695
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 27.12 22 0 0.00 69 Fill 0.00 0 0 0.00 -695 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.62 8 0 0.00 -695 95
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 70.14 55 0 0.00 -695 680
53+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 304.37 31 31 1.00 -726 726
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 19.93 2 0 0.00 71 Fill 0.00 0 0 0.00 -726 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 1 0 0.00 -726 96
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.86 6 0 0.00 -726 686
53+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 222.57 488 488 1.00 -1214 1214
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 16.71 34 0 0.00 105 Fill 0.00 0 0 0.00 -1214 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -1214 112
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 115 0 0.00 -1214 801
53+89.25 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 244.29 339 339 1.00 -1553 1553
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 19.78 27 0 0.00 132 Fill 0.00 0 0 0.00 -1553 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.46 12 0 0.00 -1553 124
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 62.04 90 0 0.00 -1553 891
54+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 198.81 88 88 1.00 -1641 1641
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 14.98 7 0 0.00 139 Fill 0.00 0 0 0.00 -1641 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 3 0 0.00 -1641 127
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 61.59 25 0 0.00 -1641 916
54+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 176.48 347 347 1.00 -1988 1988
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 12.50 25 0 0.00 164 Fill 0.00 0 0 0.00 -1988 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -1988 143
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -1988 1030
55+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 164.63 316 316 1.00 -2304 2304
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 11.61 22 0 0.00 186 Fill 0.00 0 0 0.00 -2304 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -2304 159
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -2304 1144
55+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 161.39 302 302 1.00 -2606 2606
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 11.04 21 0 0.00 207 Fill 0.00 0 0 0.00 -2606 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -2606 175
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -2606 1258
56+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 153.21 291 291 1.00 -2897 2897
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 10.32 20 0 0.00 227 Fill 0.00 0 0 0.00 -2897 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -2897 191
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -2897 1372
56+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 171.05 300 300 1.00 -3197 3197
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 10.88 20 0 0.00 247 Fill 0.00 0 0 0.00 -3197 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -3197 207
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -3197 1486
57+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 224.70 366 366 1.00 -3563 3563
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 12.62 22 0 0.00 269 Fill 0.00 0 0 0.00 -3563 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -3563 223
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 64.21 116 0 0.00 -3563 1602
57+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 283.33 470 470 1.00 -4033 4033
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 15.82 26 0 0.00 295 Fill 0.00 0 0 0.00 -4033 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -4033 239
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 116 0 0.00 -4033 1718
57+60.76 RDWYEXC
Fill 313.18 119 119 1.00 -4152 4152
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 17.63 7 0 0.00 302 Fill 0.00 0 0 0.00 -4152 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.06 3 0 0.00 -4152 242
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.23 25 0 0.00 -4152 1743
58+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 269.67 424 424 1.00 -4576 4576
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 14.46 23 0 0.00 325 Fill 0.00 0 0 0.00 -4576 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 13 0 0.00 -4576 255
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 93 0 0.00 -4576 1836
58+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 281.99 511 511 1.00 -5087 5087
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 14.62 27 0 0.00 352 Fill 0.00 0 0 0.00 -5087 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -5087 271
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -5087 1950
59+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 331.16 568 568 1.00 -5655 5655
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 17.32 30 0 0.00 382 Fill 0.00 0 0 0.00 -5655 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0
Fill 8.39 16 0 0.00 -5655 287
SUBEXBACKFILL
Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -5655 2064
59+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 443.89 718 718 1.00 -6373 6373
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 21.52 36 0 0.00 418 Fill 0.00 0 0 0.00 -6373 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -6373 303
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -6373 2178
60+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 343.17 729 729 1.00 -7102 7102
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 21.46 40 0 0.00 458 Fill 0.00 0 0 0.00 -7102 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -7102 319
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 61.59 114 0 0.00 -7102 2292
60+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 75.59 388 388 1.00 -7490 7490
TOPSOIL
Excavation 0.00 0 0 0.00 12 Subsoil Exc 10.42 30 0 0.00 488 Fill 0.00 0 0 0.00 -7490 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -7490 335
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.82 119 0 0.00 -7490 2411
61+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.89 71 71 1.00 -7561 7561
SUBEXCAVATION
Excavation 13.53 13 13 1.00 299
Fill 0.00 0 0 1.00 -7561 0 Mass ordinate for SUBEXCAVATION = 299
TOPSOIL
Excavation 4.40 4 0 0.00 16 Subsoil Exc 0.88 10 0 0.00 498 Fill 0.00 0 0 0.00 -7561 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -7561 351
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 66.17 123 0 0.00 -7561 2534
61+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 1 1 1.00 -7562 7562
SUBEXCAVATION
Excavation 45.48 55 55 1.00 354 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -7562 0 Mass ordinate for SUBEXCAVATION = 354
TOPSOIL
Excavation 2.10 6 0 0.00 22 Subsoil Exc 0.00 1 0 0.00 499 Fill 0.00 0 0 0.00 -7562 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 16 0 0.00 -7562 367
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 57.82 115 0 0.00 -7562 2649
62+00.00 RDWYEXC
Excavation 1.91 2 2 0.85 2 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.16 0 0 1.00 -7560 7562
SUBEXCAVATION
Excavation 55.94 94 94 1.00 448 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -7560 0 Mass ordinate for SUBEXCAVATION = 448
TOPSOIL
Excavation 2.26 4 0 0.00 26 Subsoil Exc 0.16 0 0 0.00 499 Fill 0.00 0 0 0.00 -7560 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.36 16 0 0.00 -7560 383
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.41 108 0 0.00 -7560 2757
62+10.00 RDWYEXC
Excavation 1.92 0 0 0.85 2
Fill 0.16 0 0 1.00 -7560 7562
SUBEXCAVATION
Excavation 55.95 21 21 1.00 469 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 -7560 0 Mass ordinate for SUBEXCAVATION = 469
TOPSOIL
Excavation 2.58 1 0 0.00 27 Subsoil Exc 0.16 0 0 0.00 499 Fill 0.00 0 0 0.00 -7560 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.39 3 0 0.00 -7560 386
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 58.43 22 0 0.00 -7560 2779 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 2 2 0.85 Subsoil Exc 0 0 1.00 Fill 7562 7562 1.00
SUBEXCAVATION
Excavation 469 469 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00
TOPSOIL
Excavation 27 0 0.00 Subsoil Exc 499 0 0.00 Fill 0 0 0.00
GRAVEL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 386 0 0.00
SUBEXBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 2779 0 0.00
** THE CALCULATED LAYERS FOR 'SUBEXCAVATION' AND 'SUBEXBACKFILL' ARE FOR THE SELECT BORROW LAYER AND NOT SUBEXCAVATION. IF THE 'SUBEXCAVATION' EXCAVATION VALUE IS SUBTRACTED FROM THE 'SUBEXBACKFILL' FILL VALUE, THE REMAINING VOLUME IS EQUIVALENT TO THE REQUIRED
SELECT BORROW FOR TYPICAL SECTION NO. 2.**
COMPUTING EARTHWORKS FOR BASELINE = E-05
COMPUTING EARTHWORKS FOR JOB = 54
FORMING LIST OF XSCELLS
BEGINNING EARTHWORKS COMPUTATION
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
9+50.00 RDWYEXC
Excavation 1.83 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.34 0 0 1.00 0 0
TOPSOIL
Excavation 0.94 0 0 0.00 0 Subsoil Exc 3.85 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.72 0 0 0.00 0 0
10+00.00 RDWYEXC
Excavation 1.49 3 3 0.85 3 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.60 8 8 1.00 -5 8
TOPSOIL
Excavation 1.03 2 0 0.00 2 Subsoil Exc 2.62 6 0 0.00 6 Fill 0.00 0 0 0.00 -5 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.93 14 0 0.00 -5 14
10+50.00 RDWYEXC
Excavation 0.00 1 1 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 12.00 14 14 1.00 -18 22
TOPSOIL
Excavation 0.00 1 0 0.00 3 Subsoil Exc 3.28 5 0 0.00 11 Fill 0.00 0 0 0.00 -18 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 15 0 0.00 -18 29
11+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.59 45 45 1.00 -63 67
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.71 9 0 0.00 20 Fill 0.00 0 0 0.00 -63 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0
Fill 7.73 14 0 0.00 -63 43
11+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 52.09 82 82 1.00 -145 149
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.97 13 0 0.00 33 Fill 0.00 0 0 0.00 -145 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -145 57
12+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 83.95 126 126 1.00 -271 275
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 8.90 15 0 0.00 48 Fill 0.00 0 0 0.00 -271 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -271 71
12+44.57 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 124.32 172 172 1.00 -443 447
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 10.31 16 0 0.00 64 Fill 0.00 0 0 0.00 -443 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.19 14 0 0.00 -443 85
12+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 92.51 22 22 1.00 -465 469
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 8.32 2 0 0.00 66 Fill 0.00 0 0 0.00 -465 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 2 0 0.00 -465 87
13+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 79.76 160 160 1.00 -625 629
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.45 14 0 0.00 80 Fill 0.00 0 0 0.00 -625 0
Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -625 101
13+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.76 124 124 1.00 -749 753
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 5.35 11 0 0.00 91 Fill 0.00 0 0 0.00 -749 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -749 115
13+71.02 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 49.66 40 40 1.00 -789 793
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 6.46 5 0 0.00 96 Fill 0.00 0 0 0.00 -789 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.51 6 0 0.00 -789 121
14+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.69 40 40 1.00 -829 833
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 4.99 6 0 0.00 102 Fill 0.00 0 0 0.00 -829 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 9 0 0.00 -829 130
14+50.00 RDWYEXC
Excavation 0.53 0 0 0.85 4 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.94 28 28 1.00 -857 861
TOPSOIL
Excavation 0.02 0 0 0.00 3 Subsoil Exc 2.16 7 0 0.00 109 Fill 0.00 0 0 0.00 -857 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -857 144
15+00.00 RDWYEXC
Excavation 0.27 1 1 0.85 5
Fill 8.22 13 13 1.00 -869 874
TOPSOIL
Excavation 0.01 0 0 0.00 3 Subsoil Exc 3.24 5 0 0.00 114 Fill 0.00 0 0 0.00 -869 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 14 0 0.00 -869 158
15+42.37 RDWYEXC
Excavation 0.10 0 0 0.85 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.88 8 8 1.00 -877 882
TOPSOIL
Excavation 0.00 0 0 0.00 3 Subsoil Exc 0.00 3 0 0.00 117 Fill 0.00 0 0 0.00 -877 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.10 12 0 0.00 -877 170
15+50.00 RDWYEXC
Excavation 0.09 0 0 0.85 5 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.07 0 0 1.00 -877 882
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.73 2 0 0.00 -877 172
16+00.00 RDWYEXC
Excavation 1.68 1 1 0.85 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.67 2 2 1.00 -878 884
TOPSOIL
Excavation 1.34 1 0 0.00 4 Subsoil Exc 0.67 1 0 0.00 118 Fill 0.00 0 0 0.00 -878 0 Mass ordinate for TOPSOIL = 0
GRAVEL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.84 14 0 0.00 -878 186
� G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 6 6 0.85 Subsoil Exc 0 0 1.00 Fill 884 884 1.00
TOPSOIL
Excavation 4 0 0.00 Subsoil Exc 118 0 0.00 Fill 0 0 0.00
GRAVEL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 186 0 0.00
| mt-d1654_Earthwork_Cover_Sheet |
| mt-d1654_E-2_MP2 |
| mt-d1654_E-4_MP2 |
File details come from the government source that posted it. Updated .