About this file

Plans

View the file

Other files for this federal contract opportunity

Other files attached to MT DOD 16(54), Minuteman Missile Base Roads, newest first.
File Type Posted
Bid_Opening_Summary_for_DTFH70-16-B-00013_MT_DOD_16(54).pdf PDF
Q A_MT_DOD_16(54).pdf PDF
A002_MT_DOD_16(54)_Minuteman_Missile_Base_Roads.pdf PDF
A001_MT_DOD_16(54)_Minuteman_Missile_Base_Roads.pdf PDF
Q A_MT_DOD_16(54).pdf PDF
Plan_Request__Minuteman.pdf PDF
mt-d1654_Earthwork_Data_Listing.pdf PDF
SWPPP_Minutemen_Missile_Base_Road _MT_DOD_16(54)_Judith_Basin_and_Fergus_Counties _Montana.pdf PDF
mt-d1654_XS_Signoff.pdf PDF
IFB_Minuteman.pdf PDF
PROJECT_DESCRIPTION_MT_DOD_16(54).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WESTERN FEDERAL LANDS HIGHWAY DIVISION

DETAIL APPROVED FOR USE 11/2001

REVISED: 9/2005 1/2007 10/2009 10/2014

W101-1

AND ABBREVIATIONS

PLAN SYMBOLS

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e

E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT

Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north

OG

OD

o. to o.

o. c.

original ground outside diameter out to out on center pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W

R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph

V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material A

M

J a n u a r y

U

S C

F h ig h w a y s F

H W

A

O M

A D

D e s ig n G e n e r a l I n fo r m a ti o n m t-d a b .d g n

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DETAIL

U.S. CUSTOMARY DETAIL

STATE PROJECT

NUMBER

SHEET

A.2 DOD 16(54) MT

BH

CP GPS

JH

TP

DI

36 31

6 1

36 31

6 1

SEC.

SEC.

EL. 1234.56

N

E

RIP

G G

W W

DI

T T

NOTE:

NO SCALE

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub

Ø spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water

P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain

EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use,

- no symbol -

EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut wall face

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

Fiber Roll or Wattle

Creek

Wolf

Ar ro w

Coffee

C re ek

N

A.3

STATE PROJECT

NUMBER

MT

DOD 16(54)

F e b

A

M m t-d a c

B .d g n

U

S I n t2

D

B

T h o m p s o n h e c k e d b y

B e ll

D s ig n e d b y

1 0.5 0 1 2

SCALE IN MILES

B-03

COFFEE CREEK

DENTON

D-10

N

C O

F F E

E C

R E

E K R

D

D E

M A

R S R

D

S

C O

F F E

E C

R E

E K R

D

U R

S R

D

TESAREK RD

CARPENTER RD

D

N

D E

N T

O N R

D

CARPENTER RD

P O

S S

U M R

U N R

D

N

C O

F F E

E C

R E

E K R

D

N

D E

N T

O N R

D

N

B A I N S

T

MONTANA

MONTANA

MP 0.08

SCHEDULE C

BEGIN D-09 ROAD WORK

MP 2.19

SCHEDULE C

END D-09 ROAD WORK

MP 3.01

SCHEDULES B & C

END B-03 ROAD WORK

MP 0.00

SCHEDULES B & C

BEGIN D-10 ROAD WORK

MP 0.00

SCHEDULES B & C

BEGIN B-03 ROAD WORK

MP 7.24

SCHEDULES B & C

END D-10 ROAD WORK

B-03, D-09, & D-10 ROADS

VICINITY MAP

g

C r e e k

Creek

Creek

Salt

C r e e k

Little

Salt

R os e

C re e k

C r e e k

C r e e k

E a st

F o rk

S a lt

S a lt

D o g

Murph y

N

A.4

STATE PROJECT

F e b

A

M m t-d a c

E .d g n

U

S I n t2

D

T h o m p s e c k e d b y

B s ig n e d b y

1 0.5 0 1 2

SCALE IN MILES

SUFFOLK

E-05

E R I E L

N

SALT CREEK RD

E-01

WASHBOARD RD

ECHO DR

SUFFOLK RD

BUTCHER RD

M ile s T o H ilg e r

.5 M ile s

T o W in ifre d

MP 0.00

SCHEDULES A, B, & C

BEGIN E-01 ROAD WORK

MP 4.31

SCHEDULES A, B, & C

END E-01 ROAD WORK

MP 5.96

SCHEDULES A, B, & C

END E-05 ROAD WORK

MP 0.00

SCHEDULES A, B, & C

BEGIN E-05 ROAD WORK

E-01 & E-05 ROADS

Cutbank

Creek

D o g

Creek

C re e k

Rose

D o g

C r e e k

Creek

N

A.5

STATE PROJECT

F e b

A

M m t-d a c

E .d g n

U

S I n t2

D

T h o m p s e c k e d b y

B s ig n e d b y

1 0.5 0 1 2

SCALE IN MILES

E

E-11

E-04

T O

B I N L

N

P N BRIDGE RD

K U

C E

R A R

D

JUDITH RIVER RD

S T

A F F

O R

D F

E R

R Y R

D

K J O

R L I E

N R

D

D-Y TRAIL

WINIFRED

MP 7.30

SCHEDULES A, B, & C

END E-02 ROAD WORK

MP 0.00

SCHEDULES A, B, & C

BEGIN E-02 ROAD WORK

MP 0.02

SCHEDULES A, B, & C

BEGIN E-11 ROAD WORK

MP 4.60

SCHEDULES A, B, & C

END E-11 ROAD WORK

MP 0.00

SCHEDULES A, B, & C

BEGIN E-04 ROAD WORK

MP 5.55

SCHEDULES A, B, & C

END E-04 ROAD WORK

E-02, E-04, & E-11 ROADS

re e k

Creek

Creek

L a s t

M o cc a si n

In d ia n

Spring

W arm

C oulee

M ing

Little

Dog

Box

Elder

C reek

C r e e k

C h a n c e

N

A.6

STATE PROJECT

F e b

A

M m t-d a c

E .d g n

U

S I n t2

D

T h o m p s e c k e d b y

B s ig n e d b y

1 0.5 0 1 2

SCALE IN MILES

E

COLONY

DEERFIELD

P L U

M C

R E E

K R

D

SMART LN

72 BENCH RD

SANDROCK

RD

MONTANA

MONTANA

M ile s

T o L e w is to w n

S A

LT C

R

EEK

R

D

MOULTON RD

MP 0.01

SCHEDULES A, B, & C

BEGIN E-08 ROAD WORK

MP 4.92

SCHEDULES A, B, & C

END E-08 ROAD WORK

E-08 ROAD

C r e e k

W es t

F o r k

S a lt

C re e k

C r e e k

Cr ee k

Creek

Little

Dog

Dog

Box

Elder

C reek

D e e r

D o g

N

1 0.5 0 1 2

SCALE IN MILES

E-09

MEEHAN RD

CHRISTINA

P H I L L I P S L

N

MOULTON RD

A.7

STATE PROJECT

M a r

A

M m t-d a c

E .d g n

U

S I n t2

D

T h o m p s e c k e d b y

B s ig n e d b y

S A L T C

R E E K R

D

M ile s

T o W in ifre d

M ile s T o H ilg e r

P L

U M C

R E E

K R

D

MP 0.00

SCHEDULES A, B, & C

BEGIN E-09 ROAD WORK

MP 8.74

SCHEDULES A, B, & C

END E-09 ROAD WORK

E-09 ROAD

Road Number

E-01 E-02 E-04 E-05 E-08 E-09 E-11 Allowance Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND

STAKING LPSM ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15705-1300 SOIL EROSION CONTROL,

TEMPORARY DIVERSION CHANNEL LNFT 124 100 6 230

A0140 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 390 2,800 490 610 60 150 180 20 4,700

A0160 15801-0000 WATERING FOR DUST CONTROL MGAL 476 865 644 682 597 964 569 203 5,000

A0180 20101-0000 CLEARING AND GRUBBING ACRE 1.2 0.4 1.6 Contract Quantity

A0200 20301-1900 REMOVAL OF PIPE CULVERT (E-04

ROAD) EACH 2 2

A0220 20302-0800 REMOVAL OF FENCE, BARBED WIRE LNFT 1,982 218 124 26 2,350

A0240 20401-0000 ROADWAY EXCAVATION CUYD 527 128 655 Contract Quantity

A0260 20402-0000 SUBEXCAVATION CUYD 1,012 156 200 356 276 2,000

A0280 20404-0000 UNCLASSIFIED BORROW TON 14,899 601 15,500

A0300 20411-0000 SELECT BORROW TON 6,548 308 1,741 395 700 308 10,000

A0320 20701-0300 SEPARATION-STABILIZATION

GEOTEXTILE, CLASS 1, TYPE C

(NONWOVEN) (SUBEXCAVATION) SQYD 1,833 289 356 644 378 3,500

A0340 20703-2000 GEOGRID, STABILIZATION SQYD 1,688 244 356 556 356 3,200

A0360 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (ENERGY DISSIPATOR) CUYD 30 3 20 7 60

A0380 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (RIPRAP HEADWALL) CUYD 10 85 123 82 14 16 330

A0400 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (SLOPE ARMOR) CUYD 630 70 700

A0420 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (BANK PROTECTION) CUYD 18 7 25

A0440 25101-0300 PLACED RIPRAP, METHOD A,

CLASS 3 (APRON) CUYD 80 195 25 300

A0460 30202-2000 ROADWAY AGGREGATE, METHOD 2

(E ROADS) TON 165 590 290 165 280 355 545 110 2,500

A0480 30302-6000 ROADWAY RECONDITIONING LNFT 22,757 37,330 29,304 30,835 25,925 46,147 24,182 216,480 Contract Quantity

A0500 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (E ROADS) TON 11,802 22,633 16,626 17,380 15,973 23,932 15,416 488 124,250

A0520 31110-0000 CALCIUM CHLORIDE TON 202 387 284 296 273 409 263 11 2,125

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

-A pr -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

D O

D

6(

M in ut em an

M is si le

B as e R oa ds \P

R _L

O A _E

E\ [m t-d1

4_

Es tim at e-

_S ch ed ul eA

_0 2.

xl sx

]S he et

STATE PROJECT

B.1DOD 16(54)MT

E-01 E-02 E-04 E-05 E-08 E-09 E-11 Allowance Bid Schedule

A0540 60201-0800 24-INCH PIPE CULVERT LNFT 132 8 140

A0560 60201-1200 48-INCH PIPE CULVERT LNFT 42 116 2 160

A0580 60201-1400 60-INCH PIPE CULVERT LNFT 146 54 200

A0600 60201-2500 144-INCH PIPE CULVERT LNFT 114 6 120

A0620 60202-0500 30-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 100 100

A0640 60202-0600 36-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 80 80

A0660 60202-0800 48-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 128 2 130

A0680 60202-1800 108-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 180 180

A0700 60704-0000 CLEANING CULVERT IN PLACE EACH 1 3 4 3 2 13

A0720 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 2 3 1 1 1 8

A0740 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 2,030 248 132 15 2,425

A0760 61903-0700 CATTLE GUARD, 24 FEET EACH 2 1 1 4

A0780 61921-1000 REMOVE AND RESET FENCE LNFT 25 50 75

A0800 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY HOUR 40

A0820 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 50

A0840 62201-2050 ROLLER HOUR 40

A0860 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE HOUR 40

A0880 62301-0000 GENERAL LABOR HOUR 40

A0900 62406-0300 PLACING CONSERVED TOPSOIL, Contract Quantity

4-INCH DEPTH ACRE 1.2 0.4 1.6

A0920 62503-0000 TURF ESTABLISHMENT SLRY 5 2 7

A0940 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

A0960 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER FXHR 300 1,000 500 440 340 560 280 3,420

Remarks and/or Determination of Estimated

Quantity

-A pr -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

D O

D

6(

M in ut em an

M is si le

B as e R oa ds \P

R _L

O A _E

E\ [m t-d1

4_

Es tim at e-

_S ch ed ul eA

_0 2.

xl sx

]S he et

2) SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.2DOD 16(54)MT

E-01 E-02 E-04 E-05 E-08 E-09 E-11 B-03 D-10 Allowance Bid Schedule

B0020 15101-0000 MOBILIZATION LPSM ALL

B0040 15201-0000 CONSTRUCTION SURVEY AND

STAKING LPSM ALL

B0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

B0080 15401-0000 CONTRACTOR TESTING LPSM ALL

B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

B0120 15705-1300 SOIL EROSION CONTROL,

TEMPORARY DIVERSION CHANNEL LNFT 124 100 6 230

B0140 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 390 2,800 490 610 60 150 180 90 30 50 4,850

B0160 15801-0000 WATERING FOR DUST CONTROL MGAL 476 865 644 682 597 964 569 314 776 313 6,200

B0180 20101-0000 CLEARING AND GRUBBING ACRE 1.2 0.4 1.6 Contract Quantity

B0200 20301-1900 REMOVAL OF PIPE CULVERT (E-04

ROAD) EACH 2 2

B0220 20302-0800 REMOVAL OF FENCE, BARBED WIRE LNFT 1,982 218 124 26 2,350

B0240 20401-0000 ROADWAY EXCAVATION CUYD 527 128 655 Contract Quantity

B0260 20402-0000 SUBEXCAVATION CUYD 1,012 156 200 356 276 2,000

B0280 20404-0000 UNCLASSIFIED BORROW TON 14,899 601 15,500

B0300 20411-0000 SELECT BORROW TON 6,548 308 1,741 395 700 308 10,000

B0320 20701-0300 SEPARATION-STABILIZATION

GEOTEXTILE, CLASS 1, TYPE C

(NONWOVEN) (SUBEXCAVATION) SQYD 1,833 289 356 644 378 3,500

B0340 20703-2000 GEOGRID, STABILIZATION SQYD 1,688 244 356 556 356 3,200

B0360 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (ENERGY DISSIPATOR) CUYD 30 3 20 5 7 65

B0380 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (RIPRAP HEADWALL) CUYD 10 85 123 82 14 16 330

B0400 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (SLOPE ARMOR) CUYD 630 70 700

B0420 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (BANK PROTECTION) CUYD 18 7 25

B0440 25101-0300 PLACED RIPRAP, METHOD A,

CLASS 3 (APRON) CUYD 80 195 25 300

B0460 30202-2000 ROADWAY AGGREGATE, METHOD 2

(B ROADS) TON 230 20 250

B0480 30202-2000 ROADWAY AGGREGATE, METHOD 2

(D ROADS) TON 280 20 300

B0500 30202-2000 ROADWAY AGGREGATE, METHOD 2

(E ROADS) TON 165 590 290 165 280 355 545 110 2,500

B0520 30302-6000 ROADWAY RECONDITIONING LNFT 22,757 37,330 29,304 30,835 25,925 46,147 24,182 15,893 38,227 270,600 Contract Quantity

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

D O

D

6(

M in ut em an

M is si le

B as e R oa ds \P

R _L

O A _E

E\ [m t-d1

4_

Es tim at e-

_S ch ed ul eB

_0 2.

xl sx

]S he et SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.3DOD 16(54)MT

Schedule

B0540 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (B ROADS) TON 7,412 88 7,500

B0560 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (D ROADS) TON 18,783 117 18,900

B0580 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (E ROADS) TON 11,802 22,633 16,626 17,380 15,973 23,932 15,416 488 124,250

B0600 31110-0000 CALCIUM CHLORIDE TON 202 387 284 296 273 409 263 127 321 13 2,575

B0620 60201-0800 24-INCH PIPE CULVERT LNFT 132 8 140

B0640 60201-1000 36-INCH PIPE CULVERT LNFT 156 4 160

B0660 60201-1200 48-INCH PIPE CULVERT LNFT 42 116 2 160

B0680 60201-1400 60-INCH PIPE CULVERT LNFT 146 54 200

B0700 60201-2500 144-INCH PIPE CULVERT LNFT 114 6 120

B0720 60202-0500 30-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 100 100

B0740 60202-0600 36-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 80 80

B0760 60202-0800 48-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 128 2 130

B0780 60202-1800 108-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 180 180

B0800 60704-0000 CLEANING CULVERT IN PLACE EACH 1 3 4 3 2 1 14

B0820 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 2 3 1 1 1 1 2 11

B0840 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 2,030 248 132 15 2,425

B0860 61903-0700 CATTLE GUARD, 24 FEET EACH 2 1 1 4

B0880 61921-1000 REMOVE AND RESET FENCE LNFT 25 50 75

B0900 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY HOUR 40

B0920 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 50

B0940 62201-2050 ROLLER HOUR 40

B0960 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE HOUR 40

Remarks and/or Determination of Estimated

Quantity

-A pr -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

D O

D

6(

M in ut em an

M is si le

B as e R oa ds \P

R _L

O A _E

E\ [m t-d1

4_

Es tim at e-

_S ch ed ul eB

_0 2.

xl sx

]S he et

2) SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.4DOD 16(54)MT

Schedule

B0980 62301-0000 GENERAL LABOR HOUR 40

B1000 62406-0300 PLACING CONSERVED TOPSOIL, Contract Quantity

4-INCH DEPTH ACRE 1.2 0.4 1.6

B1020 62503-0000 TURF ESTABLISHMENT SLRY 5 2 7

B1040 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

B1060 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER FXHR 300 1,000 500 440 340 560 280 160 420 4,000

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

-A pr -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

D O

D

6(

M in ut em an

M is si le

B as e R oa ds \P

R _L

O A _E

E\ [m t-d1

4_

Es tim at e-

_S ch ed ul eB

_0 2.

xl sx

]S he et

3) SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.5DOD 16(54)MT

E-01 E-02 E-04 E-05 E-08 E-09 E-11 B-03 D-10 D-09 Allowance Bid Schedule

C0020 15101-0000 MOBILIZATION LPSM ALL

C0040 15201-0000 CONSTRUCTION SURVEY AND

STAKING LPSM ALL

C0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

C0080 15401-0000 CONTRACTOR TESTING LPSM ALL

C0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

C0120 15705-1300 SOIL EROSION CONTROL,

TEMPORARY DIVERSION CHANNEL LNFT 124 100 46 10 280

C0140 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 390 2,800 490 610 60 150 180 90 30 300 50 5,150

C0160 15801-0000 WATERING FOR DUST CONTROL MGAL 476 865 644 682 597 964 569 314 776 245 368 6,500

C0180 20101-0000 CLEARING AND GRUBBING ACRE 1.2 0.4 1.6 Contract Quantity

C0200 20301-1900 REMOVAL OF PIPE CULVERT (E-04

ROAD) EACH 2 2

C0220 20302-0800 REMOVAL OF FENCE, BARBED WIRE LNFT 1,982 218 124 26 2,350

C0240 20401-0000 ROADWAY EXCAVATION CUYD 527 128 655 Contract Quantity

C0260 20402-0000 SUBEXCAVATION CUYD 1,012 156 200 356 276 2,000

C0280 20404-0000 UNCLASSIFIED BORROW TON 14,899 601 15,500

C0300 20411-0000 SELECT BORROW TON 6,548 308 1,741 395 700 308 10,000

C0320 20701-0300 SEPARATION-STABILIZATION

GEOTEXTILE, CLASS 1, TYPE C

(NONWOVEN) (SUBEXCAVATION) SQYD 1,833 289 356 644 378 3,500

C0340 20703-2000 GEOGRID, STABILIZATION SQYD 1,688 244 356 556 356 3,200

C0360 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (ENERGY DISSIPATOR) CUYD 30 3 20 5 7 65

C0380 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (RIPRAP HEADWALL) CUYD 10 85 123 82 14 9 17 340

C0400 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (SLOPE ARMOR) CUYD 630 70 700

C0420 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (BANK PROTECTION) CUYD 18 7 25

C0440 25101-0300 PLACED RIPRAP, METHOD A,

CLASS 3 (APRON) CUYD 80 195 25 300

C0460 30202-2000 ROADWAY AGGREGATE, METHOD 2

(B ROADS) TON 230 20 250

C0480 30202-2000 ROADWAY AGGREGATE, METHOD 2

(D ROADS) TON 280 215 30 525

C0500 30202-2000 ROADWAY AGGREGATE, METHOD 2

(E ROADS) TON 165 590 290 165 280 355 545 110 2,500

C0520 30302-6000 ROADWAY RECONDITIONING LNFT 22,757 37,330 29,304 30,835 25,925 46,147 24,182 15,893 38,227 11,141 281,741 Contract Quantity

-A pr -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

D O

D

6(

M in ut em an

M is si le

B as e R oa ds \P

R _L

O A _E

E\ [m t-d1

4_

Es tim at e-

_S ch ed ul eC

_0 2.

xl sx

]S he et SUMMARY OF QUANTITIES - Schedule C

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.6DOD 16(54)MT

Schedule

C0540 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (B ROADS) TON 7,412 88 7,500

C0560 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (D ROADS) TON 18,783 6,321 146 25,250

C0580 31103-3000 STABILIZED AGGREGATE SURFACE

COURSE, CALCIUM CHLORIDE,

IMPORTED AGGREGATE (E ROADS) TON 11,802 22,633 16,626 17,380 15,973 23,932 15,416 488 124,250

C0600 31110-0000 CALCIUM CHLORIDE TON 202 387 284 296 273 409 263 127 321 108 15 2,685

C0620 60201-0800 24-INCH PIPE CULVERT LNFT 132 76 12 220

C0640 60201-1000 36-INCH PIPE CULVERT LNFT 156 4 160

C0660 60201-1100 42-INCH PIPE CULVERT LNFT 40 40

C0680 60201-1200 48-INCH PIPE CULVERT LNFT 42 116 2 160

C0700 60201-1400 60-INCH PIPE CULVERT LNFT 146 54 200

C0720 60201-2500 144-INCH PIPE CULVERT LNFT 114 6 120

C0740 60202-0500 30-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 100 100

C0760 60202-0600 36-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 80 80

C0780 60202-0800 48-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 128 2 130

C0800 60202-0900 54-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 42 3 45

C0820 60202-1800 108-INCH EQUIVALENT DIAMETER

ARCH OR ELLIPTICAL PIPE

CULVERT LNFT 180 180

C0840 60704-0000 CLEANING CULVERT IN PLACE EACH 1 3 4 3 2 1 2 16

C0860 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 2 3 1 1 1 1 2 11

C0880 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 2,030 248 132 15 2,425

C0900 61903-0700 CATTLE GUARD, 24 FEET EACH 2 1 1 4

C0920 61921-1000 REMOVE AND RESET FENCE LNFT 25 50 75

C0940 62201-0300 DUMP TRUCK, 12 CUBIC YARD

MINIMUM CAPACITY HOUR 40

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

-A pr -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

D O

D

6(

M in ut em an

M is si le

B as e R oa ds \P

R _L

O A _E

E\ [m t-d1

4_

Es tim at e-

_S ch ed ul eC

_0 2.

xl sx

]S he et

2) SUMMARY OF QUANTITIES - Schedule C

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.7DOD 16(54)MT

Schedule

C0960 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 50

C0980 62201-2050 ROLLER HOUR 40

C1000 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM

BLADE HOUR 40

C1020 62301-0000 GENERAL LABOR HOUR 40

C1040 62406-0300 PLACING CONSERVED TOPSOIL, Contract Quantity

4-INCH DEPTH ACRE 1.2 0.4 1.6

C1060 62503-0000 TURF ESTABLISHMENT SLRY 5 2 7

C1080 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

C1100 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER FXHR 300 1,000 500 440 340 560 280 160 420 380 4,380

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

-A pr -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

D O

D

6(

M in ut em an

M is si le

B as e R oa ds \P

R _L

O A _E

E\ [m t-d1

4_

Es tim at e-

_S ch ed ul eC

_0 2.

xl sx

]S he et

3) SUMMARY OF QUANTITIES - Schedule C

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.8DOD 16(54)MT

(FEET)

E-01 1 4.31 20 E-02 1 2.70 24 E-02 2 0.23 24 E-02 1 4.37 22 E-04 1 5.55 22 E-05 1 2.10 22 E-05 3 0.12 22 E-05 1 3.74 21 E-08 1 4.91 24 E-09 1 8.74 20 E-11 1 4.58 24

41.35 B-03 1 3.01 18 D-10 1 7.24 19

51.60 D-09 1 2.11 22

53.71

FOOTNOTE:

[1] Quantities are based on the following:

1. 50 MGAL/mile for roadway reconditioning and dust control.

2. 0.022 MGAL/TON for imported surface course aggregate.

[2] Quantity represents material for road approaches.

Quantities based on the following:

1. 15 TON/approach for private approaches.

2. 10 TON/approach for farm field approaches.

3. 40 TON/approach for public approaches.

(LNFT) 4. 60 TON/approach for missile launch facility approaches.

E-02 LT 2 250

E-02 1 100 [3] Quantities are based on 1.97 TON/CUYD.

E-02 1 300 E-04 1 100 [4] Calcium chloride quantities based on 1.7% by dry weight E-08 1 100 of item 31103-3000.

E-11 1 100 E-11 1 100 [5] See Sheets C.2 - C.3.

[6] See Sheet C.5.

[7] For estimating purposes only. See Sheets C.2-C.4 for further information on the required width.

Schedule B Total 123,762

7,412

270,6002,390

TYPICAL SECTION QUANTITIES

Item 31103-3000

Stabilized aggregate surface course, calcium chloride, imported aggregate

(E Roads) [3]

(TON)

11,802 8,784

Average width [7]

15,973

123,762

6,291

10,723

Item 31103-3000 Stabilized aggregate surface course, calcium chloride, imported aggregate

(D Roads) [3]

13,091 16,626

18,783 6,321

25,104

23,932 15,416

123,762

2,390

Item 30202-2000 Roadway aggregate, method 2 (E Roads) [2] [3]

(TON)

MP 0.79 to MP 0.85 1051

444 333MP 0.53 to MP 0.58 MP 0.62 to MP 0.64

MP 2.01 to MP 2.03

(TON) (SQYD) (SQYD)

MP 1.54 to MP 1.56 267

Location

2,932

6,132

Typical No. [5]

Schedule C Total

Item 20402-0000 Subexcavation

Item 30202-2000 Roadway aggregate, method 2 (D Roads) [2] [3]

(TON)

281,741

(LNFT)

1,644

7,412 2,670

11,088

(CUYD)

(TON)

19,747

11,141

38,227

Item 31110-0000 Calcium chloride

[4]

(TON)

22,757

Miles

Item 30302-6000 Roadway reconditioning

Item 15801-0000 Watering for dust control [1]

507 23,074

(MGAL)

3,240 2,467

14,256

644 29,304

Type

Schedule A, B, & C Total

Road Number

Item 20411-0000 Select borrow [3]

46,147

Road Number

(TON)

Item 31103-3000 Stabilized aggregate surface course, calcium chloride, imported aggregate (B Roads) [3]

Item 30202-2000 Roadway aggregate, method 2 (B Roads) [2] [3]

Schedule A Total 569 24,182

25,925

2,562

4,797 0 216,480 0 2,114 15,893

18,783

Side

495 2,390

5,887 230

SUBEXCAVATION QUANTITIES [6]

7,412

MP 4.58 to MP 4.60 185 365 322 278

Length

Item 20701-0300 Separation-stabilization geotextile, class 1, type C (nonwoven)

Item 20703-2000 Geogrid, stabilization

MP 1.67 to MP 1.69

STATE PROJECT

DOD 16(54) C.1MT

F:

\h ig hw ay s\

FH

W

A\

_O

M A D

_1 6(

D es ig n\

Ty pi ca l S ec ti on s\ [m t- 7-

M ar

-2

:4

PM

N

B

EL

L

/2

B

TH

O

M

PS

O N

/2

D es ig ne d by

C he ck ed b y:

NUMBER

TABULATION OF TYPICAL

SECTION QUANTITIES

C.2

STATE PROJECT

M a r

P

M m t-d c a .d g n

U

S I n t2

D

T h o m p s e c k e d b y

B s ig n e d b y

1:3

Travel lane Travel lane

1:3

LC

Existing Slope

Existing Slope li m it s

C o n s tr u c ti o n li m it s

C o n s tr u c ti o n

Original ground

FOOTNOTE:

Roadway reconditioning

TYPICAL SECTIONS

(4" AGGREGATE SURFACING)

TYPICAL SECTION NO. 1

4" compacted depth calcium chloride, imported aggregate, Stabilized aggregate surface course, NO SCALE

[3]9' min. - 12' max. [3]9' min. - 12' max.

[1] 5% Crown + 1/2% [1]5% Crown + 1/2%

NOTE:

1. See Sheet C.1 for quantities.

Taper at a rate of 25:1 between widths. See Sheet C.4.

Adjust to match existing road width as approved. [3]

Ensure drainage down to existing ditch.

Remove 3 feet of foreslope vegetation and slope to drain.[2] superelevation. Do not exceed 8% superelevation.

Superelevate roadway on curves to match the existing roadway[1]

[2]3' [2]3'

C.3

M a r

P

M m t-d c b .d g n

U

S I n t2

D

T h o m p s e c k e d b y

B s ig n e d b y

1:3

Travel lane Travel lane

1:3

LC

Existing Slope

Existing Slope

FOOTNOTE:

Original ground

TYPICAL SECTIONS

5% Crown5% Crown

Profile grade

Slope stake

Slope stake 4" compacted depth calcium chloride, imported aggregrate, Stabilized aggregate surface course, 1:3

Travel lane Travel lane

1:3

LC

Existing Slope

Existing Slope

Original ground

11' 11'

5% Crown5% Crown

Profile grade

Slope stake

Slope stake

Select borrow

4" compacted depth calcium chloride, imported aggregrate, Stabilized aggregate surface course, (E-02 ROAD GRADE RAISE)

TYPICAL SECTION NO. 2

(E-05 ROAD GRADE RAISE)

TYPICAL SECTION NO. 3

Unclassified borrow

12' 12'

NO SCALE

li m it s

C le a r in g li m it s

C le a r in g

Turf establishment limits

Placing conserved topsoil, 4-inch depthPlacing conserved topsoil, 4-inch depth

Placing conserved topsoil, 4-inch depth li m it s

C le a r

Placing conserved topsoil, 4-inch depth li m it s

C le a r

Construct slopes as shown in the Staking Report.[1]

[1

Va ria ble

[1]

Variable

[1

Va ria ble

[1]

Variable

5' [2]

5' [2]

5' [2]

5' [2]

NOTE:

1. See Sheets C.1 and D.1 for quantities.

Select borrow

[3] 2'

Do not excavate into existing ground to ensure 2' of select borrow.

Depth may be less above existing roadbed. See cross-sections.[3]

5' or to existing permanent easement line, whichever is less.[2]

C.4

M a r

A

M m t-d c c .d g n

U

S I n t2

D

T h o m p s e c k e d b y

B s ig n e d b y

TYPICAL DETAILS

CONNECTION WITH NONPAVED ROADWAYS

AT THE BEGINNING AND END OF

TYPICAL TREATMENT OF GRAVEL SECTIONS

PROFILE

PROFILE

d e p th s u r fa c in g

B e g in E n d f u

Cattle Guard

New profile

PROFILE

25:1 Taper

25:1 Taper

TYPICAL TAPER

PLAN

LC

FOOTNOTE:

NO SCALE

or paved roadway

Existing structure e x is ti n g w id th

V a r ia b le e x is ti n g w id th

V a r ia b le

Profile grade grade line

Existing road

Profile grade line Existing road grade surfacing section

Match mainline surfacing section

Match mainline

Profile grade surfacing section

Match mainline

NEW CATTLE GUARDS

TYPICAL TREATMENT AT

calcium chloride, imported aggregate Stabilized aggregate surface course, calcium chloride, imported aggregate

Stabilized aggregate surface course, calcium chloride, imported aggregate

Stabilized aggregate surface course, [2]50' min.

[2]50' min.

[2]50' min.

grade line

[1]Existing road

CATTLE GUARDS TO REMAIN IN-PLACE, AND PAVED INTERSECTIONS

TYPICAL TREATMENT AT EXISTING BRIDGES,

structures and existing roadways as approved.

Adjust transition length to provide a smooth transition to[2] surfacing.

Do not measure excavation and disposal of gravel profile grade from existing grade to the depth shown.

intersecting roadway or from the structure. Taper

Excavate existing gravel surfacing from the edge of [1]

NO SCALE

LC

Travel lane Travel lane

Existing centerline

FOOTNOTE:

NOTE:

Original ground

1:

21:2

B E

G I N S

U B

E X

C A

V A

T I O

N

E N

D S

U B

E X

C A

V A

T I O

N

SUBEXCAVATION PROFILE

DETAILS

SUBEXCAVATION

class 1, type C (nonwoven)

Separation-stabilization geotextile, stabilization

Geogrid, Ex ist ing S lop e

Ex ist in g

Sl op e section

Surfacing

LC

Travel lane Travel lane

Existing centerline

Original ground class 1, type C (nonwoven)

Separation-stabilization geotextile, stabilization

Geogrid, Ex ist ing S lop e

Ex ist in g

Sl op e class 1, type C (nonwoven)

Separation-stabilization geotextile, stabilization

Geogrid, 24" compacted depth

Select borrow, 24" compacted depth

Select borrow, 24" compacted depth

Select borrow, 24" Subexcavation depth

[1]Varies [1]Varies

Cross slope [1]

[1]Surfacing section Cross slope [1]

[1]Surfacing section

[1]Varies

Cross slope [1] Cross slope [1]

[1]Varies

1. See Sheet C.1 for approximate locations and quantities.

2. Stake locations and lengths of subexcavation in field for approval prior to starting work. Adjust or add locations and types to meet field conditions.

grade

Profile

SUBEXCAVATION, TYPE 1

FULL-WIDTH

SUBEXCAVATION, TYPE 2 [2]

HALF-WIDTH

S u b e x c a v a ti o n d e p th

[3

[3

[3

[1] See Sheet C.2.

[2] Mirror details about centerline as appropriate.

[3] Daylight to drain as approved. Do not excavate beyond existing ditch bottom.

24" Subexcavation depth

C.5

STATE PROJECT

NUMBER

P a r c h

I n t_ ft h ig h w a y s F

H W

A

O M

A D

D e s ig n T y p ic a l S e c ti o n s m t-d c d .d

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

E-02 2.70 - 2.93 E-05 2.10 - 2.22

E-01 0.46 E-01 2.48 E-02 2.70-2.93 E-02 6.60 [1] Includes conserved topsoil.

E-04 1.64 RT

E-04 1.70 [2] Quantities are based on 1.97 TON/CUYD.

E-05 2.10-2.22 E-05 4.97 [3] Based on a conserved topsoil depth of 4 inches.

Keith Conroy

527 4,555

Kinder Morgan Pipeline USA, LLC (Spectra Energy)

Montana Department of Transportation

2,324

1.2

1.6

Triangle Communications

CATTLE GUARD & FENCE QUANTITIES - SCHEDULES A, B, & C

MP

CenturyLink Communications, Inc.

Noah Davis

Mike Best

Item 20302-0800 Removal of fence, barbed wire

(LNFT)

Monte Obert/Guy Johnson Poy Wong

Doug Lutke1620 Airport Rd., Lewistown, MT 59457

Fergus Electric Cooperative, Inc.

P.O. Box 1140, Havre, MT 59501

NorthWestern Energy

(406) 538-3465

(406) 731-2459

(406) 394-2786

(406) 394-2751

(406) 538-1201

(406) 441-6251

752,410

UTILITY CONTACT INFORMATION

B-03, D-09, D-10 302 South Dawes St., Lewistown, MT 59457

1021 Chestnut St., Helena, MT 59601

Item 20411-0000 Select borrow [2]

(TON)

Conserved topsoil

FOR INFORMATION

ONLY [3]

(CUYD)

0.4

FOOTNOTE:

Item 61921-1000 Remove and reset fence

(LNFT)

84423 US HWY 87, Lewistown, MT 59457

138 Rose Creek Rd., Winifred, MT 59489

E-01, E-02, E-08, E-11

Sleepy Hollow Oil & Gas, LLC (Kykuit Resources)

E-08

Road Number

Road Number

1.6

D-10

MP

B-03, D-09, E-08

Item 61901-0900 Fence, barbed wire, 4 strand

(LNFT)

Item 61903-0700 Cattle guard, 24 feet

(EACH)

6,29614,899

Total

E-01, E-02, E-04, E-05, E-09, E-11

Item 62503-0000 Turf establishment (hydraulic method)

(SLRY)

ROADWAY QUANTITIES - SCHEDULES A, B, & C

Scott Leeds Bruce Kudrna

B-03, D-09, D-10, E-01, E-02, E-04, E-05, E-09, E-11

B-03, D-09, D-10, E-01, E-02, E-04, E-05, E-08, E-09, E-11 USAF - Malmstrom Cable Affairs

1.2

Item 20101-0000 Clearing and grubbing

(ACRE)

Item 20401-0000 Roadway excavation

[1]

(CUYD)

Item 62406-0300 Placing conserved topsoil, 4-inch depth

(ACRE)

6932 Goddard Dr., Bldg. 165, Rm. 153, Malmstrom AFB, MT 59402

Item 20404-0000 Unclassified borrow [2]

(TON)

14,899

218 248 124 132

Road Number

0.4 128 1,741

Total

Company Address Contact Phone #

(406) 366-5981

(406) 538-1301

(406) 670-0884Brian TomlinsonSuite 352, 800 Werner Ct., Casper, WY 82601

STATE PROJECT

DOD 16(54) D.1MT

F:

\h ig hw ay s\

FH

W

A\

_O

M A D

_1 6(

D es ig n\

Li ne

G ra ph s\

[m t-

-M ar -2

1:

P M

N

B

EL

L

/2

B

TH

O

M

PS

O N

/2

D es ig ne d by

C he ck ed b y:

NUMBER

TABULATION OF PLAN

QUANTITIES

m t-d la

B .d g n

I n t_ ft

D

D.2

STATE PROJECT

M a r

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

M P .0

M P .0

M P .0

M P .0

NO SCALE

P u b li c A p p r

R T

M P .1 g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

F a r m F ie ld A p p r

R T

M P .6 r iv a te A p p r

L T

M P .7

P r iv a te A p p r

L T

M P .1

F a r m F ie ld A p p r

L T

M P .0

E n d P r o je c t

M P .0

E n d A g g r e g a te S u r fa c in g

M is s il e L a u n c h F a c il it y B

M is s il e L a u n c h F a c il it y A p p r

R T

.0

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

S tr u c tu r e

R e p a ir D r a in a g e

M P .1

SCHEDULES B & C

LINE GRAPH

B-03 ROAD

B e g in o f

D R o a d

P u b li c A p p r

L T

M P .5

.0

M P .0

M P .0

NO SCALE SCHEDULE C

LINE GRAPH

D-09 ROAD

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

m t-d li

D .d g n

I n t_ ft

D

D.3

STATE PROJECT

F e b

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

M is s il e L a u n c h F a c il it y D

M is s il e L a u n c h F a c il it y A p p r d P r o je c t

M P .1

E n d A g g r e g a te S u r fa c in g

F a r m F ie ld A p p r

L T

M P .1

P u b li c A p p r

R T

M P .3 iv a te A p p r

R T

M P iv a te A p p r

L T

M P .5

P r iv a te A p p r

L T

M P .5

F a r m F ie ld A p p r

R T

M P iv a te A p p r

R T

M P .7 a r m F ie ld A p p r

R T

M P .4 iv a te A p p r

L T

M P .9

F a r m F ie ld A p p r

L T

M P .9

C le a n

C u lv e r ts i n P la c e

M P .4

R e p la c e w it h

P ip e C u lv e r t

M P .1

R e p la c e w it h

P ip e C u lv e r t

M P .5

R e p la c e w it h

P ip e C u lv e r t

M P .7

R T

C o n s tr u c t

R ip r a p H e a d w a ll

R e p la c e w it h

P ip e A r c h

M P

.0

M P .0

M P .0

M P .0

M P .0

M P .0

M P .0

M P .0

FOOTNOTE:

NO SCALE

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

m t-d lj

D .d g n

I n t_ ft

D

D.4

STATE PROJECT

J a n

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

E n d P r o je c t

M P .2

E n d A g g r e g a te S u r fa c in g

M is s il e L a u n c h F a c il it y D

M is s il e L a u n c h F a c il it y A p p r

.2 iv a te A p p r

L T

M P .5

P u b li c A p p r

R T

M P f o r

C u lv e r t in P la c e

C o n s tr u c t

E n e r g y D is s ip a to r

M P .9

F a r m F ie ld A p p r

L T

M P .4

F a r m F ie ld A p p r

L T

M P .9

P r iv a te A p p r

R T

M P iv a te A p p r

L T

M P .8

P r iv a te A p p r

R T

M P iv a te A p p r

R T

M P iv a te A p p r

L T

M P .8

F a r m F ie ld A p p r

L T

M P .9

F a r m F ie ld A p p r

L T

M P .8

P u b li c A p p r

R T

M P r m F ie ld A p p r

R T

M P tr u c tu r e

R e p a ir D r a in a g e

M P .1

S tr u c tu r e

R e p a ir D r a in a g e

M P .4

C le a n C u lv e r t in P la c e

M P .0

P ip e C u lv e r ts

R e p la c e w it h

M P .4

P ip e C u lv e r ts

R e p la c e w it h

M P .6

SCHEDULES B & C

LINE GRAPH

D-10 ROAD

Existing culvert is concrete. See Section 203 for restrictions.[1]

.0

M P .0

M P .0

M P .0

M P .0

NO SCALE

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

m t-d lk

E .d g n

I n t_ ft

D

D.5

STATE PROJECT

J a n

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

M is s il e L a u n c h F a c il it y E

M is s il e L a u n c h F a c il it y A p p r d P r o je c t

M P .3

E n d A g g r e g a te S u r fa c in g

P r iv a te A p p r

R T

M P p la c e w it h

C a tt le G u a r d

M P .4

P r iv a te A p p r

R T

M P le a n C u lv e r t i n P la c e

M P .6

F a r m F ie ld A p p r

L T

M P .4

P r iv a te A p p r

L T

M P .6

F a r m F ie ld A p p r

R T

M P iv a te A p p r

R T

M P iv a te A p p r

L T

M P .2

F a r m F ie ld A p p r

R T

M P .9

L

R

T

C o n s tr u c t

R ip r a p H e a d w a ll s

R e p la c e w it h

P ip e C u lv e r t

M P .3

R e p la c e w it h

C a tt le G u a r d

M P .4

SCHEDULES A, B, & C

LINE GRAPH

E-01 ROAD

.0

M P .0

M P .0

M P .0

M P .0

M P .0

M P .0

M P .0

NO SCALE

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

m t-d ll

E .d g n

I n t_ ft

D

D.6

STATE PROJECT

F e b

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

M is s il e L a u n c h F a c il it y E

M is s il e L a u n c h F a c il it y A p p r

L T

M P .3

E n d P r o je c t

M P .3

E n d A g g r e g a te S u r fa c in g

P r iv a te A p p r

L T

M P .0

F a r m F ie ld A p p r

R T

M P iv a te A p p r

R T

M P iv a te A p p r

L T

M P .0

P r iv a te A p p r

L T

M P .1

F a r m F ie ld A p p r

L T

M P .4

P r iv a te A p p r

L T

M P .1

P r iv a te A p p r

L T

M P .1

P r iv a te A p p r

L T

M P .1

C le a n C u lv e r t in P la c e

M P r m F ie ld A p p r

R T

M P r m F ie ld A p p r

R T

M P iv a te A p p r

L T

M P .8

C le a n C u lv e r t i n P la c e

M P .0

F a r m F ie ld A p p r

R T

M P r m F ie ld A p p r

R T

M P r m F ie ld A p p r

L T

M P .4

P r iv a te A p p r

R T

M P iv a te A p p r

L T

M P .3

P r iv a te A p p r

R T

M P b li c A p p r

R T

M P b li c A p p r

R T

M P b li c A p p r

L T

M P .2

P r iv a te A p p r

R T

M P r m F ie ld A p p r

R T

M P r m F ie ld A p p r

L T

M P .4

C le a n C u lv e r t i n P la c e

M P .1

P r iv a te A p p r

R T

M P tr u c tu r e

R e p a ir D r a in a g e

M P .1

S tr u c tu r e

R e p a ir D r a in a g e

M P .5

FOOTNOTE:

R e p la c e w it h

C a tt le G u a r d

M P .6

I n s ta ll R ip r a p A p r o n L

T

C o n s tr u c t

R ip r a p H e a d w a ll L

T

R e p la c e w it h

P ip e C u lv e r t

M P .7

I n s ta ll E n e r g y D is s ip a to r L

T

C o n s tr u c t

R ip r a p H e a d w a ll L

T

R e p la c e w it h

P ip e C u lv e r t

M P .7

SCHEDULES A, B, & C

LINE GRAPH

E-02 ROAD

I n s ta ll E n e r g y D is s ip a to r L

T

L T R

T

C o n s tr u c t

R ip r a p H e a d w a s

I s ta ll

P ip e C u lv e r t

M P .8

See Sheet C.5.[1]

See Sheet D.12.[2]

See Sheet F.5.[3]

See Sheet F.6.[4]

See Sheet F.7.[5]

T y p e

S u b e x c a v a ti o n

M P .5

.5

T y p e

S u b e x c a v a ti o n

M P .6

.6

T y p e

S u b e x c a v a ti o n

M P .7

.8

F e n c e L

T R

T

I n s ta ll N w n c e L

T R

T

R e m o v e E x is ti n g

A r m o r S lo p e R

T

R a is e G r a d

.7

.9

B e g in o f

E R o a d

P u b li c A p p r

R T

M P

.0

M P .0

M P .0

M P .0

M P .0

M P .0

NO SCALE

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

m t-d lm

E .d g n

I n t_ ft

D

D.7

STATE PROJECT

M a r

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

M is s il e L a u n c h F a c il it y E

M is s il e L a u n c h F a c il it y A p p r

L T

M P .5

E n d P r o je c t

M P .5

E n d A g g r e g a te S u r fa c in g

P u b li c A p p r

R T

M P b li c A p p r

R T

M P r m F ie ld A p p r

R T

M P b li c A p p r

L T

M P .9

P u b li c A p p r

L T

M P .9

P u b li c A p p r

L T

M P .9

F a r m F ie ld A p p r

R T

M P r m F ie ld A p p r

L T

M P f o r

C u lv e r t in P la c n s tr u c t

R ip r a p H e a d w a ll

M P .8 fo r

P ip e A r c h i n P la n s tr u c t

R ip r a p H e a d w a ll s

M P .4

L T f o r

C u lv e r t in P la c e

C o n s tr u c t

E n e r g y D is s ip a to r

S tr u c tu r e

R e p a ir D r a in a g e

M P .6

S tr u c tu r e

R e p a ir D r a in a g e

M P .5

FOOTNOTE:

S tr u c tu r e R

T

R e p a ir A p p r

D r a in a g e

M P .0

R e m o v e a n d R e s e t

F e n c e R

T

L T R

T

C o n s tr u c t

R ip r a p H e a d w a ll s

P ip e C u lv e r ts

I n s ta ll N e w

M P .6

SCHEDULES A, B, & C

LINE GRAPH

E-04 ROAD

D o N o t

D is tu r b

E x is ti n g

P ip e C u lv e r t

M P .5

See Sheet C.5.[1]

See Sheet D.13.[2]

See Sheet F.8.[3]

See Sheet F.9.[4]

T y p e

S u b e x c a v a ti o n

M P .0

.0

D r a in a g e W o r k

R o s e C r e k

.5

.7

I n s ta ll N e w F e n c e L

T R

T

R e m o v e E x is ti n g F e n c e L

T R

T

I n s ta ll R ip r a p A p r o n L

T

L T R

T

C o n s tr u c t

R ip r a p H e a d w a ip e A r c h e s

R e p la c e w it h

P ip e C u lv e r ts

R e m o v e E x is ti n g

.0

M P .0

M P .0

M P .0

M P .0

M P .0

FOOTNOTE:

NO SCALE

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

m t-d ln

E .d g n

I n t_ ft

D

D.8

STATE PROJECT

M a r

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

M is s il e L a u n c h F a c il it y E

M is s il e L a u n c h F a c il it y A p p r

L T

M P .9

E n d P r o je c t

M P .9

E n d A g g r e g a te S u r fa c in g

F a r m F ie ld A p p r

R T

M P iv a te A p p r

L T

M P .6

F a r m F ie ld A p p r

R T

M P r m F ie ld A p p r

L T

M P .6

P r iv a te A p p r

R T

M P r m F ie ld A p p r

L T

M P .3

F a r m F ie ld A p p r

L T

M P .7

F a r m F ie ld A p p r

L T

M P .0

C le a n C u lv e r t i n P la c e

M P .3

C le a n C u lv e r t i n P la c e

M P .7

P r iv a te A p p r

L T

M P .9

C le a n C u lv e r t i n P la c e

M P .3

C le a n C u lv e r t i n P la c e

M P .4

S tr u c tu r e

R e p a ir D r a in a g e

M P .1

L T R

T f o r

C u lv e r t in P la c e

C o n s tr u c t

R ip r a p H e a d w a ll s

M P .8

R e p la c e w it h

C a tt le G u a r d

M P .9

L T R

T

C o n s tr u c t

R ip r a p H e a d w a ll s

A r c h e s

R e p la c e w it h

P ip e

M P .7

D o N o t

D is tu r b

E x is ti n g

P ip e C u lv e r t

M P .2

L T R

T

R e m o v e a n d R e s e t

F e n c e

L T R

T

C o n s tr u c t

R ip r a p H e a d w a ll s

P ip e A r c h e s

R e p la c e w it h

M P .1

SCHEDULES A, B, & C

LINE GRAPH

E-05 ROAD

See Sheet D.14.[1]

See Sheet F.10.[2]

See Sheet F.11.[3]

R a is e G r a d

.1

.2

I n s ta ll N e w F e n c e L

T R

T

R e m o v e E x is ti n g F e n c e L

T R

T

L T R

T

C o n s tr u c t

R ip r a p H e a d w a ll s

P ip e A r c h e s

R e p la c e w it h

M P

.0

M P .0

M P .0

M P .0

M P .0

FOOTNOTE:

NO SCALE

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

m t-d lo

E .d g n

I n t_ ft

D

D.9

STATE PROJECT

J a n

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

M is s il e L a u n c h F a c il it y E

M is s il e L a u n c h F a c il it y A p p r d P r o je c t

M P .9

E n d A g g r e g a te S u r fa c in g

P r iv a te A p p r

L T

M P .0

P r iv a te A p p r

L T

M P .5

P r iv a te A p p r

L T

M P .7

F a r m F ie ld A p p r

R T

M P r m F ie ld A p p r

L T

M P .6

F a r m F ie ld A p p r

L T

M P .3

F a r m F ie ld A p p r

L T

M P .4

F a r m F ie ld A p p r

L T

M P .6

F a r m F ie ld A p p r

R T

M P b li c A p p r

L T

M P .8

P r iv a te A p p r

R T

M P .8 iv a te A p p r

R T

M P r m F ie ld A p p r

L T

M P .0

F a r m F ie ld A p p r

R T

M P iv a te A p p r

R T

M P r m F ie ld A p p r

L T

M P .6

S tr u c tu r e

R e p a ir D r a in a g e

M P .3

I n s ta ll

P ip e C u lv e r t

M P .7

R e p la c e w it h

P ip e C u lv e r t

M P .4

R e p la c e w it h

P ip e C u lv e r t

M P .8

SCHEDULES A, B, & C

LINE GRAPH

E-08 ROAD

Existing culvert is concrete. See Section 203 for restrictions.[1]

See Sheet C.5.[2]

T y p e

S u b e x c a v a ti o n

M P .5

.0

M P .0

M P .0

M P .0

M P .0

M P .0

M P .0

M P .0

M P .0

2. All culverts are existing unless otherwise noted.

existing widths and radii as approved by CO.

1. Gravel existing approaches and turnouts to match

NOTE: FOOTNOTE:

NO SCALE

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g m t-d lp

E .d g n

I n t_ ft

D

D.10

STATE PROJECT

J a n

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

E n d P r o je c t

M P .7

E n d A g g r e g a te S u r fa c in g E

M is s il e L a u n c h F a c il it y

A p p r is s il e L a u n c h F a c il it y

M P r m F ie ld A p p r

R T

M P iv a te A p p r

L T

M P .6

P r iv a te A p p r

R T

M P iv a te A p p r

R T

M P iv a te A p p r

L T

M P .3

F a r m F ie ld A p p r

R T

M P iv a te A p p r

L T

M P .8

F a r m F ie ld A p p r

R T

M P r m F ie ld A p p r

R T

M P a n C u lv e r t i n P la c e

M P .2

C le a n C u lv e r t i n P la c e

M P .3

P r iv a te A p p r

R T

M P b li c A p p r

L T

M P .2

P r iv a te A p p r

R T

M P r m F ie ld A p p r

L T

M P .9

P u b li c A p p r

L T

M P .1

P u b li c A p p r

L T

M P .1

F a r m F ie ld A p p r

R T

M P a n C u lv e r t i n P la c e

M P .4

F a r m F ie ld A p p r

L T

M P .6

P r iv a te A p p r

L T

M P .3

F a r m F ie ld A p p r

L T

M P .4

C o n s tr u c t

R ip r a p H e a d w a ll f o r

C u lv e r t in P la n s tr u c t

E n e r g y D is s ip a to r

M P .6

L T n s tr u c t

R ip r a p H e a d w a n s tr u c t

E n e r g y D is s ip a to r R

T

R e p la c e w it h

P ip e C u lv e r t

M P .2

SCHEDULES A, B, & C

LINE GRAPH

E-09 ROAD See Sheet F.12.[1] o te c ti o n n s tr u c t

R ip r a p B a n k

M P .2 contact information.

4. See Sheet D.1 for utility quantities.

widths and application

3. See Sheet C.1 for roadway

.0

M P .0

M P .0

M P .0

M P .0

NO SCALE

B e g in P r o je c t

M P .0

B e g in A g g r e g a te S u r fa c in g

4. See Sheet D.1 for utility contact information.

3. See Sheet C.1 for roadway widths and application quantities.

2. All culverts are existing unless otherwise noted.

and radii as approved by CO.

1. Gravel existing approaches and turnouts to match existing widths

NOTE:

m t-d lq

E .d g n

I n t_ ft

D

D.11

STATE PROJECT

M a r

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

M is s il e L a u n c h F a c il it y E

M is s il e L a u n c h F a c il it y A p p r

L T

M P .6

E n d P r o je c t

M P .6

E n d A g g r e g a te S u r fa c in g

P r iv a te A p p r

L T

M P .0

P r iv a te A p p r

L T

M P .0

P r iv a te A p p r

R T

M P iv a te A p p r

L T

M P .1

P u b li c A p p r

L T

M P .1

P u b li c A p p r

R T

M P b li c A p p r

L T

M P .2

P r iv a te A p p r

R T

M P iv a te A p p r

L T

M P .4

P r iv a te A p p r

L T

M P .4

P u b li c A p p r

L T

M P .4

P r iv a te A p p r

L T

M P .5

P u b li c A p p r

L T

M P .6

P r iv a te A p p r

L T

M P .6

P r iv a te P u b li c A p p r

L T

M P .7

P r iv a te A p p r

L T

M P .7

P r iv a te A p p r

L T

M P .1

C le a n C u lv e r t i n P la c e

M P .3

F a r m F ie ld A p p r

R T

M P r m F ie ld A p p r

R T

M P iv a te A p p r

R T

M P b li c A p p r

R T

M P iv a te A p p r

L T

M P .7

C le a n C u lv e r t in P la c e

M P .8

S tr u c tu r e

R e p a ir D r a in a g e

M P .3

FOOTNOTE:

SCHEDULES A, B, & C

LINE GRAPH

E-11 ROAD

See Sheet C.5.[1]

T y p e

S u b e x c a v a ti o n

M P .6

.6

T y p e

S u b e x c a v a ti o n

M P .5

W

R N

I N

G B

U R

I E

D U

T I L

I T

Y

W A

R N

I N

G B

U R

I E

D U

T I L

I T

Y5

P O

T

.7

N

Line to be constructed

Profile grade

Existing ground

NAME NORTHING EASTING ELEVATION

CONTROL POINTS

CUYD

EXC.

CUYD

EMB.

60+0057+5055+0052+50 50+00

3180 3180

3185 3185

3190 3190

3195 3195

3200 3200

3205 3205

3210 3210

3215 3215

3220 3220 m t-d ls

E

G r a d e

R a is e P

P .d g n

I n t_ ft

D

D.12

STATE PROJECT

M a r

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

El. = 3196.77

E = 2006759.617

N = 1214091.556

El. = 3216.63

E = 2006752.253

N = 1215301.534

1215310.849

1214779.561

1214260.087

2006778.628

2006790.414

2006729.822

3217.01

3191.46

3192.47

END GRADE RAISE

E-02 ROAD

62+10.00 = MP 2.93

BEGIN GRADE RAISE

E-02 ROAD

50+00.00 = MP 2.70

60' LT & RT

52+00

GPS

GPS

GPS

STAFFORD FERRY ROAD

62+50

60' LT & RT

61+00

110' LT

54+25

9,876

See Sheet F.14

Placed riprap, method A, class 2 (slope armor) missile cable

Underground

SCHEDULES A, B, & C

E-02 GRADE RAISE

See Sheet E.3

Install fiber roll

51+00

62+00

See Sheet D.1 for complete excavation and embankment quantities.

Embankment volumes represent unclassified borrow and select borrow quantities.

Excavation volumes do not include conserved topsoil quantities.

Q ,0 c fs

Q c fs

P ip e C u lv e r t

R e p la c e w it h

M

P .7

P ip e C u lv e r t

R e p la c e w it h

M

P .7

I n s ta ll

P ip e C u lv e r t

M

P .8

LEGEND:

Wetland

LT & RT

Farm Field Appr.

MP 2.73

110' LT

52+00

Removal of fence, barbed wire, LT

Removal of fence, barbed wire, RT

See Sheets G.4-G.5

Fence, barbed wire, 4 strand, LT

See Sheets G.4-G.5

Fence, barbed wire, 4 strand, RT

Rose Creek

,1

.7

,1

.7

-1.3467%

+0.0000%

200' VC

K = 149

,1

.7

7.

%350' VC

K = 50

0 P

O T

.3

N

Existing ground

NAME NORTHING EASTING ELEVATION

CONTROL POINTS

CUYD

EXC.

CUYD

EMB.

110+00107+50105+00102+50100+00

3200 3200

3205 3205

3210 3210

3215 3215

3220 3220

3225 3225

3230 3230

3235 3235

3240 3240 m t-d ls

E

G r a d e

R a is e P

P .d g n

I n t_ ft

D

D.13

STATE PROJECT

M a r

T h o m p s

B

C h e c k e d b y

D e s ig n e d b y

1210249.301

1210250.914

1210363.021

2014994.714

2015735.128

2016158.760

3220.12

3224.90

3223.25

GPS

GPS

GPS

112+50

D-Y TRAIL

90' RT

108+45

90' RT

109+55 fence RT

Remove & reset

50' RT

109+55

50' RT

108+45

55' LT

109+65

55' LT

108+45

100' LT

109+65

100' LT

108+45SCHEDULES A, B, & C

E-04 ROAD

(2) 84" culverts

Remove existing

D o N o t

D is tu r b

E x is ti n g

P ip e C u lv e r t

M

P .5

P ip e C u lv e r ts

I n s ta ll

M

P .6

Q c fs

Q c fs

P ip e A r c h e s

R e p la c e w it h

P ip e C u lv e r ts

R e m o v e E x is ti n g

M

P .7

115+00

R o s e C re e k

45' RT

106+25

45' RT

105+75

45' LT

105+75

45' LT

106+25

See Sheets G.4-G.5

Fence, barbed wire, 4 strand, LT

Removal of fence, barbed wire, LT

See Sheets G.4-G.5

Fence, barbed wire, 4 strand, RT

Removal of fence, barbed wire, RT

LEGEND:

Wetland

O

T

.0

P O

T

.0

N

Line to be constructed

Profile grade

Existing ground

NAME NORTHING EASTING ELEVATION

CONTROL POINTS

See Sheet D.1 for complete excavation and embankment quantities.

Embankment volumes represent select borrow quantities.

Excavation volumes do not include conserved topsoil quantities.

BUTCHER ROAD

CUYD

EXC.

CUYD

EMB…