- OR BLM RB 330632(1), Cow Creek, Ph 1
- Solicitation number
- DTFH70-15-B-00027
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Cow_Creek.pdf | ||
| A003_Cow_Creek.pdf | ||
| A002_Cow_Creek.pdf | ||
| A001_Cow_Creek.pdf | ||
| Cow_Creek_Final_Geotechnical_Report.pdf | ||
| IFB_CowCreek.pdf | ||
| earthwork2.pdf | ||
| 14500004_Signoff_XS.pdf | ||
| ESCP_Cow_Creek_PH_1_OR_BLM_RB_330632(1).pdf | ||
| earthwork3.pdf | ||
| Plan_Request_form_CowCreek.pdf | ||
| Plans_CowCreek.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR BLM RB 330632(1), Cow Creek, Ph 1, Bureau of Land Management, Douglas County, Oregon
The work consists of grading, drainage, subgrade stabilization, bridge and surfacing, and other small items of work.
Project length: 23.3 Miles
Tentative Fixed Completion Date: Fall 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $3 million and $5 million
Location: This project is located approximately 4 Miles SW of Riddle, OR.
DESCRIPTION OF WORK IN
US CUSTOMARY UNITS
FP-03
Base Schedule Option X
Option Y
Option Z
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes Yes Yes Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes Yes Yes Yes 154 Contractor Sampling & Testing (yes/no) Yes Yes Yes Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes Yes 157 Soil Erosion Control Devices (erosion control devices)
Soil Stabilization –
2.0 Acres
Silt Fence -1000 lnft Temporary Diversion
Channel – 750 lnft
Sediment Wattle
– 7750 lnft
Temporary Diversion Channel –
120 lnft Sediment
Wattle – 500 lnft
Sediment Wattle – 800 lnft
Temporary Diversion
Channel – 120 lnft
Sediment Wattle
– 500 lnft
158 Watering for Dust Control 50 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 1.3 Acre
Base Schedule Option X
Option Y
Option Z
204 Excavation & Embankment Roadway Excavation –
9155 cuyd Subexcavation
– 7500 cuyd Select Borrow –
9500 ton 205 Rock Blasting: Controlled Blast Hole (rock blasting)
Controlled Blast Hole – 1000 lnft
207 Earthwork Geotextiles (geotextiles) Earthwork Geotextile, Type I-A -1900 sqyd
Earthwork Geotextile, Tye IV-A – 140 sqyd Geogrid, Biaxial
– 20,000 sqyd
208 Structure Excavation
Shoring and Bracing -
LPSM
Shoring and Bracing -
LPSM
211 Roadway Obliteration Method 2 – 898 cuyd
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap Class 3 – 90 cuyd Class 4 – 65 cuyd Class 3 – 130 cuyd Class 3 – 200 cuyd Class 3 – 160 cuyd 252 Rockery, Special Rock Embankment, and Rock Butttress
Special Rock Embankment –
130 cuyd
DIVISION 300 – Aggregate Courses 308 Minor Crushed Aggregate (crushed aggregate)
Method 2 – 7,500 ton
Method 2 – 550 ton
Method 2 – 275 ton
Method 2 – 315 ton
310 Recycled Aggregate Course (asphalt pavement recycling)
Recycled Aggregate Base
– 18,000 sqyd
X
Option Y
Option Z
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Hot Asphalt Concrete Pavement (asphalt concrete pavement) 6,900 ton 215 ton 105 ton 120 ton 412 Asphalt Tack Coat (asphalt surface treatment) 17 ton 1 ton 1 ton 1 ton 413 Asphalt Pavement Milling 2 inch depth –
450 sqyd
DIVISION 550 – Bridge Construction 575 Minor Bridge Work Abutment
Repair - LPSM
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both) 18-Inch Culvert
– 50 lnft 24-Inch Culvert
– 3,900 lnft 36-Inch Culvert
– 525 lnft 48-Inch Culvert
– 470 lnft 60-Inch Culvert
– 70 lnft 66-Inch Culvert
– 65 lnft End Section 36-
Inch – 1 each Debris Rack – 1 each
Precast reinforced concrete box culvert ( 18 ft span x 5 ft rise) – 92 lnft
603 Structural Plate Structures (culverts & drains)
(162-Inch x 114-Inch) – 92 lnft
168-Inch Structural Plate
Pipe – 96 lnft 604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which)
Manhole – 1 each
Inlet (Pond Riser) – 1 each
605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which)
Standard Underdrain
System – 1,300 lnft
X
Option Y
Option Z
607 Cleaning, Reconditioning, and Repairing Existing Drainage Structures
Cleaning culvert in place – 50 each Reconditioning drainage system – 30 each 622 Rental Equipment (yes/no) Yes Yes Yes Yes 622 General Labor (yes/no) Yes Yes Yes Yes 625 Turf Establishment (indicate seeding or mulching separately)
Hydraulic Method – 10
SLRY
629 Rolled Erosion Control Products & Cellular Confinement Systems (turf establishment)
Type 4 – 2,200 sqyd
633 Permanent Traffic Control Devices (traffic control devices)
Sign System – 42 sqft
634 Permanent Pavement Markings (traffic pavement markings)
Type A, Solid (White) – 65,250 lnft Type A, Solid
(Yellow) – 65,000 lnft
Type A, Broken (White) – 320 lnft Type A, Solid
(White) – 24 sqft
Type A, Solid (White) – 1,400 lnft
Type A, Solid (Yellow) – 1,400 lnft
Type A, Solid (White) – 800 lnft Type A, Solid (Yellow) – 800 lnft
Type A, Solid (White) – 900 lnft
Type A, Solid (Yellow) – 900
X
Option Y
Option Z
635 Temporary Traffic Control – Items Barricade Type 3 – 12 each
Cone, Type 36- Inch – 50 each
Drum – 50 each
Portable
Changeable Message Sign –
2 each
Concrete Barrier – 300
Construction Sign – 450 sqft
Plastic Fence
– 265 lnft
635 Temporary Traffic Control – Flagger 6,400 HR 300 HR 400 HR 400 HR 647 Mitigation (use pay item description)
Fish Passage Boulder – 10 each
Streambed Material – 265 cuyd
Log Weir – 6
Rock Weir – 2
Boulder – 7
Material – 350 cuyd
Channel
Realignment – 650 cuyd
Rock Weir – 19
Boulder – 14
Material – 340 cuyd