earthwork2.pdf

PDF 34 KB Posted

Attached to
OR BLM RB 330632(1), Cow Creek, Ph 1
Solicitation number
DTFH70-15-B-00027
Issued by

About this file

Earthwork 2

View the file

Other files

File Type Posted
BidSum_Cow_Creek.pdf PDF
A003_Cow_Creek.pdf PDF
A002_Cow_Creek.pdf PDF
A001_Cow_Creek.pdf PDF
Cow_Creek_Final_Geotechnical_Report.pdf PDF
IFB_CowCreek.pdf PDF
14500004_Signoff_XS.pdf PDF
ESCP_Cow_Creek_PH_1_OR_BLM_RB_330632(1).pdf PDF
earthwork3.pdf PDF
Plan_Request_form_CowCreek.pdf PDF
Plans_CowCreek.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

or-b-rb33063201xa02_ew.log

OR BLM RB 330632(1)

OR BLM MED 330701(1)

COW CREEK ROAD

DOE CREEK BRIDGE TURNOUT EARTHWORK

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu.

yd.)

1292+60.00 RDWYEXC

Excavation 47.08 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.53 0 0 0.00 0

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.66 0 0 0.00 0

1292+75.00 RDWYEXC

Excavation 50.58 27 27 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 27

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.42 3 0 0.00 27

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.16 9 0 0.00 27

1293+00.00 RDWYEXC

Excavation 43.49 44 44 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.05 1 1 1.00 70

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.36 8 0 0.00 70

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.79 21 0 0.00 70

1293+03.00 RDWYEXC

Excavation 43.60 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.09 1 1 1.00 74

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.67 1 0 0.00 74

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.49 3 0 0.00 74

1293+25.00 RDWYEXC

Excavation 41.07 34 34 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.00 8 8 1.00 100

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.67 9 0 0.00 100

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.51 22 0 0.00 100

1293+50.00 RDWYEXC

Excavation 40.76 37 37 1.00

Subsoil Exc 0.00 0 0 1.00 Fill 13.37 11 11 1.00 126

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.68 10 0 0.00 126

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.53 25 0 0.00 126

1293+69.03 RDWYEXC

Excavation 40.15 29 29 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.59 10 10 1.00 145

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.68 8 0 0.00 145

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.54 19 0 0.00 145

1293+75.00 RDWYEXC

Excavation 40.81 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.76 3 3 1.00 150

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.25 2 0 0.00 150

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.59 6 0 0.00 150

1294+00.00 RDWYEXC

Excavation 41.36 38 38 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.53 8 8 1.00 180

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.48 9 0 0.00 180

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.56 22 0 0.00 180

1294+16.00 RDWYEXC

Excavation 44.33 25 25 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 205

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.34 5 0 0.00 205

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.99 12 0 0.00 205

1294+25.00 RDWYEXC

Excavation 43.50 15 15 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 220

ASPHALT

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.34 2 0 0.00 220

AGGREGATE

Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00

Fill 18.98 6 0 0.00 220

� G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 262 262 1.00 Subsoil Exc 0 0 1.00 Fill 42 42 1.00

ASPHALT

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 57 0 0.00

AGGREGATE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 145 0 0.00

File details come from the government source that posted it. Updated .