earthwork2.pdf
PDF 34 KB Posted
- Attached to
- OR BLM RB 330632(1), Cow Creek, Ph 1
- Solicitation number
- DTFH70-15-B-00027
About this file
Earthwork 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Cow_Creek.pdf | ||
| A003_Cow_Creek.pdf | ||
| A002_Cow_Creek.pdf | ||
| A001_Cow_Creek.pdf | ||
| Cow_Creek_Final_Geotechnical_Report.pdf | ||
| IFB_CowCreek.pdf | ||
| 14500004_Signoff_XS.pdf | ||
| ESCP_Cow_Creek_PH_1_OR_BLM_RB_330632(1).pdf | ||
| earthwork3.pdf | ||
| Plan_Request_form_CowCreek.pdf | ||
| Plans_CowCreek.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
or-b-rb33063201xa02_ew.log
OR BLM RB 330632(1)
OR BLM MED 330701(1)
COW CREEK ROAD
DOE CREEK BRIDGE TURNOUT EARTHWORK
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu.
yd.)
1292+60.00 RDWYEXC
Excavation 47.08 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 0
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 4.53 0 0 0.00 0
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 12.66 0 0 0.00 0
1292+75.00 RDWYEXC
Excavation 50.58 27 27 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 27
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.42 3 0 0.00 27
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.16 9 0 0.00 27
1293+00.00 RDWYEXC
Excavation 43.49 44 44 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 3.05 1 1 1.00 70
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.36 8 0 0.00 70
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.79 21 0 0.00 70
1293+03.00 RDWYEXC
Excavation 43.60 5 5 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 9.09 1 1 1.00 74
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.67 1 0 0.00 74
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.49 3 0 0.00 74
1293+25.00 RDWYEXC
Excavation 41.07 34 34 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.00 8 8 1.00 100
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.67 9 0 0.00 100
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.51 22 0 0.00 100
1293+50.00 RDWYEXC
Excavation 40.76 37 37 1.00
Subsoil Exc 0.00 0 0 1.00 Fill 13.37 11 11 1.00 126
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.68 10 0 0.00 126
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.53 25 0 0.00 126
1293+69.03 RDWYEXC
Excavation 40.15 29 29 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 14.59 10 10 1.00 145
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.68 8 0 0.00 145
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 26.54 19 0 0.00 145
1293+75.00 RDWYEXC
Excavation 40.81 8 8 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.76 3 3 1.00 150
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 10.25 2 0 0.00 150
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 25.59 6 0 0.00 150
1294+00.00 RDWYEXC
Excavation 41.36 38 38 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.53 8 8 1.00 180
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.48 9 0 0.00 180
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.56 22 0 0.00 180
1294+16.00 RDWYEXC
Excavation 44.33 25 25 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 205
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.34 5 0 0.00 205
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.99 12 0 0.00 205
1294+25.00 RDWYEXC
Excavation 43.50 15 15 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 220
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.34 2 0 0.00 220
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Fill 18.98 6 0 0.00 220
� G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 262 262 1.00 Subsoil Exc 0 0 1.00 Fill 42 42 1.00
ASPHALT
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 57 0 0.00
AGGREGATE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 145 0 0.00
File details come from the government source that posted it. Updated .