A001_Cow_Creek.pdf
PDF 578 KB Posted
- Attached to
- OR BLM RB 330632(1), Cow Creek, Ph 1
- Solicitation number
- DTFH70-15-B-00027
About this file
Amendment A001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Cow_Creek.pdf | ||
| A003_Cow_Creek.pdf | ||
| A002_Cow_Creek.pdf | ||
| Cow_Creek_Final_Geotechnical_Report.pdf | ||
| IFB_CowCreek.pdf | ||
| earthwork2.pdf | ||
| 14500004_Signoff_XS.pdf | ||
| ESCP_Cow_Creek_PH_1_OR_BLM_RB_330632(1).pdf | ||
| earthwork3.pdf | ||
| Plan_Request_form_CowCreek.pdf | ||
| Plans_CowCreek.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 03/02/2016 N/A OR BLM RB
330632(1) Cow Creek, PH 1
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X DTFH70-15-B-00027
9B. DATED (SEE ITEM 11)
02/17/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OR BLM RB 330632(1), Cow Creek, PH 1
See page 2 for revisions.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, 03/02/2016 OR BLM RB 330632(1) Solicitation No. DTFH70-15-B-00027 Cow Creek, PH 1
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-11. Revises Bid Item 63509-1000 Temporary Traffic Control, Flagger Page A-12. Revises Bid Item 63509-1000 Temporary Traffic Control, Flagger Page A-13. Revises Bid Item 63509-1000 Temporary Traffic Control, Flagger Page A-15. Revises Bid Item 63509-1000 Temporary Traffic Control, Flagger
SOLICITATION PROVISIONS
The following FAR Provision is amended :
52.204-8, Annual Representations and Certifications (Feb 2016)
CONTRACT CLAUSES
The following FAR Clauses are amended:
52.222-37, Employment Reports on Veterans (Feb 2016) 52.244-6, Subcontracts for Commercial Items (Feb 2016)
MINIMUM WAGE SCHEDULE
Page D-1 through D-17. Updates Davis-Bacon General Wage Decision Number OR1 to current effective date of 02/26/2016.
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision E-11 106.01 Conformity with Contract Requirements Revises link; deletes EEBACS E-17 Subsection 107.10 Deletes (d) F-7 Section 205 Rock Blasting Revised Section 205
PLANS
Plan sheet D.36 Adds fence
ENCLOSURES
Pages A-7 through A-15 Pages F-7 through F-7h Page C-35 through C-36, Clause 52.222-37 Page C-81, Clause 52.244-6 Page B-1 through B-4, Provision 52.204-8 Pages D-1 through D-17, Davis-Bacon General Wage Decision Number OR1 Plan Sheets: D.36 Page E-11 Page E-17
Notice to Bidders: Please submit revised pages A-7 through A-15 with your bid.
Notice to Bidders: Please submit revised pages B-1 through B-4 with your bid.
A - 7
Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.
Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.
When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.
When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.
Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No: OR BLM RB 330632(1)
Project Name: Cow Creek, PH 1
B I D S C H E D U L E Schedule A Account: ALL
Project No: OR BLM RB 330632(1)
OR BLM MED 330702(1)
Name: COW CREEK, PH 1 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000 Line A0020 ALL LPSM
15201-0000 Line A0040 ALL LPSM
15301-0010 Line A0060 ALL LPSM
15401-0000 Line A0080 ALL LPSM
15501-0000 Line A0100 ALL LPSM
15703-1000 Line A0120 2.0 ACRE $ $
15705-0100 Line A0140 1,000 LNFT $ $
15705-1300 Line A0160 750 LNFT $ $
15705-1500 Line A0180 7,750 LNFT $ $
15801-0000 Line A0200 50 MGAL $ $
20101-0000 Line A0220 1.3 ACRE (CQ) $ $
20401-0000 Line A0240 9,155 CUYD (CQ) $ $
20402-0000 Line A0260 7,500 CUYD $ $
20411-0000 Line A0280 9,500 TON $ $
20701-0100 Line A0300 1,900 SQYD $ $
20701-1200 Line A0320 140 SQYD $ $
20703-2000 Line A0340 20,000 SQYD $ $
21101-2000 Line A0360 898 SQYD (CQ) $ $
25101-3000 Line A0380 90 CUYD $ $
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL AND ASSURANCE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SOIL STABILIZATION
PLACED RIPRAP, CLASS 3 (RIPRAP HEADWALL)
SUBEXCAVATION
SELECT BORROW
EARTHWORK GEOTEXTILE, TYPE I-A (NONWOVEN)
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
SOIL EROSION CONTROL, SEDIMENT WATTLE
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
ROADWAY EXCAVATION
EARTHWORK GEOTEXTILE, TYPE IV-A (NONWOVEN)
GEOGRID, BIAXIAL
ROADWAY OBLITERATION, METHOD 2
Schedule Total: ________________________
Submitted by: _________________________
A-8
Leeann.Bush Text Box
Project No: OR BLM RB 330632(1)
OR BLM MED 330702(1)
Name: COW CREEK, PH 1 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
25101-4000 Line A0400 65 CUYD $ $
25201-1000 Line A0420 130 CUYD $ $
30802-2000 Line A0440 7,500 TON $ $
31001-0000 Line A0460 18,000 SQYD $ $
40301-0000 Line A0480 6,900 TON $ $
41201-1000 Line A0500 17 TON $ $
41301-0600 Line A0520 450 SQYD $ $
57501-0000 Line A0540 ALL LPSM
60201-0600 Line A0560 50 LNFT $ $
60201-0800 Line A0580 3,900 LNFT $ $
60201-1000 Line A0600 525 LNFT $ $
60201-1200 Line A0620 470 LNFT $ $
60201-1400 Line A0640 70 LNFT $ $
60201-1500 Line A0660 65 LNFT $ $
60210-1000 Line A0680 1 EACH $ $
60230-0000 Line A0700 1 EACH $ $
60401-0000 Line A0720 1 EACH $ $
60403-0000 Line A0740 1 EACH $ $
60501-0000 Line A0760 1,300 LNFT $ $
48-INCH PIPE CULVERT
60-INCH PIPE CULVERT
66-INCH PIPE CULVERT
PLACED RIPRAP, CLASS 4 (ENERGY DISSIPATOR)
SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
MINOR BRIDGE WORK (ABUTMENT REPAIR)
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
ROADWAY AGGREGATE, METHOD 2
RECYCLED AGGREGATE BASE (FULL DEPTH RECYCLING)
HOT ASPHALT CONCRETE PAVEMENT
INLET (POND RISER)
STANDARD UNDERDRAIN SYSTEM
END SECTION FOR 36-INCH PIPE CULVERT
DEBRIS RACK
MANHOLE
A-9
Project No: OR BLM RB 330632(1)
OR BLM MED 330702(1)
Name: COW CREEK, PH 1 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
60704-0000 Line A0780 50 EACH $ $
60705-0000 Line A0800 30 EACH $ $
62201-0250 Line A0820 50 HOUR $ $
62201-0550 Line A0840 50 HOUR $ $
62201-0950 Line A0860 40 HOUR $ $
62201-2850 Line A0880 40 HOUR $ $
62201-3400 Line A0900 40 HOUR $ $
62201-3750 Line A0920 20 HOUR $ $
62301-0000 Line A0940 120 HOUR $ $
62302-0100 Line A0960 260 HOUR $ $
62503-0000 Line A0980 10 SLRY $ $
62516-1000 Line A1000 920 SQYD $ $
62901-1100 Line A1020 2,200 SQYD $ $
63302-0000 Line A1040 42 SQFT $ $
63401-0100 Line A1060 65,250 LNFT $ $
63401-0100 Line A1080 65,000 LNFT $ $
63401-0200 Line A1100 320 LNFT $ $
63403-0100 Line A1120 24 SQFT $ $
63502-0600 Line A1140 12 EACH $ $
CLEANING CULVERT IN PLACE
RECONDITIONING DRAINAGE STRUCTURE
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
TURF ESTABLISHMENT (HYDRAULIC METHOD)
MULCHING, DRY METHOD
ROLLED EROSION CONTROL PRODUCT, TYPE 4
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE A, SOLID (WHITE)
PAVEMENT MARKINGS, TYPE A, SOLID (YELLOW)
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT
CHAIN SAW (WITHOUT OPERATOR)
GENERAL LABOR
SPECIAL LABOR, SLOPE SCALING
PAVEMENT MARKINGS, TYPE A, BROKEN (WHITE)
PAVEMENT MARKINGS, TYPE A (SOLID WHITE)
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
A-10
Project No: OR BLM RB 330632(1)
OR BLM MED 330702(1)
Name: COW CREEK, PH 1 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
63502-1000 Line A1160 50 EACH $ $
63502-1300 Line A1180 50 EACH $ $
63502-2000 Line A1200 2 EACH $ $
63503-0400 Line A1220 300 LNFT $ $
63504-1000 Line A1240 450 SQFT $ $
63509-1000 Line A1260 6,400 FIX HR RATE $ $
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
A-11
58.00 371,200.00 A001
Option X Account: ALL
Project No: OR BLM RB 330632(1)
OR BLM MED 330702(1)
Name: COW CREEK, PH 1 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000 Line X0020 ALL LPSM
15201-0000 Line X0040 ALL LPSM
15301-0010 Line X0060 ALL LPSM
15401-0000 Line X0080 ALL LPSM
15501-0000 Line X0100 ALL LPSM
15705-1300 Line X0120 120 LNFT $ $
15705-1500 Line X0140 500 LNFT $ $
20810-0000 Line X0160 ALL LPSM
25101-3000 Line X0180 130 CUYD $ $
30802-2000 Line X0200 550 TON $ $
40301-0000 Line X0220 215 TON $ $
41201-1000 Line X0240 1 TON $ $
60302-0000 Line X0260 92 LNFT $ $
62516-1000 Line X0280 440 SQYD $ $
63401-0100 Line X0300 1,400 LNFT $ $
63401-0100 Line X0320 1,400 LNFT $ $
63509-1000 Line X0340 300 FIX HR RATE $ $
64703-6000 Line X0360 10 EACH $ $
64704-1000 Line X0380 265 CUYD $ $
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL AND ASSURANCE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
MITIGATION, STREAMBED MATERIAL
STRUCTURAL PLATE PIPE-ARCH (162-INCH SPAN x 114-INCH RISE)
MULCHING, DRY METHOD
PAVEMENT MARKINGS, TYPE A, SOLID (YELLOW)
SOIL EROSION CONTROL, SEDIMENT WATTLE
SHORING AND BRACING
PLACED RIPRAP, CLASS 3 (RIPRAP HEADWALL)
ROADWAY AGGREGATE, METHOD 2
HOT ASPHALT CONCRETE PAVEMENT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
PAVEMENT MARKINGS, TYPE A, SOLID (WHITE)
TEMPORARY TRAFFIC CONTROL, FLAGGER
MITIGATION, FISH PASSAGE BOULDER
Schedule Total: ________________________
Submitted by: _________________________
A-12
58.00 17,400.00 A001
Option Y Account: ALL
Project No: OR BLM RB 330632(1)
OR BLM MED 330702(1)
Name: COW CREEK, PH 1 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000 Line Y0020 ALL LPSM
15201-0000 Line Y0040 ALL LPSM
15301-0010 Line Y0060 ALL LPSM
15401-0000 Line Y0080 ALL LPSM
15501-0000 Line Y0100 ALL LPSM
15705-1500 Line Y0120 800 LNFT $ $
20810-0000 Line Y0140 ALL LPSM
25101-3000 Line Y0160 200 CUYD $ $
30802-2000 Line Y0180 275 TON $ $
40301-0000 Line Y0200 105 TON $ $
41201-1000 Line Y0220 1 TON $ $
60220-0000 Line Y0240 92 LNFT $ $
62516-1000 Line Y0260 717 SQYD $ $
63401-0100 Line Y0280 800 LNFT $ $
63401-0100 Line Y0300 800 LNFT $ $
63503-1000 Line Y0320 265 LNFT $ $
63509-1000 Line Y0340 400 FIX HR RATE $ $
64703-3000 Line Y0360 6 EACH $ $
64703-3010 Line Y0380 2 EACH $ $
Schedule Total: ________________________
Submitted by: _________________________
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
TEMPORARY TRAFFIC CONTROL, FLAGGER
MITIGATION, LOG WEIR
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL AND ASSURANCE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SEDIMENT WATTLE
MITIGATION, ROCK WEIR
MULCHING, DRY METHOD
PAVEMENT MARKINGS, TYPE A, SOLID (WHITE)
PAVEMENT MARKINGS, TYPE A, SOLID (YELLOW)
SHORING AND BRACING
PLACED RIPRAP, CLASS 3 (RIPRAP HEADWALL)
ROADWAY AGGREGATE, METHOD 2
HOT ASPHALT CONCRETE PAVEMENT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
PRECAST REINFORCED CONCRETE BOX CULVERT (18-FOOT SPAN x 5-FOOT RISE (THREE SIDED))
A-13
58.00 23,200.00 A001
Option Y Account: ALL
Project No: OR BLM RB 330632(1)
OR BLM MED 330702(1)
Name: COW CREEK, PH 1 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
64703-6000 Line Y0400 7 EACH $ $
64704-1000 Line Y0420 350 CUYD $ $
64704-1500 Line Y0440 650 CUYD $ $
MITIGATION, STREAMBED CHANNEL REALIGNMENT
MITIGATION, FISH PASSAGE BOULDER
MITIGATION, STREAMBED MATERIAL
A-14
Option Z Account: ALL
Project No: OR BLM RB 330632(1)
OR BLM MED 330702(1)
Name: COW CREEK, PH 1 CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000 Line Z0020 ALL LPSM
15201-0000 Line Z0040 ALL LPSM
15301-0010 Line Z0060 ALL LPSM
15401-0000 Line Z0080 ALL LPSM
15501-0000 Line Z0100 ALL LPSM
15705-1300 Line Z0120 120 LNFT $ $
15705-1500 Line Z0140 500 LNFT $ $
25101-3000 Line Z0160 160 CUYD $ $
30802-2000 Line Z0180 315 TON $ $
40301-0000 Line Z0200 120 TON $ $
41201-1000 Line Z0220 1 TON $ $
60301-0280 Line Z0240 96 LNFT $ $
62516-1000 Line Z0260 368 SQYD $ $
63401-0100 Line Z0280 900 LNFT $ $
63401-0100 Line Z0300 900 LNFT $ $
63509-1000 Line Z0320 400 FIX HR RATE $ $
64703-3010 Line Z0340 19 EACH $ $
64703-6000 Line Z0360 14 EACH $ $
64704-1000 Line Z0380 340 CUYD $ $
Schedule Total: ________________________
Submitted by: _________________________
TEMPORARY TRAFFIC CONTROL, FLAGGER
MITIGATION, ROCK WEIR
MITIGATION, FISH PASSAGE BOULDER
MOBILIZATION
CONSTRUCTION SURVEY AND STAKING
CONTRACTOR QUALITY CONTROL AND ASSURANCE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
MITIGATION, STREAMBED MATERIAL
MULCHING, DRY METHOD
PAVEMENT MARKINGS, TYPE A, SOLID (WHITE)
PAVEMENT MARKINGS, TYPE A, SOLID (YELLOW)
SOIL EROSION CONTROL, SEDIMENT WATTLE
PLACED RIPRAP, CLASS 3 (RIPRAP HEADWALL)
ROADWAY AGGREGATE, METHOD 2
HOT ASPHALT CONCRETE PAVEMENT
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
168-INCH STRUCTURAL PLATE PIPE
A-15
58.00 23,200.00 A001
F-7
Special Contract Requirements Project: OR BLM RB 330632(1), Cow Creek, PH 1
03USC04/26/10
Section 205. — ROCK BLASTING
Description
205.01 This work consists of rock fragmentation blasting using production and controlled blasting techniques to construct engineered rock cuts.
205.02 Definitions.
(a) Production blasting. Blasting using widely spaced blast holes that typically contain larger explosive charges to expedite movement and fragmentation for rock removal.
(b) Controlled blasting. Blasting that includes presplit blasting and cushion blasting hole techniques. Controlled blasting uses closely-spaced and carefully aligned blast holes that typically contain lighter charges than production holes to produce stable, aesthetically pleasing rock faces with minimal blast damage. Controlled blast holes are the first row of blast holes, normally located within 24 inches (600 millimeters) of the top of the staked slope.
(1) Presplit blasting. Presplit blasting detonates closely spaced backslope holes before drilling for production blasting or before detonating the production blasting holes to produce a highly controlled, smooth cut face.
(2) Cushion blasting. Cushion blasting is similar to presplitting, except that the detonation of the cushion holes along the backslope is detonated immediately after the detonation of the production and buffer holes, generally resulting in a more natural cut face appearance.
Construction Requirements
205.03 Regulations. Comply with Federal, state, and local regulations for the purchase, transportation, storage, and use of explosive material. Federal regulations include the following:
(a) Safety and health. OSHA, 29 CFR Part 1926, Subpart U.
(b) Storage, security, and accountability. Bureau of Alcohol, Tobacco, and Firearms (BATF), 27 CFR Part 555, Commerce in Explosives.
(c) Shipment. DOT, 49 CFR Parts 171-179, 390-397.
(d) National Park Service. For projects in National Park Service lands, comply with National Park Service Director’s Order No. 65, Explosives Use and Blasting Safety.
205.04 Qualifications. Submit the following for approval at least 14 days before drilling and blasting operations begin:
(a) Blaster-in-charge. Furnish an individual who can directly supervise the drilling and blasting crew during drilling, loading, and detonation of charges. Include the following:
Revised by Amendment A001
F-7a
Project: OR BLM RB 330632(1), Cow Creek, PH 1
(1) Name of blaster-in-charge;
(2) A résumé showing at least 5 years’ experience as a blaster-in-charge on projects with similar work;
(3) Copy of a valid blaster license accepted by the state where the project is located for the type of blasting required; and
(4) Five references with knowledge of qualifications and reliability. Include name, relationship, and current telephone number for each reference.
(b) Blasting crew personnel. Names of personnel and evidence they have completed at least 24 hours of blasting safety training in the last five years or have at least two years of blasting experience along with proof of a Federal Employee Possesser Permit for each crew person.
(c) Drillers. Names and evidence they are proficient in drilling methods required to perform the work.
(d) Vibration specialist. Name and résumé showing at least 5 years’ experience as a vibration specialist on projects with similar work.
205.05 Blasting Plans. Submit proof of applicable permits, licenses, and a general blasting plan signed by the blaster-in-charge at least 14 days before drilling and blasting operations. Blasting plans are not required for boulder reduction blasts (mudcapping or blockholing).
(a) General blasting plan. Submit a general blasting plan for review and approval by the CO.
Include the following:
(1) Procedures and safety precautions for transporting, handling, storing, loading, and detonating explosives, conducting pre- and post-blast surveys, monitoring blasts, managing misfires, and removing and disposing of excess explosives.
(2) Explosives transportation and storage plan, including:
(a) Name, address, and telephone number of explosives suppliers;
(b) Description and license number of explosives transport vehicles, routes to be traveled, proposed hours of travel, and driver qualifications;
(c) Magazine and day-box locations;
(d) Explosives and accessories inventory system; and
(e) Contact information for the person responsible for security of project blasting material and supplies.
(3) Area security plan including explosives and general site security, methods of site communication, pre- and post-blast signage and audible signaling systems, road closure requirements, and pre-blast notification for affected agencies or entities.
(4) Manufacturer’s technical data sheets for proposed explosives, primers, initiators, and related blasting devices and accessories.
F-7b
Project: OR BLM RB 330632(1), Cow Creek, PH 1
(5) Excavation plans and equipment lists for pre-blast scaling and pioneered access roads, and benches for drilling and blasting operations.
(6) Scaled, typical plan and section views for both production and controlled blasting that include the following: stationing intended for each typical blast plan, maximum blast length, free face, burden and hole spacing, hole inclination, hole depth, hole diameter, stemming depth, subdrill depth, powder factor, charge weight per delay, and initiation method, sequence, and delay times.
(7) Methods for limiting dust and noise.
(8) Fire watch plan including number of post-blast observers and duration of the fire watch.
(9) Contingency plan for blast flyrock containment, including the names and qualifications of those responsible for preparing containment system designs.
Do not deliver explosives to the project until the general blasting plan is accepted. Submit revisions and updates within 48 hours of changes in the above information. Allow 7 days for review and approval of the General Blasting Plan.
(b) Site-specific blasting plans and general plan revisions and updates. Submit site-specific blasting plans after approval of the general blasting plan or at times there is a change in drilling and blasting methods provided in the general blasting plan. Allow 3 days for approval. Do not begin drilling until the plan is approved. Include the following:
(1) Proposed excavation sequence;
(2) Station limits and plan view of the proposed blast, showing how the proposed blast fits into the lift excavation sequence;
(3) Elevations of the tops and bottoms of each lift;
(4) Scaled drawings for each blast showing access, containment, plan and section views of drill patterns, clearing limits, free face, burden, blast hole locations, blast hole spacing, subdrill depths, lift height, blast hole diameters, and blast hole angles;
(5) Loading diagram for each blast showing powder factor, charge per delay, type and quantity of explosives, primers, initiators, locations of decking, and range of stemming depths for substantial variations within the drill pattern;
(6) Initiation method and sequence of blast holes for each blast. Include delay times, delay system, and down hole firing times;
(7) Flyrock, airblast overpressure (noise), and ground vibration control measures;
(8) Estimated volume of in-place rock to be blasted. Include the total length of production and controlled blast hole;
(9) Location and orientation of significant joints, fractures, faulting, bedding planes or other rock mass structural features to be accounted for in the site-specific blasting plan; and
(10) Post-blast rockfall containment designs and procedures.
F-7c
Project: OR BLM RB 330632(1), Cow Creek, PH 1
(11) When structures are within an area of ground vibration and/or air-blast overpressure concern, the site-specific blast plan shall include the attenuation study information for the affected structures and indicate that the peak particle velocity versus peak frequency will not damage each structure.
205.06 Pre-Blast Condition Survey and Vibration Monitoring and Control. The Contractor is responsible for damage resulting from blast related ground vibrations and air-blast over-pressures.
Determine the need for vibration monitoring depending on soil and rock conditions, blasting parameters as outlined in the blasting plan, and proximity of buildings, structures, utilities, and sensitive natural features that may be subject to damage from ground vibrations or air-blasts. If vibration monitoring is required conform to the following requirements:
(a) If not specified in the contract, establish referenceable blasting criteria for buildings, structures, utilities and natural features that conform to federal, state, or local regulations. Present blasting criteria in terms of distance of the facility or feature from blasting, maximum allowable peak particle velocity limits versus structure type, maximum allowable peak particle velocity versus peak frequency, and air over-pressure structure damage limits.
(b) Conduct a pre-blast condition survey of nearby buildings, structures, utilities, and natural features potentially damaged by blasting-related ground vibrations or air-blast. Document the natural frequency of each affected structure or feature. Use a survey method acceptable to the Contractor’s insurance company. Submit a copy of pre-blast condition survey records with the site-specific blasting plans for CO review.
(c) Control ground vibrations and air-blast over-pressures with properly designed delay sequences and maximum allowable charge weights per delay. Verify allowable charge weights per delay by conducting representative trial blasts and measuring ground vibrations and air-blast over-pressure levels. The attenuation study will enable successful prediction of the peak particle velocity in any component (longitudinal, transverse, or vertical) anywhere on the surface of the structure(s).
Conduct test blasts with blast plan modifications that limit ground vibrations and air-blast over-pressures to levels that will not cause damage to nearby buildings, structures, utilities and/or natural features as determined by the Vibration Specialist. Submit a copy of the attenuation study results and predicted peak particle velocity versus peak frequency for each structure.
(d) When ground vibration or air-blast damage is possible, monitor each blast with digital recording seismographs and air-blast monitoring equipment calibrated within the last year and approved by the CO. Locate monitoring equipment per the directions of the Vibration Specialist, placing a minimum of three recording stations between the blast area and closest susceptible structures, utilities or natural features, as well as at least one station on the structure. For ground vibration monitoring, use self-triggering seismographs capable of measuring peak air blast overpressure and recording particle velocity, displacement and acceleration for three mutually perpendicular components of vibration in the range generally found for controlled blasting. The instrument shall contain internal calibration and triaxial orthogonal transducers with flat frequency response from 2 to 250 hertz with a minimum sampling rate of 1000 data points per second with sufficient memory to store the full blasting sequence and their locations. Seismographs must be capable of producing a permanent digital time history file for each ground motion episode.
F-7d
Project: OR BLM RB 330632(1), Cow Creek, PH 1
(e) Environmental Restrictions and Monitoring. The following environmental restrictions and monitoring requirements must be incorporated in the blast plans:
Prohibit blasting between October 1 and July 15;
Do not use explosives during the period of two hours before sunset until two hours after sunrise;
All blasting will be a minimum of 100 feet (slope distance) from Cow Creek;
Air-blast overpressure and peak particle velocities (PPV) will need to be monitored at the closest water’s edge to the blast during each shot using a piezoelectric hydrophone and triaxial geophones meeting the requirements outlined in 205.06(d). Air-blast overpressures and PPV can not exceed 7.3 pounds per square inch (psi) and 2.0 inches per second (ips), respectively. Monitoring will document that the established tolerances are met during each shot for the duration of the project;
Exposure to peak sound levels shall not exceed 138 dBA at a distance of 300 feet from all shots.
Submit a written document to the CO for each blast that includes: air blast overpressure, peak particle velocity, and peak sound levels for each shot.
Place blast mats over charges prior to detonation;
Do not use surface shots;
Cover detonator cord on the surface, if used, with a minimum of 6 inches of fill; and
All shots should be fired in pre-drilled or dug holes that are small in diameter, shallow, and properly stemmed or back-filled.
Ensure blasting operations incorporate collected data and findings from vibration monitoring by having the Vibration Specialist interpret all seismograph and air-blast records. Submit a copy of the interpreted seismograph and air-blast records to the CO with a certifying signature by the Vibration Specialist. If actual peak particle velocity versus peak frequency measurements exceed those predicted for a structure, the site-specific blast plan will need to be adjusted for the actual structural response to the blasting. The plan may include adjustments to pattern, loading, timing, flyrock measures, etc.
Each blast shall be recorded using digital video equipment from two locations that clearly show the entire proposed blast site, preferably from locations on both sides of the blast.
205.07 Test Blasting. Before beginning full-scale drilling and blasting, demonstrate adequacy of the site specific-blasting plan by drilling, blasting, and excavating a test blast up to 100 lineal feet in length, as measured along centerline, with any proposed containment measures in-place. Conduct the test blast at an approved location within the planned excavation area.
Space blast holes for presplit/cushion blasting no more than 30 inches apart for the initial test blast.
Adjust the spacing based on the results of the test blast(s) for each excavation in differing geology as approved by the CO. Use the approved spacing in the full-scale blasting or subsequent test blasts if necessary.
F-7e
Project: OR BLM RB 330632(1), Cow Creek, PH 1
A test blast is unacceptable when it results in excessive flyrock, potentially damaging ground vibrations or air-blasts, unplanned overbreak and backbreak, excessive damage to the final rock cut face, or results in unwanted overhangs. When a test blast is unacceptable, revise the site-specific blasting plan and conduct additional test blasts until the combination of blast hole pattern spacing, timing, controlled blast-hole alignment, and charges produce acceptable results.
205.08 Blasting. Use explosives and initiating devices less than 1-year old. Locate explosives magazines at sites approved by the CO.
Inspect the pre-blast area and submit the proposed extent of pre-blast clearing and scaling for approval.
Use angle- or fan-drilled holes as needed during initial pioneering operations to obtain the desired face.
Controlled blasting requirements are applicable to pioneering work.
Record and maintain a log of each blast hole drilled identifying the depth, color, and character of the cuttings, penetration rate, hole collar location and hole orientation, and other pertinent information.
Before initiating the blast, prepare a blast plan map and submit it showing designated hole numbers along with individual hole logs completed, dated and signed by the driller.
Ensure blast holes are free of obstructions for the entire depth before placing charges. Take necessary precautions when placing charges so, caving of material from the walls of the holes and the hole collar will not occur.
Mitigate uncontrolled gas pressure loss during blasting and excessive blast noise by stemming the upper portion of blast holes with appropriate dry granular material passing the ½-inch (12.5-millimeter) sieve. Do not stem holes with drill cuttings.
Blast according to the approved site-specific blasting plan. Use blasting mats, rockfall containment systems, and other protective devices to prevent damage to surrounding features.
Stop drilling and blasting operations, and submit a revised site-specific blasting plan according to Subsection 205.05(b), when the following occur:
Slopes are unstable;
Slopes exceed overbreak tolerances within the limits of the excavation, as shown in the Plans, or as determined by the CO for the site geology;
Unwanted overhangs, ridges, or ledges are created;
Excessive blast damage occurs within the limits of the excavation, as shown in the Plans, or as determined by the CO;
Poor fragmentation results in oversize material requiring secondary blasting and rehandling;
Safety of the public is jeopardized;
Property or natural features are endangered;
Excessive or uncontrolled flyrock is generated;
Excessive ground vibration or air-blast over-pressures occurs where damage to buildings, structures, utilities or natural features is possible; or
F-7f
Project: OR BLM RB 330632(1), Cow Creek, PH 1
Desired slope or rock face conditions are not produced.
Remove or stabilize cut face rock that is loose, hanging, or potentially dangerous after each blast.
Scale by methods approved by the CO. Leave minor irregularities or surface variations in place if they do not create a hazard. Excavate and remove material outside of the planned neat line slopes which is unstable and constitutes a potential hazard. Do not drill the next lift until slope stabilization and blast cleanup work is complete.
(a) Production blasting. When conducting cushion blasting or presplitting, drill a lighter-loaded buffer row of production holes on a parallel plane adjacent to the controlled blast line to minimize blast damage to the final slope.
Drill production blast holes a maximum of 4 inches (100 millimeters) in diameter to a sufficient depth such that unbroken rock does not extend above the finish surface. Drill production blast holes to the design depth. If more than 5 percent of the production blast holes in a lift do not conform to the design depth requirements, redrill the shallow holes to the proper. Except when subdrilling, do not drill production blast holes, below the base plane of the controlled blast holes.
Drill production blast holes within two drill hole diameters of the planned collar location. If more than 5 percent of the drill hole collars in a lift are out of tolerance, fill each hole outside of the location tolerance with crushed stone and redrill at the proper.
Detonate production holes in a controlled delay sequence.
(b) Controlled blasting. Use angled or fan drilled holes for pioneering the tops of rock cuts and preparing working platforms. Use equipment or methods approved by the CO for areas not accessible to track drill equipment.
Before drilling, completely remove overburden, soil, and loose or decomposed rock along the top of the excavation for a distance of at least 30 feet (9 meters) beyond the end of the production hole drilling limits, or to the end of the cut.
Use controlled blasting to form the final cut face on rock cuts where the staked slope ratio is 1⅓V:1H or steeper and the slope height is more than 10 feet (3 meters) above the ditch grade.
Use drilling equipment that accurately controls the angle the drill as it enters the rock. Select a lift height and conduct drilling operations so the blast hole spacing and down-hole alignment does not vary more than 8 inches (200 millimeters) from the proposed spacing and alignment. If more than 5 percent of the holes exceed the variance, reduce the lift height and modify drilling operations until the holes are within tolerance.
Drill holes a maximum of 3 inches (75 millimeters) in diameter and within 3 inches (75 millimeters) of the staked collar location. Fill and redrill blast holes outside of the location tolerance when more than 5 percent of the hole collars in a lift are outside of the location tolerance Use crushed stone to fill the blast holes before redrilling. Drill the controlled blast hole line at least 30 feet (9 meters) beyond loaded production holes or to the end of the cut.
F-7g
Project: OR BLM RB 330632(1), Cow Creek, PH 1
Do not exceed 30 feet (9 meters) for bench height or drill hole length. Limit subdrilling of holes to one-half of the hole spacing or 24 inches (600 millimeters) whichever is deeper.
Offset lifts up to 24 inches (600 millimeters) horizontally to allow for drill equipment clearance.
Remove benches resulting from the drilling offset.
Compensate for drift that may occur in the upper lifts. Adjust the drill inclination angle or the initial drill collar location to obtain the required typical section. Limit drilling to one-half of the hole spacing or 24 inches (600 millimeters) whichever is deeper.
Do not use bulk ammonium nitrate and fuel oil for controlled blasting. Only standard explosives manufactured specifically for controlled blasting will be used in controlled blast holes, unless approved by the CO.
Maximum diameter of explosives used in controlled blast holes will be no greater than one-half the diameter of the presplit hole.
205.09 Reporting.
(a) Post-blast. Prepare an post-blast report for blasts. Submit the report within 3 days following a blast and before drilling for the next blast. Include the following:
(1) Results of the blast (overbreak, blast damage, noise levels, flyrock, drill trace retention, fragmentation, material containment, material rehandling requirements, and misfires);
Submit proposed changes for future site-specific blasting plans that will produce acceptable results if blasting objectives were not met. Submit proposed repairs or stabilization plans for unstable or blast damaged backslopes;
(2) A detailed blasting plan amended to show significant changes in pattern, loading, or timing;
(3) Drilling logs for each hole completed (dated and signed by the driller) that identify the depth, color, and character of the cuttings. Also include the penetration rate, hole collar location, hole orientation, and conditions that adversely affected drilling or explosives loading operations;
(4) Depth measurements of production and controlled blast holes;
(5) A drawing or sketch showing the direction of blast, the face, or faces, hole numbers, and the physical blast layout;
(6) Measurement of overbreak quantities following lift mucking;
(7) Date and time of loading and detonating the blast; and
(8) Name and signature of the blaster-in-charge.
(b) Monitoring. Submit copies of the digital videos to the CO after each blast. The next blast will not occur until the video has been received by the CO with an opportunity to review it over the course of a 24-hour period.
If vibration and/or air-blast monitoring is required, submit a vibration and air-blast report for CO review within 3 days following a blast and prior to drilling for further blasting. Include the following:
F-7h
Project: OR BLM RB 330632(1), Cow Creek, PH 1
(1) Type of vibration or air-blast recording station used and instrument identification numbers;
(2) Name of vibration specialist observing the blast and interpreting vibration and air-blast data;
(3) Blast identification number and location of blast;
(4) Distance and direction of ground vibration and air-blast over-pressure recording stations from the blast area;
(5) Type of material ground vibration recording stations were sitting on at the time of the blast;
(6) Maximum applicable charge weight per delay;
(7) Peak displacement, particle velocity and frequency recorded at each ground vibration sensor location;
(8) Peak over-pressure recorded at each air-blast sensor location;
(9) Dated and signed copy of all instrument records;
(10) Post-blast condition survey noting changes from the pre-blast survey; and
(11) Comments on success of the blast in terms of adherence to established ground vibration or air-blast criteria and management practices.
When failing to meet ground vibration and air-blast criteria and management objectives, submit proposed changes to future site-specific blasting plans that will produce acceptable results.
(c) Close-out. Submit a written statement signed by the blaster-in-charge certifying:
(1) Blastholes loaded with explosive material have been either detonated or unloaded and disposed of properly; and
(2) Blasting is complete and explosive material has been removed from the project site.
205.10 Acceptance. Material for rock blasting will be evaluated under Subsections 106.02 and 106.03.
Rock blasting will be evaluated under Subsections 106.02 and 106.04.
Measurement
205.11 Rock Blasting will not be measured for payment.
Payment
205.12 Rock blasting is subsidiary to roadway excavation.
C-35
Contract Clauses Project: OR BLM RB 330632(1), Cow Creek, PH I comply with the requirements of Executive Order 11246, as amended, the implementing regulations, or this clause, the Deputy Assistant Secretary shall take action as prescribed in 41 CFR 60-4.8.
(n) The Contractor shall designate a responsible official to—
(1) Monitor all employment-related activity to ensure that the Contractor’s equal employment policy is being carried out;
(2) Submit reports as may be required by the Government; and
(3) Keep records that shall at least include for each employee the name, address, telephone number, construction trade, union affiliation (if any), employee identification number, social security number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, separate records are not required to be maintained.
(o) Nothing contained herein shall be construed as a limitation upon the application of other laws that establish different standards of compliance or upon the requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Program).
52.222-35 Equal Opportunity for Veterans (Oct 2015)
(a) Definitions. As used in this clause-- “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,”
“disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.222-36 Affirmative Action for Workers with Disabilities (Jul 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.222-37 Employment Reports on Veterans (Feb 2016)
Revised by A001
C-36
(a) Definitions. As used in this clause, “active duty wartime or campaign badge veteran,'” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” and “recently separated veteran,'' have the meanings given in FAR 22.1301.
(b) Unless the Contractor is a State or local government agency, the Contractor shall report at least annually, as required by the Secretary of Labor, on—
(1) The total number of employees in the contractor's workforce, by job category and hiring location, who are protected veterans (i.e., active duty wartime or campaign badge veterans, Armed Forces service medal veterans, disabled veterans, and recently separated veterans;
(2) The total number of new employees hired during the period covered by the report, and of the total, the number of protected veterans (i.e., active duty wartime or campaign badge veterans, Armed Forces service medal veterans, disabled veterans, and recently separated veterans); and
(3) The maximum number and minimum number of employees of the Contractor or subcontractor at each hiring location during the period covered by the report.
(c) The Contractor shall report the above items by filing the VETS-4212 ``Federal Contractor Veterans' Employment Report'' (see “VETS-4212 Federal Contractor Reporting'' and ``Filing Your VETS-4212 Report'' at http://www.dol.gov/vets/vets4212.htm).”
(d) The Contractor shall submit VETS-100A Reports no later than September 30 of each year.
(e) The employment activity report required by paragraphs (b)(2) and (b)(3) of this clause shall reflect total new hires, and maximum and minimum number of employees, during the most recent 12–month period preceding the ending date selected for the report. Contractors may select an ending date—
(1) As of the end of any pay period between July 1 and August 31 of the year the report is due; or
(2) As of December 31, if the Contractor has prior written approval from the Equal Employment
Opportunity Commission to do so for purposes of submitting the Employer Information Report EEO-1 (Standard Form 100).
(f) The number of veterans reported must be based on data known to the contractor when completing the VETS-100A. The contractor’s knowledge of veterans status may be obtained in a variety of ways, including an invitation to applicants to self-identify (in accordance with 41 CFR 60-300.42), voluntary self-disclosure by employees, or actual knowledge of veteran status by the contractor. This paragraph does not relieve an employer of liability for discrimination under 38 U.S.C. 4212.
(g) The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor.
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)
(a) During the term of this contract, the Contractor shall post an employee notice, of such size and in such form, and containing such content as prescribed by the Secretary of Labor, in conspicuous places in and about its plants and offices where employees covered by the National Labor Relations Act engage in activities relating to the performance of the contract, including all places where notices to employees are customarily posted both physically and electronically, in the languages employees speak, in accordance with 29 CFR 471.2(d) and (f).
(1) Physical posting of the employee notice shall be in conspicuous places in and about the Contractor’s plants and offices so that the notice is prominent and readily seen by employees who are covered by the National Labor Relations Act and engage in activities related to the performance of the contract.
(2) If the Contractor customarily posts notices to employees electronically, then the Contractor shall also post the required notice electronically by displaying prominently, on any Web site that is maintained by the Contractor and is customarily used for notices to employees about terms and conditions of employment, a link to the Department of Labor’s Web site that contains the full text of the poster. The link to the Department’s Web site, as referenced in (b)(3) of this section, must read, ‘‘Important Notice about Employee Rights to Organize and Bargain Collectively with Their Employers.’’
C-81
(i) The Government reserves the right to review the Contractor’s purchasing system as set forth in FAR Subpart 44.3.
(j) Paragraphs (d) and (f) of this clause do not apply to the following subcontracts, which were evaluated during negotiations: _____________________________________________________.
52.244-6 Subcontracts for Commercial Items (Feb 2016)
(a) Definitions. As used in this clause— “Commercial item” has the meaning contained in Federal Acquisition Regulation 2.101, Definitions.
“Subcontract” includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the
Contractor or subcontractor at any tier.
(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.
(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509), if the subcontract exceeds $5.5 million and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.
(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of…
This is the start of the file's text. The full file is on GovTribe.