earthwork3.pdf
PDF 41 KB Posted
- Attached to
- OR BLM RB 330632(1), Cow Creek, Ph 1
- Solicitation number
- DTFH70-15-B-00027
About this file
Earthwork 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_Cow_Creek.pdf | ||
| A003_Cow_Creek.pdf | ||
| A002_Cow_Creek.pdf | ||
| A001_Cow_Creek.pdf | ||
| Cow_Creek_Final_Geotechnical_Report.pdf | ||
| IFB_CowCreek.pdf | ||
| earthwork2.pdf | ||
| 14500004_Signoff_XS.pdf | ||
| ESCP_Cow_Creek_PH_1_OR_BLM_RB_330632(1).pdf | ||
| Plan_Request_form_CowCreek.pdf | ||
| Plans_CowCreek.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
or-b-rb33063201xa03_ew.log
OR BLM RB 330632(1)
OR BLM MED 330701(1)
COW CREEK ROAD
CURVE REALIGNMENT EARTHWORK
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu.
yd.)
1367+25.00 RDWYEXC
Excavation 24.82 0 0 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.59 0 0 1.00 0
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 6.93 0 0 0.00 0
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.20 0 0 0.00 0
1367+50.00 RDWYEXC
Excavation 25.76 23 23 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 7.68 4 4 1.00 19
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.00 6 0 0.00 19
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.19 17 0 0.00 19
1367+75.00 RDWYEXC
Excavation 25.65 24 24 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.84 4 4 1.00 39
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.00 6 0 0.00 39
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.19 17 0 0.00 39
1368+00.00 RDWYEXC
Excavation 26.62 24 24 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 63
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.08 7 0 0.00 63
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.19 17 0 0.00 63
1368+25.00 RDWYEXC
Excavation 25.41 24 24 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.50 0 0 1.00 87
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.00 7 0 0.00 87
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.19 17 0 0.00 87
1368+50.00 RDWYEXC
Excavation 23.48 23 23 1.00
Subsoil Exc 0.00 0 0 1.00 Fill 11.40 6 6 1.00 104
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.00 6 0 0.00 104
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.20 17 0 0.00 104
1368+75.00 RDWYEXC
Excavation 21.80 21 21 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 21.09 15 15 1.00 110
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.27 7 0 0.00 110
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.80 17 0 0.00 110
1369+00.00 RDWYEXC
Excavation 19.13 19 19 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 26.95 22 22 1.00 107
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.60 7 0 0.00 107
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.56 18 0 0.00 107
1369+25.00 RDWYEXC
Excavation 32.54 24 24 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 29.43 26 26 1.00 105
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.93 7 0 0.00 105
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.32 18 0 0.00 105
1369+50.00 RDWYEXC
Excavation 64.53 45 45 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 24.64 25 25 1.00 125
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.27 7 0 0.00 125
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.09 19 0 0.00 125
1369+75.00 RDWYEXC
Excavation 317.27 177 177 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 29.27 25 25 1.00 277
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.60 8 0 0.00 277
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00
Fill 21.86 20 0 0.00 277
1370+00.00 RDWYEXC
Excavation 398.47 331 331 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 18.86 22 22 1.00 586
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.94 8 0 0.00 586
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.63 21 0 0.00 586
1370+25.00 RDWYEXC
Excavation 387.33 363 363 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 15.30 16 16 1.00 933
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.98 8 0 0.00 933
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.72 21 0 0.00 933
1370+50.00 RDWYEXC
Excavation 466.77 395 395 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 7 7 1.00 1321
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.98 8 0 0.00 1321
AGGREGATE
Excavation 0.00 0 0 0.00
Subsoil Exc 0.00 0 0 0.00 Fill 22.72 21 0 0.00 1321
1370+75.00 RDWYEXC
Excavation 713.42 546 546 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 1867
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.98 8 0 0.00 1867
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.72 21 0 0.00 1867
1371+00.00 RDWYEXC
Excavation 891.03 742 742 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 2609
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.98 8 0 0.00 2609
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.72 21 0 0.00 2609
1371+25.00 RDWYEXC
Excavation 1216.16 975 975 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 3584
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.98 8 0 0.00 3584
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.72 21 0 0.00 3584
1371+50.00 RDWYEXC
Excavation 1329.88 1178 1178 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 4762
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.98 8 0 0.00 4762
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.72 21 0 0.00 4762
1371+75.00 RDWYEXC
Excavation 1325.98 1229 1229 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 5991
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.83 8 0 0.00 5991
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 22.36 21 0 0.00 5991
1372+00.00 RDWYEXC
Excavation 903.96 1032 1032 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 7023
ASPHALT
Excavation 0.00 0 0 0.00
Subsoil Exc 0.00 0 0 0.00 Fill 8.49 8 0 0.00 7023
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 21.57 20 0 0.00 7023
1372+25.00 RDWYEXC
Excavation 531.31 664 664 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 7687
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 8.15 8 0 0.00 7687
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.80 20 0 0.00 7687
1372+50.00 RDWYEXC
Excavation 278.02 374 374 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8061
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.82 7 0 0.00 8061
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 20.07 19 0 0.00 8061
1372+75.00 RDWYEXC
Excavation 121.61 186 186 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8247
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.50 7 0 0.00 8247
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 19.38 18 0 0.00 8247
1373+00.00 RDWYEXC
Excavation 36.56 73 73 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 10.41 5 5 1.00 8315
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.17 7 0 0.00 8315
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.71 18 0 0.00 8315
1373+25.00 RDWYEXC
Excavation 56.98 44 44 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 23.25 16 16 1.00 8343
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.02 7 0 0.00 8343
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.39 17 0 0.00 8343
1373+27.93 RDWYEXC
Excavation 58.19 6 6 1.00 Subsoil Exc 0.00 0 0 1.00
Fill 23.22 3 3 1.00 8346
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.05 1 0 0.00 8346
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.46 2 0 0.00 8346
1373+50.00 RDWYEXC
Excavation 65.17 50 50 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.39 10 10 1.00 8386
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.02 6 0 0.00 8386
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.39 15 0 0.00 8386
1373+75.00 RDWYEXC
Excavation 68.33 62 62 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8448
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.02 7 0 0.00 8448
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.39 17 0 0.00 8448
1374+00.00 RDWYEXC
Excavation 64.61 62 62 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8510
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.02 7 0 0.00 8510
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.39 17 0 0.00 8510
1374+25.00 RDWYEXC
Excavation 55.67 56 56 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8566
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.02 6 0 0.00 8566
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.39 17 0 0.00 8566
1374+50.00 RDWYEXC
Excavation 45.57 47 47 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8613
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.02 7 0 0.00 8613
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.39 17 0 0.00 8613
1374+75.00 RDWYEXC
Excavation 38.83 40 40 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8653
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.02 7 0 0.00 8653
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.39 17 0 0.00 8653
1374+78.02 RDWYEXC
Excavation 37.77 4 4 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8657
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 7.02 1 0 0.00 8657
AGGREGATE
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 18.40 2 0 0.00 8657
1375+00.00 RDWYEXC
Excavation 35.68 30 30 1.00 Subsoil Exc 0.00 0 0 1.00 Fill 0.00 0 0 1.00 8687
ASPHALT
Excavation 0.00 0 0 0.00 Subsoil Exc 0.00 0 0 0.00 Fill 6.99 6 0 0.00 8687
AGGREGATE
Excavation 0.00 0 0 0.00
Subsoil Exc 0.00 0 0 0.00 Fill 18.39 15 0 0.00 8687 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 8893 8893 1.00 Subsoil Exc 0 0 1.00 Fill 206 206 1.00
ASPHALT
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 224 0 0.00
AGGREGATE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 576 0 0.00 � S P L I T S U M M A R Y T O T A L S
XS Quant XS Quant Add/Sub Quant Add/Sub Quant Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor
(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)
RDWYEXC
Excavation 8893 8893 0 0 1.00 Subsoil Exc 0 0 0 0 1.00 Fill 206 206 0 0 1.00
ASPHALT
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 224 0 0 0 0.00
AGGREGATE
Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 576 0 0 0 0.00