TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
Project Location
PLANS FOR PROPOSED PROJECT
DENALI
NATIONAL
PARK
MC KINLEY PARK
R O A
D
DENALI
NATIONAL
PARK
E A
S T
F O
R K
T O K L A T
T O
K L A
T R
IV
ER
RIVER
HEALY
KANTISHNA
ALASKA
DENALI BOROUGH
R.19 W. R.17 W. R.15 W. R.13 W. R.11 W. R.9 W. R.7 W. R.5 W.
T .1
S
T .1
S
T .1
S
T .1
S
PROJECT LOCATION F
a ir b a n k s m ile s
A n c h o r a g e m il e s
SCALE IN MILES
5 0 5 10 15 20
35 MPH
V
SADT (2035)
SADT (2015)
NPS PMIS NO. 185910A
AK NPS DENA 10(41)
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
APPROVED:
DATE
DATE
DATE
Denali National Park and Preserve
Superintendent, Western Federal Lands Highway Division
Director, Project Delivery, National Park Service
Regional Director, Alaska Region, CEAN
OCITCRA
i r e B n g ea S
PACIFIC OCEAN
Gulf of A la k a s
Dillingham
Bethel ANCHORAGE
Homer
King Salmon
Kodiak
Valdez
Tok YUKON
WHITEHORSE
JUNEAU
Unalaska
Kotzebue
Nome
FAIRBANKS
Barrow
S
IB
E R
IA
C A
N A
D A
U N I T
E D S
T A
T E S
BC
PARK
NATIONAL
DENALI
NAT'L PARK
ST. ELIAS
WRANGELL-
NAT'L PARK
LAKE CLARK
N.P.
FJORDS
KENAI
NAT'L PARK
THE ARCTIC
GATES OF
N.P.
VALLEY
KOBUK
PRESERVE
KATMAI N.P.
NAT'L PARK
GLACIER BAY
ALASKA KEY MAP
k u
Y o n
R
UNI
TE
D
STATE
S
RUSS
IA
PROJECT MANAGER
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
SPECIFICATION:
DENALI NATIONAL PARK AND PRESERVE
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
B. CHON
Schedule locations
See A.3 for
N
NATIONAL
PARK
SERVICE
LENGTH: 11.5 MILES
LENGTH: 11.5 MILES
LENGTH: 11.5 MILES
reconstruction, and striping
Subexcavation, reclamation, paving, MP 3.4 TO 14.9
REPAVE DENALI PARK ROAD
SCHEDULE C:
SCHEDULE B:
SCHEDULE A:
A.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d d e n a a a .d g n
AK NPS DENA 10(41)
P
M
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
/s/ Don Striker
/s/ Herbert C. Frost 9/14/2015
9/10/2015
9/17/2015/s/ Brent Coe for
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material A
A u g u s t
U
S C m y fi le s p w p r o d u c ti o n d d e n a a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 NPS DENA 10(41) AK
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
Margaret
Mount
Mt Healy
Park
McKinley
Park Headquarters
Denali National
Lagoon
DENALI PARK
RO
AD
DENALI
PARK
ROAD
Fo x
Cr
Grizz ly Cr
Hornet
C r
Ice w o rm Gulc h
Jun co
Cre ek
Kin gfis her
NENANA
Ly nx
C r
C r
Lake
Horseshoe
RIVERHine s
S a v a g e
R iver
Jenny
Creek
H ines
Creek
R ile y
C r e e k
Litt le
Cre ek
Creek
Ewe
Lakes
Triple
BEGIN PROJECT
END PROJECT
Cr
N
G E
O R
G E
P A
R K
S
H
IG
H W
A
YSTAGING AREA
295+50
MILE 5 PIT
STAGING AREA
367+80
MILE 7 PIT
SCALE IN MILES
.5 .25 0 .5 1 1.5 2
E = 1754003.4243
N = 3559260.9894
E = 1807899.2743
N = 3553932.3810
787+25 M.P. 14.9 Repave Denali Park Road
AK NPS DENA 10(41)
180+00.00
M.P. 3.4
Repave Denali Park Road
AK NPS DENA 10(41)
VICINITY MAP
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Campground
Savage River
TRUCK TURN AROUND
781+73.5
SAVAGE RIVER BRIDGE
777+53 to 780+73
TRUCK TURN AROUND
775+18
NOTE:
1.
SCHEDULE C
SAVAGE RIVER PARKING EAST
SAVAGE RIVER PARKING WEST
A.3
STATE PROJECT
NUMBER
SHEET
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a a c .d g n
R J O
H N
S O
P O
B
R
C h e c k e d b y
D e s ig n e d b y
S C
H E
D U
L E B , C
SCHEDULE A, B, C
between 183+00 to 776+20.
Subexcavation locations total 11,650 LF (2.2 miles)
Sheet and Description
SECTION C SECTION D SECTION E SECTION F -
TYPICAL
SECTIONS
PLAN &
PROFILE
TEMPORARY
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 400 50 450
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (GOVERNMENT FURNISHED) LNFT 900 50 950
A0160 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 2 2
A0180 20401-0000 ROADWAY EXCAVATION CUYD 507 78 585
A0200 20402-0000 SUBEXCAVATION CUYD 29,315 585 29,900
A0220 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A SQYD 44,358 2,442 46,800
A0240 20703-2000 GEOGRID, STABILIZATION SQYD 134,198 6,002 140,200
A0260 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 58,827 2,973 61,800
A0280 30302-1000 DITCH RECONDITIONING LNFT 700 100 800
A0300 40301-0000 ASPHALT CONCRETE PAVEMENT (TYPE I) TON 4,010 190 4,200
A0320 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,883 1,883
A0340 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0360 62201-2050 ROLLER HOUR 40
A0380 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 40
A0400 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 40
A0420 62301-0000 GENERAL LABOR HOUR 80
A0440 63302-0000 SIGN SYSTEM SQFT 12.50 12.50
A0460 63316-1000 REMOVE AND RESET SIGN EACH 7 7
A0480 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE STOP LINE) LNFT 120 120
A0500 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 199,475 125 199,600
A0520 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW) LNFT 29,785 215 30,000
A0540 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH EACH 200 200
A0560 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 30 30
A0580 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A EACH 6 6
A0600 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM EACH 1 1
A0620 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 23,300 1,000 24,300
A0640 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 348 348
A0660 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 102 102
A0680 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN DAY 72 72
A0700 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 2,700 2,700
A0720 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM LPSM All ALL
A0740 63703-0000 RESIDENTIAL HOUSING EACH 3
A0760 63704-0000 VEHICLE EACH 3
MileStone: 100% Date Completed: In Progress Report Date: 09/16/15
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-S ep
-2
3:
P
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D
EN
A
_s um m ar y_ of _q ua nt iti es
.x ls m ]S he et
STATE PROJECT
B.1NPS DENA 10(41)AK
SHEET
NUMBER
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
TYPICAL
SECTIONS
PLAN &
PROFILE
TEMPORARY
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
B0020 15101-0000 MOBILIZATION LPSM ALL
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
B0080 15401-0000 CONTRACTOR TESTING LPSM ALL
B0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 400 50 450
B0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (GOVERNMENT FURNISHED) LNFT 900 50 950
B0160 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 2 2
B0180 20401-0000 ROADWAY EXCAVATION CUYD 507 78 585
B0200 20402-0000 SUBEXCAVATION CUYD 29,315 585 29,900
B0220 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A SQYD 44,358 2,442 46,800
B0240 20703-2000 GEOGRID, STABILIZATION SQYD 134,198 6,002 140,200
B0260 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 59,798 3,102 62,900
B0280 30302-1000 DITCH RECONDITIONING LNFT 700 100 800
B0300 30604-0600 FULL DEPTH RECLAMATION WITH FOAMED ASPHALT, 6-INCH DEPTH SQYD 44,574 2,226 46,800
B0320 30611-0000 CEMENT TON 135 7 142
B0340 30613-0000 ASPHALT BINDER (GRADE PG 52-28) TON 394 16 410
B0360 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE II ROUGHNESS) TON 7,882 318 8,200
B0400 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 79 6 85
B0440 40301-0000 ASPHALT CONCRETE PAVEMENT (TYPE I) TON 4,010 190 4,200
B0460 41201-0000 TACK COAT TON 25 1 26
B0480 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,883 1,883
B0500 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40
B0520 62201-2050 ROLLER HOUR 40
B0540 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 40
B0560 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 40
B0580 62301-0000 GENERAL LABOR HOUR 80
B0600 63302-0000 SIGN SYSTEM SQFT 31.25 31.25
B0620 63316-1000 REMOVE AND RESET SIGN EACH 8 8
B0640 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE STOP LINE) LNFT 270 270
B0660 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 199,475 125 199,600
B0680 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW) LNFT 29,785 215 30,000
B0700 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH EACH 250 250
B0720 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 40 40
B0740 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A EACH 10 10
B0760 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM EACH 1 1
B0780 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 52,720 2,000 54,720
B0800 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 348 348
B0820 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 125 125
-S ep -2
3:
P M
MileStone: 100% Date Completed: In Progress Report Date: 09/16/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D
EN
A
_s um m ar y_ of _q ua nt iti es
.x ls m ]S he et
2)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.2NPS DENA 10(41)AK
SHEET
NUMBER
TYPICAL
SECTIONS
PLAN &
PROFILE
TEMPORARY
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
B0840 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN DAY 93 93
B0860 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 3,175 3,175
B0880 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM LPSM All ALL
B0900 63703-0000 RESIDENTIAL HOUSING EACH 3
B0920 63704-0000 VEHICLE EACH 3
-S ep -2
3:
P M
MileStone: 100% Date Completed: In Progress Report Date: 09/16/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D
EN
A
_s um m ar y_ of _q ua nt iti es
.x ls m ]S he et
3)
SUMMARY OF QUANTITIES - Schedule B
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.3NPS DENA 10(41)AK
SHEET
NUMBER
TYPICAL
SECTIONS
PLAN &
PROFILE
TEMPORARY
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
C0020 15101-0000 MOBILIZATION LPSM ALL
C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
C0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
C0080 15401-0000 CONTRACTOR TESTING LPSM ALL
C0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
C0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 400 50 450
C0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (GOVERNMENT FURNISHED) LNFT 900 50 950
C0160 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 2 2
C0180 20401-0000 ROADWAY EXCAVATION CUYD 507 78 585
C0200 20402-0000 SUBEXCAVATION CUYD 29,315 585 29,900
C0220 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A SQYD 44,358 2,442 46,800
C0240 20703-2000 GEOGRID, STABILIZATION SQYD 134,198 6,002 140,200
C0260 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 60,420 3,130 63,550
C0280 30302-1000 DITCH RECONDITIONING LNFT 700 100 800
C0300 30604-0600 FULL DEPTH RECLAMATION WITH FOAMED ASPHALT, 6-INCH DEPTH SQYD 97,732 4,918 102,650
C0320 30611-0000 CEMENT TON 295 10 305
C0340 30613-0000 ASPHALT BINDER (GRADE PG 52-28) TON 852 33 885
C0380 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE II ROUGHNESS) TON 16,026 634 16,660
C0400 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 160 5 165
C0440 40301-0000 ASPHALT CONCRETE PAVEMENT (TYPE 1) TON 4,010 190 4,200
C0460 41201-0000 TACK COAT TON 48 2 50
C0480 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 1,883 1,883
C0500 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40
C0520 62201-2050 ROLLER HOUR 40
C0540 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 40
C0560 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 40
C0580 62301-0000 GENERAL LABOR HOUR 80
C0600 63302-0000 SIGN SYSTEM SQFT 31.25 31.25
C0620 63316-1000 REMOVE AND RESET SIGN EACH 9 9
C0640 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 199,475 125 199,600
C0660 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE STOP LINE) LNFT 270 270
C0680 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW) LNFT 29,785 215 30,000
C0700 63502-1200 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 28-INCH EACH 300 300
C0720 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 50 50
C0740 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A EACH 14 14
C0760 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM EACH 1 1
C0780 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 86,800 4,000 90,800
C0800 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 348 348
C0820 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 154 154
-S ep -2
3:
P M
MileStone: 100% Date Completed: In Progress Report Date: 09/16/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D
EN
A
_s um m ar y_ of _q ua nt iti es
.x ls m ]S he et
4)
SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.4NPS DENA 10(41)AK
SHEET
NUMBER
TYPICAL
SECTIONS
PLAN &
PROFILE
TEMPORARY
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
C0840 63507-0800 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN DAY 110 110
C0860 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 3,650 3,650
C0880 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM LPSM All ALL
C0900 63703-0000 RESIDENTIAL HOUSING EACH 3
C0920 63704-0000 VEHICLE EACH 3
-S ep -2
3:
P M
MileStone: 100% Date Completed: In Progress Report Date: 09/16/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0
D
EN
A
_s um m ar y_ of _q ua nt iti es
.x ls m ]S he et
5)
SUMMARY OF QUANTITIES - Schedule C
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.5NPS DENA 10(41)AK
SHEET
NUMBER
FOOTNOTE:
C h e c k e d b y
D e s ig n e d b y
C.1
STATE PROJECT
NUMBER
SHEET
AK
NPS DENA 10(41)
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a c a .d g n
Estimated at 1.94 TON/CUYD.
Estimated at 1.97 TON/CUYD.
QUANTITIES
TABULATION OF
SCHEDULE A
Estimated at 0.10 GAL/SQYD, 240 GAL/TON per square yard.
Estimated at 1% by weight of ITEM 40101-5600.
Estimated at 1.94 TON/CUYD.
QUANTITIES
TABULATION OF
ITEM 30613-0000 is estimated at 3% by weight of ITEM 30604-0600.
Full Depth Reclamation unit weight is estimated at 135 LBS/CUFT.
ITEM 30611-0000 is estimated at 1% by weight of ITEM 30604-0600.
Full Depth Reclamation unit weight is estimated at 135 LBS/CUFT.
Estimated at 1.97 TON/CUYD.
C h e c k e d b y
D e s ig n e d b y
C.2
STATE PROJECT
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a c b .d g
SCHEDULE B
Estimated at 0.10 GAL/SQYD, 240 GAL/TON per square yard.
Estimated at 1% by weight of ITEM 40101-5600.
Estimated at 1.94 TON/CUYD.
See Sheet C.2 for quantity totals.
1.
C h e c k e d b y
D e s ig n e d b y
C.3
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a c c .d g n
QUANTITIES
TABULATION OF
ITEM 30613-0000 is estimated at 3% by weight of ITEM 30604-0600.
Full Depth Reclamation unit weight is estimated at 135 LBS/CUFT.
ITEM 30611-0000 is estimated at 1% by weight of ITEM 30604-0600.
Full Depth Reclamation unit weight is estimated at 135 LBS/CUFT.
Estimated at 1.97 TON/CUYD.
SCHEDULE C
TYPICAL SECTIONS
LC
LC
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
FOOTNOTE:
2 2
Varies
780+72 to 787+25
DENALI PARK ROAD RECONSTRUCTION
Varies
6-inch compacted depth
Roadway aggregate, method 2, Separation stabilization geotextile, class 1, Type A (non-woven)
SAFETY EDGE DETAIL
NOTE:
6-inch compacted depth foamed asphalt, Full depth reclamation with
Varies
Existing road
LC
2 2
Varies 1 Varies
Existing ground
DENALI PARK ROAD OVERLAY
li m it
C o n s tr u c ti o li m it
C o n s tr u c ti
Existing pavement surface
NO SCALE
pavement surface
Match existing pavement surface
Match existing
Pullout
Shoulder Shoulder
1' to 2' 1' to 2'
30°
Varies
Varies
Varies
Varies
Width varies
4-inch compacted depth placed in 2 equal lifts
Asphalt concrete pavement, Type I, NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 ground
Existing ground
Existing
Varies
Full depth reclamation
DENALI PARK ROAD FULL DEPTH RECLAMATION
2 2
Va rie s
AGGREGATE PULLOUT
681+14 to 685+70
PAVED PULLOUT
Va rie s
Pullout width varies reclamation
Full depth
Existing ground Existing ground this sheet (typ.)
Edge Detail
See Safety
Asphalt concrete pavement
Existing ground ground
Existing li m it
C o n s tr u c ti o n li m it
C o n s tr u c ti o
Existing pavement surface
First lift asphalt concrete pavement
Second lift asphalt concrete pavement
3-inch compacted depth method 2, Roadway aggregate, method 2, typical
Roadway aggregate, Varies
Detail this sheet, typical
See Safety Edge
3.
2.
1.
Traveled laneTraveled lane depth, placed in 2 equal lifts, Type II-A roughness
0.3 to < 3 million ESAL, 3-inch compacted
-inch nominal maximum size aggregate,4 3-inch or 2
Asphalt concrete pavement, gyratory mix, cover safety edge aggregate to
Place roadway
Shoulder
1' to 2'
Traveled lane
Shoulder
1' to 2'
Shoulder
2'
Shoulder
2' reclamation locations.
See Sheets C.1 to C.3 and D Sheets (D.3 - D.23) for full depth
Aggregate Pullout quantities included in Item 30202-2000.
See D Sheets (D.3 - D.23) for pullout locations.
Match existing top pavement width.
2% minimum cross slope and match existing supers.
C h e c k e d b y
D e s ig n e d b y
C.4
STATE PROJECT
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a c d .d g n
394+95 to 585+00 SCHEDULE C
585+00 to 777+53 SCHEDULE B & C
394+95 to 585+00 SCHEDULE C
585+00 to 777+53 SCHEDULE B & C
SCHEDULE B & C
pavement concrete
Asphalt
Full Depth Reclamation includes paved pullouts.
Road Overlay work, see typical this sheet.
After full depth reclamation is complete, perform Denali Park boring logs, existing pavement depths, etc.
September 15, 2015 for geotechnical information, including
See Final Geotechnical Memorandum No. 26-15, dated
208+00 to 214+50, RT
TYPICAL SECTIONS
LC
SUBEXCAVATION TYPE 1
V ar ie s
Varies
SUBEXCAVATION TYPE 2
LC
5% min.
1Varies
Varies
Varies
5% min.
Varies
2 2
FOOTNOTE:
NOTE:
Roadway aggregate, method 2 class 1, Type A (non-woven)
Separation stabilization geotextile, s eir a V
SUBEXCAVATION TYPE 3
LC
at 6" vertical spacing
Place geogrid, stabilization
1Varies
5% min.
Varies
Roadway aggregate, method 2 eir a V
Existing ground
Existing ground
Existing ground
Existing ground
Place geogrid, stabilization at 6" vertical spacing, (typ.)
Type I, 2-inch compacted depth
Asphalt concrete pavement, Type I, 2-inch compacted depth
Asphalt concrete pavement, Type I, 2-inch compacted depth
Asphalt concrete pavement, NO SCALE pavement surface
Match existing pavement surface
Match existing pavement surface
Match existing
5% min.
Existing ground
Existing ground
Geogrid, stabilization
Existing pipe culvert
Existing road surface
Top of subexcavation geotextile, class 1, type A
Separation stabilization
Asphalt concrete pavement, Type I
2-inch, compacted depth
ELEVATION
m in ty p subex. depth
Varies
1' to 2' 1' to 2'
1' to 2'1' to 2'
1' to 2' 1' to 2'
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
14" min.
SUBEXCAVATION AT PIPE CULVERT CROSSING
m in
S u b e x d e p th m in
S u b e x d e p th class 1, Type A (non-woven)
Separation stabilization geotextile, class 1, Type A (non-woven)
Separation stabilization geotextile, stabilization
Geogrid, stabilization
Geogrid, Roadway aggregate, method 2
Denali Park Road Overlay Section, see Sheet C.4
Traveled lane Traveled lane
4.
3.
2.
1.
Roadway aggregate, method 2
C.5
STATE PROJECT
e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a c e .d g
C h e c k e d b y
D e s ig n e d b y
UNDERDRAIN SYSTEM
STANDARD
453+20 to 459+09, LT
208+00 to 214+50, LT stabilization
Geogrid, UNDERDRAIN SYSTEM
STANDARD
the CO.
Slope bottom of subexcavation draining to the left or as directed by geogrid layers.
Provide a minimum of 2-inch vertical distance between adjacent culvert and the overlaying layer of stabilization geogrid.
Provide 2-inch of roadway aggregate between the top of the pipe culvert.
if they are within 3-inch vertical distance of the top of the pipe
Wrap layers of stabilization geogrid over the top of the pipe culverts pipe culvert.
layers are more than 3-inch vertical distance below the top of the
Cut layers of stabilization geogrid flush with the pipe culverts if the
Lap separation and stabilization geotextile 6-inch up pipe culverts.
are encountered within the specified subexcavation depth.
Use the following procedure for all subexcavations when pipe culverts
Station locations.
See Sheets C.1 to C.3 and D Sheets (D.3 - D.23) for Subexcavation
Match existing top pavement width.
2% minimum cross slope and match existing superelevation.
see Sheet G.2 for Standard Underdrain System Details.
208+00 to 214+50, RT and LT and 453+20 to 459+00, LT
Standard Underdrain Systems -
Subexcavation does not include pullouts.
Park Road overlay work, see typical drawing Sheet C.3.
After subexcavation construction is complete, perform Denali logs, existing pavement depths, etc.
November 4, 2014 for geotechnical information, including boring
See Final Geotechnical Memorandum No. 26-15, dated
QUANTITIES
TABULATION OF PLAN
FOOTNOTE:
453+20 to 459+00, LT
208+00 to 214+50, RT & LT
S C
H E
D U
L
C
H E
D U
B
C
H E
D U
C
H E
D U
L E
A S C
H E
D U
C
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fa .d g n
AK NPS DENA 10(41)
S e p te m b e r
C h e c k e d b y
D e s ig n e d b y
Quantity includes double application.
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
QUANTITIES
TRAFFIC CONTROL
TABULATION OF PERMANENT
S C
H E
D U
C
H E
D U
L E
B C
D.2
STATE PROJECT
NUMBER
SHEET
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fb .d g
C h e c k e d b y
D e s ig n e d b
Existing gate to remain
180+08
BEGIN PROJECT
To Rock Creek Reservoir
Flagpole Parking LotN
N
180+00 to 200+00
DENALI PARK ROAD
Boring location
188+75, 7' LT
B u s
T u rn a ro u n d
T o D o g K e n n e ls
NOTE:
1.
E=1807899.2743
N=3553932.3810
B e g in d o u b le s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Remove and reset sign
185+00 LT
Remove and reset sign
190+32 LT
Remove and reset sign
189+58 RT
LEGEND:
Subexcavation
Reconstruction
6-inch compacted depth with foamed asphalt, Full depth reclamation
Transition
50'
DETAIL
PAVEMENT CONNECTION
EXISTING
pavement surface
Existing
Subexcav ation type
183+00 to 191
+00
Subexcavation type 3
183+00 to 191+00
Apply tack coat joint.
Sawcut vertical
585+00 (Schedule B)
394+95 (Schedule C) pavement marking
Centerline pavement marking
Centerline
2 equal lifts, Type II-A roughness compacted depth, placed in
0.3 to < 3 million ESAL, 3-inch maximum size aggregate, -inch 4 3-inch or 2
1gyratory mix, Asphalt concrete pavement, D.3
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fc .d
C h e c k e d b y
D e s ig n e d b y
M.P. 3.4
Repave Denali Park Road
NPS DENA 10(41)
from 180+00 to 787+25.
Apply Permanent Pavement Markings
SG1
4-
200+00 to 230+00
DENALI PARK ROAD
MP4
Ditch reconditioning, LT
05+222 ot 07+122
SG14-09
05+412 ot 00+802
1 epyT ,noitavacxebuS
TL dna TR ,metsys niardrednu dradnatS liated rof 2.G teehS eeS
Right lane boring location
210+50, RT
Remove and reset sign
213+55, RT
pavement marking
Centerline pavement marking
Centerline
1 epyt noitavacxebuS
See Standard Underdrain
Outlet Pipe Layout below
10'
STANDARD UNDERDRAIN OUTLET PIPE LAYOUT
D.4
STATE PROJECT
e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fd .d
C h e c k e d b y
D e s ig n e d b y
CP
26114
CP
26114
CP
CP
26115 26116
N
N
230+00 to 260+00
DENALI PARK ROAD
1+ to
+34 , L
T
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 pavement marking Centerline pavement marking Centerline
Ex ist in g pu llo ut to re m ain
D.5
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fe .d
C h e c k e d b y
D e s ig n e d b y
GPS
PK1
N
N
260+00 to 290+00
DENALI PARK ROAD
Boring location
264+90, RT lane 271+90 to 276+00Subexcavation type 2
+00 to
+00
Su bex cav atio n t ype
Subex cavati on typ e 2271+90 to
276+00
T R w oll e y n e k o r b ni g e
B
B e g in d o u b le s o li d y e ll o w
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Sediment Control Quantities.
See Sheet E.1 for Soil Erosion and 1.
NOTE:
Remove and reset sign
264+24 LT
MP5
pavement marking
Centerline pavement marking
Centerline
Existing pullout to remain281+59 to 2
85+23, LT
Install fiber roll, see Sheet E.1 for details
260+70 to 262+30, LT and RT
D.6
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a ff .d
C h e c k e d b y
D e s ig n e d b y
SG14
-10
Subexcavation type 1
313+50 to 315+50
N
N
290+00 to 320+00
DENALI PARK ROAD
Boring location
314+00, 7.5' RT
NOTE:
1.
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Stabilized Construction Exit Details
See Sheet E.1 for
Staging area
Mile 5 Pit
MP6
+1 o t
+0
1 e pyt n oit av ac xe bu
S
Sheet E.1 for details
Install fiber roll, see
290+00 to 291+00, RT approach road
Mile 5 Pit
295+50 pavement marking
Centerline pavement marking
Centerline
Sediment Control Quantities.
See Sheet E.1 for Soil Erosion and
D.7
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fg .d
C h e c k e d b y
D e s ig n e d b y
SG14-11
Subexcava tion type 1
337+00 to 345+
N
N
320+00 to 350+00
DENALI PARK ROAD
Boring location
341+00, 9.5' LT
R
T
B e g in b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 pavement marking
Centerline pavement marking
Centerline
D.8
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fh .d
C h e c k e d b y
D e s ig n e d b y
0 3
SG14-12
MOOSE
GPS
N
H in e s
C r e e k
350+00 to 380+00
DENALI PARK ROAD
368+40 to 3 77+70
Subexc avation type 2
Boring location
370+80, 7' RT
NOTE:
1.
B e g in d o u b le s o li d y e ll o w
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Stabilized Construction Exit Details
See Sheet E.1 for
Staging area
Mile 7 Pit
Remove and reset sign
375+89 RT
MP7
SG14-13
350+00 to 357+00
Subexcavation type 2 approach road
Mile 7 Pit
368+00
Existing pullout to remain
377+18 to 383+13, LT and Sediment Control Quantities.
See Sheet E.1 for Soil Erosion
D.9
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fi .d
C h e c k e d b y
D e s ig n e d b y pavement marking
Centerline pavement marking
Centerline
Sheet E.1 for details
Install fiber roll, see
372+00 to 373+40, LT and RT
5 3
5 3
380+00 to 410+00
DENALI PARK ROAD
395+00 to 4 31+50
Full de pth rec lamation
See Sheet D.9 for pullout information
Paved pullout
401+60 to 4
05+79, LT
R
T
B e g in b r o k e n y e ll o w
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
R
T
B e g in s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
B e g in s in g le b r o k e n y e ll o w
C ELUDEHCS
C ELUDEHCS
pavement marking
Centerline pavement marking
Centerline
D.10
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fj .d
C h e c k e d b y
D e s ig n e d b y
395+00
BEGIN OVERLAY SCHEDULE C
431+50 to 433+00
N
410+00 to 440+00
DENALI PARK ROAD
Full depth reclamation
395+00 to 431+50
Full depth reclamation
433+00 to 438+00
Full depth reclamation
439+00 to 442+00
Boring location
438+30, 7' RT
Subexcavation type 1
438+00 to 439+00
R
T
B e g in b r o k e n y e ll o w
395+00 to 431+50
Full depth reclamation
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
B e g in s in g le b r o k e n y e ll o w
MP8
SCHEDULE C SCHEDULE C SCHEDULE C
Remove and reset sign
429+95, RT
pavement marking
Centerline pavement marking
Centerline
D.11
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fk .d
C h e c k e d b y
D e s ig n e d b y
SG14
-15
442+00 to 444+00
N
440+00 to 470+00
DENALI PARK ROAD
453+20 to 459+00
Subexcavation type 2
444+00 to 453+20
Full depth reclamationFull depth reclamation
439+00 to 442+00
Full depth reclamation
459+00 to 467+50
L
T
B e g in b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
B e g in s o li d y e ll o w
R
T 453+20 to 459+00
Subexcavation type 2 Subexcavation type 1
467+50 to 473+30
See Sheet G.2 for detail w oll e y dil o s el b u o d ni g e B
SCHEDULE C SCHEDULE C
SCHEDULE C
system, LT
Standard underdrain pavement marking
Centerline pavement marking
Centerline
D.12
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fl .d
C h e c k e d b y
D e s ig n e d b y
See Sheet G.2 for detail
Standard underdrain system, LT
GPS
MP9
470+00 to 500+00
DENALI PARK ROAD
Subexcavation type 1
467+50 to 473+30
473+30 to 539+40
Full depth reclamation
Full depth reclamation
473+30 to 539+40
MP9
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
469+42 to 473+23
Paved pullout pavement marking Centerline pavement marking Centerline
SCHEDULE C
SCHEDULE C
SCHEDULE C
D.13
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fm .d
C h e c k e d b y
D e s ig n e d b y
500+00 to 530+00
DENALI PARK ROAD
473+30 to 539+40
Full depth reclamation
Boring location
515+00, 11' LT
Boring location
515+00, 11' LT
473+30 to 539+40
Full depth reclamation
B e g in b r o k e n y e ll o w
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
R
T
R
T
B e g in s o li d y e ll o w
B e g in s in g le b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
MP10
SCHEDULE C
SCHEDULE C
pavement marking Centerline pavement marking Centerline
D.14
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fn .d
C h e c k e d b y
D e s ig n e d b y
SG14-16
SG14-
total = 158,724 sqft pullout = 7967 sqft
150,757 SQFT
RECLAMATION
530+00 to 560+00
DENALI PARK ROAD
Full depth reclamation
473+30 to 539+40
Subexcavation type 2
539+40 to 542+90
542+90 to 585+00Full depth reclamation
Paved pullout
532+66 to 536+12, RT
Full depth reclamation
542+90 to 585+00
Paved pullout
554+44 to 558+09, LT
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
SCHEDULE C
SCHEDULE C SCHEDULE C
SCHEDULE C
SCHEDULE C
pavement marking
Centerline pavement marking
Centerline
D.15
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fo .d
C h e c k e d b y
D e s ig n e d b y
MP11
N
N
560+00 to 590+00
DENALI PARK ROAD
Full depth reclamation
542+90 to 585+00
Full depth reclamation
542+90 to 585+00
Boring location
564+50, 7' LT
MP11
Paved pullout
569+13 to 570+88, RT
R
T
B e g in b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 pavement marking
Centerline pavement marking
Centerline
SCHEDULE C
e g in s in g le b r o k e n y e ll o w
585+00 to 610+00
Full depth reclamation
D.16
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fp .d
C h e c k e d b y
D e s ig n e d b y
585+00
BEGIN OVERLAY SCHEDULE B
SCHEDULE B & C
5 5
0 5
SG14-17
590+00 to 620+00
DENALI PARK ROAD
Full depth reclamation
585+00 to 610+00
Full depth reclamation
614+00 to 639+50
Paved pullout
618+71 to 621+95, LT
Subexcavation type
610+00 to 614+00
00+016 ot 00+585 noitamalcer htped lluF
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
R
T
B e g in s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 pavement marking
Centerline pavement marking
Centerline
L
T
D.17
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fq .d
C h e c k e d b y
D e s ig n e d b y
SCHEDULE B & C
SCHEDULE B
& C
SCHEDULE B & C
SCHEDULE B & C
5 6
620+00 to 650+00
DENALI PARK ROAD
639+50 to 641+20 Subexcavation type 2
614+00 to 639+50
Full depth reclamation
Full depth reclamation 646+00 to 650+30
Subexcavation type 2
Full depth reclamation
614+00 to 639+50
Boring location
648+50 8' RT
641+20 to 646+00
R
T
B e g in b r o k e n y e ll o w
L
T
B e g in d o u b le s o li d y e ll o w
R
T
B e g in s o li d y e ll o w B e g in b r o k e n y e ll o w
B e g in s in g le b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
MP12
Paved pullout
618+71 to 621+95 pavement marking
Centerline pavement marking
Centerline
SCHEDULE B & C
SCHEDULE B & C
SCHEDULE B & C
SCHEDULE B & C
D.18
STATE PROJECT
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fr .d
C h e c k e d b y
D e s ig n e d b y
5276 sqft
SG14-18
VISTA
R iv e r
C a m p g ro u n d
T o S a v a g e
N
N
650+00 to 680+00
DENALI PARK ROAD
650+30 to 697+50Full depth reclamation
Full depth reclamation
650+30 to 697+50
Boring location
659+80, 6' RT
SHUTTLE STOP
CAMPGROUND
SAVAGE RIVER
672+87 to 674+06, RT
Paved shuttle stop pullout
NOTE:
1.See Sheet G.1 for Approach Road Detail.
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Subexcavation type 2
Paved approach
670+21 LT
Aggregate surfaced approach
672+12 LT
Paved approach
673+34 LT
30' R
24'
30' R 30' R 25' R 30' R
25' R
646+00 to 650+30
D.25 for detail
See Sheet
12" wide stop line, D.25 for detail
See Sheet
12" wide stop line, STOP STOP
16'
STOP
17' system
Install sign
670+02, LT
system
Install sign
671+95, LT
system
Install sign
673+28, LT
R1-1 R1-1 R1-1 pavement marking
Centerline pavement marking
Centerline
D.19
STATE PROJECT
S e p te m b e r
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fs .d
C h e c k e d b y
D e s ig n e d b y
SCHEDULE B & C
SCHEDULE B & C
SCHEDULE B & C
SCHEDULE B & C
SCHEDULE B & C
SG14-19
697+50 to 705+00
N
N
680+00 to 710+00
DENALI PARK ROAD
650+30 to 697+
Full depth reclamation
Full depth reclamation
705+00 to 714+90
Full depth reclamation
650+30 to 697+50
Existing gate to remain
686+00
Savage River cabin trail
681+14 to 685+
70, RT
Aggregate surface pu llout
R
T
B e g in b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
B e g in s in g le b r o k e n y e ll o w
MP13
pavement marking
Centerline pavement marking
Centerline
D.20
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a ft .d
C h e c k e d b y
D e s ig n e d b y
SCHEDULE B & C
SCHEDULE B & C
SCHEDULE B & C SCHEDULE B & C
SAVAGE
N
N
710+00 to 740+00
DENALI PARK ROAD
714+90 to 716+
Subexcava tion type 1
716+40 to 728 +70
Full dept h reclamation
705+00 to 714+90 Full depth reclamation
728+70 to 741+50Subexcavation type 2
Boring location
734+00, 7' RT
L
T
B e g in b ro k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
R
T
B e g in s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
MP14
noitamalcer htped lluF
07+827 ot 04+617 pavement marking
Centerline pavement marking
Centerline
Remove and reset sign
728+12, RT
Install fiber roll, see Sheet E.1 for details
730+50 to 731+50, RT and LT and Sediment Control Quantities.
See Sheet E.1 for Soil Erosion1.
NOTE:
D.21
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fu .d
C h e c k e d b y
D e s ig n e d b y
SCHEDULE
B
& C
SCHEDULE B & C
SCHEDULE B & C
728+70 to 741+50
742+ 50 to 745+
S ubexcavation type 2
740+00 to 770+00
DENALI PARK ROAD
753+50 to 754+60 Subexcavation type 1 t o
Fu ll d ep th r ec la m at io n
754+60 to 757+30Full depth reclamation
757+30 to 762+10
Subexcavation type 2
762+10 to 773+30
Full depth reclamation
754+60 to 757+30 Full depth reclamation
Boring location
742+00, 8' LT
Pa ve d p ull ou t
0+ t o 7
+96 , L
T
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Remove and reset sign
743+80 LT
Subexcavation type 3 741+50 to 742+50
2 e py t n oit ava cxe buS pavement marking
Centerline pavement marking
Centerline
D.22
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fv .d
C h e c k e d b y
D e s ig n e d b y
SCHEDULE B & C
S C H E D
U
LE
B C
SCHEDULE B & C
SCHEDULE B & C
SCHEDULE
B C
END PROJECT
787+25
End Reconstruction
MP 3.4 to 14.9
REPAVE DENALI PARK ROAD
AK NPS DENA 10(41)
E = 1754003.4243
N = 3559260.9894
Savage River Bridge
780+73
BEGIN RECONSTRUCTION
Do Not Disturb
Savage River Bridge Station
781+25
SAVAGE
RIVER
W es t Pa rk in g
To S av ag e
R iv er
R iv e r P a r k in g T o S a v a g e Boring location
775+60, RT lane
770+00 to 787+25
DENALI PARK ROAD
N
+73 to 7 87+
50' R
N intersection
Tie to gravel
781+73.5
NOTE:
1.See Sheet G.1 for Approach Road Detail.
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 bridge deck concrete
Existing
780+73
6-inch compacted depth method 2, Roadway aggregate, AT RECONSTRUCTION
CONNECTION DETAIL
SAVAGE RIVER BRIDGE
EXISTING
See Sheet D.25 for detail
12" Wide stop line.
Type A (non-woven) geotextile, class 1, Separation stabilization
SG14-22
777+03
50' R no it a ma lc er h tp ed ll uF
+3 o t
+2
See Sheet G.3 for detail traffic detector system, Install system installation, 783+00
6-inch compacted depth with foamed asphalt, Full depth reclamation
50'
Transition bridge deck
Existing concrete
6+ t o
7+
Fu ll de pt h re cl am at io n
773+30 to 776+20
STOP
Paved approach
775+18, RT
CONNECTION DETAIL AT OVERLAY
SAVAGE RIVER BRIDGE
EXISTING
STOP
33' system
Install sign
775+37, RT
R1-1
SAVAGE RIVER PARKING
TRUCK TURN AROUND
SAVAGE RIVER BRIDGE
SAVAGE RIVER BRIDGE
SAVAGE RIVER WEST
TRUCK TURN AROUND
system
Install sign
782+10, RT
R1-1
2 equal lifts, Type II-A roughness compacted depth, placed in
0.3 to < 3 million ESAL, 3-inch maximum size aggregate, -inch4 3-inch or 2
1gyratory mix, Asphalt concrete pavement, Apply tack coat pavement marking
Centerline pavement marking
Centerline
2 e pyT
,n oit av ac xe bu
S
EXC C
UYD =
Rec ons tru ctio n r oad way depth, placed in 2 equal lifts, Type II-A roughness
0.3 to < 3 million ESAL, 4-inch compacted
-inch nominal maximum size aggregate,4 3-inch or 2
Asphalt concrete pavement, gyratory mix, D.23
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fw .d
C h e c k e d b y
D e s ig n e d b y
Savage River Bridge
SCHEDULE B & C
777+53
END OVERLAY
SCHEDULE B & C
S C H
ED
U
LE
B C
GPK FILE DATED 9/14/2010
PROJECT COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION
MOOSE 3550871.686 1789582.137 2723.362 63° 42'51.453469 N 149°04'48.351685 W 2768.4028 0.99979332 5/8" IR w/FHWA alum cap
MP9 3549649.065 1780632.001 3045.525 63° 42'40.649037 N 149°08'07.394338 W 3090.6972 0.99977502 5/8" IR w/FHWA alum cap
MP11 3549466.889 1769895.824 2972.154 63° 42'40.230969 N 149°12'05.745633 W 3017.3361 0.99977522 5/8" IR w/FHWA alum cap
PK1 3551519.343 1798690.710 2389.035 63° 42'56.498240 N 149°01'25.945351 W 2433.8651 0.99981245 PK nail
SAVAGE 3554180.909 1758307.038 2719.833 63° 43'27.995761 N 149°16'21.783212 W 2764.8071 0.999784 5/8" IR w/FHWA alum cap
VISTA 3550822.767 1762672.916 2759.539 63° 42'54.441273 N 149°14'45.711692 W 2804.6453 0.99978329 5/8" IR w/FHWA alum cap
26114 3551606.042 1802078.005 2263.854 63°42'56.836830 N 149°0'10.722976 W 2308.595 0.99981966 5/8" IR w/FHWA alum cap
26115 3551500.075 1801722.830 2276.862 63°42'55.848288 N 149°0'18.643923 W 2321.615 0.99981891 5/8" IR w/FHWA alum cap
26116 3551696.792 1801370.337 2297.104 63°42'57.838530 N 149°0'26.400792 W 2341.86 0.99981781 5/8" IR w/FHWA alum cap
11651 3559690.531 1755295.944 2604.379 63°44'22.563870 N 149°17"27.292190 W 2649.1896 0.99991501 5/8" IR w/FHWA alum cap
11652 3559651.590 1754698.581 2592.619 63°44'22.245640 N 149°17"40.574410 W 2637.4286 0.999914854 5/8" IR w/FHWA alum cap
Note:
PROJECT : Repave Denali Park Road 3.4 to 14.9
DATE OF FIELD WORK :7/2010
DATE OF FINAL ADJUSTMENT :7/2010
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : SPCS NAD83; Alaska Zone 4
EPOCH DATE :2003.000
VERTICAL DATUM : NAVD88 based on Geoid 06
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
STATE PROJECT
DENA 10(41) D.24AK
C
U se rs \c ur tis
.j or ge ns on \D es kt op
D
EN
A _1
1_
C on tr ol
S he et .x ls x]
Sh ee t
-S ep
-2
:5
W
FL
H D
S ur ve y
D av ie s
D es ig ne d by
C he ck ed b y:
NUMBER
SURVEY CONTROL
PAVEMENT MARKINGS
LINEAR
10'30'10'30'10'
4" broken yellow centerline
NOTE:
NO SCALE
s s
Transition
Curve widening
Transition
S h o u ld e r s
T ra v e l
L
T ra v e l
L
S h o u ld e r s s L h o u ld e r
L a n e
T r a v e l
L a n e
T r a v e l h o u ld e r
3.
2.
1.
TYPICAL PAVEMENT MARKING APPLICATIONS
CENTERLINE MODIFICATION FOR CURVES WITH WIDENING APPLIED ON INSIDE
CENTERLINE DETAIL
See Note 2 for treatment of curves when widening "w" is split equally on both sides of centerline
L w
Minor approach w
CL
CL
L a n e
L a n e
Design location of top lift pavement joint pavement markings and
Offset centerline for
Centerline as required
4" solid double yellow centerline
Edge of pavement markings when specified
Approach road pavement
Major approach road required by the maintaining agency when specified in the plans or when
Increase spacing between parallel lines
Varies by the maintaining agency.
pavement markings when specified on the plans or when required
Typical pavement marking widths are shown. Use wider locations.
widening area. See staking details for curve widening transition
Maintain a constant shoulder width "s" throughout the curve widening "w" to achieve equal lane widths within the roadway.
Paint centerline pavement markings on curves with curve interface when curb is present.
Place edge line pavement markings at asphalt/concrete curb
Turnout
See Detail this sheet allow sufficient sight distance.
Locate 12" wide stop line to m a x m in
STOP LINE DETAIL
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
D.25
STATE PROJECT
NUMBER
SHEET
J u n e
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fy .d g
C h e c k e d b y
D e s ig n e d b
REVISED:
W633-7
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2009
6" x 8" when located within the clear zone or if the
WOOD POSTS
INSTALLATION
PERMANENT SIGN
Product of X-Y-Z in CUFT(inch)
8 x 12
8 x 10
6 x 10
6 x 8
6 x 6
4 x 6
4 x 4
6'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
3'-0"
"4
"4
"2
7 ft
5 ft6 ft
2 ft
For all retroflectorized signs where W > 25' all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum maximum
X=5 ft to 12 ft (max.)
X=4 ft (min.)
18 ft (max.)
X=10 ft (min.) to
22 ft (max.)
X=14 ft (min.) to
V may be reduced by 1 foot in rural districts for
" lock nut16
" oversized washer16
" bolt16
" bolt thru the post8
" outside dia.) 4 1(1 oversized washer
" nonmetallic16
N o v e m b e r
U m y fi le s p w p r o d u c ti o n d d e n a fz .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
D.26 NPS DENA 10(41) AK
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
SINGLE POST SIGNS
POST DETAIL
THREE POST SIGNS FOUR POST SIGNS
MINIMUM DISTANCE TO SIGN
SIGN INSTALLATION ANGLE
SIGNS WITHOUT ANGLES
TYPICAL MOUNTING FOR
WOOD POST SELECTION TABLE
Direction of traffic flow
SIZE
POST NUMBER OF POSTS
1 2 3 4 D diameter and hole depth
Notch from curb
Offset (W)
Lateral
Height (V)
Mounting
NOTE:
NO SCALE
0.6X0.2X 0.2X
W
.5
Y
Z ty p
D
V Y
H
5.
4.
3.
2.
1. Traffic barrier protection is required for all posts larger than
H
TWO POST SIGNS
of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Long side of post single post installations of post. Omit notch for
Saw cut notch full width
(See Post Selection table)
Notch depth (where required)
W
0.15X0.35X0.35X0.15X
0.125X0.25X0.25X0.25X0.125X
Same post size
V Y ty p
DBackfill material ty p
Z
.5
Y
.5
Y Z
V Y
H
H
H 1
H
H
H
H
Location
Rural Districts
Residence Districts
Business or
W
W
V Y
.5
Y
Z ty p
D
H
CL
Bottom of sign post
See table for hole size post, parallel to sign face.
Field drill holes through
Finish ground line
Same post size
Backfill materialBackfill material
Same post size
Backfill material a secondary sign mounted below another sign.
exceeds the limit for the largest post, use steel post installation.
Values shown are the maximum permitted. If the product of XYZ
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r rectangle enclosing all the signs.
- Multiple sign installations: X and Y are the dimensions of a dimensions of the signs.
- Single sign, or back to back signs: X and Y are the overall
For the purpose of post selection X and Y are as follows:
longest post.
Z is the height from ground line to mid-height of sign at the conditions. See Wood Post Selection Table below.
D is the minimum post embedment depth for average soil to fit field conditions.
indicate overall post length. Select post lengths 4 thru H1H clear zone.
post is vulnerable to being struck when placed outside the
Flo
Flo w
Flow
Flow
Culvert inlet
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Fiber roll
FIBER ROLL AT CULVERT INLET
DETAILS
AND TREATMENT
TABULATION OF QUANTITIES
Existing paved road
NOTE:
type IV-E
Geotextile, aggregate, 3" to 6" in diameter
Clean, crushed
50' typ.
6" min.
See Note 2
25' R, typ.
ingress / egress area, 20' typ.
Provide full width of
Adjust length to fit field conditions as approved by the CO.
onto paved roadway.
Remove build-up of sediment as necessary to reduce tracking exit.
Construct radius to allow turning movement of typical truck using drainage ditches.
Provide temporary drainage where entrance crosses existing
Construct drainage ditches along entrance as directed by the CO.
4.
3.
2.
1.
STABILIZED CONSTRUCTION EXIT
See Note 2
25' R, typ.
FOOTNOTE:
Area measured using Google Earth.
Location directed by the CO.
E.1
STATE PROJECT
S e p te m b e r
I n t_ ft m y fi le s p w p r o d u c ti o n d d e n a e b .d
J o r g e n s
P o b a r
C h e c k e d b y
D e s ig n e d b
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
157-1
SILT FENCE
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
m in m in m in min.
4"
6" min. trench
STATE PROJECT
NUMBER
SHEET
E.2
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
A p r il
U m y fi le s p w p r o d u c ti o n d d e n a e c .d g n
NPS DENA 10(41) AK
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 fo r s p a c in g
S e e n o te
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
See Note 1
SILT FENCE INSTALLATION IN A DRAINAGE DITCH
4.
3.
2.
1.
Fi ll slo pe around…