TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
Project Location
PLANS FOR PROPOSED PROJECT
DENALI
NATIONAL
PARK
MCKINLEYPARK
R O
A D
DENALI
NATIONAL
PARK
E A
S T
F O
R K
T O
K L
A T
T O
K L
A T
R
IV
E R
R
IV
E R
HEALY
KANTISHNA
ALASKA
DENALI BOROUGH
R.19 W. R.17 W. R.15 W. R.13 W. R.11 W. R.9 W. R.7 W. R.5 W.
T .1
S
T .1
S
T .1
S
T .1
S
PROJECT LOCATION F
a ir b a n k s m ile s
A n c h o r a g e m il e s
SCALE IN MILES
5 0 5 10 15 20
35 MPH
V
SADT (2035)
SADT (2015)
NPS PMIS NO. 185910A
AK NPS DENA 10(41)
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
APPROVED:
DATE
DATE
DATE
Denali National Park and Preserve
Superintendent, Western Federal Lands Highway Division
Director, Project Delivery, National Park Service
Regional Director, Alaska Region, CEAN
OCITCRA
i r e B n g ea S
PACIFIC OCEAN
Gulf of A la k a s
Dillingham
Bethel ANCHORAGE
Homer
King Salmon
Kodiak
Valdez
Tok YUKON
WHITEHORSE
JUNEAU
Unalaska
Kotzebue
Nome
FAIRBANKS
Barrow
S
IB
E R
IA
C A
N A
D A
U N I T
E D S
T A
T E S
BC
PARK
NATIONAL
DENALI
NAT'L PARK
ST. ELIAS
WRANGELL-
NAT'L PARK
LAKE CLARK
N.P.
FJORDS
KENAI
NAT'L PARK
THE ARCTIC
GATES OF
N.P.
VALLEY
KOBUK
PRESERVE
KATMAI N.P.
NAT'L PARK
GLACIER BAY
ALASKA KEY MAP
k u
Y o n
R
UNI
TE
D
STATE
S
RUSS
IA
PROJECT MANAGER
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
SPECIFICATION:
DENALI NATIONAL PARK AND PRESERVE
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
B. CHON
M.P. 3.4 TO 14.9
REPAVE DENALI PARK ROAD
Schedule locations
See A.3 for
Subexcavation, reclamation, paving
N
NATIONAL
PARK
SERVICE
SCHEDULE C: 394+95 to 585+00
SCHEDULE B: 585+00 to 777+53
SCHEDULE A: 180+00 to 787+25
A.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d d e n a a a .d g n
AK NPS DENA 10(41)
P
M
A u g u s t
C h e c k e d b y
D e s ig n e d b y
LENGTH: 11.5 MILES
LENGTH: 11.5 MILES
LENGTH: 11.5 MILES
Margaret
Mount
Mt Healy
Park
McKinley
Park Headquarters
Denali National
Lagoon
DENALI PARK
RO
AD
DENALI
PARK
ROAD
Fo x
Cr
Grizz ly Cr
Hornet
C r
Ice w o rm Gulc h
Jun co
Cre ek
Kin gfis her
NENANA
Ly nx
C r
C r
Lake
Horseshoe
RIVERHine s
S a v a g e
R iver
Jenny
Creek
H ines
Creek
R ile y
C r e e k
Litt le
Cre ek
Creek
Ewe
Lakes
Triple
BEGIN PROJECT
END PROJECT
Cr
N
G E
O R
G E
P A
R K
S
H
IG
H W
A
YSTAGING AREA
295+50
MILE 5 PIT
STAGING AREA
367+80
MILE 7 PIT
SCALE IN MILES
.5 .25 0 .5 1 1.5 2
E = 1754003.4243
N = 3559260.9894
E = 1807899.2743
N = 3553932.3810
787+25 M.P. 14.9 Repave Denali Park Road
AK NPS DENA 10(41)
180+00.00
M.P. 3.4
Repave Denali Park Road
AK NPS DENA 10(41)
VICINITY MAP
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Campground
Savage River
SAVAGE RIVER WEST
TRUCK TURN AROUND
781+73.5
SAVAGE RIVER BRIDGE
777+53 to 780+73
SAVAGE RIVER PARKING
TRUCK TURN AROUND
775+18
A.3
STATE PROJECT
NUMBER
SHEET
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a a c .d g n
R J O
H N
S O
N
S
P O
B A
C h e c k e d b y
D e s ig n e d b y
NOTE:
11,650 LF (2.2 miles) between 183+00 to 776+20.
SCHEDULE A subexcavation locations total 1.
SCHEDULE A
SCHEDULE C
S C
H E
D U
L E B
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
Y
TYPICAL SECTIONS
LC
LC
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
FOOTNOTE:
2 2
Varies
780+72 to 787+25
DENALI PARK ROAD RECONSTRUCTION
Varies
6-inch compacted depth
Roadway aggregate, method 2, Separation stabilization geotextile, class 1, Type A (non-woven)
SAFETY EDGE DETAIL
NOTE:
6-inch compacted depth foamed asphalt, Full depth reclamation with
Varies
Existing road
LC
2 2
Varies 1 Varies
Existing ground
DENALI PARK ROAD OVERLAY
li m it
C o n s tr u c ti o li m it
C o n s tr u c ti o
Existing pavement surface
180+00 to 777+53
NO SCALE
pavement surface
Match existing pavement surface
Match existing
Pullout
11' 11'
Shoulder Shoulder
1' to 2' 1' to 2'
30°
Varies
Varies
Varies
Varies
Width varies
4-inch compacted depth placed in 2 equal lifts
Asphalt concrete pavement, Type I, NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 ground
Existing ground
Existing
Varies
Full depth reclamation
DENALI PARK ROAD FULL DEPTH RECLAMATION
2 2
Va rie s
AGGREGATE PULLOUT
681+14 to 685+70
PAVED PULLOUT
Va rie s
Pullout width varies pavement
Asphalt concrete reclamation
Full depth
Existing ground Existing ground this sheet (typ.)
Edge Detail
See Safety
Asphalt concrete pavement
Existing ground ground
Existing li m it
C o n s tr u c ti o n li m it
C o n s tr u c ti o
Existing pavement surface
First lift asphalt concrete pavement
Second lift asphalt concrete pavement
3-inch compacted depth method 2, Roadway aggregate, method 2, typical
Roadway aggregate, Varies
Detail this sheet, typical
See Safety Edge
3.
2.
1.
180+00 to 777+53
Full Depth Reclamation includes paved pullouts.
Road Overlay work, see typical this sheet.
After full depth reclamation is complete, perform Denali Park boring logs, existing pavement depths, etc.
November 4, 2014 for geotechnical information, including
See Final Geotechnical Memorandum No. 26-15, dated
Traveled laneTraveled lane
Shoulder
1' to 2'
Traveled lane
11'
Traveled lane
11'
Shoulder
1' to 2'
Shoulder
2'
Traveled lane
11'
Traveled lane
11'
Shoulder
2' depth, placed in 2 equal lifts, Type II-A roughness
0.3 to < 3 million ESAL, 3-inch compacted
-inch nominal maximum size aggregate,4 3-inch or 2
Asphalt concrete pavement, gyratory mix, cover safety edge aggregate to
Place roadway
C h e c k e d b y
D e s ig n e d b y
C.4
STATE PROJECT
NUMBER
SHEET
AK
NPS DENA 10(41)
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a c d .d g n reclamation locations.
See Sheets C.1 to C.3 and D Sheets (D.3 - D.23) for full depth
Aggregate Pullout quantities included in Item 30202-2000.
See D Sheets (D.3 - D.23) for pullout locations.
Match existing top pavement width (22-foot minimum).
2% minimum cross slope and match existing supers.
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
TYPICAL SECTIONS
SUBEXCAVATION TYPE 1
V ar ie s
Varies
Geogrid, stabilization
SUBEXCAVATION TYPE 2
5% min.
11' 11'
1Varies
Varies
Varies
5% min.
Varies
2 2 method 2
Roadway aggregate, FOOTNOTE:
NOTE:
Roadway aggregate, method 2 class 1, Type A (non-woven)
Separation stabilization geotextile, s eir a V
SUBEXCAVATION TYPE 3
LC
at 6" vertical spacing
Place geogrid, stabilization
1Varies
5% min.
Varies
Roadway aggregate, method 2 s eir a V
Existing ground
Existing ground
Existing ground
Existing ground
Place geogrid, stabilization at 6" vertical spacing, (typ.)
Type I, 2-inch compacted depth
Asphalt concrete pavement, Type I, 2-inch compacted depth
Asphalt concrete pavement, Type I, 2-inch compacted depth
Asphalt concrete pavement, NO SCALE pavement surface
Match existing pavement surface
Match existing pavement surface
Match existing
5% min.
Existing ground
Existing ground
3.
2.
1.
Geogrid, stabilization
Existing pipe culvert
Existing road surface
Top of subexcavation geotextile, class 1, type A
Separation stabilization
Asphalt concrete pavement, Type I
2-inch, compacted depth
ELEVATION
m in ty p subex. depth
Varies
1' to 2' 1' to 2'
1' to 2'1' to 2'
1' to 2' 1' to 2'
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
14" min.
SUBEXCAVATION AT PIPE CULVERT CROSSING
m in
S u b e x d e p th m in
S u b e x d e p th class 1, Type A (non-woven)
Separation stabilization geotextile, class 1, Type A (non-woven)
Separation stabilization geotextile, stabilization
Geogrid, stabilization
Geogrid, Roadway aggregate, method 2
Denali Park Road Overlay Section, see Sheet C.4
Traveled lane Traveled lane
Traveled lane
11'
11'
11'
11'
Subexcavation does not include pullouts.
Park Road overlay work, see typical drawing Sheet C.3.
After subexcavation construction is complete, perform Denali logs, existing pavement depths, etc.
November 4, 2014 for geotechnical information, including boring
See Final Geotechnical Memorandum No. 26-15, dated
C.5
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a c e .d g
C h e c k e d b y
D e s ig n e d b y the CO.
Slope bottom of subexcavation draining to the left or as directed by geogrid layers.
Provide a minimum of 2-inch vertical distance between adjacent culvert and the overlaying layer of stabilization geogrid.
Provide 2-inch of roadway aggregate between the top of the pipe culvert.
if they are within 3-inch vertical distance of the top of the pipe
Wrap layers of stabilization geogrid over the top of the pipe culverts pipe culvert.
layers are more than 3-inch vertical distance below the top of the
Cut layers of stabilization geogrid flush with the pipe culverts if the
Lap separation and stabilization geotextile 6-inch up pipe culverts.
are encountered within the specified subexcavation depth.
Use the following procedure for all subexcavations when pipe culverts
Station locations.
See Sheets C.1 to C.3 and D Sheets (D.3 - D.23) for Subexcavation
Match existing top pavement width (22-foot minimum).
2% minimum cross slope and match existing superelevation.
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
Existing gate to remain
180+08
BEGIN PROJECT
To Rock Creek Reservoir
Flagpole Parking LotN
N
Begin Overlay 180+00
M.P. 3.4
Repave Denali Park Road
NPS DENA 10(41)
180+00 to 200+00
DENALI PARK ROAD
Boring location
188+75, 7' LT
B u s
T u rn a ro u n d
T o D o g K e n n e ls
NOTE:
1.E=1807899.2743
N=3553932.3810
B e g in d o u b le s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Remove and reset sign
185+00 LT
Remove and reset sign
190+32 LT
Remove and reset sign
189+58 RT
LEGEND:
Subexcavation
Reconstruction
6-inch compacted depth with foamed asphalt, Full depth reclamation
Transition
50'
DETAIL
PAVEMENT CONNECTION
EXISTING
pavement surface
Existing
Subexcav ation type
183+00 to 191
+00
Subexcavation type 3
183+00 to 191+00
Apply tack coat joint.
Sawcut vertical
585+00 (Schedule B)
394+95 (Schedule C) pavement marking
Centerline
SCHEDULE A
A ELUDEHCS
pavement marking
Centerline from 180+00 to 787+25.
Apply Permanent Pavement Markings
Schedule A:
2 equal lifts, Type II-A roughness compacted depth, placed in
0.3 to < 3 million ESAL, 3-inch maximum size aggregate, -inch 4 3-inch or 2
1gyratory mix, Asphalt concrete pavement, D.3
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fc .d
C h e c k e d b y
D e s ig n e d b y
SG1
4-
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
200+00 to 230+00
DENALI PARK ROAD
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
MP4
Ditch reconditioning, LT
05+222 ot 07+122
SG14-09
05+412 ot 00+802
1 epyT ,noitavacxebuS
TL dna TR ,metsys niardrednu dradnatS liated rof 2.G teehS eeS
Right lane boring location
210+50, RT
Remove and reset sign
213+55, RT
pavement marking
Centerline pavement marking
Centerline
1 epyt noitavacxebuS
A ELUDEHCS
A ELUDEHCS
A ELUDEHCS
D.4
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fd .d
C h e c k e d b y
D e s ig n e d b y
A ELUDEHCS
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
CP
26114
CP
26114
CP
CP
26115 26116
N
N
230+00 to 260+00
DENALI PARK ROAD
1+ to
+34 , L
T
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 pavement marking Centerline pavement marking Centerline
Ex ist in g pu llo ut to re m ain
D.5
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fe .d
C h e c k e d b y
D e s ig n e d b y
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
GPS
PK1
N
N
260+00 to 290+00
DENALI PARK ROAD
Boring location
264+90, RT lane 271+90 to 276+00Subexcavation type 2
+00 to
+00
Su bex cav atio n t ype
Subex cavati on typ e 2271+90 to
276+00
T R w oll e y n e k o r b ni g e
B
B e g in d o u b le s o li d y e ll o w
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Sediment Control Quantities.
See Sheet E.1 for Soil Erosion and 1.
NOTE:
Remove and reset sign
264+24 LT
MP5
pavement marking
Centerline pavement marking
Centerline
A ELUDEHCS
Existing pullout to remain281+59 to 2
85+23, LT
A ELUDEHCS
A ELUDEHCS
Install fiber roll, see Sheet E.1 for details
260+70 to 262+30, LT and RT
D.6
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a ff .d
C h e c k e d b y
D e s ig n e d b y
SG14
-10
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
Subexcavation type 1
313+50 to 315+50
N
N
290+00 to 320+00
DENALI PARK ROAD
Boring location
314+00, 7.5' RT
NOTE:
1.
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Stabilized Construction Exit Details
See Sheet E.1 for
Staging area
Mile 5 Pit
MP6
+1 o t
+0
1 e pyt n oit av ac xe bu
S
Sheet E.1 for details
Install fiber roll, see
290+00 to 291+00, RT
A
EL
UDEHCS
approach road
Mile 5 Pit
295+50 pavement marking
Centerline pavement marking
Centerline
A ELUDEHCS
Sediment Control Quantities.
See Sheet E.1 for Soil Erosion and
D.7
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fg .d
C h e c k e d b y
D e s ig n e d b y
SG14-11
O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
Subexcava tion type 1
337+00 to 345+
N
N
320+00 to 350+00
DENALI PARK ROAD
Boring location
341+00, 9.5' LT
R
T
B e g in b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
A ELUDEHCS
pavement marking
Centerline pavement marking
Centerline
D.8
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fh .d
C h e c k e d b y
D e s ig n e d b y
0 3
SG14-12
O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
MOOSE
GPS
N
H in e s
C r e e k
350+00 to 380+00
DENALI PARK ROAD
368+40 to 3 77+70
Subexc avation type 2
Boring location
370+80, 7' RT
NOTE:
1.
B e g in d o u b le s o li d y e ll o w
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Stabilized Construction Exit Details
See Sheet E.1 for
Staging area
Mile 7 Pit
Remove and reset sign
375+89 RT
MP7
SG14-13
350+00 to 357+00
Subexcavation type 2 approach road
Mile 7 Pit
368+00
Existing pullout to remain
377+18 to 383+13, LT and Sediment Control Quantities.
See Sheet E.1 for Soil Erosion
D.9
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fi .d
C h e c k e d b y
D e s ig n e d b y pavement marking
Centerline pavement marking
Centerline
A ELUDEHCS
A ELUDEHCS
Sheet E.1 for details
Install fiber roll, see
372+00 to 373+40, LT and RT
5 3
5 3
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
380+00 to 410+00
DENALI PARK ROAD
395+00 to 4 31+50
Full de pth rec lamation
See Sheet D.9 for pullout information
Paved pullout
401+60 to 4
05+79, LT
R
T
B e g in b r o k e n y e ll o w
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
R
T
B e g in s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
B e g in s in g le b r o k e n y e ll o w
C ELUDEHCS
C ELUDEHCS
pavement marking
Centerline pavement marking
Centerline
D.10
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fj .d
C h e c k e d b y
D e s ig n e d b y
BEGIN SCHEDULE C
395+00
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
431+50 to 433+00
N
410+00 to 440+00
DENALI PARK ROAD
Full depth reclamation
395+00 to 431+50
Full depth reclamation
433+00 to 438+00
Full depth reclamation
439+00 to 442+00
Boring location
438+30, 7' RT
Subexcavation type 1
438+00 to 439+00
R
T
B e g in b r o k e n y e ll o w
395+00 to 431+50
Full depth reclamation
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
B e g in s in g le b r o k e n y e ll o w
MP8
SCHEDULE C
SCHEDULE C SCHEDULE C SCHEDULE CSCHEDULE A
SCHEDULE A
Remove and reset sign
429+95, RT
pavement marking
Centerline pavement marking
Centerline
D.11
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fk .d
C h e c k e d b y
D e s ig n e d b y
SG14
-15
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
442+00 to 444+00
N
440+00 to 470+00
DENALI PARK ROAD
453+20 to 459+00
Subexcavation type 2
444+00 to 453+20
Full depth reclamationFull depth reclamation
439+00 to 442+00
Full depth reclamation
459+00 to 467+50
L
T
B e g in b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
B e g in s o li d y e ll o w
R
T 453+20 to 459+00
Subexcavation type 2 Subexcavation type 1
467+50 to 473+30
See Sheet G.2 for detail w oll e y dil o s el b u o d ni g e B
SCHEDULE C SCHEDULE C
SCHEDULE C SCHEDULE A
SCHEDULE A
SCHEDULE A
SCHEDULE A
system, LT
Standard underdrainSCHEDULE A pavement marking
Centerline pavement marking
Centerline
D.12
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fl .d
C h e c k e d b y
D e s ig n e d b y
SCHEDULE A
See Sheet G.2 for detail
Standard underdrain system, LT
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
GPS
MP9
470+00 to 500+00
DENALI PARK ROAD
Subexcavation type 1
467+50 to 473+30
473+30 to 539+40
Full depth reclamation
Full depth reclamation
473+30 to 539+40
MP9
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
469+42 to 473+23
Paved pullout pavement marking Centerline pavement marking Centerline
SCHEDULE A
SCHEDULE C
SCHEDULE C
SCHEDULE C
D.13
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fm .d
C h e c k e d b y
D e s ig n e d b y
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
500+00 to 530+00
DENALI PARK ROAD
473+30 to 539+40
Full depth reclamation
Boring location
515+00, 11' LT
Boring location
515+00, 11' LT
473+30 to 539+40
Full depth reclamation
B e g in b r o k e n y e ll o w
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
R
T
R
T
B e g in s o li d y e ll o w
B e g in s in g le b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
MP10
SCHEDULE C
SCHEDULE C
pavement marking Centerline pavement marking Centerline
D.14
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fn .d
C h e c k e d b y
D e s ig n e d b y
SG14-16
SG14-
total = 158,724 sqft pullout = 7967 sqft
150,757 SQFT
RECLAMATION
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
530+00 to 560+00
DENALI PARK ROAD
Full depth reclamation
473+30 to 539+40
Subexcavation type 2
539+40 to 542+90
542+90 to 585+00Full depth reclamation
Paved pullout
532+66 to 536+12, RT
Full depth reclamation
542+90 to 585+00
Paved pullout
554+44 to 558+09, LT
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
SCHEDULE C
SCHEDULE C SCHEDULE C
SCHEDULE C
SCHEDULE C
SCHEDULE A
pavement marking
Centerline pavement marking
Centerline
D.15
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fo .d
C h e c k e d b y
D e s ig n e d b y
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
MP11
N
N
560+00 to 590+00
DENALI PARK ROAD
Full depth reclamation
542+90 to 585+00
Full depth reclamation
542+90 to 585+00
Boring location
564+50, 7' LT
MP11
Paved pullout
569+13 to 570+88, RT
R
T
B e g in b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 pavement marking
Centerline pavement marking
Centerline
SCHEDULE C
SCHEDULE C
SCHEDULE C
SCHEDULE B
B e g in s in g le b r o k e n y e ll o w
585+00 to 610+00
Full depth reclamation
D.16
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fp .d
C h e c k e d b y
D e s ig n e d b y
585+00
END SCHEDULE C BEGIN SCHEDULE B
585+00
5 5
0 5
SG14-17
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
590+00 to 620+00
DENALI PARK ROAD
Full depth reclamation
585+00 to 610+00
Full depth reclamation
614+00 to 639+50
Paved pullout
618+71 to 621+95, LT
Subexcavation type
610+00 to 614+00
00+016 ot 00+585 noitamalcer htped lluF
L
T
B e g in b r o k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
R
T
B e g in s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 pavement marking
Centerline pavement marking
Centerline
SCHEDULE B
SCHEDULE B
SCHEDULE B
SCHEDULE A
SCHEDULE B
L
T
D.17
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fq .d
C h e c k e d b y
D e s ig n e d b y
5 6
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
620+00 to 650+00
DENALI PARK ROAD
639+50 to 641+20 Subexcavation type 2
614+00 to 639+50
Full depth reclamation
Full depth reclamation 646+00 to 650+30
Subexcavation type 2
Full depth reclamation
614+00 to 639+50
Boring location
648+50 8' RT
641+20 to 646+00
R
T
B e g in b r o k e n y e ll o w
L
T
B e g in d o u b le s o li d y e ll o w
R
T
B e g in s o li d y e ll o w B e g in b r o k e n y e ll o w
B e g in s in g le b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
MP12
Paved pullout
618+71 to 621+95
SCHEDULE B
SCHEDULE B
SCHEDULE B
SCHEDULE B
SCHEDULE A
SCHEDULE A
pavement marking
Centerline pavement marking
Centerline
D.18
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fr .d
C h e c k e d b y
D e s ig n e d b y
5276 sqft
SG14-18
O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
VISTA
R iv e r
C a m p g ro u n d
T o S a v a g e
N
N
650+00 to 680+00
DENALI PARK ROAD
650+30 to 697+50Full depth reclamation
Full depth reclamation
650+30 to 697+50
Boring location
659+80, 6' RT
SHUTTLE STOP
CAMPGROUND
SAVAGE RIVER
672+87 to 674+06, RT
Paved shuttle stop pullout
NOTE:
1.See Sheet G.1 for Approach Road Detail.
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Subexcavation type 2
Paved approach
670+21 LT
Aggregate surfaced approach
672+12 LT
Paved approach
673+34 LT
30' R
24'
30' R 30' R 25' R 30' R
25' R
646+00 to 650+30
D.25 for detail
See Sheet
12" wide stop line, D.25 for detail
See Sheet
12" wide stop line, STOP STOP
16'
STOP
17' system
Install sign
670+02, LT
system
Install sign
671+95, LT
system
Install sign
673+28, LT
R1-1 R1-1 R1-1 pavement marking
Centerline pavement marking
Centerline
D.19
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fs .d
C h e c k e d b y
D e s ig n e d b y
B EL
UDEHCS
SCHEDULE A
SCHEDULE B
SCHEDULE B
SCHEDULE B
SCHEDULE B
SCHEDULE B
SG14-19
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
697+50 to 705+00
N
N
680+00 to 710+00
DENALI PARK ROAD
650+30 to 697+
Full depth reclamation
Full depth reclamation
705+00 to 714+90
Full depth reclamation
650+30 to 697+50
Existing gate to remain
686+00
Savage River cabin trail
681+14 to 685+
70, RT
Aggregate surface pu llout
R
T
B e g in b r o k e n y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
B e g in s in g le b r o k e n y e ll o w
MP13
pavement marking
Centerline pavement marking
Centerline
SCHEDULE B
SCHEDULE B
SCHEDULE B SCHEDULE BSCHEDULE A
D.20
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a ft .d
C h e c k e d b y
D e s ig n e d b y
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
SAVAGE
N
N
710+00 to 740+00
DENALI PARK ROAD
714+90 to 716+
Subexcava tion type 1
716+40 to 728 +70
Full dept h reclamation
705+00 to 714+90 Full depth reclamation
728+70 to 741+50Subexcavation type 2
Boring location
734+00, 7' RT
L
T
B e g in b ro k e n y e ll o w
B e g in d o u b le s o li d y e ll o w
R
T
B e g in s o li d y e ll o w
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
MP14
noitamalcer htped lluF
07+827 ot 04+617
B EL
UDEHCS
B ELUDEHCS
B ELUDEHCS
A ELUDEHCS
A EL
UDEHCS
pavement marking
Centerline pavement marking
Centerline
Remove and reset sign
728+12, RT
Install fiber roll, see Sheet E.1 for details
730+50 to 731+50, RT and LT and Sediment Control Quantities.
See Sheet E.1 for Soil Erosion1.
NOTE:
D.21
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fu .d
C h e c k e d b y
D e s ig n e d b y
G
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
728+70 to 741+50
742+ 50 to 745+
S ubexcavation type 2
740+00 to 770+00
DENALI PARK ROAD
753+50 to 754+60 Subexcavation type 1 t o
Fu ll d ep th r ec la m at io n
754+60 to 757+30Full depth reclamation
757+30 to 762+10
Subexcavation type 2
762+10 to 773+30
Full depth reclamation
754+60 to 757+30 Full depth reclamation
Boring location
742+00, 8' LT
Pa ve d p ull ou t
0+ t o 7
+96 , L
T
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Remove and reset sign
743+80 LT
Subexcavation type 3 741+50 to 742+50
2 e py t n oit ava cxe buS
A
EL
UDEHCS
A E
L U
DE
H
C S
SCHEDULE A
SCHEDULE A
SCHEDULE A SCHEDULE B
B
EL
U D
E H
C S
B ELUDEHCS
SCHEDULE B
SCHEDULE B
pavement marking
Centerline pavement marking
Centerline
D.22
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fv .d
C h e c k e d b y
D e s ig n e d b y
G
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
END PROJECT
787+25
End Reconstruction
MP 3.4 to 14.9
REPAVE DENALI PARK ROAD
AK NPS DENA 10(41)
E = 1754003.4243
N = 3559260.9894
Savage River Bridge
780+73
BEGIN RECONSTRUCTION
Do Not Disturb
Savage River Bridge Station
781+25
SAVAGE
RIVER
W es t Pa rk in g
To S av ag e
R iv er
R iv e r P a r k in g T o S a v a g e
Savage River Bridge
777+53
END OVERLAY
Boring location
775+60, RT lane
770+00 to 787+25
DENALI PARK ROAD
N
+73 to 7 87+
50' R
N intersection
Tie to gravel
781+73.5
NOTE:
1.See Sheet G.1 for Approach Road Detail.
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294 bridge deck concrete
Existing
780+73
6-inch compacted depth method 2, Roadway aggregate, AT RECONSTRUCTION
CONNECTION DETAIL
SAVAGE RIVER BRIDGE
EXISTING
See Sheet D.25 for detail
12" Wide stop line.
Type A (non-woven) geotextile, class 1, Separation stabilization
SG14-22
777+03
50' R no it a ma lc er h tp ed ll uF
+3 o t
+2
See Sheet G.3 for detail traffic detector system, Install system installation, 783+00
6-inch compacted depth with foamed asphalt, Full depth reclamation
50'
Transition bridge deck
Existing concrete
6+ t o
7+
Fu ll de pt h re cl am at io n
773+30 to 776+20
STOP
Paved approach
775+18, RT
CONNECTION DETAIL AT OVERLAY
SAVAGE RIVER BRIDGE
EXISTING
STOP
33' system
Install sign
775+37, RT
R1-1
SAVAGE RIVER PARKING
TRUCK TURN AROUND
SAVAGE RIVER BRIDGE
SAVAGE RIVER BRIDGE
SAVAGE RIVER WEST
TRUCK TURN AROUND
system
Install sign
782+10, RT
R1-1
2 equal lifts, Type II-A roughness compacted depth, placed in
0.3 to < 3 million ESAL, 3-inch maximum size aggregate, -inch4 3-inch or 2
1gyratory mix, Asphalt concrete pavement, Apply tack coat pavement marking
Centerline pavement marking
Centerline
B E
L U
DE
HCS
2 e pyT
,n oit av ac xe bu
S
A
EL
UDEHCS
A ELUDEHCS
EXC C
UYD =
Rec ons tru ctio n r oad way depth, placed in 2 equal lifts, Type II-A roughness
0.3 to < 3 million ESAL, 4-inch compacted
-inch nominal maximum size aggregate,4 3-inch or 2
Asphalt concrete pavement, gyratory mix, D.23
STATE PROJECT
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fw .d
C h e c k e d b y
D e s ig n e d b y
SCH
ED
U
LE
B
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
NO SCALE
NOTE:
m at ch ex ist in g m atchexisting
Existing connecting roadway width Match existing
ELEVATION
PAVED ROAD APPROACH
FOOTNOTE:
LC LC
V a r ia b le seiraV
LC
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Edge of asphalt pavement connecting roadway
Match existing
DETAILS
MISCELLANEOUS
Exisiting curb, timber to remain
Exisiting shuttle bus platform to remain
See Sheet C.4
Denali Park Road Overlay.
See Sheet C.4
Full Depth Reclamation.
Denali Park Road
PLAN
Approximately 6" of handwork anticipated
Pullout width variesTraveled way to remain curb reveal
6" Existing See Sheet C.4
Overlay Section
Denali Park Road
Length varies
Length varies Mainline
SHUTTLE STOP
SAVAGE RIVER CAMPGROUND
PAVEMENT TAPER
See D Sheets for approach road geometry.1.
Match existing super elevation or crown.
See Sheets C.1 to C.3 for pavement structure quantities.
775+21 Savage River Parking - SCHEDULE B
673+33 LT Savage River Campground - SCHEDULE B
672+11, LT - SCHEDULE B
670+21, LT - SCHEDULE B
at curb face
Taper from 0" depth to 3" depth material prior to overlay.
depth reclamation
Remove full
SCHEDULE B
672+87 to 674+06, RT
G.1
STATE PROJECT
NUMBER
SHEET
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d d e n a g a .d g
C h e c k e d b y
D e s ig n e d b y
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A overlap full width of trench at top
Geotextile filter, class 2, Type C, Granular backfill
Backfill
Granular Backfill Type I-A Nonwoven
Earthwork Geotextile
0.26 CUYD/FT 1.45 SQYD/FT
NO SCALE
NOTE:
FOOTNOTE:
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Dit ch slo pe of fill slo pe
Existing ground
SYSTEM DETAIL
STANDARD UNDERDRAIN
24"
LC
SECTION
DitchShoulder
453+20 to 459+00, LT
208+00 to 214+50, RT & LT
6-inchs from ground
Extend outlet
STANDARD UNDERDRAIN WITH OUTLET PIPE
UNDERDRAIN DETAIL
STANDARD
Underdrain Detail below
See Standard
4.
3.
2.
1.
Place materials in the underdrain at the following rates:
Limits are 2-feet outside ditch.
of new underdrain as needed if encountered during excavation.
foam board from station 209+00 to 212+00 and adjust alignment Avoid damaging existing subexcavation with underdrain and based on field conditions.
200-feet of underdrain. Place at approximately equal intervals 453+20 to 459+00, LT, Construct one outlet for every parallel to the roadway.
to ditch line as approved by CO. Construct the flowline gradient 214+50, RT & LT, Daylight underdrain with outlet pipe normal or toe of fill slope
Proposed ditch invert polyethylene drainage tubing
8-inch Perforated corrugated
Traveled lane
Outlet drain pipe is non-perforated and does not require geotextile.
bands or by other approved means.
605.03. Hold the screen securely in place with standard coupling
Cover the end of outlet pipe with screen according to Subsection
Clear and grub existing ditch prior to system installation.
trench.
Conserve material from trench excavation for top 6-inchs of
Section 209.
a height of 12-inches above pipe and compact according to
Backfill outlet pipe with conserved excavation. Place backfill to5.
G.2
STATE PROJECT
NUMBER
SHEET
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d d e n a g b .d g
C h e c k e d b y
D e s ig n e d b y slope to drain, 2% min. to 10% max.
Outlet Drain Pipe 8" Ø, N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A
NO SCALE
NPS PMIS No. 185910A NPS Drwg. No. 184/80,294
Lead wire
50'
W e s tb o u n d
E a s tb o u n d
LC LC
Camera
PLAN
Counter
(offset to counteract lane drift)
Lead wire
Pre-formed cable
ELEVATION
SECTION A-A
A
A
LCLC
T o C o u n te r
(Dual 6' x 6' loops per lane)
DETAIL
TRAFFIC DETECTOR
Edge of travel lane
Edge of travel lane
Edge of travel lane
Edge of travel lane
Edge of travel lane
Edge of travel lane
783+00
SCHEMATIC OF INDUCTIVE LOOP SYSTEM
6-inch compacted depth
Roadway aggregate, method 2, 4-inch compactd depth, place in 2 equal lifts
Asphalt concrete pavement, Type 1, G.3
STATE PROJECT
NUMBER
SHEET
A u g u s t
I n t_ ft m y fi le s p w p r o d u c ti o n d d e n a g c .d g
C h e c k e d b y
D e s ig n e d b y
6' 6'
18'
N O
T
F
O R
C
O N
S T
R U
C T
IO
N
P R
E
LI
M
IN
A