File: c:\myfiles\pw_production\d0231292\wa-a2013021-V8_EARTHWORK.log 7/21/2015, 3:41:57 PM
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 300 300 1.00 Subsoil Exc 0 0 1.00 Fill 10 10 1.00
MSEWALLEXC
Excavation 131 131 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00
LAYER3
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 182 0 0.00
SELECTWALLBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 227 0 0.00
GRANULARBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 23 0 0.00
FOUNDATIONFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 9 0 0.00
Page: 1