wa-a2013021-Sheets-B.pdf
PDF 19 KB Posted
- Attached to
- WA SKAGIT 40076(1), Hard Creek Bridge Repairs
- Solicitation number
- DTFH70-15-B-00011
About this file
Sheets B
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION I SECTION J SECTION K -
TYPICAL
SECTIONS
PLAN &
PROFILE BRIDGE
SEDIMENTATION
AND EROSION
CONTROL PLANS
MSE WALLS SAFETY
FEATURES
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND
ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF
ESTABLISHMENT ACRE 0.1 0.1
A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 266 266
A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
(CHECK DAMS) LNFT 80 80
A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.2 0.2
A0200 20301-2400 REMOVAL OF SIGN EACH 6 6
A0220 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER LNFT 130 130
A0240 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS (ROCKERY WALLS) LPSM All ALL
A0260 20304-4000 REMOVAL OF BRIDGE SUPERSTRUCTURE LPSM All ALL
A0280 20401-0000 ROADWAY EXCAVATION CUYD 287 29 316
A0300 20421-0000 ROCK EXCAVATION (STREAM CHANNEL ROCK
REMOVAL) CUYD 11 1 12
A0320 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 419 42 461
A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 359 31 390 182 CUYD @ 1.97 TONS/CUYD
A0360 55220-0000 REPAIR CONCRETE SQYD 50 50
A0380 55224-0000 SEAL CONCRETE SURFACE SQYD 105 105
A0400 55302-0500 PRECAST, PRESTRESSED CONCRETE SLABS,
48-INCH VOIDED LNFT 230 230
A0420 55601-0900 BRIDGE RAILING, STEEL (TEXAS-T223) LNFT 92 92
A0440 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 20 20
A0460 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B
WOOD POSTS (WEATHERING STEEL) LNFT 75 75
A0480 61701-4350 GUARDRAIL SYSTEM CRG, TYPE 4, CLASS B
(WEATHERING STEEL) LNFT 25 25
A0500 61702-0400 TERMINAL SECTION, TYPE G4-CRT EACH 1 1
A0520 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 3 3
A0540 61707-0000 STRUCTURE TRANSITION RAILING
(WEATHERING STEEL) LNFT 46 46
A0560 63302-0000 SIGN SYSTEM SQFT 25 25
A0580 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE
TYPE 3 EACH 3 3
MileStone: 100% FINAL Date Completed: 07/27/15 Report Date: 07/27/15
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-J ul
-2
1:
P
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities c:
\m yf ile s\ pw
_p ro du ct io n\ d0 w a2 ba _S um m ar y.
xl sm
]S he et
STATE PROJECT
SKAGIT 40076(1) B.1WA
NUMBER
SHEET
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION I SECTION J SECTION K -
TYPICAL
SECTIONS
PLAN &
PROFILE BRIDGE
SEDIMENTATION
AND EROSION
CONTROL PLANS
MSE WALLS SAFETY
FEATURES
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0600 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE
36-INCH EACH 15 15
A0620 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 15 15
A0640 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING
LIGHT TYPE B EACH 6 6
A0660 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 117 117
A0680 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 680 680
A0700 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION
(TEMPORARY) LPSM All ALL
-J ul -2
1:
P M
MileStone: 100% FINAL Date Completed: 07/27/15 Report Date: 07/27/15 c:
\m yf ile s\ pw
_p ro du ct io n\ d0 w a2 ba _S um m ar y.
xl sm
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
SKAGIT 40076(1) B.2WA
NUMBER
SHEET
File details come from the government source that posted it. Updated .