wa-a2013021-Sheets-B.pdf

PDF 19 KB Posted

Attached to
WA SKAGIT 40076(1), Hard Creek Bridge Repairs
Solicitation number
DTFH70-15-B-00011
Issued by

About this file

Sheets B

View the file

Other files

File Type Posted
BidSum_HardCreek.pdf PDF
A001_HardCreek.pdf PDF
wa-a2013021-Sheets-G.pdf PDF
wa-a2013021-Sheets-H.pdf PDF
wa-a2013021-Final_Cross_Sections.pdf PDF
wa-a2013021-Sheets-F.pdf PDF
wa-a2013021-Sheets-D.pdf PDF
Geotechnical_Report_07-08.pdf PDF
GM_07-08.pdf PDF
wa-a2013021-Sheets-A.pdf PDF
wa-a2013021-Sheets-C.pdf PDF
Plan_Request_HardCreek.pdf PDF
wa-a2013021-V8_EARTHWORK.pdf PDF
wa-a2013021-Sheets-I.pdf PDF
wa-a2013021-Sheets-J.pdf PDF
wa-a2013021-Sheets_E.pdf PDF
IFB_HardCreek_reduced.pdf PDF
GM_27-15_Hard_Creek_Bridge_WA_SKAGIT_40076(1)_MSE_Wall_Recommendations.pdf PDF
wa-a2013021-Sheets-K.pdf PDF
PROJECT_DESCRIPTION_WA_SKAGIT_40076(1).pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet and Description

SECTION C SECTION D SECTION E SECTION F SECTION G SECTION I SECTION J SECTION K -

TYPICAL

SECTIONS

PLAN &

PROFILE BRIDGE

SEDIMENTATION

AND EROSION

CONTROL PLANS

MSE WALLS SAFETY

FEATURES

TEMPORARY

TRAFFIC

CONTROL

PERMANENT

TRAFFIC

CONTROL

ALLOWANCE Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND

ASSURANCE LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF

ESTABLISHMENT ACRE 0.1 0.1

A0140 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 266 266

A0160 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

(CHECK DAMS) LNFT 80 80

A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.2 0.2

A0200 20301-2400 REMOVAL OF SIGN EACH 6 6

A0220 20302-1300 REMOVAL OF GUARDRAIL, CONCRETE BARRIER LNFT 130 130

A0240 20304-1000 REMOVAL OF STRUCTURES AND

OBSTRUCTIONS (ROCKERY WALLS) LPSM All ALL

A0260 20304-4000 REMOVAL OF BRIDGE SUPERSTRUCTURE LPSM All ALL

A0280 20401-0000 ROADWAY EXCAVATION CUYD 287 29 316

A0300 20421-0000 ROCK EXCAVATION (STREAM CHANNEL ROCK

REMOVAL) CUYD 11 1 12

A0320 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 419 42 461

A0340 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 359 31 390 182 CUYD @ 1.97 TONS/CUYD

A0360 55220-0000 REPAIR CONCRETE SQYD 50 50

A0380 55224-0000 SEAL CONCRETE SURFACE SQYD 105 105

A0400 55302-0500 PRECAST, PRESTRESSED CONCRETE SLABS,

48-INCH VOIDED LNFT 230 230

A0420 55601-0900 BRIDGE RAILING, STEEL (TEXAS-T223) LNFT 92 92

A0440 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 20 20

A0460 61701-2000 GUARDRAIL SYSTEM G4, TYPE 4, CLASS B

WOOD POSTS (WEATHERING STEEL) LNFT 75 75

A0480 61701-4350 GUARDRAIL SYSTEM CRG, TYPE 4, CLASS B

(WEATHERING STEEL) LNFT 25 25

A0500 61702-0400 TERMINAL SECTION, TYPE G4-CRT EACH 1 1

A0520 61702-0800 TERMINAL SECTION TYPE TANGENT EACH 3 3

A0540 61707-0000 STRUCTURE TRANSITION RAILING

(WEATHERING STEEL) LNFT 46 46

A0560 63302-0000 SIGN SYSTEM SQFT 25 25

A0580 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE

TYPE 3 EACH 3 3

MileStone: 100% FINAL Date Completed: 07/27/15 Report Date: 07/27/15

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-J ul

-2

1:

P

M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities c:

\m yf ile s\ pw

_p ro du ct io n\ d0 w a2 ba _S um m ar y.

xl sm

]S he et

STATE PROJECT

SKAGIT 40076(1) B.1WA

NUMBER

SHEET

Sheet and Description

SECTION C SECTION D SECTION E SECTION F SECTION G SECTION I SECTION J SECTION K -

TYPICAL

SECTIONS

PLAN &

PROFILE BRIDGE

SEDIMENTATION

AND EROSION

CONTROL PLANS

MSE WALLS SAFETY

FEATURES

TEMPORARY

TRAFFIC

CONTROL

PERMANENT

TRAFFIC

CONTROL

ALLOWANCE Bid Schedule

A0600 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE

36-INCH EACH 15 15

A0620 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 15 15

A0640 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING

LIGHT TYPE B EACH 6 6

A0660 63504-1000 TEMPORARY TRAFFIC CONTROL,

CONSTRUCTION SIGN SQFT 117 117

A0680 63509-1000 TEMPORARY TRAFFIC CONTROL, FLAGGER FXHR 680 680

A0700 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION

(TEMPORARY) LPSM All ALL

-J ul -2

1:

P M

MileStone: 100% FINAL Date Completed: 07/27/15 Report Date: 07/27/15 c:

\m yf ile s\ pw

_p ro du ct io n\ d0 w a2 ba _S um m ar y.

xl sm

]S he et

2) SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

STATE PROJECT

SKAGIT 40076(1) B.2WA

NUMBER

SHEET