WA SKAGIT 40076(1), Hard Creek Bridge Repairs
Solicitation number
DTFH70-15-B-00011
Issued by

View the file

Other files

File Type Posted
BidSum_HardCreek.pdf PDF
A001_HardCreek.pdf PDF
wa-a2013021-Sheets-G.pdf PDF
wa-a2013021-Sheets-H.pdf PDF
wa-a2013021-Final_Cross_Sections.pdf PDF
wa-a2013021-Sheets-F.pdf PDF
wa-a2013021-Sheets-D.pdf PDF
wa-a2013021-Sheets-B.pdf PDF
Geotechnical_Report_07-08.pdf PDF
GM_07-08.pdf PDF
wa-a2013021-Sheets-A.pdf PDF
wa-a2013021-Sheets-C.pdf PDF
Plan_Request_HardCreek.pdf PDF
wa-a2013021-V8_EARTHWORK.pdf PDF
wa-a2013021-Sheets-I.pdf PDF
wa-a2013021-Sheets-J.pdf PDF
wa-a2013021-Sheets_E.pdf PDF
IFB_HardCreek_reduced.pdf PDF
GM_27-15_Hard_Creek_Bridge_WA_SKAGIT_40076(1)_MSE_Wall_Recommendations.pdf PDF
wa-a2013021-Sheets-K.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA SKAGIT 40076(1), Hard Creek Bridge Repairs, Skagit County, Washington

The work consists of grading, bridge repair, transition rail, MSE walls and other small items of work.

Project length: .055 Miles

Tentative Fixed Completion Date: May 2016 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Less than $500,000

Location: 13.5 Miles SE of Marblemount, WA

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e Sc h N am e

A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices)

Temporary Turf Establishment Silt Fence Fiber Roll (Checkdams)

0.1 ACRE

266 LNFT

80 LNFT

DIVISION 200 – Earthwork 201 Clearing & Grubbing 0.2 ACRE 203 Removal of Structures & Obstructions (structures, demolition)

Removal Of Boulder (Rockery Wall) Removal Of Sign Removal Of Guardrail Concrete Barrier Removal Of Bridge Superstructure

1 EACH

6 EACH

130 LNFT

LPSM

204 Excavation & Embankment Roadway excavation Embankment Rock Excavation (Rock Removal)

287 CUYD

13 CUYD

11 CUYD

DIVISION 250 – Slope Reinforcement and Retaining Walls 255 Mechanically Stabilized Earth Walls (retaining walls) 419 SQFT

DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate

Roadway Aggregate, Method 2 359 TON

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e Sc h N am e

A

DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures)

Repair Concrete Seal Concrete Surface

50 SQYD

105 SQYD

553 Prestressed Concrete Precast, Prestressed Concrete Slabs 48-Inch Voided 230 LNFT

556 Bridge Railing Bridge Railing, Steel (Texas –T223) 92 LNFT

564 Bearing Devices Bearing Device, Elastomeric 20 EACH

DIVISION 600 – Incidental Construction 617 Guardrail

Guardrail System G4, Type 4, Class A Wood Posts (Weathering Steel) Guardrail System CRG, Type 4, Class A Wood Posts (Weathering Steel) Terminal Section , Type G4-CRT (Weathering Steel) Terminal Section Type Tangent (Weathering Steel) Structure Transition Railing (Weathering Steel)

75 LNFT

25 LNFT

1 EACH

3 EACH

46 LNFT

633 Permanent Traffic Control (traffic control devices) Sign System 25 SQFT

635 Temporary Traffic Control – Flagger 680 FXHR 635 Temporary Traffic Control –

Barricade Type 3 Cone, Type 36-Inch Drum Warning Light Type B Construction Sign

3 EACH

15 EACH

15 EACH

6 EACH

99 EACH

650 Temporary Diversions LPSM