wa-a2013021-Sheets-F.pdf

PDF 938 KB Posted

Attached to
WA SKAGIT 40076(1), Hard Creek Bridge Repairs
Solicitation number
DTFH70-15-B-00011
Issued by

About this file

Sheets F

View the file

Other files

File Type Posted
BidSum_HardCreek.pdf PDF
A001_HardCreek.pdf PDF
wa-a2013021-Sheets-G.pdf PDF
wa-a2013021-Sheets-H.pdf PDF
wa-a2013021-Final_Cross_Sections.pdf PDF
wa-a2013021-Sheets-D.pdf PDF
wa-a2013021-Sheets-B.pdf PDF
Geotechnical_Report_07-08.pdf PDF
GM_07-08.pdf PDF
wa-a2013021-Sheets-A.pdf PDF
wa-a2013021-Sheets-C.pdf PDF
Plan_Request_HardCreek.pdf PDF
wa-a2013021-V8_EARTHWORK.pdf PDF
wa-a2013021-Sheets-I.pdf PDF
wa-a2013021-Sheets-J.pdf PDF
wa-a2013021-Sheets_E.pdf PDF
IFB_HardCreek_reduced.pdf PDF
GM_27-15_Hard_Creek_Bridge_WA_SKAGIT_40076(1)_MSE_Wall_Recommendations.pdf PDF
wa-a2013021-Sheets-K.pdf PDF
PROJECT_DESCRIPTION_WA_SKAGIT_40076(1).pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLAN QUANTITIES

EROSION CONTROL

SEDIMENTATION AND

F.1

STATE PROJECT

NUMBER

SHEET

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d w a a d a .d g n

WA SKAGIT 40076(1)

A

M

M a y

C

C o n r a d

C h e c k e d b y

D e s ig n e d b y

10301030

EROSION CONTROL PLANS

SEDIMENTATION AND

Elev 1,024.52

E 20,011.54

N 10328.44

11+75

WA SKAGIT 40076(1)

Elev 1,031.25

E 19,795.50

N 10,517.71

8+84

WA SKAGIT 40076(1)

N

F.2

STATE PROJECT

NUMBER

SHEET

U

S S u r ft

D m y fi le s p w p r o d u c ti o n d w a a d b .d g n

WA SKAGIT 40076(1)

A

J u ly

C o n r

C h e c k e d b y

D e s ig n e d b y

END PROJECT

BEGIN PROJECT

NOTE

Flow arrow

Temporary turf establishment

Fiber roll checkdams

Silt fence

LEGEND

See sheet F.3 for details

Silt fence

Clearing limit

Clearing limit ordinary high water (OHW)

Limits of

See sheets F.4 for details

Fiber roll checkdams

See sheets F.4 for details

Fiber roll checkdams

Clearing limit

Temporary turf establishment Temporary turf establishment Temporary turf establishment

Temporary turf establishment

Temporary turf establishment

See Note 1

CO for approval prior to work.

meets the requirements of permit NWS - 2015 - 482 to

Submit diversion plan according to Section 157 and that1.

8' maximum

FLOW

Max. reach = 500'

SLOPE SLOPE

ponding area Storm water

END STAKE

SILT FENCE - PLAN VIEW

NOTE:

Staple or tie

POSTS AT JOINTS

Panel B

Panel A

END POSTS DETAIL

Geotextile fabric

Steel or wood post

Staple or tie

NO SCALE

SILT FENCE DETAILS

POST AND GEOTEXTILE SILT FENCE - AT TOE OF FILL

2.

1.

Fasten fabric to posts around each post one full turn.

Fold geotextile fabric

Top of posts tied together

Posts driven tightly together.

Steel or wood posts.

18" min. into ground posts driven

54" min. fence

Toe of fill slope infiltration

Storm water

Toe of slope

Silt fence

4' minimum

6" min. fabric entrenchment m in m in m a x

Undisturbed ground

6" with excavated material fabric and backfilled

Line trench with filter m in m a x

Vari es

[1]moving laterally along silt fence prevent storm water from

Sandbag barriers used to

FOOTNOTE:

Not measured for payment[1]

F.3

STATE PROJECT

NUMBER

SHEET

U

S C u s to m a r m y fi le s p w p r o d u c ti o n d w a a d c .d g n

WA SKAGIT 40076(1)

P

J u ly

C o n r

C h e c k e d b y

D e s ig n e d b y

Geotextile

Geotextile the fence.

sediment deposits then grade and seed prior to removal of accumulates to one-third the original height. Remove the ends. Remove sediment from behind the fence when it silt fence upgrade to prevent water from running around the

Install silt fence along ground contours. Curve ends of does not slide down, supporting posts.

All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.

as long as specified dimensions are satisfied. Follow

Alternate pre-assembled silt fence options will be allowed

PLAN

Direction of runoff Fi ll slo pe

Flow direction

INSTALLATION BEYOND TOE OF SLOPE

disturbed areas

Runoff from as specified in plans

T o e o f fi ll s lo p e

3' min.

3' min. or

Existing ground

Flow

PLAN

INSTALLATION ALONG DITCH

NOTE:

Flow

PROFILE

CROSS SECTION

GRADE

DITCH

(FT)

Flow

Flow Line

CROSS SECTION

STAKING DETAIL

max.

SPACING (S)

SPACING*

ALONG DITCH

NO SCALE

above top of wattle.

Expose stakes 2" min.

2' max. between stakes

6" min. 6" min.

penetration (typ.)

1'-6" min.

Flowline

A B

Space check dams the same elevation

"A" and "B" are the distance apart where points between stakes 4' max.

Wooden stake (typ.)

" 4 3" x 4 flow around the ends

Curve ends upstream to prevent

4.

3.

2.

1.

7%

5%

4%

3%

2%

1% uphhill side of fiber roll

Place excavated material on

12" Ø min. fiber roll.

* Spacing calculated based on

Fiber roll

DETAILS

FIBER ROLL

Fiber roll

Fiber roll and close cut ends or substitue biobags.

For narrow ditches either cut fiber rolls to fit ditch width and at maximum space as shown.

Do not crush fiber roll while staking. Drive stakes at each end

Install check dams in ditches perpendicular to the flowline.

Repair all rills or gullies prior to installation.

F.4

STATE PROJECT

NUMBER

SHEET

U

S C u s to m a r m y fi le s p w p r o d u c ti o n d w a a d e .d g n

WA SKAGIT 40076(1)

P

M a y

C o n r

C h e c k e d b y

D e s ig n e d b

File details come from the government source that posted it. Updated .