PLAN
ELEVATION
N
Elev. 1031.05 Elev. 1030.46
Elev. 1030.46 Elev. 1031.05 railing (typ.)
Transition
RoadwayCL
BEGIN BRIDGE
Elev. 1031.05
Sta. 10+00.00
END BRIDGE
s u p e r s tr u c tu r e
E x is ti n g B r id g e
R e m o v e a n d r e p la c e
R a il
R a il
BridgeCL
90°
To Rockport
Campground
To Mineral Park to remain
Abutment No. 1 to remain
Abutment No. 2
F lo w
Exp. Fix
SIII-48 voided slabs
AASHTO type to remain
Abutment No. 1
No.2 to remain
Abutment
CLground at of structure
Approximate existing
-1.2867%
Texas T-223 railing (typ.)
Cast-in-place
46'-0" (Field verify)
Transition railing (typ.)
BEGIN BRIDGE
Elev. 1031.05 Elev. 1030.46
END BRIDGE
PROFILE GRADE DIAGRAM
Bridge elevations are at profile grade @ layout line
NTS
,0
.0
+0.2623%
,0
.3
-2.8185% profile grade
Proposed
See Sheet G.2 for details
MSE Wall "A"
See Sheet G.2 for details
MSE Wall "B"
-1.2867%
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
PLAN AND ELEVATION
HARD CREEK BRIDGE REPAIRS
MT. BAKER-SNOQUALMIE NATIONAL FOREST
RG3037-A JULY 2015 B. OLTMANN 1/8" = 1'-0" A. FISHER C. TUTTLE F. QUINONEZ
U
S S u r ft
D c m y fi le s p w p r o d u c ti o n d w a a ta .d g n
P
M
J u ly
STATE PROJECT
NUMBER
SHEET
E.1 WA SKAGIT 40076(1)
Elev. 1030.46
AASHTO HL-93
estimated losses of 25,480 psi.
The final estimated effective prestress force per strand is 27,080 lb based on
Pre-tension each strand to a total load of 31,000 lb (f'si = 0.75f's = 202,500 psi).
steel conforming to AASHTO M 203.
" diameter, seven-wire, low-relaxation, prestressing2 1Furnish grade 270, SPECIFICATIONS:
CONSTRUCTION AND DESIGN:
DESIGN STRESSES:
DESIGN LOADING:
CONCRETE:
REINFORCING STEEL:
PRESTRESSED STEEL:
" unless otherwise noted.4 3Chamfer exposed edges of all concrete and class A (AE) for others.
Furnish class P (Prestressed) concrete for voided slab units, AASHTO SIII-48, Prestressing Steel:
Reinforcing Steel:
Class P (Prestressed) Concrete:
Class A (AE) Concrete:
fs = 270,000 psi fy = 60,000 psi f'ci = 5,500 psi at time of release f'c = 7,000 psi at 28 days f'c = 4,000 psi at 28 days
BEARINGS:
AASHTO LRFD Bridge Design Specifications, 2014, 7th Edition.
on Federal Highway Projects, FP-14 U.S. Customary Units.
Standard Specifications for Construction of Roads and Bridges
Provide 2" cover for reinforcing steel unless otherwise noted.
Provide standard hooks as defined by AASHTO for bends unless otherwise noted.
Provide epoxy coated reinforcing steel for voided slabs and railings.
Furnish reinforcing steel conforming to AASHTO M 31, grade 60 deformed.
Bridge Construction Specifications, with 60 durometer hardness, follow AASHTO LRFD design method A.
Provide laminated elastomeric bearing pads conforming to the requirements of Section 18.2 of the AASHTO LFRD
GENERAL NOTES
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
GENERAL NOTES
RG3037-B JULY 2015 B. OLTMANN NO SCALE A. FISHER C. TUTTLE F. QUINONEZ
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tb .d g n
J u ly
STATE PROJECT
NUMBER
SHEET
E.2 WA SKAGIT 40076(1)
BRIDGE LOAD RATING:
Operating Rating Factor = 1.63 (strength I)
Inventory Rating Factor = 1.26 (strength I)
Load Rating Vehicle = HL-93
Rating per AASHTO Manual for Bridge Evaluation, Second Edition, 2011
13'-9"16'-0"13'-9"
6" 9"
BearingCL
BRIDGE
BEGIN
90°
(typ.)
S p a c e s
(typ.)
2'-0" 5"5"
(typ.) (typ.) Anchor Detail (typ.)
See Laterial Tie
6"to remain
Abutment No. 1
Existing to remain
Abutment No. 2
Existing post-tensioning rod (typ.)
" Ø8
7 CL
CL
BearingCL
Beam (typ.)
BRIDGE
END
B1
B2
B3
B4
B5
AA
FRAMING PLAN
TYPICAL SECTION
" = 1'-0"16
3SCALE:
" = 1'-0"8
3SCALE:
(Looking Ahead)
20'-3"
" = 16'-3"4 34 Spaces @ 4'-0 2'-0"2'-0"
Beam (typ.)CL
B1 B5 railing (typ.)
Texas T-233
Cast-in-place voided slabs (typ.)
AASHTO type SIII-48
00.00%
CL
Fill shear keys with high strength
(Min. f'c = 5000 psi at 24 hours) non-shrink grout after all erection work has been completed, and before final tensioning of lateral ties
3"Ø Precast hole for lateral post-tensioning rod
Voided slab (typ.)
NOTE: Omit shear key on exterior face of exterior beams.
SHEAR KEY DETAIL
LC
(Symm.)
Shear key
"8
"4
"8
"16
1" Ø Backer rod
NOTE:
DETAIL A
BearingCL downstream edge
Existing abutment No. 2
B5of line
Outside edge
" = 1'-0"4
3SCALE:
DETAIL
LATERAL TIE ANCHOR
"Ø Rod8
" 1
"2 1"2
18"2
" x 5" x 8" Plate2 m in elastomeric pad
" x 5" x 8" Preformed 8 tensioned after tie-rod has been non-shrink grout. Grout
Fill recess with approved
" = 1'-0"4
3SCALE:
" = 1'-0"4
3SCALE:
[1]
See Sheet E.10 for Section A-A.[1]
FOOTNOTE:
Bridge
" Chamfer4
(typ.)
9"
See Detail A this sheet
"2 11'-317'-8""2
11'-3 attainable (see Note 4)
Maintain anchors to the minimum
Post-tension each rod to 30,000 lbs.
structural rods with threaded ends.
" Ø galvanized8 7Provide 4 - 0
4.
3.
2.
1.
Hex nut & washer entire length of the strand except at anchorage locations.
coat strands with corrosion inhibiting grease for the approval. If high-strength strands are substituted, high-strength strands may be substituted with CO's
If desired, equivalent rods with rolled threads or
AASHTO M 232 (ASTM A153).
Galvanize hex nuts and washers in accordance with
Cut threads on tie rods to the coarse series class 2A.
AASHTO M 111 (ASTM A123).
(ASTM A722). Galvanize in accordance with
Provide tie rods conforming to AASHTO M 275
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTION
FRAMING PLAN AND
RG3037-C JULY 2015 B. OLTMANN AS SHOWN A. FISHER C. TUTTLE F. QUINONEZ
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tc .d g n
A u g u s t
STATE PROJECT
NUMBER
SHEET
E.3 WA SKAGIT 40076(1)
DETAIL A
PARTIAL ELEVATION
PARTIAL PLAN
LC
46'-0"
LC
B
A
B A
C
6"9"
8'-0"13'-9"1'-3"
6"3"
"2 11'-1
5"5"
"4
23'-0"
4-#SE1
21'-0"1'-3"9"
3"Ø Hole (typ.) 10"Ø Void (typ.)
Symmetrical
Abut. mid span of slab
"Ø Low lax strands2 18-
#4SE2 (typ.)"Ø Low lax strands2 12-
4-#4SE1
3-#4SE3#4SE2
See Detail A
#4SE2
Bearing
" Low lax strands2 116-
2-#4SE1
voided slab
Interior
Abut. mid span of slab
3"Ø Hole for lateral post-tensioning rod (typ.)
at both ends of each void (typ.)
"Ø Non-ferrous drain4 3Provide
4-#4SE4
Bearing (typ.)
2"Ø Dowel hole (typ.)
#4SE2
7 Spaces @ 1'-0" O.C. = 7'-0"
8-#4SE214-#4SE24-#4SE26-#4SE2
14 Spaces @ 9" O.C. = 10'-6"
NOTE:
Bearing Pad and Camber Details.
See Drawing No. RG3037-K for
Symmetrical
3" O.C.
6 Spaces
1'-6" 1'-6"
6" O.C.
3 Spaces
SCALE: 11
2" = 1'-0"
SCALE: 12" = 1'-0"
SCALE: 12" = 1'-0"
NOTE:
Adjust #4SE2 as needed in order to clear the 3" Ø hole.
" approved non-shrink grout beam. Fill holes with an
" below top of4 3Cut strand
3 Cable clamps
LIFTING EYE
NTS
Lifting eye (typ.)
See Lifting Eye Detail
8" 4" Chamfer (typ.)
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
INTERIOR VOIDED SLAB DETAILS
RG3037-D JULY 2015 B. OLTMANN AS SHOWN A. FISHER C. TUTTLE F. QUINONEZ
S S u r ft m y fi le s p w p r o d u c ti o n d w a a td .d g n
J u ly
STATE PROJECT
NUMBER
SHEET
E.4 WA SKAGIT 40076(1)
(1 of 2)
"2 19"2
114"2 114"2
4'-0"
Voided slab
"16
"16
10"
(typ.)
both ends of each void (typ.)
" Ø Non-ferrous drain at4 for post-tensioning rod
3" Ø Precast hole
LC
#4SE2
#4SE2
INTERIOR SLAB
SECTION A-A
TYPE 2
C
B
C
6"6"
Voided slabLC
2" Ø Dowel hole (typ.)CL
#4SE4 #4SE4
3-#4SE3
SECTION B-B
SECTION C-C
4"4"4"8"4"4"8"4"4"4"
#4SE2
QUANTITY TABLE
STRAND
STEEL
CONCRETE
LNFT
LB
CUYD
Quantities are for one slab
8 -12" Ø Strands
16 -12" Ø Strands
2"2"
2 - 12" Ø strands
2-#4SE1 bars (bottom)
4-#4SE1 bars (top)
7.80
B
TYPE 11
D
N = Number of laps
For Information Only
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
(2 of 2)
INTERIOR VOIDED SLAB DETAILS
RG3037-E JULY 2015 B. OLTMANN 1"=1'-0"A. FISHER C. TUTTLE F. QUINONEZ
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a te .d g n
STATE PROJECT
NUMBER
E.5 WA SKAGIT 40076(1)
DETAIL A
PARTIAL ELEVATION
PARTIAL PLAN
B
A
B A
6"9"
8'-0"13'-9"1'-3"
6"
"2 11'-1
5"5"
"4
23'-0"
LC
21'-0"1'-3"9"
10"Ø Void (typ.)
Symmetrical
Abut. mid span of slab
See Detail A
#4SE2
Bearing voided slab
Exterior
Abut. mid span of slab
3"Ø Hole for lateral post-tensioning rod (typ.)
4-#4SE4
Bearing (typ.)
2"Ø Dowel hole (typ.)
#4SE2
7 Spaces @ 1'-0" O.C. = 7'-0"
8-#4SE214-#4SE24-#4SE26-#4SE2
14 Spaces @ 9" O.C. = 10'-6"
NOTE:
Symmetrical
3" O.C.
6 Spaces
1'-6" 1'-6"
6" O.C.
3 Spaces
46'-0"
3"
4-#4SE1 at both ends of each void (typ.)
" Ø Non-ferrous drain4 3Provide
#4SE2 (typ.)
@ 6" O.C.
#5SE1 (typ.)
4-#5SE2
7-#5SE1 (typ.) @ 6" O.C.
8-#5SE2 (typ.) @ 6" O.C.
" Ø strands2 116-
2-#4SE1 " Ø Strands2 18-3" Ø Hole (typ.)
#5SE1
#5SE2
" Ø strands2 12-
4-#4SE1
#4SE2 (typ.)
3-#4SE3
SCALE: 12" = 1'-0"
SCALE: 12" = 1'-0"
SCALE: 11
2" = 1'-0"
" approved non-shrink grout beam. Fill holes with an
" below top of4 3Cut strand
3 Cable clamps
LIFTING EYE
NTS
Lifting eye (typ.)
See Lifting Eye Detail
NOTE:
Adjust #4SE2 as needed in order to clear the 3" Ø hole.
8"" Chamfer (typ.)4
1.
2.
3.
4.
8-#5SE2 (typ.) 7-#5SE1 (typ.)
For clarity, roughened surface areas not shown.
Drawing RG3037-N for details.
Water barriers at opening not shown. See and Drawing No. RG3037-N.
Work this sheet with Drawing No. RG3037-M
Camber Details.
See Drawing No. RG3037-K for Bearing Pad and
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
EXTERIOR VOIDED SLAB DETAILS
RG3037-F JULY 2015 B. OLTMANN AS SHOWN A. FISHER C. TUTTLE F. QUINONEZ
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tf .d g n
J u ly
STATE PROJECT
NUMBER
SHEET
E.6 WA SKAGIT 40076(1)
(1 of 2)
Voided slab
"16
"16
10"
(typ.)
both ends of each void (typ.)
" Ø Non-ferrous drain at4
EXTERIOR SLAB
SECTION A-A
TYPE 2
C
B
C
B
C
6"6"
Voided slabLC
2" Ø Dowel hole (typ.)CL
#4SE4 #4SE4
3-#4SE3
SECTION B-B
SECTION C-C
4"4"4"8"4"4"8"4"4"4"
B
C
"2 11'-2 "2
192'-0"
2"2"
QUANTITY TABLE
STRAND
STEEL
CONCRETE
LNFT
LB
CUYD
8.60
Quantities are for one slab
8 -12" Ø Strands
16 -12" Ø Strands
2-#4SE1 bars (bottom)
4-#4SE1 bars (top) 2 - 12" Ø strands
(Bars #5SE1 and #5SE2 not shown)
"2 17"2
12 Roughened surface
(Roughened surface area only applies at each railing opening) rod post-tensioning hole for
3" Ø Precast
2.
1.
3.
NOTE:
See Sheet E.14 for location of bars #3WBE1.
" wide x 3'-0" long2 1 7
At Interior openings:
" wide x 6'-0" long2 1 7
At Exterior openings:
the following roughened surface areas:
For water barrier at openings, provide for details.
Water barrier not shown. See Drawing RG3037-N
B
TYPE 10
TYPE 11
TYPE 26
N = Numbers of laps
#5SE2
#5SE1
D
For Information Only
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
(2 of 2)
EXTERIOR VOIDED SLAB DETAILS
RG3037-G JULY 2015 B. OLTMANN 1"=1'-0"A. FISHER C. TUTTLE F. QUINONEZ
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tg .d g n
STATE PROJECT
NUMBER
E.7 WA SKAGIT 40076(1)
(Looking Back)
Existing backwall to remain
4- #3BW1
Joint
"2
#4BW2 Dowels
3 - #3BW3
ty p
#4BW2 Dowels
2 - #4BW2 Dowels
10'-2"6" epoxy resin into hole and fill with
#8 dowels. Place dowels existing abutment for
Drill 2" Ø holes into
BearingCL
BridgeCL backwall portion
Construct new
"4 33'-01'-0" 1'-0" "4
33'-0 to remain
Existing abutment
BridgeCL
Existing backwall to remain
Existing backwall to be removed
#4BW2 Dowel
Dowel spacing bridge symmetrical about
CL
Field determined
#3BW1
M a tc h e x is ti n g b a c k w a ll w id th
Limits of existing abutment
NOTE:
Remove existing backwalls (at both ends of existing slabs).
Prior to placement of bearing pads clean, and level top surface of abutment with high strength non-shrink grout.
Maintain existing elevation at top of botlh abutments.
Construct new backwall portion.
1.
2.
3.
4.
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAILS
EXISTING ABUTMENT NO. 1 REPAIR
RG3037-H JULY 2015 B. OLTMANN 1/4" = 1'-0" A. FISHER C. TUTTLE F. QUINONEZ
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a th .d g n
STATE PROJECT
NUMBER
E.8 WA SKAGIT 40076(1)
bridge symmetrical about
CL
CL
CL
(Looking Ahead) epoxy resin into hole and fill with
#8 dowels. Place dowels existing abutment for
Drill 2" Ø holes into
10'-2"
Existing backwall to remain
#3BW1
4 - #4BW2 Dowels 2 - #4BW2 Dowels
Bearing
Bridge
"4 33'-0 1'-0""4
33'-01'-0"6"
NOTE:
ground line
Approximate with flowable concrete
Fill scour voids
Joint
"2
13 - #3BW3
4-#4BW1
#4BW2 Dowels ( ty p
Existing backwall to remain backwall portion Construct new
See Note No 2 shotcrete line
Approximate existing
Dowel spacing
CL Bridge
6"
Existing abutment to remain to be removed
Existing backwall to remain
Existing backwall determined
Field backwall width
Match existing
Limits of existing abutment
Fill scour void(s) under existing abutment with flowable concrete material, according to Section 614.
Patch all spalled surface areas with or without exposed rebars.
Remove existing backwalls (at both ends of existing slabs).
Prior to placement of bearing pads, clean and level top surface of abutment with high strength non-shrink grout.
Maintain existing elevation at top of both abutments.
Construct new backwall portion.
1.
2.
3.
4.
5.
6.
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAILS
EXISTING ABUTMENT NO. 2 REPAIR
RG3037-I JULY 2015 B. OLTMANN 1/4" = 1'-0" A. FISHER C. TUTTLE F. QUINONEZ
A u g u s t
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a ti .d g n
STATE PROJECT
NUMBER
E.9 WA SKAGIT 40076(1)
SCALE: 1" = 1'-0"
SECTION A-A
(See Sheet E.3 for Cut Section)
9"6"9"
2'-0"
V o id
Voided slab post-tensioning rod (typ.)
3" Ø Hole for lateral
Bearing pad
Bearing pads (typ.)
BearingCL
CL
BEGIN / END
BRIDGE
NOTE:
and Abutment No. 2 to remain
Existing Abutment No. 1
NOTE:
stainless steel dowel bar
1" Ø ASTM A276 Grade 302
DETAIL C
NTS
See Detail C high-strength, non-shrink grout.
then fill rest of hole with
" above top of dowels, 2 1to 2 holes with joint sealant material
At expansion end, fill dowel grout.
with high-strength, non-shrink
At fixed end, fill dowel holes
" Chamfer (typ.)4
4.
3.
2.
1.
rubber sheet (see Note 4)
" thick x 18" butyl 8 wedge anchors at 12" O.C.
plate (typ.) Attach with
" galv. steel 4
3" x 3"x anchor plates as shown.
adhesive to each side of the rubber and immediately an approved adhesive. Apply a 4" wide strip of
Bond butyl rubber sheet to concrete and plate with
Provide a polystyrene layer behind the bearing pads.
Place all bearing pads over a clean and level surface.
of the abutments.
voided slabs; clean, repatch, and level the top surface
After the removal of the existing backwalls and
Provide polystyrene layer
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
MISCELLANEOUS DETAILS
RG3037-J JULY 2015 B. OLTMANN AS SHOWN A. FISHER C. TUTTLE F. QUINONEZ
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tj .d g n
STATE PROJECT
NUMBER
E.10WA SKAGIT 40076(1)
6" 8" 8" 6"
6" 6"
BeamCL
#8 Dowel (typ.)BearingCL
Bearing pad (typ.)
BEARING PAD LAYOUT
CAMBER DIAGRAM
Line between span ends
L/2L/2
Midspan (Symm.)LC BearingsLC
B
A
CAMBER TABLE (in.)
A B
Interior Beam Midspan
Exterior Beam Midspan
1.89 1.54
1.65 1.30
(typ.)
BEARING PAD
SECTION
moulded securely to pad
" Steel shim 16
1'-0"
NTS
" = 1'-0"2
1SCALE: 1
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CAMBER DIAGRAM DETAILS
BEARING PAD AND
RG3037-K JULY 2015 B. OLTMANN AS SHOWN C. TUTTLE F. QUINONEZ
existing abutment
Back face of
" Top & bottom layer4
" Interior layers8 32 -
" Cover all around4
B = net camber after placement of rails.
and self weight of voided slab at erection.
A = estimated camber due to prestress, diaphragms, Polystyrene layer
A. FISHER
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tk .d g n
STATE PROJECT
NUMBER
E.11WA SKAGIT 40076(1)
1'-0" 1'-0"
3'-0"3'-0"4'-0"6'-0"4'-0"6'-0"4'-0"6'-0"4'-0"3'-0"3'-0" opening
Exterior opening
ExteriorInterior PostInterior PostInterior PostInterior Post Interior Opening Interior Opening Interior Opening
END BRIDGE
BEGIN BRIDGE
See Detail A terminal connector
Thrie-beam
ROADWAY ELEVATION OF RAIL
" = 1'-0"4
1SCALE:
" = 1'-0"2
1SCALE:
TERMINAL CONNECTION DETAILS
46'-0" Bridge Length
10'-0" C/C Interior Posts (typ.)
6" R
CL
CL
8"1'-8"
DETAIL A
3'-0"3'-0"
NOTE:
1.
-inch beyond nut.4
-inch to2 1Provide bolts of sufficient length to extend connector. See Note
Thrie-beam terminal
1'-0"
5 ~7
" Ø (ASTM A325 or A449)
Heavy Hex Head Bolts, with two
13 " O.D. washers under each head and nut. Bolts shall be of sufficient length to extend through the full thickness of the rail, washer, and nut. Install with bolt heads on traffic face
Top of slab
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
TRAFFIC RAIL
RG3037-L JULY 2015 B. OLTMANN AS SHOWN A. FISHER C. TUTTLE F. QUINONEZ
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tl .d g n
STATE PROJECT
NUMBER
E.12WA SKAGIT 40076(1)
" = 1'-0"2
1SCALE:
PARTIAL RAIL ELEVATION
(TYPICAL REINFORCING LAYOUT)
Bar #3RE1 @ 6" (max.)6"
5 - #5RE6 (typ.)
5 - #3RE1 (typ.)
8 - #5RE5
5 - #5SE1 (typ.)
4 - #5SE2 (typ.)
8 - #5SE2 (typ.)
#5RE4 (typ.)
7 - #5SE1 (typ.)
(each face) (typ.)
4 - #5RE3
#3RE1 (typ.)8 - #5RE6 (typ.)
3'-0"4'-0"6'-0"4'-0"3'-0"3'-0"
V o id e d s la b
C a s t-in p la c e r a il
Symmetrical
Abut. mid span of slabExterior Post Interior Post Interior PostInterior OpeningExterior Opening
CL
DD A
A B
B
C
C
NOTE:
" = 1'-0"1SCALE:
SECTION D-D
#5RE3
Inside face
6" R
#3RE1 (typ.)
1'-0" Field bend
5.
4.
3.
2.
1.
for details.
Water barriers not shown. See Drawing RG3037-N
Construct railings after tensioning transverse tie rods.
#3RE1 in exterior posts.
For clarity, #3RE2 bar not shown. Match #3RE2 with slabs reinforcing.
only. These bars are included in the exterior voided
Bars #5SE1 and #5SE2 are shown for information and Drawing No. RG3037-N.
Work this sheet with Drawing No. RG3037-F
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
TRAFFIC RAIL REINFORCING
RG3037-M JULY 2015 B. OLTMANN AS SHOWN A. FISHER C. TUTTLE F. QUINONEZ
J u ly
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tm .d g n
STATE PROJECT
NUMBER
E.13WA SKAGIT 40076(1)
SECTION A-A SECTION B-B SECTION C-C
GENERAL NOTES:
"2 11'-3
(typ.)
"2
"4
#5RE5
#5SE1
#5SE2
#3RE1
#5RE6
#5RE3
#3RE2
" Chamfer (typ.)4 3 " Chamfer (typ.)4
3 " Chamfer (typ.)4
Traffic side
"2 11'-3
Traffic side
#5RE6
#3RE1
(typ.)
"2
"2 11'-3
Traffic side
#3RE1
(typ.)
"2
#5SE2
#5SE1
#5RE3
"2 11 "2
14"2
Post
1" "2 17 1"
Top of slab (typ.)
shown for information only.
Bar #5SE1 and #5SE2 are
NOTE:
Typical water barrier
See Detail A
"2 17"2
(typ.)
Water barrier
" Cover2
Voided slab
Roughened surface
DETAIL A
Water Barrier
Top of slab
WATER BARRIER:
is allowed.
construction of the water barrier
Both precast and cast-in-place epoxy cement.
voided slab with an approved
Bond water barrier to top of the
Construct water barrier at opening.
2.
1.
(typ.)
(typ.)
#5RE4 (typ.)
#5RE3 (typ.)
#3WBE2 (#3WBE3)
#3WBE1 @ 1'-0" O.C.
CONCRETE FINISH DETAIL
voided slabs and railings exposed surfaces of exterior
Apply Class 6 color finish on
See Sheet E.15 for reinforcing steel schedule.
Provide shop drawings for approval.
speeds of 45 mph and less.
transition is used, this rail can only be used for transition is used. When a TL-2 rated guard fence
50 mph and greater when TL-3 rated guard fence
TL-4 criteria. This rail can be used for speeds of have been crash tested to meet NCHRP Report 350 equal strength to railings with like geometry, which
The rail has been evaluated and accepted to be of
3.
2.
1.
NO. DATE BY REVISIONS NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER BRIDGE DRAWING DATE
TRAFFIC RAIL SECTIONS
DRAWING NO.
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
F. QUINONEZ C. TUTTLE A. FISHER 1/2" = 1'-0" B. OLTMANN JULY 2015 RG3037-N
S S u r ft m y fi le s p w p r o d u c ti o n d w a a tn .d g n
A u g u s t
STATE PROJECT
NUMBER
E.14WA SKAGIT 40076(1)
STR TYPE 11
TYPE 4
TYPE 2
A
G
B
C
B
D
B
C
C
B
All "E" bars are epoxy coated.
Dimensions in bending diagrams are out-to-out bars.
NOTE:
2.
1.
b.f. = both faces o.f. = other face f.f = fill face
ABBREVIATIONS:
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
MT. BAKER-WNOQUALMIE NATIONAL FOREST
HARD DREEK BRIDGE REPAIRS
RG3037-O
NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
B. OLTMANN NO SCALE A. FISHER C. TUTTLE F. QUINONEZ
NO. DATE BY REVISIONS
BRIDGE DRAWING
15 of 15 JULY 2015
DATE
REBAR LIST
DRAWING NO.
E.15
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d w a a to .d g n
WA SKAGIT 40076(1)
J u ly
File details come from the government source that posted it. Updated .