PAGE
ID PFH 60(5), Salmon River Road Connection/Extension, Nez Perce National Forest, Idaho County, Idaho The work consists of subexcavation, slope protection, rock excavation, MSE retaining walls, grading, drainage, base, and paving and other small items of work.
Project length: 8.282 Kilometers Fixed Completion Date: October 12, 2012 Estimated Price Range: $10 million to $15 million
Location: .3 Kilometers W of Riggins, Idaho DESCRIPTION OF WORK in METRIC UNITS
DIVISION 150 – Project Requirements
| 152 |
| Construction Survey & Staking |
| x |
| YES |
NO
| 153 |
| Contractor Quality Control and Assurance |
| x |
| YES |
NO
| 154 |
| Contractor Sampling & Testing |
| x |
| YES |
NO
| 155 |
| Schedules for Construction Contracts (construction schedules) |
| x |
| YES |
NO
| 157 |
| Soil Erosion Control Devices, plastic lining |
Soil Erosion Control Devices, silt fence
Soil Erosion Control Devices, temporary culvert pipe
Soil Erosion Control Devices, temporary diversion channel
Soil Erosion Control Devices, turbidity barrier
Soil Erosion Control Devices, check dam
Soil Erosion Control Devices, sandbags
Soil Erosion Control Devices, temporary turf establishment 625 m2
3,150 m
30 m
25 m
110 m
50 each
500 each
55 slry
| 158 |
| Watering for Dust Control |
| 10,000 m3 |
DIVISION 200 – Earthwork
| 201 |
| Clearing & Grubbing |
| 7.0 ha |
| 203 |
| Removal of Structures & Obstructions, guardrail |
| 70 m |
| 204 |
| Excavation |
Embankment
Sub-excavation 55,450 m3
16,000 m3
4,3000 m3
| 205 |
| Rock Blasting: Controlled Blast Hole (rock blasting) |
| 4,000 m |
Blasting Consultant (Consultant/Engineering Services)
| Yes |
| X |
| No |
| 207 |
| Earthwork Geotextiles (geotextiles) |
| 7,150 m2 |
| Other:208 Shoring and Bracing |
| 695 m2 |
DIVISION 250 - Slope Reinforcement and Retaining Walls
| 251 |
| Riprap |
| 11,425 m3 |
| 255 |
| Mechanically Stabilized Earth Walls (retaining walls) |
| 3,100 m2 |
| 261 |
| Rock Dowels |
| 35 each |
| Other:252 Rock Buttress |
| 2,700 m3 |
DIVISION 300 – Aggregate Courses
| 309 |
| Emulsified Asphalt Treated Base Course (crushed aggregate) |
| 21,000 ton |
DIVISION 400 – Asphalt Pavements & Surface Treatments
| 401 |
| Superpave Hot Asphalt Concrete Pavement |
| 9,000 ton |
| 412 |
| Asphalt Tack Coat (asphalt surface treatment) |
| 22,350 liter |
DIVISION 600 – Incidental Construction
| 601 |
| Minor Concrete Structures (concrete – minor structures) |
| 602 |
| Culverts & Drains, 600 mm |
Culverts & Drains, 900 mm
Culverts & Drains, 1200 mm 590 m
185 m
42 m
| 603 |
| Structural Plate Structures (culverts & drains) |
| 604 |
| Catch Basins |
(culverts & drains) (indicate which) 36 each
| 605 |
| Underdrains, geocomposite |
(culverts & drains) (indicate which) 500 m
| 608 |
| Paved Waterways (culverts & drains) |
| 609 |
| Curb & Gutter (concrete) |
| 4,100 m |
| 610 |
| Horizontal Drains |
| 2,340 m |
| 617 |
| Guardrail |
| 1000 m |
| 619 |
| Fences, Gates & Cattle Guards |
| 5 gates |
1 cattleguard
| 621 |
| Monuments & Markers (construction survey & staking) |
| YES |
| X |
| NO |
| 622 |
| Rental Equipment |
| X |
| YES |
NO
| 624 |
| Topsoil (landscaping & related items) |
| 200 m3 |
| 625 |
| Turf Establishment (indicate seeding or mulching separately) |
| 70 slry |
| 626 |
| Plants, Trees, Shrubs, Vines & Groundcovers |
Willow bundles 695 trees
1575 each
| 634 |
| Permanent Pavement Markings (traffic pavement markings) |
| 41,000 m |
| 635 |
| Temporary Traffic Control – Flagger |
| Hours:9,000 |
| 635 |
| Temporary Traffic Control – Pilot Car |
| Hours:1,200 |
| 636 |
| Signal, Lighting, & Electrical Systems |
| 2 each |
| 637 |
| Facilities & Services (field offices, laboratories, & housing) |
| 1 each |
Other:636 Conduit
636 Utility box, concrete
635 Traffic Supervisor 18,175 m
26 each
158 days