Project Description

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE

ID PFH 60(5), Salmon River Road Connection/Extension, Nez Perce National Forest, Idaho County, Idaho The work consists of subexcavation, slope protection, rock excavation, MSE retaining walls, grading, drainage, base, and paving and other small items of work.

Project length: 8.282 Kilometers Fixed Completion Date: October 12, 2012 Estimated Price Range: $10 million to $15 million

Location: .3 Kilometers W of Riggins, Idaho DESCRIPTION OF WORK in METRIC UNITS

DIVISION 150 – Project Requirements

152
Construction Survey & Staking
x
YES

NO

153
Contractor Quality Control and Assurance
x
YES

NO

154
Contractor Sampling & Testing
x
YES

NO

155
Schedules for Construction Contracts (construction schedules)
x
YES

NO

157
Soil Erosion Control Devices, plastic lining

Soil Erosion Control Devices, silt fence

Soil Erosion Control Devices, temporary culvert pipe

Soil Erosion Control Devices, temporary diversion channel

Soil Erosion Control Devices, turbidity barrier

Soil Erosion Control Devices, check dam

Soil Erosion Control Devices, sandbags

Soil Erosion Control Devices, temporary turf establishment 625 m2

3,150 m

30 m

25 m

110 m

50 each

500 each

55 slry

158
Watering for Dust Control
10,000 m3

DIVISION 200 – Earthwork

201
Clearing & Grubbing
7.0 ha
203
Removal of Structures & Obstructions, guardrail
70 m
204
Excavation

Embankment

Sub-excavation 55,450 m3

16,000 m3

4,3000 m3

205
Rock Blasting: Controlled Blast Hole (rock blasting)
4,000 m

Blasting Consultant (Consultant/Engineering Services)

Yes
X
No
207
Earthwork Geotextiles (geotextiles)
7,150 m2
Other:208 Shoring and Bracing
695 m2

DIVISION 250 - Slope Reinforcement and Retaining Walls

251
Riprap
11,425 m3
255
Mechanically Stabilized Earth Walls (retaining walls)
3,100 m2
261
Rock Dowels
35 each
Other:252 Rock Buttress
2,700 m3

DIVISION 300 – Aggregate Courses

309
Emulsified Asphalt Treated Base Course (crushed aggregate)
21,000 ton

DIVISION 400 – Asphalt Pavements & Surface Treatments

401
Superpave Hot Asphalt Concrete Pavement
9,000 ton
412
Asphalt Tack Coat (asphalt surface treatment)
22,350 liter

DIVISION 600 – Incidental Construction

601
Minor Concrete Structures (concrete – minor structures)
602
Culverts & Drains, 600 mm

Culverts & Drains, 900 mm

Culverts & Drains, 1200 mm 590 m

185 m

42 m

603
Structural Plate Structures (culverts & drains)
604
Catch Basins

(culverts & drains) (indicate which) 36 each

605
Underdrains, geocomposite

(culverts & drains) (indicate which) 500 m

608
Paved Waterways (culverts & drains)
609
Curb & Gutter (concrete)
4,100 m
610
Horizontal Drains
2,340 m
617
Guardrail
1000 m
619
Fences, Gates & Cattle Guards
5 gates

1 cattleguard

621
Monuments & Markers (construction survey & staking)
YES
X
NO
622
Rental Equipment
X
YES

NO

624
Topsoil (landscaping & related items)
200 m3
625
Turf Establishment (indicate seeding or mulching separately)
70 slry
626
Plants, Trees, Shrubs, Vines & Groundcovers

Willow bundles 695 trees

1575 each

634
Permanent Pavement Markings (traffic pavement markings)
41,000 m
635
Temporary Traffic Control – Flagger
Hours:9,000
635
Temporary Traffic Control – Pilot Car
Hours:1,200
636
Signal, Lighting, & Electrical Systems
2 each
637
Facilities & Services (field offices, laboratories, & housing)
1 each

Other:636 Conduit

636 Utility box, concrete

635 Traffic Supervisor 18,175 m

26 each

158 days