A002_Salmon.pdf
PDF 30 KB Posted
- Solicitation number
- DTFH70-10-B-00015
About this file
Amendment A002
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 July 22, 2010 N/A ID PFH 60(5)
SALMON RIVER ROAD
CONNECTION/EXTENSION
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X DTFH70-10-B-00015
9B. DATED (SEE ITEM 11)
June 28, 2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(_x_) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ID PFH 60(5), SALMON RIVER ROAD CONNECTION/EXTENSION
NEW BID OPENING DATE: August 4, 2010
See page 2 for further revisions
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 7/22/10 ID PFH 60(5) Solicitation No. DTFH70-10-B-00015 Salmon River Road Connection/Extension
REVISIONS ARE AS FOLLOWS:
SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)
Page A-3, Block 13A. Revises bid opening date from July 28, 2010 to August 4, 2010.
SPECIAL CONTRACT REQUIREMENTS
Page Section/Table Revision F-57 636.04 General Deletes Class C
ENCLOSURE:
Page: F-57
New bid opening date: 08/04/2010
F-57
Special Contract Requirements Project: ID PFH 60(5), Salmon River Road Connection/Extension
Section 636.— SIGNAL, LIGHTING, AND ELECTRICAL
SYSTEMS
Description
636.01 Add the following:
This work also consists of furnishing and placing utility vaults and conduit for electrical and telephone utilities.
Material
636.02 Add the following to the material list:
Bedding Material 704.02 Backfill Material 704.03 Conduit 721.01(a)(1) Cable warning tape 725.30 Frames, grates, covers and ladder rungs 725.12
Construction Requirements
636.04 General. Add the following:
Excavate conduit trench to be free of debris. Remove by hand sharp embedded rocks and loose stones over 12 millimeters in the longest dimension, or over-excavate the trench and replace the over-excavation with bedding material to provide 50 millimeters of cover over rocks and stones.
Grade evenly the bottom of the trench.
Coordinate with Idaho Power Company and Citizens Communications for them to perform the following activities:
Provide input on the type of vaults to be used on project;
Supply safety watch person(s);
Approve staking location of vaults, pedestals and conduit lines;
Inspect trenches prior to placement of bedding, conduit or backfill;
Connection of existing conduit and cable to vaults; and
Installation of wiring through conduits, and connection to existing cable inside vaults.
Initiate and conduct coordination meeting(s) with Idaho Power Company and Citizens Communications a minimum of 4 weeks prior to the anticipated dates of the above activities.
Bed conduit according to Subsection 209.09(a).
Revised by Amendment A002
File details come from the government source that posted it. Updated .