RECOVERY - ID PFH 60(5), Salmon River Road Connection/Extension
Solicitation number
DTFH70-10-B-00015
Issued by

About this file

Amendment A004

View the file

Other files

File Type Posted
amdA003 SF30.DOC.pdf PDF
A002_Salmon.pdf PDF
Amend A001_SalmonRvr.pdf PDF
IFB_Book 2_SalmonRv.pdf PDF
Plan Request Form_SalmonRv.pdf PDF
IFB_Book 3_SalmonRv-2.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/plans/id-pfh-60(5)/ —
Physical Data Request Form _SalmonRv.pdf PDF
IFB_Book 1_SalmonRv.pdf PDF
CALL for HUBZone INTEREST__Salmon..doc DOC document
PROJECT DESCRIPTION_Salmondoc.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A004 August 2, 2010 N/A ID PFH 60(5)

SALMON RIVER ROAD

CONNECTION/EXTENSION

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-10-B-00015

9B. DATED (SEE ITEM 11)

June 28, 2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A

N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(___) is extended, ( X ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D OTHER (Specify type of modification and authority)

N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ID PFH 60(5), SALMON RIVER ROAD CONNECTION/EXTENSION

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page F-50. Subsection 625.08, Mulching - Revises reference # for Bonded fiber matrix hydromulch.

ENCLOSURE:

Page: F-50

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

F-50

Special Contract Requirements Project: ID PFH 60(5), Salmon River Road Connection/Extension

03M01/01/04

Section 625.— TURF ESTABLISHMENT

Construction Requirements

625.03 Delete the text of this Subsection and substitute the following:

Apply turf establishment to finished slopes and ditches between September 30th and May 30th .

Do not apply turf establishment during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or not friable.

625.04 Watering. Delete the text of this Subsection.

625.05 Fertilizing. Add the following to paragraph (b) Hydraulic method:

Apply fertilizer conforming to Subsection 713.03(a) at the rates shown in Table 625-1.

Fertilize areas inaccessible to hydro-type equipment by hand. Do not apply fertilizer within 15 meters of any stream or wetland system.

Table 625 - 1 Fertilizer Application Rate

Type Quantity per slurry unit

7:2:3 204.0 kilograms

625.07 Seeding. Add the following to paragraph (b) Hydraulic method:

Apply the seed mixture conforming to Subsection 713.04 at the rate of 7.0 kilograms of live seed per slurry unit. Include a tracer material consisting of either wood fiber mulch or grass cellulose fiber mulch to provide visible evidence of uniform application. Add the tracer to the slurry at a rate of 45 kilograms per slurry unit. Seed areas inaccessible to hydro-type equipment by hand.

625.08 Mulching. Delete the text of this Subsection (b) Hydraulic method and substitute the following:

Apply mulch conforming to Subsection 713.05 (g) Bonded fiber matrix hydro-mulch at the rate of 340 kilograms per slurry unit upon completion of seeding and fertilizing applications.

This rate does not apply to mulch for tracer applied under Subsection 625.07 (b), Seeding, Hydraulic method.

625.09 Protecting and Caring for Seed Areas. Delete the text of this Subsection and substitute the following:

Protect and care for seeded area until final acceptance.

Revised by Amendment A004