IFB_Book 2_SalmonRv.pdf

PDF 4 MB Posted

Attached to
RECOVERY - ID PFH 60(5), Salmon River Road Connection/Extension
Solicitation number
DTFH70-10-B-00015
Issued by

About this file

Solicitation Book 2

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BIDS

Solicitation No. DTFH70-10-B-00015

ID PFH 60(5)

SALMON RIVER ROAD CONNECTION/EXTENSION BOOK 2

Solicitation, Offer & Award, Bid Schedule, Contract Clauses, Minimum Wage Schedule, Special Contract Requirements, and Plans

This solicitation cites

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 Metric Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

610 EAST FIFTH STREET

VANCOUVER, WA 98661-3801

Phone: (360) 619-7520 – FAX: (360) 619-7932

Web site: http://www.wfl.fhwa.dot.gov/contracting/ e-mail : wfl.contracts@dot.gov

Bid Opening Date:

See Page A-3, Block 13A

QUICK INDEX

Page Item

H-1 Permits

BID REMINDERS

Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:

• Have you rechecked your bid figures?

• Have you completed the bid schedule?

• Have you completed and signed the SF 1442, Solicitation, Offer & Award?

• Have you acknowledged all amendments?

• Have you completed the Representations &

Certifications (Page B-1)?

• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?

• Does the lower left corner of the proposal envelope state “Bid Enclosed”?

• Does the lower left corner include the Solicitation Number and the project number/name?

A-1 Notice to Bidders http://www.wfl.fhwa.dot.gov/contracting/� mailto:wfl.contracts@fhwa.dot.gov�

PROJECT NAME ID PFH 60(5)

SALMON RIVER ROAD CONNECTION/EXTENSION

BEGINNING AT 1+380.00, MP 0.236

SUSPEND AT 3+200.00, MP 1.367

RESUME AT 11+617.81, MP 6.598

END AT 18+080.00, MP 10.613

NATIONAL FOREST NEZ PERCE

COUNTY IDAHO

STATE IDAHO

LENGTH 8.282 KILOMETERS

FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)

PERMITS

INDEX

Environmental Protection Agency

NOI Waiting Period End Confirmation IDR10C389.....................................H-3

National Pollutant Discharge Elimination System (NPDES), Electronic Notice of Intent (NOI), Construction General Permit (CGP) Confirmation ..................................................................................................H-5

Federal Register, EPA Modification to 2008 NPDES General Permit for Stormwater Discharges Assocated with Construction Activities ..................H-7

NPDES General Permit for Stormwater Discharges From Construction Activities, As modified effective January 8, 2009 ........................................H-8

Department of the Army, Corps of Engineers

NWW Number 040600044 (May 28, 2009) Authorization...........................H-95

Construction Drawings ..................................................................................H-99

Nationwide Permit 13 Conditions..................................................................H-145

Nationwide Permit 14 Conditions..................................................................H-146

Nationwide Permit 33 Conditions..................................................................H-147

Water Quality Certification............................................................................H-148

General Conditions ........................................................................................H-148

Compliance Certification...............................................................................H-158

Idaho Department of Environmental Quality Water Quality Certification for NWW Number 040600044 (June 7, 2009).................................................................................................H-159

General Conditions ........................................................................................H-159

Special Conditions .........................................................................................H-160

H-1

Permits Project: ID PFH 60(5), Salmon River Road Connection/Extension

(This page intentionally left blank.)

H-2

H-3

H-4

H-5

H-6

H-7

H-8

H-9

H-10

H-11

H-12

H-13

H-14

H-15

H-16

H-17

H-18

H-19

H-20

H-21

H-22

H-23

H-24

H-25

H-26

H-27

H-28

H-29

H-30

H-31

H-32

H-33

H-34

H-35

H-36

H-37

H-38

H-39

H-40

H-41

H-42

H-43

H-44

H-45

H-46

H-47

H-48

H-49

H-50

H-51

H-52

H-53

H-54

H-55

H-56

H-57

H-58

H-59

H-60

H-61

H-62

H-63

H-64

H-65

H-66

H-67

H-68

H-69

H-70

H-71

H-72

H-73

H-74

H-75

H-76

H-77

H-78

H-79

H-80

H-81

H-82

H-83

H-84

H-85

H-86

H-87

H-88

H-89

H-90

H-91

H-92

H-93

H-94

H-95

H-96

H-97

H-98

CovrBook 2_IFB_SalmonRvr.pdf
INVITATION FOR BIDS
Solicitation No. DTFH70-10-B-00015
Standard Specifications for Construction of Roads and Bridges
e-mail : wfl.contracts@dot.gov
COUNTY IDAHO
STATE IDAHO
FIXED COMPLETION DATE See FAR Clause 52.211-10
QUICK INDEX
Page Item
BID REMINDERS

A-1 Notice to Bidders

File details come from the government source that posted it. Updated .