IFB_Book 2_SalmonRv.pdf
PDF 4 MB Posted
- Solicitation number
- DTFH70-10-B-00015
About this file
Solicitation Book 2
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BIDS
Solicitation No. DTFH70-10-B-00015
ID PFH 60(5)
SALMON RIVER ROAD CONNECTION/EXTENSION BOOK 2
Solicitation, Offer & Award, Bid Schedule, Contract Clauses, Minimum Wage Schedule, Special Contract Requirements, and Plans
This solicitation cites
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 Metric Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
610 EAST FIFTH STREET
VANCOUVER, WA 98661-3801
Phone: (360) 619-7520 – FAX: (360) 619-7932
Web site: http://www.wfl.fhwa.dot.gov/contracting/ e-mail : wfl.contracts@dot.gov
Bid Opening Date:
See Page A-3, Block 13A
QUICK INDEX
Page Item
H-1 Permits
BID REMINDERS
Electronic bids will not be accepted. Submit printed copy of bid to the address listed on the enclosed SF 1442. Before submitting your bid, please review the following:
• Have you rechecked your bid figures?
• Have you completed the bid schedule?
• Have you completed and signed the SF 1442, Solicitation, Offer & Award?
• Have you acknowledged all amendments?
• Have you completed the Representations &
Certifications (Page B-1)?
• Is your bid guarantee enclosed in proper form and amount (see FAR Clause 52.228-1), including Power of Attorney affidavit?
• Does the lower left corner of the proposal envelope state “Bid Enclosed”?
• Does the lower left corner include the Solicitation Number and the project number/name?
A-1 Notice to Bidders http://www.wfl.fhwa.dot.gov/contracting/� mailto:wfl.contracts@fhwa.dot.gov�
PROJECT NAME ID PFH 60(5)
SALMON RIVER ROAD CONNECTION/EXTENSION
BEGINNING AT 1+380.00, MP 0.236
SUSPEND AT 3+200.00, MP 1.367
RESUME AT 11+617.81, MP 6.598
END AT 18+080.00, MP 10.613
NATIONAL FOREST NEZ PERCE
COUNTY IDAHO
STATE IDAHO
LENGTH 8.282 KILOMETERS
FIXED COMPLETION DATE See FAR Clause 52.211-10 (FAR Clauses begin on page C-1)
PERMITS
INDEX
Environmental Protection Agency
NOI Waiting Period End Confirmation IDR10C389.....................................H-3
National Pollutant Discharge Elimination System (NPDES), Electronic Notice of Intent (NOI), Construction General Permit (CGP) Confirmation ..................................................................................................H-5
Federal Register, EPA Modification to 2008 NPDES General Permit for Stormwater Discharges Assocated with Construction Activities ..................H-7
NPDES General Permit for Stormwater Discharges From Construction Activities, As modified effective January 8, 2009 ........................................H-8
Department of the Army, Corps of Engineers
NWW Number 040600044 (May 28, 2009) Authorization...........................H-95
Construction Drawings ..................................................................................H-99
Nationwide Permit 13 Conditions..................................................................H-145
Nationwide Permit 14 Conditions..................................................................H-146
Nationwide Permit 33 Conditions..................................................................H-147
Water Quality Certification............................................................................H-148
General Conditions ........................................................................................H-148
Compliance Certification...............................................................................H-158
Idaho Department of Environmental Quality Water Quality Certification for NWW Number 040600044 (June 7, 2009).................................................................................................H-159
General Conditions ........................................................................................H-159
Special Conditions .........................................................................................H-160
H-1
Permits Project: ID PFH 60(5), Salmon River Road Connection/Extension
(This page intentionally left blank.)
H-2
H-3
H-4
H-5
H-6
H-7
H-8
H-9
H-10
H-11
H-12
H-13
H-14
H-15
H-16
H-17
H-18
H-19
H-20
H-21
H-22
H-23
H-24
H-25
H-26
H-27
H-28
H-29
H-30
H-31
H-32
H-33
H-34
H-35
H-36
H-37
H-38
H-39
H-40
H-41
H-42
H-43
H-44
H-45
H-46
H-47
H-48
H-49
H-50
H-51
H-52
H-53
H-54
H-55
H-56
H-57
H-58
H-59
H-60
H-61
H-62
H-63
H-64
H-65
H-66
H-67
H-68
H-69
H-70
H-71
H-72
H-73
H-74
H-75
H-76
H-77
H-78
H-79
H-80
H-81
H-82
H-83
H-84
H-85
H-86
H-87
H-88
H-89
H-90
H-91
H-92
H-93
H-94
H-95
H-96
H-97
H-98
| CovrBook 2_IFB_SalmonRvr.pdf |
| INVITATION FOR BIDS |
| Solicitation No. DTFH70-10-B-00015 |
| Standard Specifications for Construction of Roads and Bridges |
| e-mail : wfl.contracts@dot.gov |
| COUNTY IDAHO |
| STATE IDAHO |
| FIXED COMPLETION DATE See FAR Clause 52.211-10 |
| QUICK INDEX |
| Page Item |
| BID REMINDERS |
A-1 Notice to Bidders
File details come from the government source that posted it. Updated .