| A005 _Rainier_.pdf | ||
| A004_Rainier.pdf | ||
| WA 2009-1 NPS MORA Rt 013 | — | |
| P1300051.jpg | JPG image | |
| WA 2009-1 NPS MORA Rt 013 | — | |
| P1300055.jpg | JPG image | |
| WA 2009-1 NPS MORA Rt 013 | — | |
| P1300059.jpg | JPG image | |
| Amendment A003 | — | |
| Amendment A002 | — | |
| Plans Req form _Rainier_.pdf | ||
| A001_Rainier.pdf | ||
| RFP_Rainier.pdf | ||
| FBO Synopsis | — |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
/s/ Robert B. Lale 3/27/09
/s/ Roger Andrascik 3/27/09
/s/ Jonathan B. Jarvis 3/30/09
PLAN SHEET SECTION -------->> Nisqually Stevens
Paradise Canyon MP
MP 12.3 14.1 BID
ITEM DESCRIPTION UNIT PLAN SCHEDULE
15101-0000 MOBILIZATION LPSM ALL ALL
15214-0000 SURVEY AND STAKING, MISCELLANEOUS LPSM ALL ALL
15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL ALL
15501-0000 CONSTRUCTION SCHEDULE LPSM ALL ALL
15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 100 200 300 300
15705-1500 SOIL EROSION CONTROL, SEDIMENT WATTLE LNFT 140 180 320 320
20102-0000 CLEARING AND GRUBBING LPSM ALL ALL
20411-0000 SELECT BORROW TON 385 700 1085 1,085
20701-0700 EARTHWORK GEOTEXTILE, TYPE II-A SQYD 1970 3000 4970 4,970
25202-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED TON 3500 8800 12300 12,300
30802-1000 ROADWAY AGGREGATE, METHOD 1 TON 40 117 157 157
40401-0000 MINOR HOT ASPHALT CONCRETE TON 82 104 186 186
41202-1000 TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H GAL 76 96 172 172
62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40 40 80 80
62201-0700 BACKHOE LOADER, 1 CUBIC YARD MINIMUM CAPACITY
FRONTEND BUCKET, 10 CUBIC FOOT MINIMUM CAPACITY
BACKHOE BUCKET, 90 HP HOUR 40 40 80 80
62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC
YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 40 40 80 80
62201-4150 POWER TOOL, SAW, CHAIN, GASOLINE POWERED, 2
FOOT BAR LENGTH (WITHOUT OPERATOR) HOUR 10 10 20 20
62301-0000 GENERAL LABOR HOUR 40 40 80 80
62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.3 0.3 0.3
62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.3 0.3 0.3
62520-0000 FERTILIZER ACRE 0.3 0.3 0.3
62641-0000 TREE WELL EACH 4 4 4
63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 560 720 1280 1,280
63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN LNFT 280 360 640 640
63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 2 2 2
63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 46 46 92 92
ESTIMATED QUANTITIES
SUMMARY OF QUANTITIES
STATE PROJECT
NPS ERFO 2009(1)-42(2) B.1WA
C m yf ile s\ p w p ro d u ct io n \d m s4
S u m m ar y.
xl s] S h ee t -M ar -2
:0
R
M ea d ow s
D
C h ec ke r
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
PLAN SHEET SECTION -------->> Nisqually Stevens
Paradise Canyon MP
MP 12.3 14.1 BID
ITEM DESCRIPTION UNIT PLAN SCHEDULE
63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4 4
63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 250 470 720 720
63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 100 200 300 300
63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 131 120 251 251
63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1600 200 1800 1,800
63506-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY
SUPERVISOR HOUR 280 20 300 300
ESTIMATED QUANTITIES
SUMMARY OF QUANTITIES
STATE PROJECT
NPS ERFO 2009(1)-42(2) B.2WA
C m yf ile s\ p w p ro d u ct io n \d m s4
S u m m ar y.
xl s] S h ee t (2
-M ar -2
:0
R
M ea d ow s
D
C h ec ke r
D es ig n ed b y:
C h ec ke d b y:
NUMBER
SHEET
File details come from the government source that posted it. Updated .