A004_Rainier.pdf

PDF 24 KB Posted

Attached to
WA NPS ERFO 2009(1)-42(2), Mount Rainier Emergency Repairs
Solicitation number
DTFH70-09-R-00019
Issued by

About this file

Amendment A004

View the file

Other files

File Type Posted
A005 _Rainier_.pdf PDF
WA 2009-1 NPS MORA Rt 013 —
P1300051.jpg JPG image
WA 2009-1 NPS MORA Rt 013 —
P1300055.jpg JPG image
WA 2009-1 NPS MORA Rt 013 —
P1300059.jpg JPG image
Amendment A003 —
Amendment A002 —
Plans Req form _Rainier_.pdf PDF
A001_Rainier.pdf PDF
Mt Rainier ERFO Complete Plans.pdf PDF
RFP_Rainier.pdf PDF
FBO Synopsis —
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A004 05/11/09 N/A WA NPS ERFO 2009(1)-42(2)

Mount Rainier Emergency Repairs

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-09-R-00019

9B. DATED (SEE ITEM 11)

April 10, 2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( X ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WA NPS ERFO 2009(1)-42(2), Mount Rainier Emergency Repairs

See Page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A004, dated 5/11/2009 Project No WA NPS ERFO 2009(1)-42(2) Solicitation No. DTFH70-09-R-00019 Project Name Mount Rainier Emergency Repairs

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)

Page A-3, Block 13A. Re-establishes the proposal due date of 5/20/2009

The amount of snowfall in the area of the Stevens Canyon Road site has delayed the snowplow operations and has covered the slide area limiting a detailed viewing of the site.

To facilitate a view of the work, the photographs taken immediately following the slide are attached.

The proposal due date will no longer be further delayed in an attempt to facilitate a site visit prior to the proposal due date. The Nisqually site has been and continues to be accessible for viewing.

The anticipated work at both sites is similar in nature with the Stevens Canyon Road site being larger in quantity as indicated on the Estimated Quantities plan sheets (B-1 and B-2).

Offeror’s may contact the Mount Rainier NP representative; Eric Walkinshaw, Park Engineer,

(360) 569-2166 to ascertain accessibility, however, access prior to the proposal due date and time is not guaranteed.

ENCLOSURES

Photos:

WA 2009-1 NPS MORA Rt 013 (Aerial).jpg WA 2009-1 NPS MORA Rt 013 (downhill).jpg WA 2009-1 NPS MORA Rt 013 (uphill).jpg P1300051.jpg P1300055.jpg P1300059.jp

Proposal Due date: 05/20/2009

File details come from the government source that posted it. Updated .