AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 05/04/09 N/A WA NPS ERFO 2009(1)-42(2)
Mount Rainier Emergency Repairs
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
DTFH70-09-R-00019
9B. DATED (SEE ITEM 11)
April 10, 2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( XX ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA NPS ERFO 2009(1)-42(2), Mount Rainier Emergency Repairs
See page 2 for revisions
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated 5/4/09 WA NPS ERFO 2009(1)-42(2) Solicitation No. DTFH70-09-R-00019 Mount Rainier Emergency Repairs
REVISIONS ARE AS FOLLOWS:
NOTICE TO BIDDERS
Page A-1 Revises site visit date
SPECIAL CONTRACT REQUIREMENTS
Page E-7 105.02 Material Sources (b) adds information
ENCLOSURES
Pages:
A-1 E-7
A-1
Notice to Offeror Project: WA NPS ERFO 2009(1)-42(2), Mount Rainier Emergency Repairs
03USC02/25/09
NOTICE TO OFFEROR
I. Project Location.
The project work is located inside of the Mount Rainier National Park. The two project locations are located (1) on the Nisqually-Paradise Road at MP 12.3 (Glacier Hill) and (2) on the Stevens Canyon Road at MP 14.1.
Signs have not been erected to identify the project limits.
Arrangements may be made with Government personnel to review the project site. Contact Eric Walkinshaw at phone number (360) 569-2166 prior to the trip. Meet park staff at the Stevens Canyon Entrance Station at 1:00 PM on 05/5/09 and 05/7/09.
Site access scheduled for 5/05/2009 is cancelled.
Site access scheduled for 5/07/2009 will be accomplished by meeting the park staff at the Longmire (Macy Dorm) at 1 PM. Longmire is at Milepost 6.2 along the Nisqually-Paradise Road. First stop is Glacier Hill and then to the Stevens Canyon site.
II. Pre-bid Information.
Requests for technical information (Plan and Division 100 –700 Specification questions only) about this project will only be accepted in writing (see Block 9 on page A-5).
REPS & CERTS. Submit or update Representations and Certifications online at http://orca.bpn.gov prior to bid submittal. For more details go to FAR Provision 52.204-8 Annual Representations and Certifications (see page B-2). If you have previously registered on-line and the NAICS code for this solicitation is different than the code listed in your online file, please note the amended changes on the lines provided in FAR 52.204-8.
Joint Venture Agreements are allowable on competitive 8(a) set-asides. However, the joint venture agreement must be received by SBA before the proposal due date and approved before contract award. If you are contemplating a joint venture on this project, you must advise your assigned Business Opportunity Specialist (BOS) as soon as practicable to ensure compliance with established regulations.
Any corrections and/or changes needed can be made only when your BOS has adequate time for a thorough review before the proposal due date. NO CORRECTIONS OR CHANGES ARE ALLOWED
AFTER TIME OF SUBMISSION OF PROPOSAL OR BIDS.
Revised by Amendment A001
Revised by Amendment A002
TECHNICAL QUESTIONS REGARDING PROPOSED WORK FOR THIS
PROJECT WILL NOT BE ACCEPTED AFTER THE CLOSE-OF-BUSINESS ON
May 15, 2009.
Questions can be submitted and answers viewed by going to project information at http://www.wfl.fha.dot.gov/edi/current.htm
E-7
Special Contract Requirements Project: WA NPS ERFO 2009(1)-42(2), Mount Rainier Emergency Repairs
03USC04/04/08
Section 105.— CONTROL OF MATERIAL
105.02 Material Sources. Amend as follows:
(a) Government-provided sources. Delete the text of this subsection and substitute the following:
There are no Government-provided sources for this project.
(b) Contractor-located sources. Add the following:
Comply with the requirements of Subsection 107.10.
Use only commercial or other sources located outside the Park boundary. Sources on private “in-holder” lands within the Park boundaries will not be permitted.
Quarry subsurface material, that has not been exposed to weed sources, may be acceptable upon inspection by the Park. Park will inspect and approve all proposed material sources before use or transport to the Park. Notify the CO at least 7 working days in advance, to allow for park inspection of proposed source.
The following sources have been found to be weed-free in past projects, but still require Park approval for weed free. Other sources may be available as well and also require Park approval for weed free.
Glacier Northwest, White River Enumclaw, WA
Randles Sand and Gravel, Lynch Creek Quarry Eatonville, WA
105.04 Storing and Handling Material. Add the following:
Use one lane of the existing road and existing turnouts for staging areas, for storage of materials such as geotextile fabric; and for equipment parking. Confine use to the limits of existing disturbance. Repair and restore the staging areas to their original condition.
In areas where there is only one lane of the existing road remaining, stage equipment and materials so that administrative vehicles have access through the site.
Revised by Amendment A002
Other files
| File | Type | Posted |
|---|---|---|
| A005 _Rainier_.pdf | ||
| A004_Rainier.pdf | ||
| WA 2009-1 NPS MORA Rt 013 | — | |
| P1300051.jpg | JPG image | |
| WA 2009-1 NPS MORA Rt 013 | — | |
| P1300055.jpg | JPG image | |
| WA 2009-1 NPS MORA Rt 013 | — | |
| P1300059.jpg | JPG image | |
| Amendment A003 | — | |
| Plans Req form _Rainier_.pdf | ||
| A001_Rainier.pdf | ||
| Mt Rainier ERFO Complete Plans.pdf | ||
| RFP_Rainier.pdf | ||
| FBO Synopsis | — |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .