Task Order Project No/Name: AK PFH 44(7) USFS 3030 Road Clean-up located in the Tongass National Forest, Prince of Wales Island, Alaska
General: This work will be solicited simultaneously with the Coffman Cove IDIQ.
This project is considered a Task Order Request for Proposal (TO-RFP) and will be used to obtain price competition for the IDIQ.
The work under this task order consists of excavation, drainage, and grading. This work also includes the replacement of a 21 meter long, 2.4 meter diameter pipe culvert, the construction of a 0.28 hectare offsite waste area, and other smaller items of work.
Project length: Multiple sites along a 7 kilometer corridor.
Fixed Completion Date: November 24, 2009
Estimated Price Range: $2 million to $3 million
Location: 5 kilometers southwest of Coffman Cove, Alaska
DESCRIPTION OF WORK in METRIC UNITS
DIVISION 150 – Project Requirements x YES NO 152 Construction Survey & Staking Miscellaneous (two man crew) 40.0 hours
153 Contractor Quality Control and Assurance YES x NO 154 Contractor Sampling & Testing YES x NO 155 Schedules for Construction Contracts (construction schedules) x YES NO 157 Soil Erosion Control Devices (erosion control devices)
Temporary diversion channel Silt fence Sediment wattle
All, lpsm
375.0 m
55.0 m
158 Watering for Dust Control 900 m3
DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition)
Removal of pavement, asphalt 1,850 m2 204 Excavation & Embankment
Roadway excavation (unsuitable material) Roadway excavation (shot rock)
1,000.0 m3 21,000.0 m3
Task Order Project No/Name: AK PFH 44(7) USFS 3030 Road Clean-up located in the Tongass National Forest, Prince of Wales Island, Alaska
DIVISION 250 - Slope Reinforcement and Retaining Walls 251 Riprap
Placed riprap, class 4 (riprap headwall)
37.8 m3
DIVISION 300 – Aggregate Courses 303 Road Reconditioning
Aggregate surface reconditioning, (remove and replace)
220.0 m
308 Roadway aggregate, method 1 11,500.0 m3 311 Stockpiled aggregate
Stockpiled aggregate (permeable backfill) Stockpiled aggregate (crushed aggregate)
10,000.0 m3 3,500.0 m3
DIVISION 600 – Incidental Construction 602 Culverts & Drains (indicate one or both)
450mm pipe culvert 600mm pipe culvert 2400mm pipe culvert
16.0 m
41.0 m
21.0 m
621 Monuments & Markers (construction survey & staking) YES x NO 622 Rental Equipment x YES NO 623 General labor 40.0 hours 625 Turf Establishment (indicate seeding or mulching separately) 80.00 slurry units 633 Permanent Traffic Control Devices (traffic control devices)
Sign system
1.75 m2
635 Temporary Traffic Control (traffic control – flaggers & pilot cars) Barricade type 2 Barricade type 3 Cone, type 700mm Warning light type A Warning light type C
22 each 4 each 80 each 12 each 10 each
Flagger: Hours: 960.0 Pilot Car: Hours:
637 Facilities & Services (field offices, laboratories, & housing)
Vehicle 2 each 646 Buildings and Fixtures (use pay item description)
Roadside development, (waste area) All, lpsm