Q-A _revised_9-14-15.pdf
PDF 105 KB Posted
- Solicitation number
- DTFH6815B00019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bid_tabs.pdf | ||
| Bid_Opening_Summary_-_CO_FLAP_1099(1).pdf | ||
| Q-A _revised_9-23-15.pdf | ||
| A003.pdf | ||
| Q-A _revised_9-21-15.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| DTFH6815B00019.pdf | ||
| Lake_Pueblo_FINAL_Geotechnical-Pavement_Report.pdf | ||
| Lake_Pueblo_XSections_FINAL_Clean.pdf | ||
| Lake_Pueblo_FINAL_Hydraulics_Report.pdf | ||
| Lake_Pueblo_PLANS_FINAL_stamped.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTFH6815B00019 Revised 9/14/15
CO FLAP 1099(1)
LAKE PUEBLO ROAD & TRAIL IMPROVEMENTS
9/14/15
QUESTION #1
Regarding Line item A1520, Pay item number 50101-2500., Minor Concrete Pavement Plain, 5 inch Depth: Specification section 501 makes reference to …”when required” ….regarding pavement reinforcement, and plan sheets K1,R1 & R2 do not indicate any reinforcement in the concrete pavement, however, Standard plan Sheets 501-1 and 501-2 indicate the possibility of reinforcement and dowel bars in this pavement. Is reinforcement and doweling required in this 5 inch pavement, and if so what are the reinforcement details?
Response: This pay item does not require reinforcement or dowels. Standard plan sheets 501-1 and 501- 2 are not included in the plans and do not apply.
QUESTION #2
Project spec calls for an H-10 VL, Drawings call for an H-5 VL. Which is correct?
Response: See amendment A001.
QUESTION #3
Each bridge has a grade. Are the interior verticals to be installed perpendicular to the bottom chord or plumb to the horizon?
Response: Install verticals perpendicular to the bottom chord.
Each bridge has a grade. Are the interior verticals to be installed perpendicular to the bottom chord or plumb to the horizon?