NOTICE TO BIDDERS
A-i
NOTE TO LARGE BUSINESSES:
Due to the compressed schedule for award of this project following the bid opening, large businesses are required to submit their completed small business subcontracting plan with their bid. Failure to submit a subcontracting plan may deem your bid non-responsive.
A sample of a subcontracting plan is included as Appendix A in this solicitation.
• Prior to development of this subcontracting plan, please read FAR Clause 52.219-
9 – Small Business Subcontracting Plan (APR 2008).
• It is the Prime Contractor’s responsibility to ensure that all small business concerns included in this subcontracting plan are eligible. The System for Award Management (SAM) is the only source for certification of Small Disadvantaged Business and HUBZone Small Business concerns.
• Prime Contractors are encouraged to post sources sought notices for subcontracting opportunities on http://web.sba.gov/subnet/ Small businesses can review this web site to identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Please submit the following with your bid:
Submit the following documents with your Bid Package–
• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2.
• Bid Schedule including Buy America Act & Hazardous Materials, Pages A-6 through A-30.
• Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.
• Completed VETS 100, Page A-ii; Bidder’s Qualifications, Pages B-3 through B-6; Annual Representations and Certifications (FAR 52.204-8), Pages B-7 through B-12 and Certification Regarding Responsibility Matters (FAR 52.209-5), Pages B-12 through B-15.
Bidders should retain all other pages for their information. Bids should be submitted in a sealed envelope and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
Amendment A002, 9/21/15 http://web.sba.gov/subnet/
A-5
Bidders must also provide a stand-alone price on the bottom of Pages A-15 (Schedule A), A-21 (Option X), A-24 (Option Y) and A-27 (Option Z) for the alternative item, Contractor Testing using a Government-furnished field laboratory. This price will not be factored into the evaluation for award. The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.
Joe.Wilson
A - 6
Contract Quantity Pay Items
20301-0400 REMOVAL OF BRIDGE
20302-0150 REMOVAL OF BRIDGE RAILING
20302-2500 REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
20303-0200 REMOVAL OF BRIDGE DECK (FULL DEPTH)
20801-0000 STRUCTURE EXCAVATION
20803-0000 STRUCTURAL BACKFILL
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55401-2000 REINFORCING STEEL, EPOXY COATED
55504-0000 PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
55504-0000 PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
55601-0500 BRIDGE RAILING, CONCRETE
56001-0000 REMOVAL OF CONCRETE BY HYDRODEMOLITION
63610-2300 CONDUIT, 3-INCH, RIGID GALVANIZED STEEL
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A1010 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
2.400 MILE $____________ $____________
A1020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
11.750 MILE $____________ $____________
A1030 15214-1000 SURVEY AND STAKING, BRIDGE
ALL LPSM $___LPSM_____ $____________
A1040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
18 EACH $____________ $____________
A1050 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
4.790 MILE $____________ $____________
A1060 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A1070 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A1080 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
A - 7
A1090 15705-0100 SOIL EROSION CONTROL, SILT FENCE
11,000 LNFT $____________ $____________
A1100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
7,900 LNFT $____________ $____________
A1110 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL)
50 EACH $____________ $____________
A1120 15706-0200 SOIL EROSION CONTROL, CHECK DAM (GRAVEL BAG)
6 EACH $____________ $____________
A1130 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
2 EACH $____________ $____________
A1140 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
(TURNAROUND)
15 EACH $____________ $____________
A1150 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A1160 20101-0000 CLEARING AND GRUBBING
30.0 ACRE $____________ $____________
A1170 20301-0100 REMOVAL OF BOLLARD
49 EACH $____________ $____________
A1180 20301-0400 REMOVAL OF BRIDGE
1 EACH $____________ $____________
A1190 20301-2000 REMOVAL OF PIPE END SECTION
2 EACH $____________ $____________
A1200 20301-2400 REMOVAL OF SIGN
48 EACH $____________ $____________
A1210 20302-0150 REMOVAL OF BRIDGE RAILING
205 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
A - 8
A1220 20302-0500 REMOVAL OF CURB, CONCRETE
115 LNFT $____________ $____________
A1230 20302-1000 REMOVAL OF FENCE, RAIL
500 LNFT $____________ $____________
A1240 20302-1200 REMOVAL OF GUARDRAIL
7,810 LNFT $____________ $____________
A1250 20302-2500 REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
230 LNFT $____________ $____________
A1260 20303-0200 REMOVAL OF BRIDGE DECK (FULL DEPTH)
90 SQYD $____________ $____________
A1270 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
1,700 SQYD $____________ $____________
A1280 20303-1900 REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH
230 SQYD $____________ $____________
A1290 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ALL LPSM $___LPSM_____ $____________
A1300 20401-0000 ROADWAY EXCAVATION
10,200 CUYD $____________ $____________
A1310 20425-1000 DITCH, EXCAVATION
220 LNFT $____________ $____________
A1320 20435-1000 BACKFILL, SELECT GRANULAR
2,930 CUYD $____________ $____________
A1330 20801-0000 STRUCTURE EXCAVATION
450 CUYD $____________ $____________
A1340 20803-0000 STRUCTURAL BACKFILL
450 CUYD $____________ $____________
A1350 21101-2000 ROADWAY OBLITERATION, METHOD 2
2,270 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
A - 9
A1360 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
45 CUYD $____________ $____________
A1370 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
55 CUYD $____________ $____________
A1380 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
365 CUYD $____________ $____________
A1390 30202-2000 ROADWAY AGGREGATE, METHOD 2
31,070 TON $____________ $____________
A1400 30302-1000 DITCH RECONDITIONING
1,050 LNFT $____________ $____________
A1410 30402-5100 FULL DEPTH RECLAMATION, METHOD 2, 3-INCH DEPTH
5,030 SQYD $____________ $____________
A1420 30402-5200 FULL DEPTH RECLAMATION, METHOD 2, 4-INCH DEPTH
30,000 SQYD $____________ $____________
A1430 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
56,000 SQYD $____________ $____________
A1440 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
16,200 TON $____________ $____________
A1460 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
160 TON $____________ $____________
A1480 40601-0000 FOG SEAL
26 TON $____________ $____________
A1490 41102-1000 PRIME COAT, METHOD 1
59,550 SQYD $____________ $____________
A1500 41105-0000 BLOTTER
55 TON $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
A - 10
A1510 41201-0000 TACK COAT
26 TON $____________ $____________
A1520 50101-2500 MINOR CONCRETE PAVEMENT, PLAIN, 5-INCH DEPTH
52,200 SQYD $____________ $____________
A1530 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
105 CUYD $____________ $____________
A1540 55401-2000 REINFORCING STEEL, EPOXY COATED
12,410 LB $____________ $____________
A1550 55504-0000 PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
ALL LPSM $___LPSM_____ $____________
A1560 55504-0000 PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
ALL LPSM $___LPSM_____ $____________
A1570 55601-0500 BRIDGE RAILING, CONCRETE
230 LNFT $____________ $____________
A1580 56001-0000 REMOVAL OF CONCRETE BY HYDRODEMOLITION
35 SQYD $____________ $____________
A1590 60101-0000 CONCRETE (ISLAND)
64 CUYD $____________ $____________
A1600 60201-0400 12-INCH PIPE CULVERT
50 LNFT $____________ $____________
A1610 60201-0600 18-INCH PIPE CULVERT
240 LNFT $____________ $____________
A1620 60201-0800 24-INCH PIPE CULVERT
65 LNFT $____________ $____________
A1630 60201-1000 36-INCH PIPE CULVERT
8 LNFT $____________ $____________
A1640 60201-1200 48-INCH PIPE CULVERT
8 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
A - 11
A1650 60210-0400 END SECTION FOR 12-INCH PIPE CULVERT
4 EACH $____________ $____________
A1660 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
16 EACH $____________ $____________
A1670 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
4 EACH $____________ $____________
A1680 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
1 EACH $____________ $____________
A1690 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT
1 EACH $____________ $____________
A1700 60404-1000 CATCH BASIN, FLH TYPE 1
2 EACH $____________ $____________
A1710 60412-2000 REMOVE AND RESET MANHOLE FRAME AND COVER
3 EACH $____________ $____________
A1720 60704-0000 CLEANING CULVERT IN PLACE
4 EACH $____________ $____________
A1730 60901-8000 CURB, TIMBER
150 LNFT $____________ $____________
A1740 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (24" CATCH PAN)
4,810 LNFT $____________ $____________
A1750 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (12" SPILL PAN)
135 LNFT $____________ $____________
A1760 60920-0000 RESET WHEELSTOP
22 EACH $____________ $____________
A1770 61108-1000 ADJUST WATER VALVE
2 EACH $____________ $____________
A1780 61503-5000 MEDIAN, STONE (12" DEPTH)
240 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
A - 12
A1790 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
6,000 LNFT $____________ $____________
A1800 61702-0600 TERMINAL SECTION, TYPE FLARED
26 EACH $____________ $____________
A1810 61707-0000 STRUCTURE TRANSITION RAILING (TYPE 3G)
43 LNFT $____________ $____________
A1820 61707-0000 STRUCTURE TRANSITION RAILING (TYPE 3G ANCHORED)
43 LNFT $____________ $____________
A1830 61904-0000 BOLLARD POST (REMOVABLE)
32 EACH $____________ $____________
A1840 61904-0000 BOLLARD POST
64 EACH $____________ $____________
A1850 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
80 HOUR $____________ $____________
A1860 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
80 HOUR $____________ $____________
A1870 62201-2050 ROLLER
60 HOUR $____________ $____________
A1880 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
60 HOUR $____________ $____________
A1890 62201-3200 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD MINIMUM
CAPACITY
40 HOUR $____________ $____________
A1900 62301-0000 GENERAL LABOR
120 HOUR $____________ $____________
A1910 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
40 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
A - 13
A1920 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
A1930 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
98,900 SQYD $____________ $____________
A1940 62510-2000 SEEDING, HYDRAULIC METHOD
20.0 ACRE $____________ $____________
A1950 62515-2000 MULCHING, HYDRAULIC METHOD
20.0 ACRE $____________ $____________
A1960 62901-0300 ROLLED EROSION CONTROL PRODUCT, TYPE 1.C
8,500 SQYD $____________ $____________
A1970 63301-0000 SIGN SYSTEM
85 EACH $____________ $____________
A1980 63309-0100 DELINEATOR, TYPE 1
270 EACH $____________ $____________
A1990 63313-0000 RUMBLE STRIP
1,850 LNFT $____________ $____________
A2000 63313-1000 RUMBLE STRIP, SHOULDER
3,030 LNFT $____________ $____________
A2010 63316-1000 REMOVE AND RESET SIGN
23 EACH $____________ $____________
A2020 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
68,950 LNFT $____________ $____________
A2030 63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN
1,960 LNFT $____________ $____________
A2040 63403-0400 PAVEMENT MARKINGS, TYPE D
1,600 SQFT $____________ $____________
A2050 63405-1300 PAVEMENT MARKINGS, TYPE D, TURN ARROW
4 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
A - 14
A2060 63405-1500 PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE
14 EACH $____________ $____________
A2070 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
2 EACH $____________ $____________
A2080 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
4 EACH $____________ $____________
A2090 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
150 EACH $____________ $____________
A2100 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
100 EACH $____________ $____________
A2110 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
2 EACH $____________ $____________
A2120 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
2 EACH $____________ $____________
A2130 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
2 EACH $____________ $____________
A2140 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A2150 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER (STRUCTURE
MOUNTED)
200 LNFT $____________ $____________
A2160 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
250 LNFT $____________ $____________
A2170 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
67,500 LNFT $____________ $____________
A2180 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
650.0 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
A - 15
A2190 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,200 HOUR $____________ $____________
A2200 63610-2300 CONDUIT, 3-INCH, RIGID GALVANIZED STEEL
230 LNFT $____________ $____________
A2210 63621-2000 UTILITY BOX, TELEPHONE PULLBOX
2 EACH $____________ $____________
A2220 64604-3000 FIXTURE, PEDESTRIAN RAILING
670 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Amendment A002, 9/21/15
Joe.Wilson Typewritten Text
A1070 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
A - 16
Contract Quantity Pay Items
20302-2500 REMOVAL OF HANDRAIL (STEEL GUARDRAIL)
20302-2500 REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55401-2000 REINFORCING STEEL, EPOXY COATED
61901-1300 FENCE, CHAIN LINK
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
X1000 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X1010 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
0.160 MILE $____________ $____________
X1020 15210-3000 CENTERLINE, VERIFICATION AND STAKING
1.250 MILE $____________ $____________
X1030 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
0.310 MILE $____________ $____________
X1040 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X1050 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X1060 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X1070 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
125 LNFT $____________ $____________
X1080 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
X1090 20102-0000 CLEARING AND GRUBBING
ALL LPSM $___LPSM_____ $____________
X1100 20301-2000 REMOVAL OF PIPE END SECTION
1 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP 1099(1)
A - 17
X1110 20301-2400 REMOVAL OF SIGN
17 EACH $____________ $____________
X1120 20302-0400 REMOVAL OF CURB, ASPHALT
510 LNFT $____________ $____________
X1130 20302-0500 REMOVAL OF CURB, CONCRETE
30 LNFT $____________ $____________
X1140 20302-1200 REMOVAL OF GUARDRAIL
570 LNFT $____________ $____________
X1150 20302-2500 REMOVAL OF HANDRAIL (STEEL GUARDRAIL)
200 LNFT $____________ $____________
X1160 20302-2500 REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
125 LNFT $____________ $____________
X1170 20303-1900 REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH
630 SQYD $____________ $____________
X1180 20401-0000 ROADWAY EXCAVATION
1,480 CUYD $____________ $____________
X1190 20402-0000 SUBEXCAVATION
1,244 CUYD $____________ $____________
X1200 21101-2000 ROADWAY OBLITERATION, METHOD 2
180 SQYD $____________ $____________
X1210 25126-0000 REMOVE AND RESET BOULDER
5 EACH $____________ $____________
X1220 30202-2000 ROADWAY AGGREGATE, METHOD 2
3,900 TON $____________ $____________
X1230 30302-1000 DITCH RECONDITIONING
200 LNFT $____________ $____________
X1240 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
17,750 SQYD $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP 1099(1)
A - 18
X1250 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
7,150 TON $____________ $____________
X1270 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
70 TON $____________ $____________
X1290 40601-0000 FOG SEAL
11 TON $____________ $____________
X1300 41102-1000 PRIME COAT, METHOD 1
25,575 SQYD $____________ $____________
X1310 41105-0000 BLOTTER
25 TON $____________ $____________
X1320 41201-0000 TACK COAT
12 TON $____________ $____________
X1330 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
40 CUYD $____________ $____________
X1340 55401-2000 REINFORCING STEEL, EPOXY COATED
3,225 LB $____________ $____________
X1350 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
1 EACH $____________ $____________
X1360 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
610 LNFT $____________ $____________
X1370 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (16" SPILL PAN)
160 LNFT $____________ $____________
X1380 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (12" SPILL PAN)
170 LNFT $____________ $____________
X1390 60920-0000 RESET WHEELSTOP
7 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP 1099(1)
A - 19
X1400 61503-5000 MEDIAN, STONE
100 SQYD $____________ $____________
X1410 61701-1200 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
400 LNFT $____________ $____________
X1420 61702-0600 TERMINAL SECTION, TYPE FLARED
2 EACH $____________ $____________
X1430 61707-0000 STRUCTURE TRANSITION RAILING (TYPE 3G)
82 LNFT $____________ $____________
X1440 61901-1300 FENCE, CHAIN LINK
250 LNFT $____________ $____________
X1450 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
15,514 SQYD $____________ $____________
X1460 62510-2000 SEEDING, HYDRAULIC METHOD
3.0 ACRE $____________ $____________
X1470 62515-2000 MULCHING, HYDRAULIC METHOD
3.0 ACRE $____________ $____________
X1480 63301-0000 SIGN SYSTEM
22 EACH $____________ $____________
X1490 63309-0100 DELINEATOR, TYPE 1
110 EACH $____________ $____________
X1500 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
X1510 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
27,200 LNFT $____________ $____________
X1520 63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN
2,899 LNFT $____________ $____________
X1530 63403-0400 PAVEMENT MARKINGS, TYPE D
80 SQFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP 1099(1)
A - 20
X1540 63405-1300 PAVEMENT MARKINGS, TYPE D, TURN ARROW
2 EACH $____________ $____________
X1550 63405-1500 PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE
1 EACH $____________ $____________
X1560 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
1 EACH $____________ $____________
X1570 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
ALL LPSM $___LPSM_____ $____________
X1580 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
4 EACH $____________ $____________
X1590 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
150 EACH $____________ $____________
X1600 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
100 EACH $____________ $____________
X1610 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
2 EACH $____________ $____________
X1620 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
2 EACH $____________ $____________
X1630 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
2 EACH $____________ $____________
X1640 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
30,836 LNFT $____________ $____________
X1650 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
500 SQFT $____________ $____________
X1660 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,000 HOUR $____________ $____________
A002 X1665 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
1 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP 1099(1)
A - 21
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Amendment A002, 9/21/15
Joe.Wilson Typewritten Text
X1050 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
A - 22
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
Y1000 15210-3000 CENTERLINE, VERIFICATION AND STAKING
0.620 MILE $____________ $____________
Y1010 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Y1020 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Y1030 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Y1040 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Y1050 20102-0000 CLEARING AND GRUBBING
ALL LPSM $___LPSM_____ $____________
Y1060 20301-2400 REMOVAL OF SIGN
2 EACH $____________ $____________
Y1070 30202-2000 ROADWAY AGGREGATE, METHOD 2
1,350 TON $____________ $____________
Y1080 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
9,200 SQYD $____________ $____________
Y1090 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
3,660 TON $____________ $____________
Y1110 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
36 TON $____________ $____________
Y1130 40601-0000 FOG SEAL
5.0 TON $____________ $____________
Y1140 41102-1000 PRIME COAT, METHOD 1
11,650 SQYD $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CO FLAP 1099(1)
A - 23
Y1150 41105-0000 BLOTTER
12 TON $____________ $____________
Y1160 41201-0000 TACK COAT
5.0 TON $____________ $____________
Y1170 61920-2000 REMOVE AND RESET GATE
1 EACH $____________ $____________
Y1180 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
5,960 SQYD $____________ $____________
Y1190 62510-2000 SEEDING, HYDRAULIC METHOD
1.0 ACRE $____________ $____________
Y1200 62515-2000 MULCHING, HYDRAULIC METHOD
1.0 ACRE $____________ $____________
Y1210 63301-0000 SIGN SYSTEM
2 EACH $____________ $____________
Y1220 63309-0100 DELINEATOR, TYPE 1
34 EACH $____________ $____________
Y1230 63316-1000 REMOVE AND RESET SIGN
1 EACH $____________ $____________
Y1240 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
13,800 LNFT $____________ $____________
Y1250 63403-0400 PAVEMENT MARKINGS, TYPE D
260 SQFT $____________ $____________
Y1260 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Y1270 64620-0400 REMOVE AND RESET MAILBOX
1 EACH $____________ $____________
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Amendment A002, 9/21/15
A - 24
Bid Schedule Schedule:Y Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Amendment A002, 9/21/15
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Y1020 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
A - 25
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
Z1000 15210-3000 CENTERLINE, VERIFICATION AND STAKING
0.950 MILE $____________ $____________
Z1010 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
Z1020 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
Z1030 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Z1040 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
65 LNFT $____________ $____________
Z1050 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
Z1060 20102-0000 CLEARING AND GRUBBING
ALL LPSM $___LPSM_____ $____________
Z1070 20301-2400 REMOVAL OF SIGN
13 EACH $____________ $____________
Z1080 30202-2000 ROADWAY AGGREGATE, METHOD 2
1,240 TON $____________ $____________
Z1090 30402-5100 FULL DEPTH RECLAMATION, METHOD 2, 3-INCH DEPTH
7,780 SQYD $____________ $____________
Z1100 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
5,960 SQYD $____________ $____________
Z1110 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, <0.3 MILLION ESAL
3,500 TON $____________ $____________
Z1130 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
34.0 TON $____________ $____________
Bid Schedule Schedule:Z Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Amendment A002, 9/21/15
A - 26
Z1150 40601-0000 FOG SEAL
6.5 TON $____________ $____________
Z1160 41102-1000 PRIME COAT, METHOD 1
15,580 SQYD $____________ $____________
Z1170 41105-0000 BLOTTER
15 TON $____________ $____________
Z1180 41201-0000 TACK COAT
7.0 TON $____________ $____________
Z1190 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
10,660 SQYD $____________ $____________
Z1200 62510-2000 SEEDING, HYDRAULIC METHOD
2.0 ACRE $____________ $____________
Z1210 62515-2000 MULCHING, HYDRAULIC METHOD
2.0 ACRE $____________ $____________
Z1220 63301-0000 SIGN SYSTEM
13 EACH $____________ $____________
Z1230 63309-0100 DELINEATOR, TYPE 1
160 EACH $____________ $____________
Z1240 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
19,800 LNFT $____________ $____________
Z1250 63403-0400 PAVEMENT MARKINGS, TYPE D
90 SQFT $____________ $____________
A002 Z1260 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
A002 Z1265 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
1 EACH $____________ $____________
Bid Schedule Schedule:Z Schedule Type:Options
Project No:CO FLAP 1099(1)
A - 27
Bid Schedule Schedule:Z Schedule Type:Options
Project No:CO FLAP 1099(1)
Project Name:Lake Pueblo Road & Trail Imp
Amendment A002, 9/21/15
Joe.Wilson Typewritten Text
Z1020 15401-0000 CONTRACTOR TESTING (GOVERNMENT-FURNISHED FIELD LABORATORY)
ALL LPSM $___LPSM_____ $____________
Joe.Wilson Typewritten Text
A - 28
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base(A - 6)
Schedule X - Option(A - 16)
Schedule Y - Option(A - 22)
Schedule Z - Option(A - 25)
Total - Schedules
Submitted By: ________________________________
Bid Schedule
Project No:CO FLAP 1099(1)
A-29
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subpart 25.1 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description
Unit of Measure
Quantity
*Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-30
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material
Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
CL
Prime Coat e% e%
CL
"Between Lifts"
Tack Coat
Varies Varies
1A See Detail
1A
See Detail
Prime Coat
Fog Seal
Paved Width
"Between Lifts"
Tack Coat surfacing existing
Edge of
0.5’
Existing Bench
Catch
0.5’
Existing
Base Course
2" to 6" Existing
Fog Seal
Base Course
2" to 6" Existing
A6
Juniper Road
14’ 14’ subgrade widening an additional 0.5’ outside of proposed
Remove existing shoulder material
(Rehabilitation)
Subgrade Widening
Widening
Subgrade e%
"Between Lifts"
Tack Coat
14’14’ e%
12’ Travel Way 12’ Travel Way
12’ Travel Way12’ Travel Way
1.5%
2’
(Min.)
2’
1.5%
1:
Rehabilitation
Profile Grade
Trail
8’ 2.5’
1A
See Detail
Fog Seal
Base Course
2" to 6" Existing
2.5’
CLProposed
Clearing and Construction Limits
Rehabilitation
Profile Grade
Proposed
Clearing and Construction Limits
1:1
Sta. 1625+53.1 to Sta. 1651+00.0
Sta. 1603+85.6 to Sta. 1619+20.0
Sta. 1628+25.1 to Sta. 1629+99.5
Sta. 1606+82.0 to Sta. 1610+30.7
Detached Trail
1.0’ - 4.9’
Varies to Sta. 1618+87
Sta. 1616+91
Shotcrete
Existing
Protect
2’
2’
2.5’
(Min.)
2’
(See Detail 1B or 1C)
8’ Trail
8’ Trail
:1 :1 .5
V a ri e s
Sta. 1614+40.0 to Sta. 1616+80.0
Embankment and appearance. 1:4 preferred slope
Shape as necessary for drainage after placement of asphalt pavement.
Roadway Aggregate (when directed by CO)
Shoulder up with excavated material or
SCHEDULE A
JUNIPER RD
TYPICAL SECTIONS
Embankment
1:6
See Detail 2A
3" Roadway Aggr.
DETAIL 1C
JUNIPER ROAD - REHABILITATION
DETAIL 1B
DETAIL 1A
JUNIPER ROAD - REHABILITATION
EXISTING TYPICAL SECTION
GENERAL NOTES
Asphalt Pavement
" Existing4 3" to 42
Asphalt Pavement
" Existing4 3" to 42
Asphalt Pavement
" Existing4 3" to 42
With Attached Trail
1.5%
Zone
14’ Clear
Zone
14’ Clear
Zone
14’ Clear
8-Inch Depth (See Note 6)
Full Depth Reclamation, Method 2
8-Inch Depth (See Note 6)
Full Depth Reclamation, Method 2
8-Inch Depth (See Note 6)
Full Depth Reclamation, Method 2
Aggr., Method 2
8" Roadway cross slope or superelevation (e%) prior to ACP overlay.
Place roadway aggregate as required to establish 2%
See plans for crown and superelevation correction (e%).
Pavement, Plain 5" Minor Concrete
5" ACP
Method 2
Aggr., 4" Roadway
Aggr., Method 2
5" Roadway
Method 2
Aggr., Roadway
Method 2
3" Roadway Aggr., Pavement, Plain 5" Minor Concrete
Method 2
Aggr., Roadway
See Special 204-A
Stabilization
Shoulder
Pavement, Plain 5" Minor Concrete
Method 2
Aggr., 4" Roadway
Method 2
Aggr., Roadway
Sta. 1672+00.0 to Sta. 1683+00.0
Sta. 1659+50.0 to Sta. 1667+00.0
Sta. 1619+20.0 to Sta. 1625+53.1
Sta. 1599+65 to Sta. 1603+85.6
Overlay
5" ACP
Overlay
5" ACP
Overlay
5" ACP
6. Pulverize a maximum depth of 8".
Do not pulverize approach roads or pullouts unless shown.5.
pavement.
Pulverize from 1’ beyond existing edge of pavement to 1’ beyond other existing edge of 4.
made for this work. Add roadway aggregate to complete shouldering as needed.
windrow material to backfill along new edge of pavement. No measurement or payment will be
Prior to pulverizing, windrow or remove existing shoulder material to outside of shoulder. Use 3.
unless otherwise shown.
Restrict all construction and construction vehicles to remain within the existing bench width 2.
Place Asphalt Concrete Pavement (ACP) in two lifts. Tack coat between lifts.1.
No Scale
S lo p e S ta k e L im it s
S lo p e S ta k e L im it s
S lo p e S ta k e L im it s
S lo p e S ta k e L im it s limits
& Mulching
Seeding
Topsoil, Slope Stake
4’ beyond limits
& Mulching
Seeding
Topsoil, Slope Stake
4’ beyond
2’
FLC
TFC
80BFC
42SHLD_SG
BISW83
OSW
TBCSW
Trail
8’ 2.5’
CUT TREATMENT-DITCH
Aggr., Method 2
4" Roadway
Pavement, Plain 5" Minor Concrete
11.5’ 11.5’
Limits of Full Depth Reclamation
1’ 1’
See Special 609-A
Concrete (24" Catch Pan)
Curb & Gutter, See Special 609-A
Concrete (24" Catch Pan)
Curb & Gutter, See Special 609-A
Concrete (24" Catch Pan)
Curb & Gutter, Aggr., Method 2
4" Roadway
1:4
(Graded)
Width
Ditch
Special
L im it s
S lo p e S ta k e limits
Seeding & Mulching
Slope Stake Topsoil, 4’ beyond 2A
Detail
See
Sta. 1644+50.0 to Sta. 1652+52.5
Sta. 1634+00.0 to Sta. 1637+38.0, Rt.
Sta. 1631+00.0 to Sta. 1637+70.0, Lt.
See Plan & Profile Sheets
Special Ditch Profile Grade
Coat
Prime
Seeding Limits
Top Soil and
Cut Slopes
Rounded
Slope Stake Limit2’ 5’
5’
Sections)
(See Cross
Cut Slope
Method 2
Aggr., 3" Roadway
See Special 609-A
Catch Pan)
Concrete (24"
Curb & Gutter, 4.
Sheet 1 of 11See Special 646-A
Safety Rail
09/21/2015 Revised Safety Rail Note
Amendment A002
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
J e n n if e r
P A
E C
L a k e P u e b lo D e s ig n
C A
D D R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P F L
A P .d g n
P
M
CO
LAKE PUEBLO
CO FLAP 1099(1)
STATE PROJECT
NUMBER
SHEET
Jennifer
DLS
J n n if e r
P A
E C
L a k e P u e b lo D e s ig n
C A
D D R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P F L
A P
.d g n
P
M
CO
LAKE PUEBLO
CO FLAP 1099(1)
STATE PROJECT
NUMBER
SHEET
Depth Unknown
Exist. 96" Culvert
.63
.95
.65
.39
.15
.55
49604960
.98
49654965
.60
.17
.63
.39
.33
4980 49 .45
VENT
.57
ASPHALT P
ATH
JUNIPER ROAD
JUNIP
ER R
OAD ASPHALT PATH
CROSS
IN
G
DEER
0 F
EET
CROSS
IN
G
PE
DES
TRI
AN
AHEADTRAI
L D
AMAGE
TURNLE
FT
S R
RR
S R
RR
0+
P C
.8
P T
.1
100’0
Scale in Feet
50’
CL Juniper Rd
Existing Ground
M A
T C
H L
IN
E
S T
A
CL
D
Curve = Seg2-1
PI 1602+87.67
T = 336.79’
R = 970.00’
L = 648.31’ e= 0.052’ / FT
8’ Conc. Trail
Guardrail
Remove Existing
1600+27 to 1603+40, Lt.
STA. 1599+65
CO FLAP 1099(1)
REHABILITATION
BEGIN ROADWAY
SCHEDULE A
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1603+21.4, 16’ Lt.
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1603+14.3, 16’ Rt.
Remove Existing Guardrail
1600+42 to 1603+65, Rt.
Clean Existing Culvert (96" CMP)
1601+39, Lt. & Rt.
1599+00 1600+00 1601+00 1602+00 1603+00 1604+00 1605+00 1606+00 1607+00 1608+00 1609+00 1610+00 1611+00 1612+00 1613+00
NOTE: (use Note Heading Style) as one text or as individual text.
Numbers for notes are also the Notes style. They can be placed
(Typ.)
Top of Cut
(Typ.)
Toe of Fill
(Typ.)
8’ Conc.
Curve Seg 2-1
Guardrail, Lt.
Guardrail, Rt.
Protect Trees
Curb & Gutter with detached Trail, Lt.
C1
Trail
Reservoir
Terminal SectionTerminal Section
Terminal Section Terminal Section
Protect Tree
Remove Existing Bollards (3)
Bollards. See Special 619-A.
With Restrictive and Removable
Construct Concrete Island
99+57.2
See Note 2 See Note 4
Schedule A
Sta. 99+44.31 (Ahead)
Sta. 659+00.00 (Back)=
Reservoir Trail
E 3216479.90
N 1588038.10
Match Existing
Note 1
See
Note 3
See
Remove Existing Bollards (3)
Bollards. See Special 619-A.
With Restrictive and Removable
Construct Concrete Island
100+16.7
See Note 5
See Note 6
Shoulder Stabilization, Rt.
See Special 204-A
Construct Shoulder Stabilization
1601+50 to 1603+00, Rt.
Riprap Outlet
Radius Flare = 22.0’
See Special 609-A
Begin Curb & Gutter
1603+85.6, Lt.
Curb & Gutter with attached Trail, Lt. Curb & Gutter with attached Trail, Lt.
See Special 646-A
Install 65 L.F. Safety Rail
5. 101+32 to 101+96, Lt.
N 1587995.76, E 3216925.57
Match attached Trail
4. 104+62.83 End Trail Relocation
N 1588019.08, E 216896.23
Begin Trail Relocation
3. 104+25 End Trail Rehab
N 1588084.16, E 3216723.30
Resume Trail Rehab
2. 102+30 End Trail Relocation
N 1588087.39, E 3216574.02
Begin Trail Relocation
1. 100+80 Suspend Trail Rehab
Notes:
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1600+47.4, 16’ Rt.
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1600+50.9, 16’ Lt.
1 Revised Safety Rail detail reference
09/21/2015 Revised Guardrail detail reference
Amendment A002
KEY PLANKEY PLAN
LAKE P
UEBLO
n n if e r
P A
E C
L a k e P u e b lo D e s ig n
C A
D D R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P F L
A P
.d g n
P
M
CO
LAKE PUEBLO
CO FLAP 1099(1)
STATE PROJECT
NUMBER
SHEET
S iz e D e p th U n k n o w n
E x is t.
C u lv e r t
Exist. 42" Culvert
(Abandoned)
Exist. 8" Waterline
WATER
4929.9
30 4930
WATER
4931.3
4931.5
STOP
4932.3
4932.3
4932.7
4933.5
4935 4935
4936.9
4940 4940
4941.9
4947.9
4954.7
4961.6
4967.7
4973.3
49754975
4977.1
4979.1
4980.1
4981.2
WATER
VENT
4982.5
4985 498
RIM EL=4982.6
5WATER MH
AHEAD
CURVED ROAD
S R
RR
S R
RR
P C
.6
P T
.2
P C
.0
100’0
Scale in Feet
50’
CL Juniper Rd
M A
T C
H L
IN
E
S
T A
M A T
C H L
IN
E
S T
A . 16
S a ilb o a rd R d
D
Curve = Seg2-2
PI 1618+21.25
T = 270.62’
R = 735.00’
L = 518.59’ e= 0.06’ / FT
D
Curve = Seg2-3
PI 1628+82.80
T = 461.74’
R = 720.00’
L = 821.14’ e= 0.06’ / FT
8’ Conc. Trail
(Typ.)
8’ Conc.
Guardrail
Remove Existing
1613+44 to 1625+49, Rt.
Guardrail
Remove Existing
1621+61 to 1625+33, Lt.
Existing Ground
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1624+90.2, 16’ Rt.
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1624+85.0, 17’ Lt.
1613+00 1614+00 1615+00 1616+00 1617+00 1618+00 1619+00 1620+00 1621+00 1622+00 1623+00 1624+00 1625+00 1626+00 1627+00
(Typ.)
Toe of Fill
Seg 2-2
Curve
Shotcrete Slope
Protect Existing
1618+87, Lt.
1616+91 to
(42" CMP)
Clean Existing Culvert
1624+05, Lt. & Rt.
Remove Bollard
(No Work)
Abandoned Water Valve
1624+25, Lt.
Seg 2-3
Curve
(No Work)
Water Valve
Abandoned
1626+20, Rt.
Shoulder Stabilization, Lt.
Curb & Gutter with attached Trail, Lt.
Guardrail, Rt.
Guardrail, Rt.
Guardrail, Lt. attached Trail, Lt.
Curb & Gutter with
C2
See Special 611-A
Relocate Stand Pipe
Abandoned Water Valve (No Work)
Adjust Water Manhole to Grade
Remove Bollard
1613+05, Lt.
Terminal Section Terminal Section
Terminal Section
Exist. Gates
Protect
Terminal Section
Tree
Protect
(Typ.)
Top of Cut
Remove Existing Fence, Rail
Remove Existing Guardrail
1613+49 to 1616+73, Lt.
(D-Sheets)
Reservoir Trail 2-1
See Profile See Note 2
See Note 1
See Note 3
See Note 4
(D-Sheets)
Reservoir Trail 2-2
See Profile
Radius Flare = 22.0’
See Special 609-A
Begin Curb & Gutter
1625+53.1, Lt.
Trail
ReservoirCL
See Special 204-A
Construct Shoulder Stabilization
1621+50 to 1622+50, Lt.
1619+75 to 1622+50, Rt.
Shoulder Stabilization, Rt.
Shoulder Stabilization, Lt.
Stake Limits
Verify Slope
1614+00
1613+00 to and Riprap Outlet
12" CMP W/12" FESs
Install 26 L.F.
106+90, Lt. & Rt.
Riprap Outlet
Radius Flare = 22.0’
See Special 609-A
End Curb & Gutter
1619+35.3, Lt.
N 1587376.26, E 3218873.99
Match attached Trail
4. 111+79.12 End Trail Relocation
N 1587373.19, E 3218775.27
Begin Trail Relocation
3. 110+80 End Trail Rehab
N 1587315.84, E 3218441.16
Begin Trail Rehab
2. 107+40 End Trail Relocation
N 1587287.07, E 3218216.65
Begin Trail Relocation
1. 105+12.7 Match Attached Trail
Notes:
1See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1614+14.0, 16’ Rt.
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1626+75.5, 16’ Rt.
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1620+95.9, 17’ Lt.
1See Special 646-A
Install 280 L.F. Safety Rail
See Special 204-A
Construct Shoulder Stabilization
1614+00 to 1616+80, Lt.
1 Revised Safety Rail note and detail reference
09/21/2015 Revised Guardrail detail reference
Amendment A002
Safety Rail, Lt.
KEY PLANKEY PLAN
LAKE P
UEBLO
n n if e r
P A
E C
L a k e P u e b lo D e s ig n
C A
D D R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P F L
A P
.d g n
P
M
CO
LAKE PUEBLO
CO FLAP 1099(1)
STATE PROJECT
NUMBER
SHEET
V P I
E L
,9
.3
E x is t.
C u lv e r t
P r o p o s e d
C u lv e r t
V P I
E L
,9
.5
V P I
E L
,9
.1
-1.5%
-4.0%
V P I
E L
,9
.3
V P I
E L
,9
.0
-10.8%
V P I
E L
,9
.0
V P I
E L
,9
.0
V P I
E L
,9
.0
-1.3% -1.0%
-2.0% -2.9%
V P I
E L
,9
.0
.9
.9
.3
.3
.6
.1
.9
.0
.3
.4
.2
4925 4925 4925 4925
.0
.6
.2
.4
.7
.9
M
P H
IN
V E
L
.7
C
M P
S A
IL
B O
A R
D
ASPHALT PATH
JUNIPER ROAD
ASPHALT PATH
JUNIPER ROAD
JUNIPER ROAD
ASPHALT PATH
S R
RR
S R
RR
P T
.2
P C
.9
100’0
Scale in Feet
50’
CL Juniper Rd
M A T
C H L
IN
E
S T
A
Existing Ground
M A T
C H L
IN
E
S T
A
1+
D
Curve = Seg2-3
PI 1628+82.80
T = 461.74’
R = 720.00’
L = 821.14’ e= 0.06’ / FT
Curve = Seg2-4
PI 1638+83.03
T = 343.09’
L = 640.89’ e= 0.06’ / FT
D
R = 725.00’
8’ Conc. Trail
Sidewalk
8’ Conc.
Guardrail
Remove Existing
1626+50 to 1630+44, Rt.
Guardrail
Remove Existing
1637+01 to 1638+41, Rt.
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1637+85.7, 17’ Rt.
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1630+43.3, 16’ Rt.
1627+00 1628+00 1629+00 1630+00 1631+00 1632+00 1633+00 1634+00 1635+00 1636+00 1637+00 1638+00 1639+00 1640+00 1641+00
(Typ.)
Toe of Fill
(Typ.)
Top of Cut
Protect Trees
Curve Seg 2-3
W/18" FES and Riprap Outlet
See Standard 604-1
Install Catch Basin, Type 1
1634+53, Lt. Flowline
Seg 2-4
Curve
Clean Existing Culvert and 36" End Section
Install 8 L.F. of 36" CMP
Remove 36" End Section
1638+04, Lt.
attached Trail, Lt.
Curb & Gutter with detached Trail, Lt.
Curb & Gutter with
Guardrail, Rt.
Special Ditch, Lt.
Curb & Gutter with attached Trail, Lt.
Special Ditch, Rt.
Guardrail, Rt.
C3
Terminal Section
Terminal Section
Terminal Section
Special Ditch, Lt.
Special Ditch, Rt.
Protect Tree
L=30’, W=11’
See Detail C-251-50
Place 18 C.Y. Riprap Class 2, 1637+71 to 1637+99, Lt.
Remove 232 L.F. Fence
1630+49 to 1632+75, Rt.
L=38’, W=11’
See Detail C-251-50
Place 23 C.Y. Riprap Class 2, 1637+00 to 1637+38, Rt.
See Special 204-A
Construct Shoulder Stabilization
1637+25 to 1637+75, Rt.
Shoulder Stabilization, Rt.
Remove Bollard
1635+80, Lt.
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1636+57.7, 17’ Rt.
1 09/21/2015 Revised Guardrail detail reference
Amendment A002
KEY PLANKEY PLAN
LAKE P
UEBLO
n n if e r
P A
E C
L a k e P u e b lo D e s ig n
C A
D D R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P F L
A P
.d g n
P
M
CO
LAKE PUEBLO
CO FLAP 1099(1)
STATE PROJECT
NUMBER
SHEET
P r o p o s e d
C u lv e r t
E x is t.
C u lv e r t
V P I
E L
,9
.4
+3.580
+3.66 0%
V P I
E L
,9
.0
V P I
E L
,9
.3
0+2.210%
V P I
E L
,9
.0
+0.700% -0.160%
V P I
E L
,9
.9
V P I
E L
,9
.6
-1.300% -1.570%
V P I
E L
,9
.0
-4.649%
E L
,9
.6
V P I
.4
E L
,9
.2
V P I
V P I
E L
,9
.4
-1.719%
380’ VC
4898.66
49004900
4902.63
4902.97
WATER
4903.72
4903.84
4905.91
4907.57
4909.69
4910 4910
4910.16 STOP
4911.13
4911.93
4912.77
4913.44
4914.36
4915 4915 4915
4916.49
4916.72
4918.34
4918.68 4919.29
4919.62
VENT
49254925
4925 4925
INV EL=4880.03
48" CMP
N-1 COVE
INV EL=4886.58
48" CMP
S R
RR
S R
RR
P T
.8
P C
.2
P T
.2
P C
.9
P T
.9
P C
.0
PC 1+14.49
PT 1+
56.36
PO
T 2+
45.45
100’0
Scale in Feet
50’
CL Juniper Rd
M A
T C
H L
A
1+
Existing Ground
M A T
C H L
IN
E
S T
A
Curve = Seg2-4
PI 1638+83.03
T = 343.09’
L = 640.89’ e= 0.06’ / FT
D
Curve = Seg2-5
PI 1649+32.80
T = 166.56’
L = 330.03’ e= 0.052’ / FT
D
CL
CL
R = 990.00’
R = 725.00’
Lake Pueblo (N-2 Cove)
Profile Grade
8’ Conc. Trail
8’ Conc. (Typ.)
Guardrail
Remove Existing
1641+50 to 1643+62, Rt.
Cove N-1
Guardrail
Remove Existing
1642+04 to 1643+84, Lt.
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1643+23.1, 17’ Rt.
1641+00 1642+00 1643+00 1644+00 1645+00 1646+00 1647+00 1648+00 1649+00 1650+00 1651+00 1652+00 1653+00 1654+00 1655+00
W/18" FES and Riprap Outlet
Install 40 L.F. 18" CMP
See Standard 604-1
Install Catch Basin, Type 1
1642+68, Lt. Flowline
Curve Seg 2-4
(No Work)
Abandoned Water Valve
1642+73, Lt.
Seg 2-5
Curve Seg 2-6
Curve
See Sheet D1
N-1 Cove
D e= 0.07’ / FT
PI 1653+19.02
R = 530.00’
T = 111.09’
L = 219.02’
Curb & Gutter with attached Trail, Lt.
Guardrail, Rt.
Guardrail, Rt.
Guardrail, Lt.
Curve = Seg2-6
C4
Trail
Reservoir
Terminal Section
Terminal Section
Terminal Section
Clean Existing Culvert
W/48" FES
Install 6 L.F. 48" CMP
Remove Existing End Section (48")
1642+88, Lt.
Special Ditch, Lt.
Special Ditch, Lt.
Terminal Section
Begin Reconstruction
Rehabilitation
Suspend Roadway
1651+00
See Sheet D1
Trail RelocationSee Special 611-A
Relocate Stand Pipe
Abandoned Water Valve (No Work)
Adjust Water Manhole to Grade
1649+70, Lt.
(Typ.)
Top of Cut
(Typ.)
Toe of Fill
Protect Trees
Riprap Outlet
Radius Flare = 22.0’
See Special 609-A
End Curb & Gutter
1652+69.3, Lt.
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1641+21.7, 17’ Rt.
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1654+59.1, 16’ Lt.
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1654+64.2, 16’ Rt.
Revised Safety Rail note and detail reference
09/21/2015 Revised Guardrail detail reference
Amendment A002
Safety Rail, Lt.
See Special 646-A
Install 140 L.F. Safety Rail
1642+30 to 1643+70, Lt.
KEY PLANKEY PLAN
LAKE P
UEBLO
n n if e r
P A
E C
L a k e P u e b lo D e s ig n
C A
D D R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P F L
A P
.d g n
P
M
CO
LAKE PUEBLO
CO FLAP 1099(1)
STATE PROJECT
NUMBER
SHEET
V P I
E L
,9
.9
+4.45 9%
V P I
E L
,9
.6
-7.898%
V P I
E L
,9
.1
-1.719% +4.45 9%
380’ VC
2.7
4900 4900
1.0
49054905
4905 4905
9.1
4910 4910
1.1
1.2
4.0
6.0
6.5
1.5
2.1
VENT
VENT
5.7
6.1
VENT
PARKING LOT
8.1
8.2
8.8
ASPHALT PATH
JUNIPER ROAD
CROSSI
NGPEDESTRIA
N
DEER
RIM
EL=492
7.7
WATER M
H
RIM
EL=492
5.5
WATER M
H
RIM
EL=492
3.3
WATER M
H
GRADE A
HEAD
CAUTIO
N:
STEEP
CROSSI
NGPEDESTRIA
N
CLOSEDAREA
INFORMATIO
N
DAM C
ROSSI
NG
PARKIN
GNO
POIN
TBEYOND T
HIS
NO V
EHIC
LES
JUNIPER ROAD
ASPHALT PATH
ASPHALT P
ATH
S R
RR
S R
RR
P T
.9
100’0
Scale in Feet
50’
CL Juniper Rd
M A
T C
H L
A
Existing Ground
M A
T C
H L
A
CL
D a m C r o s s in g
Profile Grade
Guardrail
Remove Existing
1654+50 to 1662+39, Rt.
Guardrail
Remove Existing
1652+72 to 1661+04, Lt.
Guardrail
Remove Existing
1664+20 to 1672+38, Rt.
Guardrail
Remove Existing
1664+14 to 1672+26, Lt.
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1662+50.8, 16’ Rt.
See Standard 617-19
Type Flared
Install Guardrail Terminal, End Guardrail
1660+35.0, 16’ Lt.
1655+00 1656+00 1657+00 1658+00 1659+00 1660+00 1661+00 1662+00 1663+00 1664+00 1665+00 1666+00 1667+00 1668+00 1669+00
(Typ.)
Toe of Fill
PI 1655+84.52
R = 4275.00’
T = 125.46’
L = 250.85’ e= N.C.
D
Curve = Seg2-7
Curve Seg 2-7 Hydrant
Protect Fire
See Special 611-A
Relocate Stand Pipe
Abandoned Water Valve (No Work)
Adjust Water Manhole to Grade
Remove Bollard
1661+16, Lt.
Guardrail, Lt.
Guardrail, Rt.
Guardrail, Lt.
Guardrail, Rt.
C5
Trail
Reservoir
Terminal Section
Terminal Section Terminal Section
Terminal Section
Remove 14 Bollards (Wood Post)
1662+52 to 1664+12, Rt.
(Typ.)
Top of Cut
D1
See Sheet
Trail Relocation
See Sheet D2
Parking Area
Trail Relocation &
Resume Rehabilitation
End Roadway Reconstruction
1659+50
See Special 204-A
Construct Shoulder Stabilization
1667+00 to 1668+00, Lt.
Shoulder Stabilization, Lt.
Begin Roadway Reconstruction
Suspend Rehabilitation
1667+00
Profile Grade
(Typ.)
8’ Conc.
1See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1665+48.8, 16’ Lt.
See Special 617-A
Begin Guardrail
See Standard 617-19
Type Flared
Install Guardrail Terminal, 1664+60.5, 16’ Rt.
09/21/2015 Revised Guardrail detail reference
Amendment A002
KEY PLANKEY PLAN
LAKE P
UEBLO
Untitled
| Text1: |
| Text2: |
| 0: 1 |
| 1: 42 |
| Text3: |
| 0: A002 |
| 1: 9/21/2015 |
| 2: |
| 0: |
| 1: CO FLAP 1099(1) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: Joe Wilson 1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6815B00019 |
| 1: August 31, 2015 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0 * |
| Text11: |
| 0: |
| 1: |
| Text12: See Below * |
| Text13: Invitation for Bid |
Remove Page A-i and replace with attached Page A-i dated September 21, 2015.
Remove Pages A-5 thru A-29 and replace with attached Pages A-5 thru A-30 dated September 21, 2015.
Plan Sheets Remove Plan Sheets A6, B8, B10, B24, B26, C1, C2, C3, C4, C5, C8, C13, C23, D8 and replace with the attached A6, B8, B10, B24, B26, C1, C2, C3, C4, C5, C8, C13, C23, D8 dated September 21, 2015.
NOTE: When printing revised sheets, turn on 'Document and Markups' in the Print Properties menu to illustrate changes on hard copy print.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN ITEM 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .