bid_tabs.pdf
PDF 736 KB Posted
- Solicitation number
- DTFH6815B00019
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO FLAP 1099(1), Lake Pueblo Road & Trail Improvements - Bid Tabs (Schedule A)
Contractor Responsive Amount RBK Construction Yes 8,102,569.50 A&S Construction Yes 9,771,100.00 Merry Technology No 6,277,210.50 American Civil Constructors Yes 9,380,479.00 Steve Manning Construction Yes 10,975,992.00 Rocky Mountain Materials & Asphalt Yes 9,906,807.00 Kiewit Infrastructure Yes 13,270,224.00 Engineer's Estimate 8,607,000.00
Contractor Pay Item No. Description Quantity Unit Unit Price Amount 15101-0000
RBK Construction ALL LPSM $ 650,000.00 $ 650,000.00
A&S Construction ALL LPSM $ 800,000.00 $ 800,000.00
Merry Technology ALL LPSM $ 500,000.00 $ 500,000.00
American Civil Constructors ALL LPSM $ 935,000.00 $ 935,000.00
Steve Manning Construction ALL LPSM $ 1,000,000.00 $ 1,000,000.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 1,012,943.01 $ 1,012,943.01
Kiewit Infrastructure ALL LPSM $ 1,500,000.00 $ 1,500,000.00
Engineer's Estimate ALL LPSM $ 782,881.00 $ 782,881.00
15206-0000
RBK Construction 2.4 MILE $ 12,500.00 $ 30,000.00
A&S Construction 2.4 MILE $ 11,000.00 $ 26,400.00
Merry Technology 2.4 MILE $ 300.00 $ 720.00
American Civil Constructors 2.4 MILE $ 15,000.00 $ 36,000.00
Steve Manning Construction 2.4 MILE $ 10,350.00 $ 24,840.00
Rocky Mountain Materials & Asphalt 2.4 MILE $ 8,313.73 $ 19,952.95
Kiewit Infrastructure 2.4 MILE $ 5,000.00 $ 12,000.00
Engineer's Estimate 2.4 MILE $ 20,000.00 $ 48,000.00
15210-3000
RBK Construction 11.75 MILE $ 1,800.00 $ 21,150.00
A&S Construction 11.75 MILE $ 2,000.00 $ 23,500.00
Merry Technology 11.75 MILE $ 400.00 $ 4,700.00
American Civil Constructors 11.75 MILE $ 4,000.00 $ 47,000.00
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
CENTERLINE, VERIFICATION AND STAKING
Steve Manning Construction 11.75 MILE $ 1,600.00 $ 18,800.00
Rocky Mountain Materials & Asphalt 11.75 MILE $ 3,679.27 $ 43,231.42
Kiewit Infrastructure 11.75 MILE $ 1,000.00 $ 11,750.00
Engineer's Estimate 11.75 MILE $ 4,000.00 $ 47,000.00
15214-1000
RBK Construction ALL LPSM $ 30,000.00 $ 30,000.00
A&S Construction ALL LPSM $ 3,000.00 $ 3,000.00
Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00
American Civil Constructors ALL LPSM $ 8,000.00 $ 8,000.00
Steve Manning Construction ALL LPSM $ 12,500.00 $ 12,500.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 3,326.08 $ 3,326.08
Kiewit Infrastructure ALL LPSM $ 25,000.00 $ 25,000.00
Engineer's Estimate ALL LPSM $ 10,000.00 $ 10,000.00
15215-3000
RBK Construction 18. EACH $ 800.00 $ 14,400.00
A&S Construction 18. EACH $ 900.00 $ 16,200.00
Merry Technology 18. EACH $ 2,000.00 $ 36,000.00
American Civil Constructors 18. EACH $ 600.00 $ 10,800.00
Steve Manning Construction 18. EACH $ 750.00 $ 13,500.00
Rocky Mountain Materials & Asphalt 18. EACH $ 295.62 $ 5,321.16
Kiewit Infrastructure 18. EACH $ 1,000.00 $ 18,000.00
Engineer's Estimate 18. EACH $ 615.00 $ 11,070.00
15216-2000
RBK Construction 4.79 MILE $ 8,000.00 $ 38,320.00
A&S Construction 4.79 MILE $ 5,000.00 $ 23,950.00
Merry Technology 4.79 MILE $ 400.00 $ 1,916.00
American Civil Constructors 4.79 MILE $ 10,000.00 $ 47,900.00
Steve Manning Construction 4.79 MILE $ 4,300.00 $ 20,597.00
Rocky Mountain Materials & Asphalt 4.79 MILE $ 12,842.16 $ 61,513.95
Kiewit Infrastructure 4.79 MILE $ 20,000.00 $ 95,800.00
Engineer's Estimate 4.79 MILE $ 20,000.00 $ 95,800.00
15301-0000
RBK Construction ALL LPSM $ 160,000.00 $ 160,000.00
A&S Construction ALL LPSM $ 152,000.00 $ 152,000.00
Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00
SURVEY AND STAKING, BRIDGE
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
American Civil Constructors ALL LPSM $ 125,000.00 $ 125,000.00
Steve Manning Construction ALL LPSM $ 150,000.00 $ 150,000.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 228,573.95 $ 228,573.95
Kiewit Infrastructure ALL LPSM $ 250,000.00 $ 250,000.00
Engineer's Estimate ALL LPSM $ 105,000.00 $ 105,000.00
15401-0000
RBK Construction ALL LPSM $ 270,000.00 $ 270,000.00
A&S Construction ALL LPSM $ 185,000.00 $ 185,000.00
Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00
American Civil Constructors ALL LPSM $ 135,000.00 $ 135,000.00
Steve Manning Construction ALL LPSM $ 200,000.00 $ 200,000.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 528,401.48 $ 528,401.48
Kiewit Infrastructure ALL LPSM $ 100,000.00 $ 100,000.00
Engineer's Estimate ALL LPSM $ 70,000.00 $ 70,000.00
15501-0000
RBK Construction ALL LPSM $ 10,000.00 $ 10,000.00
A&S Construction ALL LPSM $ 30,000.00 $ 30,000.00
Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00
American Civil Constructors ALL LPSM $ 75,000.00 $ 75,000.00
Steve Manning Construction ALL LPSM $ 19,900.00 $ 19,900.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 3,677.57 $ 3,677.57
Kiewit Infrastructure ALL LPSM $ 10,000.00 $ 10,000.00
Engineer's Estimate ALL LPSM $ 9,000.00 $ 9,000.00
15705-0100
RBK Construction 11,000. LNFT $ 1.50 $ 16,500.00
A&S Construction 11,000. LNFT $ 2.00 $ 22,000.00
Merry Technology 11,000. LNFT $ 3.15 $ 34,650.00
American Civil Constructors 11,000. LNFT $ 4.00 $ 44,000.00
Steve Manning Construction 11,000. LNFT $ 4.00 $ 44,000.00
Rocky Mountain Materials & Asphalt 11,000. LNFT $ 2.45 $ 26,950.00
Kiewit Infrastructure 11,000. LNFT $ 3.00 $ 33,000.00
Engineer's Estimate 11,000. LNFT $ 5.00 $ 55,000.00
15705-1400
RBK Construction 7,900. LNFT $ 3.00 $ 23,700.00
A&S Construction 7,900. LNFT $ 4.00 $ 31,600.00
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, FIBER ROLL
Merry Technology 7,900. LNFT $ 3.50 $ 27,650.00
American Civil Constructors 7,900. LNFT $ 3.00 $ 23,700.00
Steve Manning Construction 7,900. LNFT $ 8.00 $ 63,200.00
Rocky Mountain Materials & Asphalt 7,900. LNFT $ 2.43 $ 19,197.00
Kiewit Infrastructure 7,900. LNFT $ 5.00 $ 39,500.00
Engineer's Estimate 7,900. LNFT $ 10.00 $ 79,000.00
15706-0200
RBK Construction 50. EACH $ 50.00 $ 2,500.00
A&S Construction 50. EACH $ 100.00 $ 5,000.00
Merry Technology 50. EACH $ 200.00 $ 10,000.00
American Civil Constructors 50. EACH $ 100.00 $ 5,000.00
Steve Manning Construction 50. EACH $ 150.00 $ 7,500.00
Rocky Mountain Materials & Asphalt 50. EACH $ 61.28 $ 3,064.00
Kiewit Infrastructure 50. EACH $ 120.00 $ 6,000.00
Engineer's Estimate 50. EACH $ 250.00 $ 12,500.00
15706-0200
RBK Construction 6. EACH $ 55.00 $ 330.00
A&S Construction 6. EACH $ 500.00 $ 3,000.00
Merry Technology 6. EACH $ 200.00 $ 1,200.00
American Civil Constructors 6. EACH $ 175.00 $ 1,050.00
Steve Manning Construction 6. EACH $ 200.00 $ 1,200.00
Rocky Mountain Materials & Asphalt 6. EACH $ 242.81 $ 1,456.86
Kiewit Infrastructure 6. EACH $ 800.00 $ 4,800.00
Engineer's Estimate 6. EACH $ 300.00 $ 1,800.00
15706-1000
RBK Construction 2. EACH $ 300.00 $ 600.00
A&S Construction 2. EACH $ 600.00 $ 1,200.00
Merry Technology 2. EACH $ 200.00 $ 400.00
American Civil Constructors 2. EACH $ 250.00 $ 500.00
Steve Manning Construction 2. EACH $ 210.00 $ 420.00
Rocky Mountain Materials & Asphalt 2. EACH $ 358.44 $ 716.88
Kiewit Infrastructure 2. EACH $ 10.00 $ 20.00
Engineer's Estimate 2. EACH $ 350.00 $ 700.00
15706-1600
RBK Construction 15. EACH $ 2,000.00 $ 30,000.00
SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL)
SOIL EROSION CONTROL, CHECK DAM (GRAVEL BAG)
SOIL EROSION CONTROL, INLET PROTECTION
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT (TURNAROUND)
A&S Construction 15. EACH $ 2,500.00 $ 37,500.00
Merry Technology 15. EACH $ 350.00 $ 5,250.00
American Civil Constructors 15. EACH $ 2,500.00 $ 37,500.00
Steve Manning Construction 15. EACH $ 4,800.00 $ 72,000.00
Rocky Mountain Materials & Asphalt 15. EACH $ 2,212.68 $ 33,190.20
Kiewit Infrastructure 15. EACH $ 1,500.00 $ 22,500.00
Engineer's Estimate 15. EACH $ 2,000.00 $ 30,000.00
15802-0000
RBK Construction ALL LPSM $ 15,000.00 $ 15,000.00
A&S Construction ALL LPSM $ 80,000.00 $ 80,000.00
Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00
American Civil Constructors ALL LPSM $ 155,000.00 $ 155,000.00
Steve Manning Construction ALL LPSM $ 160,000.00 $ 160,000.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 27,319.68 $ 27,319.68
Kiewit Infrastructure ALL LPSM $ 200,000.00 $ 200,000.00
Engineer's Estimate ALL LPSM $ 65,000.00 $ 65,000.00
20101-0000
RBK Construction 30. ACRE $ 500.00 $ 15,000.00
A&S Construction 30. ACRE $ 1,600.00 $ 48,000.00
Merry Technology 30. ACRE $ 2,000.00 $ 60,000.00
American Civil Constructors 30. ACRE $ 650.00 $ 19,500.00
Steve Manning Construction 30. ACRE $ 3,000.00 $ 90,000.00
Rocky Mountain Materials & Asphalt 30. ACRE $ 2,168.72 $ 65,061.60
Kiewit Infrastructure 30. ACRE $ 1,500.00 $ 45,000.00
Engineer's Estimate 30. ACRE $ 2,000.00 $ 60,000.00
20301-0100
RBK Construction 49. EACH $ 150.00 $ 7,350.00
A&S Construction 49. EACH $ 100.00 $ 4,900.00
Merry Technology 49. EACH $ 50.00 $ 2,450.00
American Civil Constructors 49. EACH $ 80.00 $ 3,920.00
Steve Manning Construction 49. EACH $ 94.00 $ 4,606.00
Rocky Mountain Materials & Asphalt 49. EACH $ 87.33 $ 4,279.17
Kiewit Infrastructure 49. EACH $ 100.00 $ 4,900.00
Engineer's Estimate 49. EACH $ 150.00 $ 7,350.00
20301-0400
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF BOLLARD
REMOVAL OF BRIDGE
RBK Construction 1. EACH $ 20,000.00 $ 20,000.00
A&S Construction 1. EACH $ 40,000.00 $ 40,000.00
Merry Technology 1. EACH $ 35,000.00 $ 35,000.00
American Civil Constructors 1. EACH $ 45,000.00 $ 45,000.00
Steve Manning Construction 1. EACH $ 25,000.00 $ 25,000.00
Rocky Mountain Materials & Asphalt 1. EACH $ 18,410.17 $ 18,410.17
Kiewit Infrastructure 1. EACH $ 50,000.00 $ 50,000.00
Engineer's Estimate 1. EACH $ 25,000.00 $ 25,000.00
20301-2000
RBK Construction 2. EACH $ 500.00 $ 1,000.00
A&S Construction 2. EACH $ 800.00 $ 1,600.00
Merry Technology 2. EACH $ 800.00 $ 1,600.00
American Civil Constructors 2. EACH $ 130.00 $ 260.00
Steve Manning Construction 2. EACH $ 400.00 $ 800.00
Rocky Mountain Materials & Asphalt 2. EACH $ 166.05 $ 332.10
Kiewit Infrastructure 2. EACH $ 500.00 $ 1,000.00
Engineer's Estimate 2. EACH $ 400.00 $ 800.00
20301-2400
RBK Construction 48. EACH $ 40.00 $ 1,920.00
A&S Construction 48. EACH $ 50.00 $ 2,400.00
Merry Technology 48. EACH $ 120.00 $ 5,760.00
American Civil Constructors 48. EACH $ 80.00 $ 3,840.00
Steve Manning Construction 48. EACH $ 100.00 $ 4,800.00
Rocky Mountain Materials & Asphalt 48. EACH $ 46.46 $ 2,230.08
Kiewit Infrastructure 48. EACH $ 45.00 $ 2,160.00
Engineer's Estimate 48. EACH $ 75.00 $ 3,600.00
20302-0150
RBK Construction 205. LNFT $ 55.00 $ 11,275.00
A&S Construction 205. LNFT $ 30.00 $ 6,150.00
Merry Technology 205. LNFT $ 50.00 $ 10,250.00
American Civil Constructors 205. LNFT $ 80.00 $ 16,400.00
Steve Manning Construction 205. LNFT $ 25.00 $ 5,125.00
Rocky Mountain Materials & Asphalt 205. LNFT $ 7.73 $ 1,584.65
Kiewit Infrastructure 205. LNFT $ 35.00 $ 7,175.00
Engineer's Estimate 205. LNFT $ 180.00 $ 36,900.00
REMOVAL OF PIPE END SECTION
REMOVAL OF SIGN
REMOVAL OF BRIDGE RAILING
20302-0500
RBK Construction 115. LNFT $ 30.00 $ 3,450.00
A&S Construction 115. LNFT $ 40.00 $ 4,600.00
Merry Technology 115. LNFT $ 30.00 $ 3,450.00
American Civil Constructors 115. LNFT $ 11.00 $ 1,265.00
Steve Manning Construction 115. LNFT $ 50.00 $ 5,750.00
Rocky Mountain Materials & Asphalt 115. LNFT $ 6.81 $ 783.15
Kiewit Infrastructure 115. LNFT $ 10.00 $ 1,150.00
Engineer's Estimate 115. LNFT $ 30.00 $ 3,450.00
20302-1000
RBK Construction 500. LNFT $ 7.00 $ 3,500.00
A&S Construction 500. LNFT $ 7.00 $ 3,500.00
Merry Technology 500. LNFT $ 25.00 $ 12,500.00
American Civil Constructors 500. LNFT $ 10.00 $ 5,000.00
Steve Manning Construction 500. LNFT $ 12.00 $ 6,000.00
Rocky Mountain Materials & Asphalt 500. LNFT $ 7.73 $ 3,865.00
Kiewit Infrastructure 500. LNFT $ 7.00 $ 3,500.00
Engineer's Estimate 500. LNFT $ 20.00 $ 10,000.00
20302-1200
RBK Construction 7,810. LNFT $ 4.00 $ 31,240.00
A&S Construction 7,810. LNFT $ 4.00 $ 31,240.00
Merry Technology 7,810. LNFT $ 4.00 $ 31,240.00
American Civil Constructors 7,810. LNFT $ 4.00 $ 31,240.00
Steve Manning Construction 7,810. LNFT $ 5.00 $ 39,050.00
Rocky Mountain Materials & Asphalt 7,810. LNFT $ 3.96 $ 30,927.60
Kiewit Infrastructure 7,810. LNFT $ 4.00 $ 31,240.00
Engineer's Estimate 7,810. LNFT $ 3.00 $ 23,430.00
20302-2500
RBK Construction 230. LNFT $ 15.00 $ 3,450.00
A&S Construction 230. LNFT $ 30.00 $ 6,900.00
Merry Technology 230. LNFT $ 50.00 $ 11,500.00
American Civil Constructors 230. LNFT $ 20.00 $ 4,600.00
Steve Manning Construction 230. LNFT $ 50.00 $ 11,500.00
Rocky Mountain Materials & Asphalt 230. LNFT $ 11.15 $ 2,564.50
Kiewit Infrastructure 230. LNFT $ 6.00 $ 1,380.00
Engineer's Estimate 230. LNFT $ 22.00 $ 5,060.00
REMOVAL OF CURB, CONCRETE
REMOVAL OF FENCE, RAIL
REMOVAL OF GUARDRAIL
REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)
20303-0200
RBK Construction 90. SQYD $ 470.00 $ 42,300.00
A&S Construction 90. SQYD $ 280.00 $ 25,200.00
Merry Technology 90. SQYD $ 10.00 $ 900.00
American Civil Constructors 90. SQYD $ 250.00 $ 22,500.00
Steve Manning Construction 90. SQYD $ 440.00 $ 39,600.00
Rocky Mountain Materials & Asphalt 90. SQYD $ 67.77 $ 6,099.30
Kiewit Infrastructure 90. SQYD $ 350.00 $ 31,500.00
Engineer's Estimate 90. SQYD $ 422.00 $ 37,980.00
20303-1600
RBK Construction 1,700. SQYD $ 8.00 $ 13,600.00
A&S Construction 1,700. SQYD $ 4.00 $ 6,800.00
Merry Technology 1,700. SQYD $ 7.00 $ 11,900.00
American Civil Constructors 1,700. SQYD $ 9.00 $ 15,300.00
Steve Manning Construction 1,700. SQYD $ 9.80 $ 16,660.00
Rocky Mountain Materials & Asphalt 1,700. SQYD $ 5.59 $ 9,503.00
Kiewit Infrastructure 1,700. SQYD $ 15.00 $ 25,500.00
Engineer's Estimate 1,700. SQYD $ 10.00 $ 17,000.00
20303-1900
RBK Construction 230. SQYD $ 23.00 $ 5,290.00
A&S Construction 230. SQYD $ 7.00 $ 1,610.00
Merry Technology 230. SQYD $ 16.00 $ 3,680.00
American Civil Constructors 230. SQYD $ 16.00 $ 3,680.00
Steve Manning Construction 230. SQYD $ 20.00 $ 4,600.00
Rocky Mountain Materials & Asphalt 230. SQYD $ 21.84 $ 5,023.20
Kiewit Infrastructure 230. SQYD $ 40.00 $ 9,200.00
Engineer's Estimate 230. SQYD $ 5.75 $ 1,322.50
20304-1000
RBK Construction ALL LPSM $ 50,000.00 $ 50,000.00
A&S Construction ALL LPSM $ 110,000.00 $ 110,000.00
Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00
American Civil Constructors ALL LPSM $ 52,000.00 $ 52,000.00
Steve Manning Construction ALL LPSM $ 30,000.00 $ 30,000.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 20,639.61 $ 20,639.61
Kiewit Infrastructure ALL LPSM $ 50,000.00 $ 50,000.00
REMOVAL OF BRIDGE DECK (FULL DEPTH)
REMOVAL OF PAVEMENT, ASPHALT
REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Engineer's Estimate ALL LPSM $ 3,000.00 $ 3,000.00
20401-0000
RBK Construction 10,200. CUYD $ 30.00 $ 306,000.00
A&S Construction 10,200. CUYD $ 26.00 $ 265,200.00
Merry Technology 10,200. CUYD $ 45.00 $ 459,000.00
American Civil Constructors 10,200. CUYD $ 25.00 $ 255,000.00
Steve Manning Construction 10,200. CUYD $ 42.00 $ 428,400.00
Rocky Mountain Materials & Asphalt 10,200. CUYD $ 21.20 $ 216,240.00
Kiewit Infrastructure 10,200. CUYD $ 50.00 $ 510,000.00
Engineer's Estimate 10,200. CUYD $ 20.00 $ 204,000.00
20425-1000
RBK Construction 220. LNFT $ 25.00 $ 5,500.00
A&S Construction 220. LNFT $ 70.00 $ 15,400.00
Merry Technology 220. LNFT $ 12.00 $ 2,640.00
American Civil Constructors 220. LNFT $ 8.00 $ 1,760.00
Steve Manning Construction 220. LNFT $ 50.00 $ 11,000.00
Rocky Mountain Materials & Asphalt 220. LNFT $ 5.29 $ 1,163.80
Kiewit Infrastructure 220. LNFT $ 20.00 $ 4,400.00
Engineer's Estimate 220. LNFT $ 30.00 $ 6,600.00
20435-1000
RBK Construction 2,930. CUYD $ 50.00 $ 146,500.00
A&S Construction 2,930. CUYD $ 54.00 $ 158,220.00
Merry Technology 2,930. CUYD $ 50.00 $ 146,500.00
American Civil Constructors 2,930. CUYD $ 60.00 $ 175,800.00
Steve Manning Construction 2,930. CUYD $ 115.00 $ 336,950.00
Rocky Mountain Materials & Asphalt 2,930. CUYD $ 60.19 $ 176,356.70
Kiewit Infrastructure 2,930. CUYD $ 90.00 $ 263,700.00
Engineer's Estimate 2,930. CUYD $ 75.00 $ 219,750.00
20801-0000
RBK Construction 450. CUYD $ 15.00 $ 6,750.00
A&S Construction 450. CUYD $ 40.00 $ 18,000.00
Merry Technology 450. CUYD $ 65.00 $ 29,250.00
American Civil Constructors 450. CUYD $ 14.00 $ 6,300.00
Steve Manning Construction 450. CUYD $ 135.00 $ 60,750.00
Rocky Mountain Materials & Asphalt 450. CUYD $ 30.39 $ 13,675.50
ROADWAY EXCAVATION
DITCH, EXCAVATION
BACKFILL, SELECT GRANULAR
STRUCTURE EXCAVATION
Kiewit Infrastructure 450. CUYD $ 70.00 $ 31,500.00
Engineer's Estimate 450. CUYD $ 17.00 $ 7,650.00
20803-0000
RBK Construction 450. CUYD $ 20.00 $ 9,000.00
A&S Construction 450. CUYD $ 55.00 $ 24,750.00
Merry Technology 450. CUYD $ 70.00 $ 31,500.00
American Civil Constructors 450. CUYD $ 40.00 $ 18,000.00
Steve Manning Construction 450. CUYD $ 179.00 $ 80,550.00
Rocky Mountain Materials & Asphalt 450. CUYD $ 73.32 $ 32,994.00
Kiewit Infrastructure 450. CUYD $ 80.00 $ 36,000.00
Engineer's Estimate 450. CUYD $ 60.00 $ 27,000.00
21101-2000
RBK Construction 2,270. SQYD $ 2.00 $ 4,540.00
A&S Construction 2,270. SQYD $ 9.00 $ 20,430.00
Merry Technology 2,270. SQYD $ 12.00 $ 27,240.00
American Civil Constructors 2,270. SQYD $ 10.00 $ 22,700.00
Steve Manning Construction 2,270. SQYD $ 4.60 $ 10,442.00
Rocky Mountain Materials & Asphalt 2,270. SQYD $ 9.47 $ 21,496.90
Kiewit Infrastructure 2,270. SQYD $ 5.00 $ 11,350.00
Engineer's Estimate 2,270. SQYD $ 6.00 $ 13,620.00
25101-2200
RBK Construction 45. CUYD $ 80.00 $ 3,600.00
A&S Construction 45. CUYD $ 110.00 $ 4,950.00
Merry Technology 45. CUYD $ 125.00 $ 5,625.00
American Civil Constructors 45. CUYD $ 100.00 $ 4,500.00
Steve Manning Construction 45. CUYD $ 248.00 $ 11,160.00
Rocky Mountain Materials & Asphalt 45. CUYD $ 101.79 $ 4,580.55
Kiewit Infrastructure 45. CUYD $ 150.00 $ 6,750.00
Engineer's Estimate 45. CUYD $ 100.00 $ 4,500.00
25101-2300
RBK Construction 55. CUYD $ 85.00 $ 4,675.00
A&S Construction 55. CUYD $ 120.00 $ 6,600.00
Merry Technology 55. CUYD $ 250.00 $ 13,750.00
American Civil Constructors 55. CUYD $ 100.00 $ 5,500.00
Steve Manning Construction 55. CUYD $ 248.00 $ 13,640.00
STRUCTURAL BACKFILL
ROADWAY OBLITERATION, METHOD 2
PLACED RIPRAP, METHOD B, CLASS 2
PLACED RIPRAP, METHOD B, CLASS 3
Rocky Mountain Materials & Asphalt 55. CUYD $ 101.77 $ 5,597.35
Kiewit Infrastructure 55. CUYD $ 160.00 $ 8,800.00
Engineer's Estimate 55. CUYD $ 125.00 $ 6,875.00
25101-2400
RBK Construction 365. CUYD $ 90.00 $ 32,850.00
A&S Construction 365. CUYD $ 140.00 $ 51,100.00
Merry Technology 365. CUYD $ 300.00 $ 109,500.00
American Civil Constructors 365. CUYD $ 100.00 $ 36,500.00
Steve Manning Construction 365. CUYD $ 248.00 $ 90,520.00
Rocky Mountain Materials & Asphalt 365. CUYD $ 101.79 $ 37,153.35
Kiewit Infrastructure 365. CUYD $ 110.00 $ 40,150.00
Engineer's Estimate 365. CUYD $ 178.00 $ 64,970.00
30202-2000
RBK Construction 31,070. TON $ 31.00 $ 963,170.00
A&S Construction 31,070. TON $ 27.00 $ 838,890.00
Merry Technology 31,070. TON $ 30.00 $ 932,100.00
American Civil Constructors 31,070. TON $ 35.00 $ 1,087,450.00
Steve Manning Construction 31,070. TON $ 32.20 $ 1,000,454.00
Rocky Mountain Materials & Asphalt 31,070. TON $ 23.49 $ 729,834.30
Kiewit Infrastructure 31,070. TON $ 30.00 $ 932,100.00
Engineer's Estimate 31,070. TON $ 25.00 $ 776,750.00
30302-1000
RBK Construction 1,050. LNFT $ 7.00 $ 7,350.00
A&S Construction 1,050. LNFT $ 22.00 $ 23,100.00
Merry Technology 1,050. LNFT $ 5.00 $ 5,250.00
American Civil Constructors 1,050. LNFT $ 3.00 $ 3,150.00
Steve Manning Construction 1,050. LNFT $ 5.00 $ 5,250.00
Rocky Mountain Materials & Asphalt 1,050. LNFT $ 3.65 $ 3,832.50
Kiewit Infrastructure 1,050. LNFT $ 4.00 $ 4,200.00
Engineer's Estimate 1,050. LNFT $ 18.00 $ 18,900.00
30402-5100
RBK Construction 5,030. SQYD $ 1.50 $ 7,545.00
A&S Construction 5,030. SQYD $ 4.00 $ 20,120.00
Merry Technology 5,030. SQYD $ 7.00 $ 35,210.00
American Civil Constructors 5,030. SQYD $ 0.80 $ 4,024.00
PLACED RIPRAP, METHOD B, CLASS 4
ROADWAY AGGREGATE, METHOD 2
DITCH RECONDITIONING
FULL DEPTH RECLAMATION, METHOD 2, 3-INCH DEPTH
Steve Manning Construction 5,030. SQYD $ 11.00 $ 55,330.00
Rocky Mountain Materials & Asphalt 5,030. SQYD $ 3.60 $ 18,108.00
Kiewit Infrastructure 5,030. SQYD $ 4.00 $ 20,120.00
Engineer's Estimate 5,030. SQYD $ 2.50 $ 12,575.00
30402-5200
RBK Construction 30,000. SQYD $ 1.25 $ 37,500.00
A&S Construction 30,000. SQYD $ 2.00 $ 60,000.00
Merry Technology 30,000. SQYD $ 5.00 $ 150,000.00
American Civil Constructors 30,000. SQYD $ 0.90 $ 27,000.00
Steve Manning Construction 30,000. SQYD $ 9.00 $ 270,000.00
Rocky Mountain Materials & Asphalt 30,000. SQYD $ 3.60 $ 108,000.00
Kiewit Infrastructure 30,000. SQYD $ 4.20 $ 126,000.00
Engineer's Estimate 30,000. SQYD $ 2.50 $ 75,000.00
30402-5500
RBK Construction 56,000. SQYD $ 1.50 $ 84,000.00
A&S Construction 56,000. SQYD $ 3.00 $ 168,000.00
Merry Technology 56,000. SQYD $ 4.00 $ 224,000.00
American Civil Constructors 56,000. SQYD $ 1.10 $ 61,600.00
Steve Manning Construction 56,000. SQYD $ 7.00 $ 392,000.00
Rocky Mountain Materials & Asphalt 56,000. SQYD $ 2.59 $ 145,040.00
Kiewit Infrastructure 56,000. SQYD $ 4.00 $ 224,000.00
Engineer's Estimate 56,000. SQYD $ 3.50 $ 196,000.00
40101-0900
RBK Construction 16,200. TON $ 68.00 $ 1,101,600.00
A&S Construction 16,200. TON $ 97.00 $ 1,571,400.00
Merry Technology 16,200. TON $ 30.00 $ 486,000.00
American Civil Constructors 16,200. TON $ 102.00 $ 1,652,400.00
Steve Manning Construction 16,200. TON $ 108.00 $ 1,749,600.00
Rocky Mountain Materials & Asphalt 16,200. TON $ 79.55 $ 1,288,710.00
Kiewit Infrastructure 16,200. TON $ 138.00 $ 2,235,600.00
Engineer's Estimate 16,200. TON $ 88.00 $ 1,425,600.00
40105-3000
RBK Construction 160. TON $ 180.00 $ 28,800.00
A&S Construction 160. TON $ 220.00 $ 35,200.00
Merry Technology 160. TON $ 320.00 $ 51,200.00
FULL DEPTH RECLAMATION, METHOD 2, 4-INCH DEPTH
FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3
MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
American Civil Constructors 160. TON $ 210.00 $ 33,600.00
Steve Manning Construction 160. TON $ 50.00 $ 8,000.00
Rocky Mountain Materials & Asphalt 160. TON $ 202.27 $ 32,363.20
Kiewit Infrastructure 160. TON $ 150.00 $ 24,000.00
Engineer's Estimate 160. TON $ 550.00 $ 88,000.00
40601-0000
RBK Construction 26. TON $ 675.00 $ 17,550.00
A&S Construction 26. TON $ 750.00 $ 19,500.00
Merry Technology 26. TON $ 1,600.00 $ 41,600.00
American Civil Constructors 26. TON $ 900.00 $ 23,400.00
Steve Manning Construction 26. TON $ 900.00 $ 23,400.00
Rocky Mountain Materials & Asphalt 26. TON $ 1,621.09 $ 42,148.34
Kiewit Infrastructure 26. TON $ 1,000.00 $ 26,000.00
Engineer's Estimate 26. TON $ 600.00 $ 15,600.00
41102-1000
RBK Construction 59,550. SQYD $ 0.75 $ 44,662.50
A&S Construction 59,550. SQYD $ 1.50 $ 89,325.00
Merry Technology 59,550. SQYD $ 3.00 $ 178,650.00
American Civil Constructors 59,550. SQYD $ 1.30 $ 77,415.00
Steve Manning Construction 59,550. SQYD $ 0.40 $ 23,820.00
Rocky Mountain Materials & Asphalt 59,550. SQYD $ 2.79 $ 166,144.50
Kiewit Infrastructure 59,550. SQYD $ 1.50 $ 89,325.00
Engineer's Estimate 59,550. SQYD $ 0.80 $ 47,640.00
41105-0000
RBK Construction 55. TON $ 45.00 $ 2,475.00
A&S Construction 55. TON $ 150.00 $ 8,250.00
Merry Technology 55. TON $ 380.00 $ 20,900.00
American Civil Constructors 55. TON $ 159.00 $ 8,745.00
Steve Manning Construction 55. TON $ 60.00 $ 3,300.00
Rocky Mountain Materials & Asphalt 55. TON $ 156.99 $ 8,634.45
Kiewit Infrastructure 55. TON $ 130.00 $ 7,150.00
Engineer's Estimate 55. TON $ 145.00 $ 7,975.00
41201-0000
RBK Construction 26. TON $ 675.00 $ 17,550.00
A&S Construction 26. TON $ 1,000.00 $ 26,000.00
FOG SEAL
PRIME COAT, METHOD 1
BLOTTER
TACK COAT
Merry Technology 26. TON $ 600.00 $ 15,600.00
American Civil Constructors 26. TON $ 1,160.00 $ 30,160.00
Steve Manning Construction 26. TON $ 1,300.00 $ 33,800.00
Rocky Mountain Materials & Asphalt 26. TON $ 1,621.10 $ 42,148.60
Kiewit Infrastructure 26. TON $ 600.00 $ 15,600.00
Engineer's Estimate 26. TON $ 500.00 $ 13,000.00
50101-2500
RBK Construction 52,200. SQYD $ 45.25 $ 2,362,050.00
A&S Construction 52,200. SQYD $ 52.00 $ 2,714,400.00
Merry Technology 52,200. SQYD $ 5.00 $ 261,000.00
American Civil Constructors 52,200. SQYD $ 40.15 $ 2,095,830.00
Steve Manning Construction 52,200. SQYD $ 47.00 $ 2,453,400.00
Rocky Mountain Materials & Asphalt 52,200. SQYD $ 55.00 $ 2,871,000.00
Kiewit Infrastructure 52,200. SQYD $ 72.00 $ 3,758,400.00
Engineer's Estimate 52,200. SQYD $ 38.00 $ 1,983,600.00
55201-0200
RBK Construction 105. CUYD $ 450.00 $ 47,250.00
A&S Construction 105. CUYD $ 800.00 $ 84,000.00
Merry Technology 105. CUYD $ 1,500.00 $ 157,500.00
American Civil Constructors 105. CUYD $ 1,000.00 $ 105,000.00
Steve Manning Construction 105. CUYD $ 800.00 $ 84,000.00
Rocky Mountain Materials & Asphalt 105. CUYD $ 557.08 $ 58,493.40
Kiewit Infrastructure 105. CUYD $ 3,000.00 $ 315,000.00
Engineer's Estimate 105. CUYD $ 1,500.00 $ 157,500.00
55401-2000
RBK Construction 12,410. LB $ 2.00 $ 24,820.00
A&S Construction 12,410. LB $ 2.00 $ 24,820.00
Merry Technology 12,410. LB $ 2.00 $ 24,820.00
American Civil Constructors 12,410. LB $ 1.00 $ 12,410.00
Steve Manning Construction 12,410. LB $ 3.00 $ 37,230.00
Rocky Mountain Materials & Asphalt 12,410. LB $ 1.99 $ 24,695.90
Kiewit Infrastructure 12,410. LB $ 2.00 $ 24,820.00
Engineer's Estimate 12,410. LB $ 1.75 $ 21,717.50
55504-0000
RBK Construction ALL LPSM $ 140,000.00 $ 140,000.00
MINOR CONCRETE PAVEMENT, PLAIN, 5-INCH DEPTH
STRUCTURAL CONCRETE, CLASS A (AE)
REINFORCING STEEL, EPOXY COATED
PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
A&S Construction ALL LPSM $ 200,000.00 $ 200,000.00
Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00
American Civil Constructors ALL LPSM $ 225,000.00 $ 225,000.00
Steve Manning Construction ALL LPSM $ 180,000.00 $ 180,000.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 205,023.67 $ 205,023.67
Kiewit Infrastructure ALL LPSM $ 220,000.00 $ 220,000.00
Engineer's Estimate ALL LPSM $ 162,000.00 $ 162,000.00
55504-0000
RBK Construction ALL LPSM $ 140,000.00 $ 140,000.00
A&S Construction ALL LPSM $ 200,000.00 $ 200,000.00
Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00
American Civil Constructors ALL LPSM $ 225,000.00 $ 225,000.00
Steve Manning Construction ALL LPSM $ 180,000.00 $ 180,000.00
Rocky Mountain Materials & Asphalt ALL LPSM $ 205,023.67 $ 205,023.67
Kiewit Infrastructure ALL LPSM $ 220,000.00 $ 220,000.00
Engineer's Estimate ALL LPSM $ 162,000.00 $ 162,000.00
55601-0500
RBK Construction 230. LNFT $ 170.00 $ 39,100.00
A&S Construction 230. LNFT $ 130.00 $ 29,900.00
Merry Technology 230. LNFT $ 45.00 $ 10,350.00
American Civil Constructors 230. LNFT $ 150.00 $ 34,500.00
Steve Manning Construction 230. LNFT $ 150.00 $ 34,500.00
Rocky Mountain Materials & Asphalt 230. LNFT $ 170.67 $ 39,254.10
Kiewit Infrastructure 230. LNFT $ 400.00 $ 92,000.00
Engineer's Estimate 230. LNFT $ 200.00 $ 46,000.00
56001-0000
RBK Construction 35. SQYD $ 650.00 $ 22,750.00
A&S Construction 35. SQYD $ 200.00 $ 7,000.00
Merry Technology 35. SQYD $ 100.00 $ 3,500.00
American Civil Constructors 35. SQYD $ 500.00 $ 17,500.00
Steve Manning Construction 35. SQYD $ 560.00 $ 19,600.00
Rocky Mountain Materials & Asphalt 35. SQYD $ 1,115.07 $ 39,027.45
Kiewit Infrastructure 35. SQYD $ 1,500.00 $ 52,500.00
Engineer's Estimate 35. SQYD $ 110.00 $ 3,850.00
60101-0000
PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)
BRIDGE RAILING, CONCRETE
REMOVAL OF CONCRETE BY HYDRODEMOLITION
CONCRETE (ISLAND)
RBK Construction 64. CUYD $ 350.00 $ 22,400.00
A&S Construction 64. CUYD $ 400.00 $ 25,600.00
Merry Technology 64. CUYD $ 100.00 $ 6,400.00
American Civil Constructors 64. CUYD $ 500.00 $ 32,000.00
Steve Manning Construction 64. CUYD $ 400.00 $ 25,600.00
Rocky Mountain Materials & Asphalt 64. CUYD $ 403.15 $ 25,801.60
Kiewit Infrastructure 64. CUYD $ 800.00 $ 51,200.00
Engineer's Estimate 64. CUYD $ 450.00 $ 28,800.00
60201-0400
RBK Construction 50. LNFT $ 60.00 $ 3,000.00
A&S Construction 50. LNFT $ 110.00 $ 5,500.00
Merry Technology 50. LNFT $ 100.00 $ 5,000.00
American Civil Constructors 50. LNFT $ 70.00 $ 3,500.00
Steve Manning Construction 50. LNFT $ 100.00 $ 5,000.00
Rocky Mountain Materials & Asphalt 50. LNFT $ 153.66 $ 7,683.00
Kiewit Infrastructure 50. LNFT $ 120.00 $ 6,000.00
Engineer's Estimate 50. LNFT $ 75.00 $ 3,750.00
60201-0600
RBK Construction 240. LNFT $ 65.00 $ 15,600.00
A&S Construction 240. LNFT $ 150.00 $ 36,000.00
Merry Technology 240. LNFT $ 165.00 $ 39,600.00
American Civil Constructors 240. LNFT $ 90.00 $ 21,600.00
Steve Manning Construction 240. LNFT $ 150.00 $ 36,000.00
Rocky Mountain Materials & Asphalt 240. LNFT $ 156.38 $ 37,531.20
Kiewit Infrastructure 240. LNFT $ 175.00 $ 42,000.00
Engineer's Estimate 240. LNFT $ 100.00 $ 24,000.00
60201-0800
RBK Construction 65. LNFT $ 100.00 $ 6,500.00
A&S Construction 65. LNFT $ 160.00 $ 10,400.00
Merry Technology 65. LNFT $ 200.00 $ 13,000.00
American Civil Constructors 65. LNFT $ 100.00 $ 6,500.00
Steve Manning Construction 65. LNFT $ 200.00 $ 13,000.00
Rocky Mountain Materials & Asphalt 65. LNFT $ 162.45 $ 10,559.25
Kiewit Infrastructure 65. LNFT $ 150.00 $ 9,750.00
Engineer's Estimate 65. LNFT $ 155.00 $ 10,075.00
12-INCH PIPE CULVERT
18-INCH PIPE CULVERT
24-INCH PIPE CULVERT
60201-1000
RBK Construction 8. LNFT $ 115.00 $ 920.00
A&S Construction 8. LNFT $ 350.00 $ 2,800.00
Merry Technology 8. LNFT $ 260.00 $ 2,080.00
American Civil Constructors 8. LNFT $ 185.00 $ 1,480.00
Steve Manning Construction 8. LNFT $ 800.00 $ 6,400.00
Rocky Mountain Materials & Asphalt 8. LNFT $ 258.16 $ 2,065.28
Kiewit Infrastructure 8. LNFT $ 1,200.00 $ 9,600.00
Engineer's Estimate 8. LNFT $ 120.00 $ 960.00
60201-1200
RBK Construction 8. LNFT $ 175.00 $ 1,400.00
A&S Construction 8. LNFT $ 280.00 $ 2,240.00
Merry Technology 8. LNFT $ 345.00 $ 2,760.00
American Civil Constructors 8. LNFT $ 200.00 $ 1,600.00
Steve Manning Construction 8. LNFT $ 900.00 $ 7,200.00
Rocky Mountain Materials & Asphalt 8. LNFT $ 269.58 $ 2,156.64
Kiewit Infrastructure 8. LNFT $ 1,300.00 $ 10,400.00
Engineer's Estimate 8. LNFT $ 340.00 $ 2,720.00
60210-0400
RBK Construction 4. EACH $ 500.00 $ 2,000.00
A&S Construction 4. EACH $ 400.00 $ 1,600.00
Merry Technology 4. EACH $ 550.00 $ 2,200.00
American Civil Constructors 4. EACH $ 400.00 $ 1,600.00
Steve Manning Construction 4. EACH $ 300.00 $ 1,200.00
Rocky Mountain Materials & Asphalt 4. EACH $ 207.41 $ 829.64
Kiewit Infrastructure 4. EACH $ 500.00 $ 2,000.00
Engineer's Estimate 4. EACH $ 260.00 $ 1,040.00
60210-0600
RBK Construction 16. EACH $ 550.00 $ 8,800.00
A&S Construction 16. EACH $ 700.00 $ 11,200.00
Merry Technology 16. EACH $ 700.00 $ 11,200.00
American Civil Constructors 16. EACH $ 450.00 $ 7,200.00
Steve Manning Construction 16. EACH $ 500.00 $ 8,000.00
Rocky Mountain Materials & Asphalt 16. EACH $ 253.37 $ 4,053.92
Kiewit Infrastructure 16. EACH $ 500.00 $ 8,000.00
Engineer's Estimate 16. EACH $ 380.00 $ 6,080.00
36-INCH PIPE CULVERT
48-INCH PIPE CULVERT
END SECTION FOR 12-INCH PIPE CULVERT
END SECTION FOR 18-INCH PIPE CULVERT
60210-0800
RBK Construction 4. EACH $ 600.00 $ 2,400.00
A&S Construction 4. EACH $ 800.00 $ 3,200.00
Merry Technology 4. EACH $ 1,100.00 $ 4,400.00
American Civil Constructors 4. EACH $ 500.00 $ 2,000.00
Steve Manning Construction 4. EACH $ 600.00 $ 2,400.00
Rocky Mountain Materials & Asphalt 4. EACH $ 301.06 $ 1,204.24
Kiewit Infrastructure 4. EACH $ 700.00 $ 2,800.00
Engineer's Estimate 4. EACH $ 570.00 $ 2,280.00
60210-1000
RBK Construction 1. EACH $ 750.00 $ 750.00
A&S Construction 1. EACH $ 1,600.00 $ 1,600.00
Merry Technology 1. EACH $ 1,500.00 $ 1,500.00
American Civil Constructors 1. EACH $ 1,200.00 $ 1,200.00
Steve Manning Construction 1. EACH $ 1,400.00 $ 1,400.00
Rocky Mountain Materials & Asphalt 1. EACH $ 486.50 $ 486.50
Kiewit Infrastructure 1. EACH $ 1,600.00 $ 1,600.00
Engineer's Estimate 1. EACH $ 785.00 $ 785.00
60210-1200
RBK Construction 1. EACH $ 1,500.00 $ 1,500.00
A&S Construction 1. EACH $ 2,200.00 $ 2,200.00
Merry Technology 1. EACH $ 2,000.00 $ 2,000.00
American Civil Constructors 1. EACH $ 2,000.00 $ 2,000.00
Steve Manning Construction 1. EACH $ 1,500.00 $ 1,500.00
Rocky Mountain Materials & Asphalt 1. EACH $ 1,224.91 $ 1,224.91
Kiewit Infrastructure 1. EACH $ 2,300.00 $ 2,300.00
Engineer's Estimate 1. EACH $ 1,400.00 $ 1,400.00
60404-1000
RBK Construction 2. EACH $ 6,000.00 $ 12,000.00
A&S Construction 2. EACH $ 5,000.00 $ 10,000.00
Merry Technology 2. EACH $ 8,500.00 $ 17,000.00
American Civil Constructors 2. EACH $ 5,000.00 $ 10,000.00
Steve Manning Construction 2. EACH $ 6,000.00 $ 12,000.00
Rocky Mountain Materials & Asphalt 2. EACH $ 7,837.71 $ 15,675.42
Kiewit Infrastructure 2. EACH $ 6,000.00 $ 12,000.00
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
CATCH BASIN, FLH TYPE 1
Engineer's Estimate 2. EACH $ 4,370.00 $ 8,740.00
60412-2000
RBK Construction 3. EACH $ 3,000.00 $ 9,000.00
A&S Construction 3. EACH $ 2,500.00 $ 7,500.00
Merry Technology 3. EACH $ 18,000.00 $ 54,000.00
American Civil Constructors 3. EACH $ 2,500.00 $ 7,500.00
Steve Manning Construction 3. EACH $ 800.00 $ 2,400.00
Rocky Mountain Materials & Asphalt 3. EACH $ 1,229.28 $ 3,687.84
Kiewit Infrastructure 3. EACH $ 1,300.00 $ 3,900.00
Engineer's Estimate 3. EACH $ 1,000.00 $ 3,000.00
60704-0000
RBK Construction 4. EACH $ 2,000.00 $ 8,000.00
A&S Construction 4. EACH $ 4,000.00 $ 16,000.00
Merry Technology 4. EACH $ 2,500.00 $ 10,000.00
American Civil Constructors 4. EACH $ 4,500.00 $ 18,000.00
Steve Manning Construction 4. EACH $ 4,000.00 $ 16,000.00
Rocky Mountain Materials & Asphalt 4. EACH $ 2,684.16 $ 10,736.64
Kiewit Infrastructure 4. EACH $ 50.00 $ 200.00
Engineer's Estimate 4. EACH $ 1,500.00 $ 6,000.00
60901-8000
RBK Construction 150. LNFT $ 70.00 $ 10,500.00
A&S Construction 150. LNFT $ 55.00 $ 8,250.00
Merry Technology 150. LNFT $ 40.00 $ 6,000.00
American Civil Constructors 150. LNFT $ 25.00 $ 3,750.00
Steve Manning Construction 150. LNFT $ 200.00 $ 30,000.00
Rocky Mountain Materials & Asphalt 150. LNFT $ 60.92 $ 9,138.00
Kiewit Infrastructure 150. LNFT $ 80.00 $ 12,000.00
Engineer's Estimate 150. LNFT $ 75.00 $ 11,250.00
60902-1000
RBK Construction 4,810. LNFT $ 16.00 $ 76,960.00
A&S Construction 4,810. LNFT $ 25.00 $ 120,250.00
Merry Technology 4,810. LNFT $ 30.00 $ 144,300.00
American Civil Constructors 4,810. LNFT $ 20.00 $ 96,200.00
Steve Manning Construction 4,810. LNFT $ 25.00 $ 120,250.00
Rocky Mountain Materials & Asphalt 4,810. LNFT $ 18.72 $ 90,043.20
REMOVE AND RESET MANHOLE FRAME AND COVER
CLEANING CULVERT IN PLACE
CURB, TIMBER
CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (24" CATCH PAN)
Kiewit Infrastructure 4,810. LNFT $ 40.00 $ 192,400.00
Engineer's Estimate 4,810. LNFT $ 20.00 $ 96,200.00
60902-1000
RBK Construction 135. LNFT $ 23.00 $ 3,105.00
A&S Construction 135. LNFT $ 32.00 $ 4,320.00
Merry Technology 135. LNFT $ 45.00 $ 6,075.00
American Civil Constructors 135. LNFT $ 27.00 $ 3,645.00
Steve Manning Construction 135. LNFT $ 25.00 $ 3,375.00
Rocky Mountain Materials & Asphalt 135. LNFT $ 27.42 $ 3,701.70
Kiewit Infrastructure 135. LNFT $ 35.00 $ 4,725.00
Engineer's Estimate 135. LNFT $ 25.00 $ 3,375.00
60920-0000
RBK Construction 22. EACH $ 200.00 $ 4,400.00
A&S Construction 22. EACH $ 105.00 $ 2,310.00
Merry Technology 22. EACH $ 350.00 $ 7,700.00
American Civil Constructors 22. EACH $ 110.00 $ 2,420.00
Steve Manning Construction 22. EACH $ 50.00 $ 1,100.00
Rocky Mountain Materials & Asphalt 22. EACH $ 60.66 $ 1,334.52
Kiewit Infrastructure 22. EACH $ 100.00 $ 2,200.00
Engineer's Estimate 22. EACH $ 60.00 $ 1,320.00
61108-1000
RBK Construction 2. EACH $ 4,000.00 $ 8,000.00
A&S Construction 2. EACH $ 2,000.00 $ 4,000.00
Merry Technology 2. EACH $ 550.00 $ 1,100.00
American Civil Constructors 2. EACH $ 400.00 $ 800.00
Steve Manning Construction 2. EACH $ 300.00 $ 600.00
Rocky Mountain Materials & Asphalt 2. EACH $ 151.92 $ 303.84
Kiewit Infrastructure 2. EACH $ 2,500.00 $ 5,000.00
Engineer's Estimate 2. EACH $ 2,500.00 $ 5,000.00
61503-5000
RBK Construction 240. SQYD $ 35.00 $ 8,400.00
A&S Construction 240. SQYD $ 32.00 $ 7,680.00
Merry Technology 240. SQYD $ 150.00 $ 36,000.00
American Civil Constructors 240. SQYD $ 37.00 $ 8,880.00
Steve Manning Construction 240. SQYD $ 98.00 $ 23,520.00
CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (12" SPILL PAN)
RESET WHEELSTOP
ADJUST WATER VALVE
MEDIAN, STONE (12" DEPTH)
Rocky Mountain Materials & Asphalt 240. SQYD $ 50.35 $ 12,084.00
Kiewit Infrastructure 240. SQYD $ 50.00 $ 12,000.00
Engineer's Estimate 240. SQYD $ 45.00 $ 10,800.00
61701-1200
RBK Construction 6,000. LNFT $ 21.00 $ 126,000.00
A&S Construction 6,000. LNFT $ 28.00 $ 168,000.00
Merry Technology 6,000. LNFT $ 25.00 $ 150,000.00
American Civil Constructors 6,000. LNFT $ 21.00 $ 126,000.00
Steve Manning Construction 6,000. LNFT $ 25.00 $ 150,000.00
Rocky Mountain Materials & Asphalt 6,000. LNFT $ 27.05 $ 162,300.00
Kiewit Infrastructure 6,000. LNFT $ 20.00 $ 120,000.00
Engineer's Estimate 6,000. LNFT $ 22.00 $ 132,000.00
61702-0600
RBK Construction 26. EACH $ 2,000.00 $ 52,000.00
A&S Construction 26. EACH $ 2,000.00 $ 52,000.00
Merry Technology 26. EACH $ 2,500.00 $ 65,000.00
American Civil Constructors 26. EACH $ 2,250.00 $ 58,500.00
Steve Manning Construction 26. EACH $ 1,800.00 $ 46,800.00
Rocky Mountain Materials & Asphalt 26. EACH $ 1,709.76 $ 44,453.76
Kiewit Infrastructure 26. EACH $ 2,000.00 $ 52,000.00
Engineer's Estimate 26. EACH $ 2,250.00 $ 58,500.00
61707-0000
RBK Construction 43. LNFT $ 100.00 $ 4,300.00
A&S Construction 43. LNFT $ 70.00 $ 3,010.00
Merry Technology 43. LNFT $ 185.00 $ 7,955.00
American Civil Constructors 43. LNFT $ 100.00 $ 4,300.00
Steve Manning Construction 43. LNFT $ 56.00 $ 2,408.00
Rocky Mountain Materials & Asphalt 43. LNFT $ 71.59 $ 3,078.37
Kiewit Infrastructure 43. LNFT $ 80.00 $ 3,440.00
Engineer's Estimate 43. LNFT $ 85.00 $ 3,655.00
61707-0000
RBK Construction 43. LNFT $ 150.00 $ 6,450.00
A&S Construction 43. LNFT $ 210.00 $ 9,030.00
Merry Technology 43. LNFT $ 180.00 $ 7,740.00
American Civil Constructors 43. LNFT $ 145.00 $ 6,235.00
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
TERMINAL SECTION, TYPE FLARED
STRUCTURE TRANSITION RAILING (TYPE 3G)
STRUCTURE TRANSITION RAILING (TYPE 3G ANCHORED)
Steve Manning Construction 43. LNFT $ 112.00 $ 4,816.00
Rocky Mountain Materials & Asphalt 43. LNFT $ 148.57 $ 6,388.51
Kiewit Infrastructure 43. LNFT $ 200.00 $ 8,600.00
Engineer's Estimate 43. LNFT $ 200.00 $ 8,600.00
61904-0000
RBK Construction 32. EACH $ 575.00 $ 18,400.00
A&S Construction 32. EACH $ 800.00 $ 25,600.00
Merry Technology 32. EACH $ 45.00 $ 1,440.00
American Civil Constructors 32. EACH $ 900.00 $ 28,800.00
Steve Manning Construction 32. EACH $ 300.00 $ 9,600.00
Rocky Mountain Materials & Asphalt 32. EACH $ 3,235.49 $ 103,535.68
Kiewit Infrastructure 32. EACH $ 1,000.00 $ 32,000.00
Engineer's Estimate 32. EACH $ 500.00 $ 16,000.00
61904-0000
RBK Construction 64. EACH $ 275.00 $ 17,600.00
A&S Construction 64. EACH $ 400.00 $ 25,600.00
Merry Technology 64. EACH $ 450.00 $ 28,800.00
American Civil Constructors 64. EACH $ 600.00 $ 38,400.00
Steve Manning Construction 64. EACH $ 200.00 $ 12,800.00
Rocky Mountain Materials & Asphalt 64. EACH $ 858.09 $ 54,917.76
Kiewit Infrastructure 64. EACH $ 300.00 $ 19,200.00
Engineer's Estimate 64. EACH $ 350.00 $ 22,400.00
62201-0250
RBK Construction 80. HOUR $ 105.00 $ 8,400.00
A&S Construction 80. HOUR $ 110.00 $ 8,800.00
Merry Technology 80. HOUR $ 160.00 $ 12,800.00
American Civil Constructors 80. HOUR $ 100.00 $ 8,000.00
Steve Manning Construction 80. HOUR $ 120.00 $ 9,600.00
Rocky Mountain Materials & Asphalt 80. HOUR $ 90.10 $ 7,208.00
Kiewit Infrastructure 80. HOUR $ 120.00 $ 9,600.00
Engineer's Estimate 80. HOUR $ 150.00 $ 12,000.00
62201-0900
RBK Construction 80. HOUR $ 135.00 $ 10,800.00
A&S Construction 80. HOUR $ 170.00 $ 13,600.00
Merry Technology 80. HOUR $ 180.00 $ 14,400.00
BOLLARD POST (REMOVABLE)
BOLLARD POST
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
American Civil Constructors 80. HOUR $ 100.00 $ 8,000.00
Steve Manning Construction 80. HOUR $ 180.00 $ 14,400.00
Rocky Mountain Materials & Asphalt 80. HOUR $ 128.71 $ 10,296.80
Kiewit Infrastructure 80. HOUR $ 150.00 $ 12,000.00
Engineer's Estimate 80. HOUR $ 155.00 $ 12,400.00
62201-2050
RBK Construction 60. HOUR $ 110.00 $ 6,600.00
A&S Construction 60. HOUR $ 130.00 $ 7,800.00
Merry Technology 60. HOUR $ 180.00 $ 10,800.00
American Civil Constructors 60. HOUR $ 75.00 $ 4,500.00
Steve Manning Construction 60. HOUR $ 180.00 $ 10,800.00
Rocky Mountain Materials & Asphalt 60. HOUR $ 123.87 $ 7,432.20
Kiewit Infrastructure 60. HOUR $ 150.00 $ 9,000.00
Engineer's Estimate 60. HOUR $ 125.00 $ 7,500.00
62201-2850
RBK Construction 60. HOUR $ 150.00 $ 9,000.00
A&S Construction 60. HOUR $ 170.00 $ 10,200.00
Merry Technology 60. HOUR $ 180.00 $ 10,800.00
American Civil Constructors 60. HOUR $ 125.00 $ 7,500.00
Steve Manning Construction 60. HOUR $ 220.00 $ 13,200.00
Rocky Mountain Materials & Asphalt 60. HOUR $ 150.73 $ 9,043.80
Kiewit Infrastructure 60. HOUR $ 200.00 $ 12,000.00
Engineer's Estimate 60. HOUR $ 150.00 $ 9,000.00
62201-3200
RBK Construction 40. HOUR $ 175.00 $ 7,000.00
A&S Construction 40. HOUR $ 240.00 $ 9,600.00
Merry Technology 40. HOUR $ 170.00 $ 6,800.00
American Civil Constructors 40. HOUR $ 160.00 $ 6,400.00
Steve Manning Construction 40. HOUR $ 220.00 $ 8,800.00
Rocky Mountain Materials & Asphalt 40. HOUR $ 198.54 $ 7,941.60
Kiewit Infrastructure 40. HOUR $ 225.00 $ 9,000.00
Engineer's Estimate 40. HOUR $ 175.00 $ 7,000.00
62301-0000
RBK Construction 120. HOUR $ 40.00 $ 4,800.00
A&S Construction 120. HOUR $ 55.00 $ 6,600.00
ROLLER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD MINIMUM CAPACITY
GENERAL LABOR
Merry Technology 120. HOUR $ 70.00 $ 8,400.00
American Civil Constructors 120. HOUR $ 30.00 $ 3,600.00
Steve Manning Construction 120. HOUR $ 60.00 $ 7,200.00
Rocky Mountain Materials & Asphalt 120. HOUR $ 73.67 $ 8,840.40
Kiewit Infrastructure 120. HOUR $ 45.00 $ 5,400.00
Engineer's Estimate 120. HOUR $ 65.00 $ 7,800.00
62302-1000
RBK Construction 40. HOUR $ 170.00 $ 6,800.00
A&S Construction 40. HOUR $ 110.00 $ 4,400.00
Merry Technology 40. HOUR $ 150.00 $ 6,000.00
American Civil Constructors 40. HOUR $ 90.00 $ 3,600.00
Steve Manning Construction 40. HOUR $ 160.00 $ 6,400.00
Rocky Mountain Materials & Asphalt 40. HOUR $ 280.69 $ 11,227.60
Kiewit Infrastructure 40. HOUR $ 150.00 $ 6,000.00
Engineer's Estimate 40. HOUR $ 150.00 $ 6,000.00
62302-1100
RBK Construction 40. HOUR $ 170.00 $ 6,800.00
A&S Construction 40. HOUR $ 130.00 $ 5,200.00
Merry Technology 40. HOUR $ 170.00 $ 6,800.00
American Civil Constructors 40. HOUR $ 185.00 $ 7,400.00
Steve Manning Construction 40. HOUR $ 200.00 $ 8,000.00
Rocky Mountain Materials & Asphalt 40. HOUR $ 409.46 $ 16,378.40
Kiewit Infrastructure 40. HOUR $ 150.00 $ 6,000.00
Engineer's Estimate 40. HOUR $ 200.00 $ 8,000.00
62405-0200
RBK Construction 98,900. SQYD $ 0.60 $ 59,340.00
A&S Construction 98,900. SQYD $ 3.00 $ 296,700.00
Merry Technology 98,900. SQYD $ 2.00 $ 197,800.00
American Civil Constructors 98,900. SQYD $ 1.00 $ 98,900.00
Steve Manning Construction 98,900. SQYD $ 2.00 $ 197,800.00
Rocky Mountain Materials & Asphalt 98,900. SQYD $ 0.63 $ 62,307.00
Kiewit Infrastructure 98,900. SQYD $ 1.40 $ 138,460.00
Engineer's Estimate 98,900. SQYD $ 1.25 $ 123,625.00
62510-2000
RBK Construction 20. ACRE $ 1,200.00 $ 24,000.00
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
SEEDING, HYDRAULIC METHOD
A&S Construction 20. ACRE $ 1,100.00 $ 22,000.00
Merry Technology 20. ACRE $ 7,350.00 $ 147,000.00
American Civil Constructors 20. ACRE $ 800.00 $ 16,000.00
Steve Manning Construction 20. ACRE $ 1,740.00 $ 34,800.00
Rocky Mountain Materials & Asphalt 20. ACRE $ 1,399.66 $ 27,993.20
Kiewit Infrastructure 20. ACRE $ 1,500.00 $ 30,000.00
Engineer's Estimate 20. ACRE $ 1,150.00 $ 23,000.00
62515-2000
RBK Construction 20. ACRE $ 1,300.00 $ 26,000.00
A&S Construction 20. ACRE $ 1,400.00 $ 28,000.00
Merry Technology 20. ACRE $ 7,350.00 $ 147,000.00
American Civil Constructors 20. ACRE $ 1,300.00 $ 26,000.00
Steve Manning Construction 20. ACRE $ 1,340.00 $ 26,800.00
Rocky Mountain Materials & Asphalt 20. ACRE $ 1,034.84 $ 20,696.80
Kiewit Infrastructure 20. ACRE $ 2,000.00 $ 40,000.00
Engineer's Estimate 20. ACRE $ 1,400.00 $ 28,000.00
62901-0300
RBK Construction 8,500. SQYD $ 2.50 $ 21,250.00
A&S Construction 8,500. SQYD $ 3.00 $ 25,500.00
Merry Technology 8,500. SQYD $ 10.00 $ 85,000.00
American Civil Constructors 8,500. SQYD $ 1.75 $ 14,875.00
Steve Manning Construction 8,500. SQYD $ 4.00 $ 34,000.00
Rocky Mountain Materials & Asphalt 8,500. SQYD $ 3.69 $ 31,365.00
Kiewit Infrastructure 8,500. SQYD $ 2.50 $ 21,250.00
Engineer's Estimate 8,500. SQYD $ 3.65 $ 31,025.00
63301-0000
RBK Construction 85. EACH $ 450.00 $ 38,250.00
A&S Construction 85. EACH $ 350.00 $ 29,750.00
Merry Technology 85. EACH $ 300.00 $ 25,500.00
American Civil Constructors 85. EACH $ 325.00 $ 27,625.00
Steve Manning Construction 85. EACH $ 500.00 $ 42,500.00
Rocky Mountain Materials & Asphalt 85. EACH $ 348.46 $ 29,619.10
Kiewit Infrastructure 85. EACH $ 350.00 $ 29,750.00
Engineer's Estimate 85. EACH $ 300.00 $ 25,500.00
63309-0100
MULCHING, HYDRAULIC METHOD
ROLLED EROSION CONTROL PRODUCT, TYPE 1.C
SIGN SYSTEM
DELINEATOR, TYPE 1
RBK Construction 270. EACH $ 21.00 $ 5,670.00
A&S Construction 270. EACH $ 20.00 $ 5,400.00
Merry Technology 270. EACH $ 100.00 $ 27,000.00
American Civil Constructors 270. EACH $ 18.00 $ 4,860.00
Steve Manning Construction 270. EACH $ 40.00 $ 10,800.00
Rocky Mountain Materials & Asphalt 270. EACH $ 18.58 $ 5,016.60
Kiewit Infrastructure 270. EACH $ 18.00 $ 4,860.00
Engineer's Estimate 270. EACH $ 25.00 $ 6,750.00
63313-0000
RBK Construction 1,850. LNFT $ 6.00 $ 11,100.00
A&S Construction 1,850. LNFT $ 6.00 $ 11,100.00
Merry Technology 1,850. LNFT $ 10.00 $ 18,500.00
American Civil Constructors 1,850. LNFT $ 1.00 $ 1,850.00
Steve Manning Construction 1,850. LNFT $ 4.40 $ 8,140.00
Rocky Mountain Materials & Asphalt 1,850. LNFT $ 1.66 $ 3,071.00
Kiewit Infrastructure 1,850. LNFT $ 6.00 $ 11,100.00
Engineer's Estimate 1,850. LNFT $ 6.00 $ 11,100.00
63313-1000
RBK Construction 3,030. LNFT $ 6.00 $ 18,180.00
A&S Construction 3,030. LNFT $ 1.00 $ 3,030.00
Merry Technology 3,030. LNFT $ 10.00 $ 30,300.00
American Civil Constructors 3,030. LNFT $ 1.00 $ 3,030.00
Steve Manning Construction 3,030. LNFT $ 4.00 $ 12,120.00
Rocky Mountain Materials & Asphalt 3,030. LNFT $ 1.66 $ 5,029.80
Kiewit Infrastructure 3,030. LNFT $ 6.00 $ 18,180.00
Engineer's Estimate 3,030. LNFT $ 6.00 $ 18,180.00
63316-1000
RBK Construction 23. EACH $ 175.00 $ 4,025.00
A&S Construction 23. EACH $ 200.00 $ 4,600.00
Merry Technology 23. EACH $ 250.00 $ 5,750.00
American Civil Constructors 23. EACH $ 175.00 $ 4,025.00
Steve Manning Construction 23. EACH $ 300.00 $ 6,900.00
Rocky Mountain Materials & Asphalt 23. EACH $ 174.23 $ 4,007.29
Kiewit Infrastructure 23. EACH $ 250.00 $ 5,750.00
Engineer's Estimate 23. EACH $ 300.00 $ 6,900.00
RUMBLE STRIP
RUMBLE STRIP, SHOULDER
REMOVE AND RESET SIGN
63401-0700
RBK Construction 68,950. LNFT $ 0.40 $ 27,580.00
A&S Construction 68,950. LNFT $ 0.50 $ 34,475.00
Merry Technology 68,950. LNFT $ 0.45 $ 31,027.50
American Civil Constructors 68,950. LNFT $ 0.50 $ 34,475.00
Steve Manning Construction 68,950. LNFT $ 0.90 $ 62,055.00
Rocky Mountain Materials & Asphalt 68,950. LNFT $ 0.40 $ 27,580.00
Kiewit Infrastructure 68,950. LNFT $ 0.50 $ 34,475.00
Engineer's Estimate 68,950. LNFT $ 0.60 $ 41,370.00
63401-0800
RBK Construction 1,960. LNFT $ 0.40 $ 784.00
A&S Construction 1,960. LNFT $ 0.50 $ 980.00
Merry Technology 1,960. LNFT $ 0.45 $ 882.00
American Civil Constructors 1,960. LNFT $ 0.50 $ 980.00
Steve Manning Construction 1,960. LNFT $ 0.90 $ 1,764.00
Rocky Mountain Materials & Asphalt 1,960. LNFT $ 0.40 $ 784.00
Kiewit Infrastructure 1,960. LNFT $ 0.40 $ 784.00
Engineer's Estimate 1,960. LNFT $ 3.15 $ 6,174.00
63403-0400
RBK Construction 1,600. SQFT $ 20.00 $ 32,000.00
A&S Construction 1,600. SQFT $ 20.00 $ 32,000.00
Merry Technology 1,600. SQFT $ 10.00 $ 16,000.00
American Civil Constructors 1,600. SQFT $ 29.00 $ 46,400.00
Steve Manning Construction 1,600. SQFT $ 5.00 $ 8,000.00
Rocky Mountain Materials & Asphalt 1,600. SQFT $ 20.59 $ 32,944.00
Kiewit Infrastructure 1,600. SQFT $ 20.00 $ 32,000.00
Engineer's Estimate 1,600. SQFT $ 30.00 $ 48,000.00
63405-1300
RBK Construction 4. EACH $ 550.00 $ 2,200.00
A&S Construction 4. EACH $ 600.00 $ 2,400.00
Merry Technology 4. EACH $ 500.00 $ 2,000.00
American Civil Constructors 4. EACH $ 730.00 $ 2,920.00
Steve Manning Construction 4. EACH $ 500.00 $ 2,000.00
Rocky Mountain Materials & Asphalt 4. EACH $ 571.83 $ 2,287.32
Kiewit Infrastructure 4. EACH $ 600.00 $ 2,400.00
Engineer's Estimate 4. EACH $ 200.00 $ 800.00
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, BROKEN
PAVEMENT MARKINGS, TYPE D
PAVEMENT MARKINGS, TYPE D, TURN ARROW
63405-1500
RBK Construction 14. EACH $ 725.00 $ 10,150.00
A&S Construction 14. EACH $ 700.00 $ 9,800.00
Merry Technology 14. EACH $ 500.00 $ 7,000.00
American Civil Constructors 14. EACH $ 950.00 $ 13,300.00
Steve Manning Construction 14. EACH $ 300.00 $ 4,200.00
Rocky Mountain Materials & Asphalt 14. EACH $ 743.38 $ 10,407.32
Kiewit Infrastructure 14. EACH $ 750.00 $ 10,500.00
Engineer's Estimate 14. EACH $ 200.00 $ 2,800.00
63405-1650
RBK Construction 2. EACH $ 850.00 $ 1,700.00
A&S Construction 2. EACH $ 800.00 $ 1,600.00
Merry Technology 2. EACH $ 350.00 $ 700.00
American Civil Constructors 2. EACH $ 1,000.00 $ 2,000.00
Steve Manning Construction 2. EACH $ 300.00 $ 600.00
Rocky Mountain Materials & Asphalt 2. EACH $ 857.75 $ 1,715.50
Kiewit Infrastructure 2. EACH $ 850.00 $ 1,700.00
Engineer's Estimate 2. EACH $ 500.00 $ 1,000.00
63502-0600
RBK Construction 4. EACH $ 225.00 $ 900.00
A&S Construction 4. EACH $ 200.00 $ 800.00
Merry Technology 4. EACH $ 140.00 $ 560.00
American Civil Constructors 4. EACH $ 400.00 $ 1,600.00
Steve Manning Construction 4. EACH $ 200.00 $ 800.00
Rocky Mountain Materials & Asphalt 4. EACH $ 116.15 $ 464.60
Kiewit Infrastructure 4. EACH $ 220.00 $ 880.00
Engineer's Estimate 4. EACH $ 330.00 $ 1,320.00
63502-0700
RBK Construction 150. EACH $ 8.00 $ 1,200.00
A&S Construction 150. EACH $ 7.00 $ 1,050.00
Merry Technology 150. EACH $ 20.00 $ 3,000.00
American Civil Constructors 150. EACH $ 35.00 $ 5,250.00
Steve Manning Construction 150. EACH $ 38.00 $ 5,700.00
Rocky Mountain Materials & Asphalt 150. EACH $ 5.81 $ 871.50
Kiewit Infrastructure 150. EACH $ 10.00 $ 1,500.00
PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE
PAVEMENT MARKINGS, TYPE D,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .