bid_tabs.pdf

PDF 736 KB Posted

Attached to
CO FLAP 1099(1) - Lake Pueblo Road & Trail Improvements
Solicitation number
DTFH6815B00019
Issued by

View the file

Other files

File Type Posted
Bid_Opening_Summary_-_CO_FLAP_1099(1).pdf PDF
Q-A _revised_9-23-15.pdf PDF
A003.pdf PDF
Q-A _revised_9-21-15.pdf PDF
A002.pdf PDF
Q-A _revised_9-14-15.pdf PDF
A001.pdf PDF
DTFH6815B00019.pdf PDF
Lake_Pueblo_FINAL_Geotechnical-Pavement_Report.pdf PDF
Lake_Pueblo_XSections_FINAL_Clean.pdf PDF
Lake_Pueblo_FINAL_Hydraulics_Report.pdf PDF
Lake_Pueblo_PLANS_FINAL_stamped.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CO FLAP 1099(1), Lake Pueblo Road & Trail Improvements - Bid Tabs (Schedule A)

Contractor Responsive Amount RBK Construction Yes 8,102,569.50 A&S Construction Yes 9,771,100.00 Merry Technology No 6,277,210.50 American Civil Constructors Yes 9,380,479.00 Steve Manning Construction Yes 10,975,992.00 Rocky Mountain Materials & Asphalt Yes 9,906,807.00 Kiewit Infrastructure Yes 13,270,224.00 Engineer's Estimate 8,607,000.00

Contractor Pay Item No. Description Quantity Unit Unit Price Amount 15101-0000

RBK Construction ALL LPSM $ 650,000.00 $ 650,000.00

A&S Construction ALL LPSM $ 800,000.00 $ 800,000.00

Merry Technology ALL LPSM $ 500,000.00 $ 500,000.00

American Civil Constructors ALL LPSM $ 935,000.00 $ 935,000.00

Steve Manning Construction ALL LPSM $ 1,000,000.00 $ 1,000,000.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 1,012,943.01 $ 1,012,943.01

Kiewit Infrastructure ALL LPSM $ 1,500,000.00 $ 1,500,000.00

Engineer's Estimate ALL LPSM $ 782,881.00 $ 782,881.00

15206-0000

RBK Construction 2.4 MILE $ 12,500.00 $ 30,000.00

A&S Construction 2.4 MILE $ 11,000.00 $ 26,400.00

Merry Technology 2.4 MILE $ 300.00 $ 720.00

American Civil Constructors 2.4 MILE $ 15,000.00 $ 36,000.00

Steve Manning Construction 2.4 MILE $ 10,350.00 $ 24,840.00

Rocky Mountain Materials & Asphalt 2.4 MILE $ 8,313.73 $ 19,952.95

Kiewit Infrastructure 2.4 MILE $ 5,000.00 $ 12,000.00

Engineer's Estimate 2.4 MILE $ 20,000.00 $ 48,000.00

15210-3000

RBK Construction 11.75 MILE $ 1,800.00 $ 21,150.00

A&S Construction 11.75 MILE $ 2,000.00 $ 23,500.00

Merry Technology 11.75 MILE $ 400.00 $ 4,700.00

American Civil Constructors 11.75 MILE $ 4,000.00 $ 47,000.00

MOBILIZATION

SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

CENTERLINE, VERIFICATION AND STAKING

Steve Manning Construction 11.75 MILE $ 1,600.00 $ 18,800.00

Rocky Mountain Materials & Asphalt 11.75 MILE $ 3,679.27 $ 43,231.42

Kiewit Infrastructure 11.75 MILE $ 1,000.00 $ 11,750.00

Engineer's Estimate 11.75 MILE $ 4,000.00 $ 47,000.00

15214-1000

RBK Construction ALL LPSM $ 30,000.00 $ 30,000.00

A&S Construction ALL LPSM $ 3,000.00 $ 3,000.00

Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00

American Civil Constructors ALL LPSM $ 8,000.00 $ 8,000.00

Steve Manning Construction ALL LPSM $ 12,500.00 $ 12,500.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 3,326.08 $ 3,326.08

Kiewit Infrastructure ALL LPSM $ 25,000.00 $ 25,000.00

Engineer's Estimate ALL LPSM $ 10,000.00 $ 10,000.00

15215-3000

RBK Construction 18. EACH $ 800.00 $ 14,400.00

A&S Construction 18. EACH $ 900.00 $ 16,200.00

Merry Technology 18. EACH $ 2,000.00 $ 36,000.00

American Civil Constructors 18. EACH $ 600.00 $ 10,800.00

Steve Manning Construction 18. EACH $ 750.00 $ 13,500.00

Rocky Mountain Materials & Asphalt 18. EACH $ 295.62 $ 5,321.16

Kiewit Infrastructure 18. EACH $ 1,000.00 $ 18,000.00

Engineer's Estimate 18. EACH $ 615.00 $ 11,070.00

15216-2000

RBK Construction 4.79 MILE $ 8,000.00 $ 38,320.00

A&S Construction 4.79 MILE $ 5,000.00 $ 23,950.00

Merry Technology 4.79 MILE $ 400.00 $ 1,916.00

American Civil Constructors 4.79 MILE $ 10,000.00 $ 47,900.00

Steve Manning Construction 4.79 MILE $ 4,300.00 $ 20,597.00

Rocky Mountain Materials & Asphalt 4.79 MILE $ 12,842.16 $ 61,513.95

Kiewit Infrastructure 4.79 MILE $ 20,000.00 $ 95,800.00

Engineer's Estimate 4.79 MILE $ 20,000.00 $ 95,800.00

15301-0000

RBK Construction ALL LPSM $ 160,000.00 $ 160,000.00

A&S Construction ALL LPSM $ 152,000.00 $ 152,000.00

Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00

SURVEY AND STAKING, BRIDGE

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, GRADE FINISHING STAKES

CONTRACTOR QUALITY CONTROL

American Civil Constructors ALL LPSM $ 125,000.00 $ 125,000.00

Steve Manning Construction ALL LPSM $ 150,000.00 $ 150,000.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 228,573.95 $ 228,573.95

Kiewit Infrastructure ALL LPSM $ 250,000.00 $ 250,000.00

Engineer's Estimate ALL LPSM $ 105,000.00 $ 105,000.00

15401-0000

RBK Construction ALL LPSM $ 270,000.00 $ 270,000.00

A&S Construction ALL LPSM $ 185,000.00 $ 185,000.00

Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00

American Civil Constructors ALL LPSM $ 135,000.00 $ 135,000.00

Steve Manning Construction ALL LPSM $ 200,000.00 $ 200,000.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 528,401.48 $ 528,401.48

Kiewit Infrastructure ALL LPSM $ 100,000.00 $ 100,000.00

Engineer's Estimate ALL LPSM $ 70,000.00 $ 70,000.00

15501-0000

RBK Construction ALL LPSM $ 10,000.00 $ 10,000.00

A&S Construction ALL LPSM $ 30,000.00 $ 30,000.00

Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00

American Civil Constructors ALL LPSM $ 75,000.00 $ 75,000.00

Steve Manning Construction ALL LPSM $ 19,900.00 $ 19,900.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 3,677.57 $ 3,677.57

Kiewit Infrastructure ALL LPSM $ 10,000.00 $ 10,000.00

Engineer's Estimate ALL LPSM $ 9,000.00 $ 9,000.00

15705-0100

RBK Construction 11,000. LNFT $ 1.50 $ 16,500.00

A&S Construction 11,000. LNFT $ 2.00 $ 22,000.00

Merry Technology 11,000. LNFT $ 3.15 $ 34,650.00

American Civil Constructors 11,000. LNFT $ 4.00 $ 44,000.00

Steve Manning Construction 11,000. LNFT $ 4.00 $ 44,000.00

Rocky Mountain Materials & Asphalt 11,000. LNFT $ 2.45 $ 26,950.00

Kiewit Infrastructure 11,000. LNFT $ 3.00 $ 33,000.00

Engineer's Estimate 11,000. LNFT $ 5.00 $ 55,000.00

15705-1400

RBK Construction 7,900. LNFT $ 3.00 $ 23,700.00

A&S Construction 7,900. LNFT $ 4.00 $ 31,600.00

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

SOIL EROSION CONTROL, FIBER ROLL

Merry Technology 7,900. LNFT $ 3.50 $ 27,650.00

American Civil Constructors 7,900. LNFT $ 3.00 $ 23,700.00

Steve Manning Construction 7,900. LNFT $ 8.00 $ 63,200.00

Rocky Mountain Materials & Asphalt 7,900. LNFT $ 2.43 $ 19,197.00

Kiewit Infrastructure 7,900. LNFT $ 5.00 $ 39,500.00

Engineer's Estimate 7,900. LNFT $ 10.00 $ 79,000.00

15706-0200

RBK Construction 50. EACH $ 50.00 $ 2,500.00

A&S Construction 50. EACH $ 100.00 $ 5,000.00

Merry Technology 50. EACH $ 200.00 $ 10,000.00

American Civil Constructors 50. EACH $ 100.00 $ 5,000.00

Steve Manning Construction 50. EACH $ 150.00 $ 7,500.00

Rocky Mountain Materials & Asphalt 50. EACH $ 61.28 $ 3,064.00

Kiewit Infrastructure 50. EACH $ 120.00 $ 6,000.00

Engineer's Estimate 50. EACH $ 250.00 $ 12,500.00

15706-0200

RBK Construction 6. EACH $ 55.00 $ 330.00

A&S Construction 6. EACH $ 500.00 $ 3,000.00

Merry Technology 6. EACH $ 200.00 $ 1,200.00

American Civil Constructors 6. EACH $ 175.00 $ 1,050.00

Steve Manning Construction 6. EACH $ 200.00 $ 1,200.00

Rocky Mountain Materials & Asphalt 6. EACH $ 242.81 $ 1,456.86

Kiewit Infrastructure 6. EACH $ 800.00 $ 4,800.00

Engineer's Estimate 6. EACH $ 300.00 $ 1,800.00

15706-1000

RBK Construction 2. EACH $ 300.00 $ 600.00

A&S Construction 2. EACH $ 600.00 $ 1,200.00

Merry Technology 2. EACH $ 200.00 $ 400.00

American Civil Constructors 2. EACH $ 250.00 $ 500.00

Steve Manning Construction 2. EACH $ 210.00 $ 420.00

Rocky Mountain Materials & Asphalt 2. EACH $ 358.44 $ 716.88

Kiewit Infrastructure 2. EACH $ 10.00 $ 20.00

Engineer's Estimate 2. EACH $ 350.00 $ 700.00

15706-1600

RBK Construction 15. EACH $ 2,000.00 $ 30,000.00

SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL)

SOIL EROSION CONTROL, CHECK DAM (GRAVEL BAG)

SOIL EROSION CONTROL, INLET PROTECTION

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT (TURNAROUND)

A&S Construction 15. EACH $ 2,500.00 $ 37,500.00

Merry Technology 15. EACH $ 350.00 $ 5,250.00

American Civil Constructors 15. EACH $ 2,500.00 $ 37,500.00

Steve Manning Construction 15. EACH $ 4,800.00 $ 72,000.00

Rocky Mountain Materials & Asphalt 15. EACH $ 2,212.68 $ 33,190.20

Kiewit Infrastructure 15. EACH $ 1,500.00 $ 22,500.00

Engineer's Estimate 15. EACH $ 2,000.00 $ 30,000.00

15802-0000

RBK Construction ALL LPSM $ 15,000.00 $ 15,000.00

A&S Construction ALL LPSM $ 80,000.00 $ 80,000.00

Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00

American Civil Constructors ALL LPSM $ 155,000.00 $ 155,000.00

Steve Manning Construction ALL LPSM $ 160,000.00 $ 160,000.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 27,319.68 $ 27,319.68

Kiewit Infrastructure ALL LPSM $ 200,000.00 $ 200,000.00

Engineer's Estimate ALL LPSM $ 65,000.00 $ 65,000.00

20101-0000

RBK Construction 30. ACRE $ 500.00 $ 15,000.00

A&S Construction 30. ACRE $ 1,600.00 $ 48,000.00

Merry Technology 30. ACRE $ 2,000.00 $ 60,000.00

American Civil Constructors 30. ACRE $ 650.00 $ 19,500.00

Steve Manning Construction 30. ACRE $ 3,000.00 $ 90,000.00

Rocky Mountain Materials & Asphalt 30. ACRE $ 2,168.72 $ 65,061.60

Kiewit Infrastructure 30. ACRE $ 1,500.00 $ 45,000.00

Engineer's Estimate 30. ACRE $ 2,000.00 $ 60,000.00

20301-0100

RBK Construction 49. EACH $ 150.00 $ 7,350.00

A&S Construction 49. EACH $ 100.00 $ 4,900.00

Merry Technology 49. EACH $ 50.00 $ 2,450.00

American Civil Constructors 49. EACH $ 80.00 $ 3,920.00

Steve Manning Construction 49. EACH $ 94.00 $ 4,606.00

Rocky Mountain Materials & Asphalt 49. EACH $ 87.33 $ 4,279.17

Kiewit Infrastructure 49. EACH $ 100.00 $ 4,900.00

Engineer's Estimate 49. EACH $ 150.00 $ 7,350.00

20301-0400

WATERING FOR DUST CONTROL

CLEARING AND GRUBBING

REMOVAL OF BOLLARD

REMOVAL OF BRIDGE

RBK Construction 1. EACH $ 20,000.00 $ 20,000.00

A&S Construction 1. EACH $ 40,000.00 $ 40,000.00

Merry Technology 1. EACH $ 35,000.00 $ 35,000.00

American Civil Constructors 1. EACH $ 45,000.00 $ 45,000.00

Steve Manning Construction 1. EACH $ 25,000.00 $ 25,000.00

Rocky Mountain Materials & Asphalt 1. EACH $ 18,410.17 $ 18,410.17

Kiewit Infrastructure 1. EACH $ 50,000.00 $ 50,000.00

Engineer's Estimate 1. EACH $ 25,000.00 $ 25,000.00

20301-2000

RBK Construction 2. EACH $ 500.00 $ 1,000.00

A&S Construction 2. EACH $ 800.00 $ 1,600.00

Merry Technology 2. EACH $ 800.00 $ 1,600.00

American Civil Constructors 2. EACH $ 130.00 $ 260.00

Steve Manning Construction 2. EACH $ 400.00 $ 800.00

Rocky Mountain Materials & Asphalt 2. EACH $ 166.05 $ 332.10

Kiewit Infrastructure 2. EACH $ 500.00 $ 1,000.00

Engineer's Estimate 2. EACH $ 400.00 $ 800.00

20301-2400

RBK Construction 48. EACH $ 40.00 $ 1,920.00

A&S Construction 48. EACH $ 50.00 $ 2,400.00

Merry Technology 48. EACH $ 120.00 $ 5,760.00

American Civil Constructors 48. EACH $ 80.00 $ 3,840.00

Steve Manning Construction 48. EACH $ 100.00 $ 4,800.00

Rocky Mountain Materials & Asphalt 48. EACH $ 46.46 $ 2,230.08

Kiewit Infrastructure 48. EACH $ 45.00 $ 2,160.00

Engineer's Estimate 48. EACH $ 75.00 $ 3,600.00

20302-0150

RBK Construction 205. LNFT $ 55.00 $ 11,275.00

A&S Construction 205. LNFT $ 30.00 $ 6,150.00

Merry Technology 205. LNFT $ 50.00 $ 10,250.00

American Civil Constructors 205. LNFT $ 80.00 $ 16,400.00

Steve Manning Construction 205. LNFT $ 25.00 $ 5,125.00

Rocky Mountain Materials & Asphalt 205. LNFT $ 7.73 $ 1,584.65

Kiewit Infrastructure 205. LNFT $ 35.00 $ 7,175.00

Engineer's Estimate 205. LNFT $ 180.00 $ 36,900.00

REMOVAL OF PIPE END SECTION

REMOVAL OF SIGN

REMOVAL OF BRIDGE RAILING

20302-0500

RBK Construction 115. LNFT $ 30.00 $ 3,450.00

A&S Construction 115. LNFT $ 40.00 $ 4,600.00

Merry Technology 115. LNFT $ 30.00 $ 3,450.00

American Civil Constructors 115. LNFT $ 11.00 $ 1,265.00

Steve Manning Construction 115. LNFT $ 50.00 $ 5,750.00

Rocky Mountain Materials & Asphalt 115. LNFT $ 6.81 $ 783.15

Kiewit Infrastructure 115. LNFT $ 10.00 $ 1,150.00

Engineer's Estimate 115. LNFT $ 30.00 $ 3,450.00

20302-1000

RBK Construction 500. LNFT $ 7.00 $ 3,500.00

A&S Construction 500. LNFT $ 7.00 $ 3,500.00

Merry Technology 500. LNFT $ 25.00 $ 12,500.00

American Civil Constructors 500. LNFT $ 10.00 $ 5,000.00

Steve Manning Construction 500. LNFT $ 12.00 $ 6,000.00

Rocky Mountain Materials & Asphalt 500. LNFT $ 7.73 $ 3,865.00

Kiewit Infrastructure 500. LNFT $ 7.00 $ 3,500.00

Engineer's Estimate 500. LNFT $ 20.00 $ 10,000.00

20302-1200

RBK Construction 7,810. LNFT $ 4.00 $ 31,240.00

A&S Construction 7,810. LNFT $ 4.00 $ 31,240.00

Merry Technology 7,810. LNFT $ 4.00 $ 31,240.00

American Civil Constructors 7,810. LNFT $ 4.00 $ 31,240.00

Steve Manning Construction 7,810. LNFT $ 5.00 $ 39,050.00

Rocky Mountain Materials & Asphalt 7,810. LNFT $ 3.96 $ 30,927.60

Kiewit Infrastructure 7,810. LNFT $ 4.00 $ 31,240.00

Engineer's Estimate 7,810. LNFT $ 3.00 $ 23,430.00

20302-2500

RBK Construction 230. LNFT $ 15.00 $ 3,450.00

A&S Construction 230. LNFT $ 30.00 $ 6,900.00

Merry Technology 230. LNFT $ 50.00 $ 11,500.00

American Civil Constructors 230. LNFT $ 20.00 $ 4,600.00

Steve Manning Construction 230. LNFT $ 50.00 $ 11,500.00

Rocky Mountain Materials & Asphalt 230. LNFT $ 11.15 $ 2,564.50

Kiewit Infrastructure 230. LNFT $ 6.00 $ 1,380.00

Engineer's Estimate 230. LNFT $ 22.00 $ 5,060.00

REMOVAL OF CURB, CONCRETE

REMOVAL OF FENCE, RAIL

REMOVAL OF GUARDRAIL

REMOVAL OF HANDRAIL (PEDESTRIAN RAILING)

20303-0200

RBK Construction 90. SQYD $ 470.00 $ 42,300.00

A&S Construction 90. SQYD $ 280.00 $ 25,200.00

Merry Technology 90. SQYD $ 10.00 $ 900.00

American Civil Constructors 90. SQYD $ 250.00 $ 22,500.00

Steve Manning Construction 90. SQYD $ 440.00 $ 39,600.00

Rocky Mountain Materials & Asphalt 90. SQYD $ 67.77 $ 6,099.30

Kiewit Infrastructure 90. SQYD $ 350.00 $ 31,500.00

Engineer's Estimate 90. SQYD $ 422.00 $ 37,980.00

20303-1600

RBK Construction 1,700. SQYD $ 8.00 $ 13,600.00

A&S Construction 1,700. SQYD $ 4.00 $ 6,800.00

Merry Technology 1,700. SQYD $ 7.00 $ 11,900.00

American Civil Constructors 1,700. SQYD $ 9.00 $ 15,300.00

Steve Manning Construction 1,700. SQYD $ 9.80 $ 16,660.00

Rocky Mountain Materials & Asphalt 1,700. SQYD $ 5.59 $ 9,503.00

Kiewit Infrastructure 1,700. SQYD $ 15.00 $ 25,500.00

Engineer's Estimate 1,700. SQYD $ 10.00 $ 17,000.00

20303-1900

RBK Construction 230. SQYD $ 23.00 $ 5,290.00

A&S Construction 230. SQYD $ 7.00 $ 1,610.00

Merry Technology 230. SQYD $ 16.00 $ 3,680.00

American Civil Constructors 230. SQYD $ 16.00 $ 3,680.00

Steve Manning Construction 230. SQYD $ 20.00 $ 4,600.00

Rocky Mountain Materials & Asphalt 230. SQYD $ 21.84 $ 5,023.20

Kiewit Infrastructure 230. SQYD $ 40.00 $ 9,200.00

Engineer's Estimate 230. SQYD $ 5.75 $ 1,322.50

20304-1000

RBK Construction ALL LPSM $ 50,000.00 $ 50,000.00

A&S Construction ALL LPSM $ 110,000.00 $ 110,000.00

Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00

American Civil Constructors ALL LPSM $ 52,000.00 $ 52,000.00

Steve Manning Construction ALL LPSM $ 30,000.00 $ 30,000.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 20,639.61 $ 20,639.61

Kiewit Infrastructure ALL LPSM $ 50,000.00 $ 50,000.00

REMOVAL OF BRIDGE DECK (FULL DEPTH)

REMOVAL OF PAVEMENT, ASPHALT

REMOVAL OF PAVEMENT, ASPHALT, 3-INCH DEPTH

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Engineer's Estimate ALL LPSM $ 3,000.00 $ 3,000.00

20401-0000

RBK Construction 10,200. CUYD $ 30.00 $ 306,000.00

A&S Construction 10,200. CUYD $ 26.00 $ 265,200.00

Merry Technology 10,200. CUYD $ 45.00 $ 459,000.00

American Civil Constructors 10,200. CUYD $ 25.00 $ 255,000.00

Steve Manning Construction 10,200. CUYD $ 42.00 $ 428,400.00

Rocky Mountain Materials & Asphalt 10,200. CUYD $ 21.20 $ 216,240.00

Kiewit Infrastructure 10,200. CUYD $ 50.00 $ 510,000.00

Engineer's Estimate 10,200. CUYD $ 20.00 $ 204,000.00

20425-1000

RBK Construction 220. LNFT $ 25.00 $ 5,500.00

A&S Construction 220. LNFT $ 70.00 $ 15,400.00

Merry Technology 220. LNFT $ 12.00 $ 2,640.00

American Civil Constructors 220. LNFT $ 8.00 $ 1,760.00

Steve Manning Construction 220. LNFT $ 50.00 $ 11,000.00

Rocky Mountain Materials & Asphalt 220. LNFT $ 5.29 $ 1,163.80

Kiewit Infrastructure 220. LNFT $ 20.00 $ 4,400.00

Engineer's Estimate 220. LNFT $ 30.00 $ 6,600.00

20435-1000

RBK Construction 2,930. CUYD $ 50.00 $ 146,500.00

A&S Construction 2,930. CUYD $ 54.00 $ 158,220.00

Merry Technology 2,930. CUYD $ 50.00 $ 146,500.00

American Civil Constructors 2,930. CUYD $ 60.00 $ 175,800.00

Steve Manning Construction 2,930. CUYD $ 115.00 $ 336,950.00

Rocky Mountain Materials & Asphalt 2,930. CUYD $ 60.19 $ 176,356.70

Kiewit Infrastructure 2,930. CUYD $ 90.00 $ 263,700.00

Engineer's Estimate 2,930. CUYD $ 75.00 $ 219,750.00

20801-0000

RBK Construction 450. CUYD $ 15.00 $ 6,750.00

A&S Construction 450. CUYD $ 40.00 $ 18,000.00

Merry Technology 450. CUYD $ 65.00 $ 29,250.00

American Civil Constructors 450. CUYD $ 14.00 $ 6,300.00

Steve Manning Construction 450. CUYD $ 135.00 $ 60,750.00

Rocky Mountain Materials & Asphalt 450. CUYD $ 30.39 $ 13,675.50

ROADWAY EXCAVATION

DITCH, EXCAVATION

BACKFILL, SELECT GRANULAR

STRUCTURE EXCAVATION

Kiewit Infrastructure 450. CUYD $ 70.00 $ 31,500.00

Engineer's Estimate 450. CUYD $ 17.00 $ 7,650.00

20803-0000

RBK Construction 450. CUYD $ 20.00 $ 9,000.00

A&S Construction 450. CUYD $ 55.00 $ 24,750.00

Merry Technology 450. CUYD $ 70.00 $ 31,500.00

American Civil Constructors 450. CUYD $ 40.00 $ 18,000.00

Steve Manning Construction 450. CUYD $ 179.00 $ 80,550.00

Rocky Mountain Materials & Asphalt 450. CUYD $ 73.32 $ 32,994.00

Kiewit Infrastructure 450. CUYD $ 80.00 $ 36,000.00

Engineer's Estimate 450. CUYD $ 60.00 $ 27,000.00

21101-2000

RBK Construction 2,270. SQYD $ 2.00 $ 4,540.00

A&S Construction 2,270. SQYD $ 9.00 $ 20,430.00

Merry Technology 2,270. SQYD $ 12.00 $ 27,240.00

American Civil Constructors 2,270. SQYD $ 10.00 $ 22,700.00

Steve Manning Construction 2,270. SQYD $ 4.60 $ 10,442.00

Rocky Mountain Materials & Asphalt 2,270. SQYD $ 9.47 $ 21,496.90

Kiewit Infrastructure 2,270. SQYD $ 5.00 $ 11,350.00

Engineer's Estimate 2,270. SQYD $ 6.00 $ 13,620.00

25101-2200

RBK Construction 45. CUYD $ 80.00 $ 3,600.00

A&S Construction 45. CUYD $ 110.00 $ 4,950.00

Merry Technology 45. CUYD $ 125.00 $ 5,625.00

American Civil Constructors 45. CUYD $ 100.00 $ 4,500.00

Steve Manning Construction 45. CUYD $ 248.00 $ 11,160.00

Rocky Mountain Materials & Asphalt 45. CUYD $ 101.79 $ 4,580.55

Kiewit Infrastructure 45. CUYD $ 150.00 $ 6,750.00

Engineer's Estimate 45. CUYD $ 100.00 $ 4,500.00

25101-2300

RBK Construction 55. CUYD $ 85.00 $ 4,675.00

A&S Construction 55. CUYD $ 120.00 $ 6,600.00

Merry Technology 55. CUYD $ 250.00 $ 13,750.00

American Civil Constructors 55. CUYD $ 100.00 $ 5,500.00

Steve Manning Construction 55. CUYD $ 248.00 $ 13,640.00

STRUCTURAL BACKFILL

ROADWAY OBLITERATION, METHOD 2

PLACED RIPRAP, METHOD B, CLASS 2

PLACED RIPRAP, METHOD B, CLASS 3

Rocky Mountain Materials & Asphalt 55. CUYD $ 101.77 $ 5,597.35

Kiewit Infrastructure 55. CUYD $ 160.00 $ 8,800.00

Engineer's Estimate 55. CUYD $ 125.00 $ 6,875.00

25101-2400

RBK Construction 365. CUYD $ 90.00 $ 32,850.00

A&S Construction 365. CUYD $ 140.00 $ 51,100.00

Merry Technology 365. CUYD $ 300.00 $ 109,500.00

American Civil Constructors 365. CUYD $ 100.00 $ 36,500.00

Steve Manning Construction 365. CUYD $ 248.00 $ 90,520.00

Rocky Mountain Materials & Asphalt 365. CUYD $ 101.79 $ 37,153.35

Kiewit Infrastructure 365. CUYD $ 110.00 $ 40,150.00

Engineer's Estimate 365. CUYD $ 178.00 $ 64,970.00

30202-2000

RBK Construction 31,070. TON $ 31.00 $ 963,170.00

A&S Construction 31,070. TON $ 27.00 $ 838,890.00

Merry Technology 31,070. TON $ 30.00 $ 932,100.00

American Civil Constructors 31,070. TON $ 35.00 $ 1,087,450.00

Steve Manning Construction 31,070. TON $ 32.20 $ 1,000,454.00

Rocky Mountain Materials & Asphalt 31,070. TON $ 23.49 $ 729,834.30

Kiewit Infrastructure 31,070. TON $ 30.00 $ 932,100.00

Engineer's Estimate 31,070. TON $ 25.00 $ 776,750.00

30302-1000

RBK Construction 1,050. LNFT $ 7.00 $ 7,350.00

A&S Construction 1,050. LNFT $ 22.00 $ 23,100.00

Merry Technology 1,050. LNFT $ 5.00 $ 5,250.00

American Civil Constructors 1,050. LNFT $ 3.00 $ 3,150.00

Steve Manning Construction 1,050. LNFT $ 5.00 $ 5,250.00

Rocky Mountain Materials & Asphalt 1,050. LNFT $ 3.65 $ 3,832.50

Kiewit Infrastructure 1,050. LNFT $ 4.00 $ 4,200.00

Engineer's Estimate 1,050. LNFT $ 18.00 $ 18,900.00

30402-5100

RBK Construction 5,030. SQYD $ 1.50 $ 7,545.00

A&S Construction 5,030. SQYD $ 4.00 $ 20,120.00

Merry Technology 5,030. SQYD $ 7.00 $ 35,210.00

American Civil Constructors 5,030. SQYD $ 0.80 $ 4,024.00

PLACED RIPRAP, METHOD B, CLASS 4

ROADWAY AGGREGATE, METHOD 2

DITCH RECONDITIONING

FULL DEPTH RECLAMATION, METHOD 2, 3-INCH DEPTH

Steve Manning Construction 5,030. SQYD $ 11.00 $ 55,330.00

Rocky Mountain Materials & Asphalt 5,030. SQYD $ 3.60 $ 18,108.00

Kiewit Infrastructure 5,030. SQYD $ 4.00 $ 20,120.00

Engineer's Estimate 5,030. SQYD $ 2.50 $ 12,575.00

30402-5200

RBK Construction 30,000. SQYD $ 1.25 $ 37,500.00

A&S Construction 30,000. SQYD $ 2.00 $ 60,000.00

Merry Technology 30,000. SQYD $ 5.00 $ 150,000.00

American Civil Constructors 30,000. SQYD $ 0.90 $ 27,000.00

Steve Manning Construction 30,000. SQYD $ 9.00 $ 270,000.00

Rocky Mountain Materials & Asphalt 30,000. SQYD $ 3.60 $ 108,000.00

Kiewit Infrastructure 30,000. SQYD $ 4.20 $ 126,000.00

Engineer's Estimate 30,000. SQYD $ 2.50 $ 75,000.00

30402-5500

RBK Construction 56,000. SQYD $ 1.50 $ 84,000.00

A&S Construction 56,000. SQYD $ 3.00 $ 168,000.00

Merry Technology 56,000. SQYD $ 4.00 $ 224,000.00

American Civil Constructors 56,000. SQYD $ 1.10 $ 61,600.00

Steve Manning Construction 56,000. SQYD $ 7.00 $ 392,000.00

Rocky Mountain Materials & Asphalt 56,000. SQYD $ 2.59 $ 145,040.00

Kiewit Infrastructure 56,000. SQYD $ 4.00 $ 224,000.00

Engineer's Estimate 56,000. SQYD $ 3.50 $ 196,000.00

40101-0900

RBK Construction 16,200. TON $ 68.00 $ 1,101,600.00

A&S Construction 16,200. TON $ 97.00 $ 1,571,400.00

Merry Technology 16,200. TON $ 30.00 $ 486,000.00

American Civil Constructors 16,200. TON $ 102.00 $ 1,652,400.00

Steve Manning Construction 16,200. TON $ 108.00 $ 1,749,600.00

Rocky Mountain Materials & Asphalt 16,200. TON $ 79.55 $ 1,288,710.00

Kiewit Infrastructure 16,200. TON $ 138.00 $ 2,235,600.00

Engineer's Estimate 16,200. TON $ 88.00 $ 1,425,600.00

40105-3000

RBK Construction 160. TON $ 180.00 $ 28,800.00

A&S Construction 160. TON $ 220.00 $ 35,200.00

Merry Technology 160. TON $ 320.00 $ 51,200.00

FULL DEPTH RECLAMATION, METHOD 2, 4-INCH DEPTH

FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH

ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3

MILLION ESAL

ANTISTRIP ADDITIVE, TYPE 3

American Civil Constructors 160. TON $ 210.00 $ 33,600.00

Steve Manning Construction 160. TON $ 50.00 $ 8,000.00

Rocky Mountain Materials & Asphalt 160. TON $ 202.27 $ 32,363.20

Kiewit Infrastructure 160. TON $ 150.00 $ 24,000.00

Engineer's Estimate 160. TON $ 550.00 $ 88,000.00

40601-0000

RBK Construction 26. TON $ 675.00 $ 17,550.00

A&S Construction 26. TON $ 750.00 $ 19,500.00

Merry Technology 26. TON $ 1,600.00 $ 41,600.00

American Civil Constructors 26. TON $ 900.00 $ 23,400.00

Steve Manning Construction 26. TON $ 900.00 $ 23,400.00

Rocky Mountain Materials & Asphalt 26. TON $ 1,621.09 $ 42,148.34

Kiewit Infrastructure 26. TON $ 1,000.00 $ 26,000.00

Engineer's Estimate 26. TON $ 600.00 $ 15,600.00

41102-1000

RBK Construction 59,550. SQYD $ 0.75 $ 44,662.50

A&S Construction 59,550. SQYD $ 1.50 $ 89,325.00

Merry Technology 59,550. SQYD $ 3.00 $ 178,650.00

American Civil Constructors 59,550. SQYD $ 1.30 $ 77,415.00

Steve Manning Construction 59,550. SQYD $ 0.40 $ 23,820.00

Rocky Mountain Materials & Asphalt 59,550. SQYD $ 2.79 $ 166,144.50

Kiewit Infrastructure 59,550. SQYD $ 1.50 $ 89,325.00

Engineer's Estimate 59,550. SQYD $ 0.80 $ 47,640.00

41105-0000

RBK Construction 55. TON $ 45.00 $ 2,475.00

A&S Construction 55. TON $ 150.00 $ 8,250.00

Merry Technology 55. TON $ 380.00 $ 20,900.00

American Civil Constructors 55. TON $ 159.00 $ 8,745.00

Steve Manning Construction 55. TON $ 60.00 $ 3,300.00

Rocky Mountain Materials & Asphalt 55. TON $ 156.99 $ 8,634.45

Kiewit Infrastructure 55. TON $ 130.00 $ 7,150.00

Engineer's Estimate 55. TON $ 145.00 $ 7,975.00

41201-0000

RBK Construction 26. TON $ 675.00 $ 17,550.00

A&S Construction 26. TON $ 1,000.00 $ 26,000.00

FOG SEAL

PRIME COAT, METHOD 1

BLOTTER

TACK COAT

Merry Technology 26. TON $ 600.00 $ 15,600.00

American Civil Constructors 26. TON $ 1,160.00 $ 30,160.00

Steve Manning Construction 26. TON $ 1,300.00 $ 33,800.00

Rocky Mountain Materials & Asphalt 26. TON $ 1,621.10 $ 42,148.60

Kiewit Infrastructure 26. TON $ 600.00 $ 15,600.00

Engineer's Estimate 26. TON $ 500.00 $ 13,000.00

50101-2500

RBK Construction 52,200. SQYD $ 45.25 $ 2,362,050.00

A&S Construction 52,200. SQYD $ 52.00 $ 2,714,400.00

Merry Technology 52,200. SQYD $ 5.00 $ 261,000.00

American Civil Constructors 52,200. SQYD $ 40.15 $ 2,095,830.00

Steve Manning Construction 52,200. SQYD $ 47.00 $ 2,453,400.00

Rocky Mountain Materials & Asphalt 52,200. SQYD $ 55.00 $ 2,871,000.00

Kiewit Infrastructure 52,200. SQYD $ 72.00 $ 3,758,400.00

Engineer's Estimate 52,200. SQYD $ 38.00 $ 1,983,600.00

55201-0200

RBK Construction 105. CUYD $ 450.00 $ 47,250.00

A&S Construction 105. CUYD $ 800.00 $ 84,000.00

Merry Technology 105. CUYD $ 1,500.00 $ 157,500.00

American Civil Constructors 105. CUYD $ 1,000.00 $ 105,000.00

Steve Manning Construction 105. CUYD $ 800.00 $ 84,000.00

Rocky Mountain Materials & Asphalt 105. CUYD $ 557.08 $ 58,493.40

Kiewit Infrastructure 105. CUYD $ 3,000.00 $ 315,000.00

Engineer's Estimate 105. CUYD $ 1,500.00 $ 157,500.00

55401-2000

RBK Construction 12,410. LB $ 2.00 $ 24,820.00

A&S Construction 12,410. LB $ 2.00 $ 24,820.00

Merry Technology 12,410. LB $ 2.00 $ 24,820.00

American Civil Constructors 12,410. LB $ 1.00 $ 12,410.00

Steve Manning Construction 12,410. LB $ 3.00 $ 37,230.00

Rocky Mountain Materials & Asphalt 12,410. LB $ 1.99 $ 24,695.90

Kiewit Infrastructure 12,410. LB $ 2.00 $ 24,820.00

Engineer's Estimate 12,410. LB $ 1.75 $ 21,717.50

55504-0000

RBK Construction ALL LPSM $ 140,000.00 $ 140,000.00

MINOR CONCRETE PAVEMENT, PLAIN, 5-INCH DEPTH

STRUCTURAL CONCRETE, CLASS A (AE)

REINFORCING STEEL, EPOXY COATED

PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)

A&S Construction ALL LPSM $ 200,000.00 $ 200,000.00

Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00

American Civil Constructors ALL LPSM $ 225,000.00 $ 225,000.00

Steve Manning Construction ALL LPSM $ 180,000.00 $ 180,000.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 205,023.67 $ 205,023.67

Kiewit Infrastructure ALL LPSM $ 220,000.00 $ 220,000.00

Engineer's Estimate ALL LPSM $ 162,000.00 $ 162,000.00

55504-0000

RBK Construction ALL LPSM $ 140,000.00 $ 140,000.00

A&S Construction ALL LPSM $ 200,000.00 $ 200,000.00

Merry Technology ALL LPSM $ 15,000.00 $ 15,000.00

American Civil Constructors ALL LPSM $ 225,000.00 $ 225,000.00

Steve Manning Construction ALL LPSM $ 180,000.00 $ 180,000.00

Rocky Mountain Materials & Asphalt ALL LPSM $ 205,023.67 $ 205,023.67

Kiewit Infrastructure ALL LPSM $ 220,000.00 $ 220,000.00

Engineer's Estimate ALL LPSM $ 162,000.00 $ 162,000.00

55601-0500

RBK Construction 230. LNFT $ 170.00 $ 39,100.00

A&S Construction 230. LNFT $ 130.00 $ 29,900.00

Merry Technology 230. LNFT $ 45.00 $ 10,350.00

American Civil Constructors 230. LNFT $ 150.00 $ 34,500.00

Steve Manning Construction 230. LNFT $ 150.00 $ 34,500.00

Rocky Mountain Materials & Asphalt 230. LNFT $ 170.67 $ 39,254.10

Kiewit Infrastructure 230. LNFT $ 400.00 $ 92,000.00

Engineer's Estimate 230. LNFT $ 200.00 $ 46,000.00

56001-0000

RBK Construction 35. SQYD $ 650.00 $ 22,750.00

A&S Construction 35. SQYD $ 200.00 $ 7,000.00

Merry Technology 35. SQYD $ 100.00 $ 3,500.00

American Civil Constructors 35. SQYD $ 500.00 $ 17,500.00

Steve Manning Construction 35. SQYD $ 560.00 $ 19,600.00

Rocky Mountain Materials & Asphalt 35. SQYD $ 1,115.07 $ 39,027.45

Kiewit Infrastructure 35. SQYD $ 1,500.00 $ 52,500.00

Engineer's Estimate 35. SQYD $ 110.00 $ 3,850.00

60101-0000

PRE-FABRICATED STEEL BRIDGE (120 FT PEDESTRIAN BRIDGE)

BRIDGE RAILING, CONCRETE

REMOVAL OF CONCRETE BY HYDRODEMOLITION

CONCRETE (ISLAND)

RBK Construction 64. CUYD $ 350.00 $ 22,400.00

A&S Construction 64. CUYD $ 400.00 $ 25,600.00

Merry Technology 64. CUYD $ 100.00 $ 6,400.00

American Civil Constructors 64. CUYD $ 500.00 $ 32,000.00

Steve Manning Construction 64. CUYD $ 400.00 $ 25,600.00

Rocky Mountain Materials & Asphalt 64. CUYD $ 403.15 $ 25,801.60

Kiewit Infrastructure 64. CUYD $ 800.00 $ 51,200.00

Engineer's Estimate 64. CUYD $ 450.00 $ 28,800.00

60201-0400

RBK Construction 50. LNFT $ 60.00 $ 3,000.00

A&S Construction 50. LNFT $ 110.00 $ 5,500.00

Merry Technology 50. LNFT $ 100.00 $ 5,000.00

American Civil Constructors 50. LNFT $ 70.00 $ 3,500.00

Steve Manning Construction 50. LNFT $ 100.00 $ 5,000.00

Rocky Mountain Materials & Asphalt 50. LNFT $ 153.66 $ 7,683.00

Kiewit Infrastructure 50. LNFT $ 120.00 $ 6,000.00

Engineer's Estimate 50. LNFT $ 75.00 $ 3,750.00

60201-0600

RBK Construction 240. LNFT $ 65.00 $ 15,600.00

A&S Construction 240. LNFT $ 150.00 $ 36,000.00

Merry Technology 240. LNFT $ 165.00 $ 39,600.00

American Civil Constructors 240. LNFT $ 90.00 $ 21,600.00

Steve Manning Construction 240. LNFT $ 150.00 $ 36,000.00

Rocky Mountain Materials & Asphalt 240. LNFT $ 156.38 $ 37,531.20

Kiewit Infrastructure 240. LNFT $ 175.00 $ 42,000.00

Engineer's Estimate 240. LNFT $ 100.00 $ 24,000.00

60201-0800

RBK Construction 65. LNFT $ 100.00 $ 6,500.00

A&S Construction 65. LNFT $ 160.00 $ 10,400.00

Merry Technology 65. LNFT $ 200.00 $ 13,000.00

American Civil Constructors 65. LNFT $ 100.00 $ 6,500.00

Steve Manning Construction 65. LNFT $ 200.00 $ 13,000.00

Rocky Mountain Materials & Asphalt 65. LNFT $ 162.45 $ 10,559.25

Kiewit Infrastructure 65. LNFT $ 150.00 $ 9,750.00

Engineer's Estimate 65. LNFT $ 155.00 $ 10,075.00

12-INCH PIPE CULVERT

18-INCH PIPE CULVERT

24-INCH PIPE CULVERT

60201-1000

RBK Construction 8. LNFT $ 115.00 $ 920.00

A&S Construction 8. LNFT $ 350.00 $ 2,800.00

Merry Technology 8. LNFT $ 260.00 $ 2,080.00

American Civil Constructors 8. LNFT $ 185.00 $ 1,480.00

Steve Manning Construction 8. LNFT $ 800.00 $ 6,400.00

Rocky Mountain Materials & Asphalt 8. LNFT $ 258.16 $ 2,065.28

Kiewit Infrastructure 8. LNFT $ 1,200.00 $ 9,600.00

Engineer's Estimate 8. LNFT $ 120.00 $ 960.00

60201-1200

RBK Construction 8. LNFT $ 175.00 $ 1,400.00

A&S Construction 8. LNFT $ 280.00 $ 2,240.00

Merry Technology 8. LNFT $ 345.00 $ 2,760.00

American Civil Constructors 8. LNFT $ 200.00 $ 1,600.00

Steve Manning Construction 8. LNFT $ 900.00 $ 7,200.00

Rocky Mountain Materials & Asphalt 8. LNFT $ 269.58 $ 2,156.64

Kiewit Infrastructure 8. LNFT $ 1,300.00 $ 10,400.00

Engineer's Estimate 8. LNFT $ 340.00 $ 2,720.00

60210-0400

RBK Construction 4. EACH $ 500.00 $ 2,000.00

A&S Construction 4. EACH $ 400.00 $ 1,600.00

Merry Technology 4. EACH $ 550.00 $ 2,200.00

American Civil Constructors 4. EACH $ 400.00 $ 1,600.00

Steve Manning Construction 4. EACH $ 300.00 $ 1,200.00

Rocky Mountain Materials & Asphalt 4. EACH $ 207.41 $ 829.64

Kiewit Infrastructure 4. EACH $ 500.00 $ 2,000.00

Engineer's Estimate 4. EACH $ 260.00 $ 1,040.00

60210-0600

RBK Construction 16. EACH $ 550.00 $ 8,800.00

A&S Construction 16. EACH $ 700.00 $ 11,200.00

Merry Technology 16. EACH $ 700.00 $ 11,200.00

American Civil Constructors 16. EACH $ 450.00 $ 7,200.00

Steve Manning Construction 16. EACH $ 500.00 $ 8,000.00

Rocky Mountain Materials & Asphalt 16. EACH $ 253.37 $ 4,053.92

Kiewit Infrastructure 16. EACH $ 500.00 $ 8,000.00

Engineer's Estimate 16. EACH $ 380.00 $ 6,080.00

36-INCH PIPE CULVERT

48-INCH PIPE CULVERT

END SECTION FOR 12-INCH PIPE CULVERT

END SECTION FOR 18-INCH PIPE CULVERT

60210-0800

RBK Construction 4. EACH $ 600.00 $ 2,400.00

A&S Construction 4. EACH $ 800.00 $ 3,200.00

Merry Technology 4. EACH $ 1,100.00 $ 4,400.00

American Civil Constructors 4. EACH $ 500.00 $ 2,000.00

Steve Manning Construction 4. EACH $ 600.00 $ 2,400.00

Rocky Mountain Materials & Asphalt 4. EACH $ 301.06 $ 1,204.24

Kiewit Infrastructure 4. EACH $ 700.00 $ 2,800.00

Engineer's Estimate 4. EACH $ 570.00 $ 2,280.00

60210-1000

RBK Construction 1. EACH $ 750.00 $ 750.00

A&S Construction 1. EACH $ 1,600.00 $ 1,600.00

Merry Technology 1. EACH $ 1,500.00 $ 1,500.00

American Civil Constructors 1. EACH $ 1,200.00 $ 1,200.00

Steve Manning Construction 1. EACH $ 1,400.00 $ 1,400.00

Rocky Mountain Materials & Asphalt 1. EACH $ 486.50 $ 486.50

Kiewit Infrastructure 1. EACH $ 1,600.00 $ 1,600.00

Engineer's Estimate 1. EACH $ 785.00 $ 785.00

60210-1200

RBK Construction 1. EACH $ 1,500.00 $ 1,500.00

A&S Construction 1. EACH $ 2,200.00 $ 2,200.00

Merry Technology 1. EACH $ 2,000.00 $ 2,000.00

American Civil Constructors 1. EACH $ 2,000.00 $ 2,000.00

Steve Manning Construction 1. EACH $ 1,500.00 $ 1,500.00

Rocky Mountain Materials & Asphalt 1. EACH $ 1,224.91 $ 1,224.91

Kiewit Infrastructure 1. EACH $ 2,300.00 $ 2,300.00

Engineer's Estimate 1. EACH $ 1,400.00 $ 1,400.00

60404-1000

RBK Construction 2. EACH $ 6,000.00 $ 12,000.00

A&S Construction 2. EACH $ 5,000.00 $ 10,000.00

Merry Technology 2. EACH $ 8,500.00 $ 17,000.00

American Civil Constructors 2. EACH $ 5,000.00 $ 10,000.00

Steve Manning Construction 2. EACH $ 6,000.00 $ 12,000.00

Rocky Mountain Materials & Asphalt 2. EACH $ 7,837.71 $ 15,675.42

Kiewit Infrastructure 2. EACH $ 6,000.00 $ 12,000.00

END SECTION FOR 24-INCH PIPE CULVERT

END SECTION FOR 36-INCH PIPE CULVERT

END SECTION FOR 48-INCH PIPE CULVERT

CATCH BASIN, FLH TYPE 1

Engineer's Estimate 2. EACH $ 4,370.00 $ 8,740.00

60412-2000

RBK Construction 3. EACH $ 3,000.00 $ 9,000.00

A&S Construction 3. EACH $ 2,500.00 $ 7,500.00

Merry Technology 3. EACH $ 18,000.00 $ 54,000.00

American Civil Constructors 3. EACH $ 2,500.00 $ 7,500.00

Steve Manning Construction 3. EACH $ 800.00 $ 2,400.00

Rocky Mountain Materials & Asphalt 3. EACH $ 1,229.28 $ 3,687.84

Kiewit Infrastructure 3. EACH $ 1,300.00 $ 3,900.00

Engineer's Estimate 3. EACH $ 1,000.00 $ 3,000.00

60704-0000

RBK Construction 4. EACH $ 2,000.00 $ 8,000.00

A&S Construction 4. EACH $ 4,000.00 $ 16,000.00

Merry Technology 4. EACH $ 2,500.00 $ 10,000.00

American Civil Constructors 4. EACH $ 4,500.00 $ 18,000.00

Steve Manning Construction 4. EACH $ 4,000.00 $ 16,000.00

Rocky Mountain Materials & Asphalt 4. EACH $ 2,684.16 $ 10,736.64

Kiewit Infrastructure 4. EACH $ 50.00 $ 200.00

Engineer's Estimate 4. EACH $ 1,500.00 $ 6,000.00

60901-8000

RBK Construction 150. LNFT $ 70.00 $ 10,500.00

A&S Construction 150. LNFT $ 55.00 $ 8,250.00

Merry Technology 150. LNFT $ 40.00 $ 6,000.00

American Civil Constructors 150. LNFT $ 25.00 $ 3,750.00

Steve Manning Construction 150. LNFT $ 200.00 $ 30,000.00

Rocky Mountain Materials & Asphalt 150. LNFT $ 60.92 $ 9,138.00

Kiewit Infrastructure 150. LNFT $ 80.00 $ 12,000.00

Engineer's Estimate 150. LNFT $ 75.00 $ 11,250.00

60902-1000

RBK Construction 4,810. LNFT $ 16.00 $ 76,960.00

A&S Construction 4,810. LNFT $ 25.00 $ 120,250.00

Merry Technology 4,810. LNFT $ 30.00 $ 144,300.00

American Civil Constructors 4,810. LNFT $ 20.00 $ 96,200.00

Steve Manning Construction 4,810. LNFT $ 25.00 $ 120,250.00

Rocky Mountain Materials & Asphalt 4,810. LNFT $ 18.72 $ 90,043.20

REMOVE AND RESET MANHOLE FRAME AND COVER

CLEANING CULVERT IN PLACE

CURB, TIMBER

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (24" CATCH PAN)

Kiewit Infrastructure 4,810. LNFT $ 40.00 $ 192,400.00

Engineer's Estimate 4,810. LNFT $ 20.00 $ 96,200.00

60902-1000

RBK Construction 135. LNFT $ 23.00 $ 3,105.00

A&S Construction 135. LNFT $ 32.00 $ 4,320.00

Merry Technology 135. LNFT $ 45.00 $ 6,075.00

American Civil Constructors 135. LNFT $ 27.00 $ 3,645.00

Steve Manning Construction 135. LNFT $ 25.00 $ 3,375.00

Rocky Mountain Materials & Asphalt 135. LNFT $ 27.42 $ 3,701.70

Kiewit Infrastructure 135. LNFT $ 35.00 $ 4,725.00

Engineer's Estimate 135. LNFT $ 25.00 $ 3,375.00

60920-0000

RBK Construction 22. EACH $ 200.00 $ 4,400.00

A&S Construction 22. EACH $ 105.00 $ 2,310.00

Merry Technology 22. EACH $ 350.00 $ 7,700.00

American Civil Constructors 22. EACH $ 110.00 $ 2,420.00

Steve Manning Construction 22. EACH $ 50.00 $ 1,100.00

Rocky Mountain Materials & Asphalt 22. EACH $ 60.66 $ 1,334.52

Kiewit Infrastructure 22. EACH $ 100.00 $ 2,200.00

Engineer's Estimate 22. EACH $ 60.00 $ 1,320.00

61108-1000

RBK Construction 2. EACH $ 4,000.00 $ 8,000.00

A&S Construction 2. EACH $ 2,000.00 $ 4,000.00

Merry Technology 2. EACH $ 550.00 $ 1,100.00

American Civil Constructors 2. EACH $ 400.00 $ 800.00

Steve Manning Construction 2. EACH $ 300.00 $ 600.00

Rocky Mountain Materials & Asphalt 2. EACH $ 151.92 $ 303.84

Kiewit Infrastructure 2. EACH $ 2,500.00 $ 5,000.00

Engineer's Estimate 2. EACH $ 2,500.00 $ 5,000.00

61503-5000

RBK Construction 240. SQYD $ 35.00 $ 8,400.00

A&S Construction 240. SQYD $ 32.00 $ 7,680.00

Merry Technology 240. SQYD $ 150.00 $ 36,000.00

American Civil Constructors 240. SQYD $ 37.00 $ 8,880.00

Steve Manning Construction 240. SQYD $ 98.00 $ 23,520.00

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH (12" SPILL PAN)

RESET WHEELSTOP

ADJUST WATER VALVE

MEDIAN, STONE (12" DEPTH)

Rocky Mountain Materials & Asphalt 240. SQYD $ 50.35 $ 12,084.00

Kiewit Infrastructure 240. SQYD $ 50.00 $ 12,000.00

Engineer's Estimate 240. SQYD $ 45.00 $ 10,800.00

61701-1200

RBK Construction 6,000. LNFT $ 21.00 $ 126,000.00

A&S Construction 6,000. LNFT $ 28.00 $ 168,000.00

Merry Technology 6,000. LNFT $ 25.00 $ 150,000.00

American Civil Constructors 6,000. LNFT $ 21.00 $ 126,000.00

Steve Manning Construction 6,000. LNFT $ 25.00 $ 150,000.00

Rocky Mountain Materials & Asphalt 6,000. LNFT $ 27.05 $ 162,300.00

Kiewit Infrastructure 6,000. LNFT $ 20.00 $ 120,000.00

Engineer's Estimate 6,000. LNFT $ 22.00 $ 132,000.00

61702-0600

RBK Construction 26. EACH $ 2,000.00 $ 52,000.00

A&S Construction 26. EACH $ 2,000.00 $ 52,000.00

Merry Technology 26. EACH $ 2,500.00 $ 65,000.00

American Civil Constructors 26. EACH $ 2,250.00 $ 58,500.00

Steve Manning Construction 26. EACH $ 1,800.00 $ 46,800.00

Rocky Mountain Materials & Asphalt 26. EACH $ 1,709.76 $ 44,453.76

Kiewit Infrastructure 26. EACH $ 2,000.00 $ 52,000.00

Engineer's Estimate 26. EACH $ 2,250.00 $ 58,500.00

61707-0000

RBK Construction 43. LNFT $ 100.00 $ 4,300.00

A&S Construction 43. LNFT $ 70.00 $ 3,010.00

Merry Technology 43. LNFT $ 185.00 $ 7,955.00

American Civil Constructors 43. LNFT $ 100.00 $ 4,300.00

Steve Manning Construction 43. LNFT $ 56.00 $ 2,408.00

Rocky Mountain Materials & Asphalt 43. LNFT $ 71.59 $ 3,078.37

Kiewit Infrastructure 43. LNFT $ 80.00 $ 3,440.00

Engineer's Estimate 43. LNFT $ 85.00 $ 3,655.00

61707-0000

RBK Construction 43. LNFT $ 150.00 $ 6,450.00

A&S Construction 43. LNFT $ 210.00 $ 9,030.00

Merry Technology 43. LNFT $ 180.00 $ 7,740.00

American Civil Constructors 43. LNFT $ 145.00 $ 6,235.00

GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS

TERMINAL SECTION, TYPE FLARED

STRUCTURE TRANSITION RAILING (TYPE 3G)

STRUCTURE TRANSITION RAILING (TYPE 3G ANCHORED)

Steve Manning Construction 43. LNFT $ 112.00 $ 4,816.00

Rocky Mountain Materials & Asphalt 43. LNFT $ 148.57 $ 6,388.51

Kiewit Infrastructure 43. LNFT $ 200.00 $ 8,600.00

Engineer's Estimate 43. LNFT $ 200.00 $ 8,600.00

61904-0000

RBK Construction 32. EACH $ 575.00 $ 18,400.00

A&S Construction 32. EACH $ 800.00 $ 25,600.00

Merry Technology 32. EACH $ 45.00 $ 1,440.00

American Civil Constructors 32. EACH $ 900.00 $ 28,800.00

Steve Manning Construction 32. EACH $ 300.00 $ 9,600.00

Rocky Mountain Materials & Asphalt 32. EACH $ 3,235.49 $ 103,535.68

Kiewit Infrastructure 32. EACH $ 1,000.00 $ 32,000.00

Engineer's Estimate 32. EACH $ 500.00 $ 16,000.00

61904-0000

RBK Construction 64. EACH $ 275.00 $ 17,600.00

A&S Construction 64. EACH $ 400.00 $ 25,600.00

Merry Technology 64. EACH $ 450.00 $ 28,800.00

American Civil Constructors 64. EACH $ 600.00 $ 38,400.00

Steve Manning Construction 64. EACH $ 200.00 $ 12,800.00

Rocky Mountain Materials & Asphalt 64. EACH $ 858.09 $ 54,917.76

Kiewit Infrastructure 64. EACH $ 300.00 $ 19,200.00

Engineer's Estimate 64. EACH $ 350.00 $ 22,400.00

62201-0250

RBK Construction 80. HOUR $ 105.00 $ 8,400.00

A&S Construction 80. HOUR $ 110.00 $ 8,800.00

Merry Technology 80. HOUR $ 160.00 $ 12,800.00

American Civil Constructors 80. HOUR $ 100.00 $ 8,000.00

Steve Manning Construction 80. HOUR $ 120.00 $ 9,600.00

Rocky Mountain Materials & Asphalt 80. HOUR $ 90.10 $ 7,208.00

Kiewit Infrastructure 80. HOUR $ 120.00 $ 9,600.00

Engineer's Estimate 80. HOUR $ 150.00 $ 12,000.00

62201-0900

RBK Construction 80. HOUR $ 135.00 $ 10,800.00

A&S Construction 80. HOUR $ 170.00 $ 13,600.00

Merry Technology 80. HOUR $ 180.00 $ 14,400.00

BOLLARD POST (REMOVABLE)

BOLLARD POST

DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY

American Civil Constructors 80. HOUR $ 100.00 $ 8,000.00

Steve Manning Construction 80. HOUR $ 180.00 $ 14,400.00

Rocky Mountain Materials & Asphalt 80. HOUR $ 128.71 $ 10,296.80

Kiewit Infrastructure 80. HOUR $ 150.00 $ 12,000.00

Engineer's Estimate 80. HOUR $ 155.00 $ 12,400.00

62201-2050

RBK Construction 60. HOUR $ 110.00 $ 6,600.00

A&S Construction 60. HOUR $ 130.00 $ 7,800.00

Merry Technology 60. HOUR $ 180.00 $ 10,800.00

American Civil Constructors 60. HOUR $ 75.00 $ 4,500.00

Steve Manning Construction 60. HOUR $ 180.00 $ 10,800.00

Rocky Mountain Materials & Asphalt 60. HOUR $ 123.87 $ 7,432.20

Kiewit Infrastructure 60. HOUR $ 150.00 $ 9,000.00

Engineer's Estimate 60. HOUR $ 125.00 $ 7,500.00

62201-2850

RBK Construction 60. HOUR $ 150.00 $ 9,000.00

A&S Construction 60. HOUR $ 170.00 $ 10,200.00

Merry Technology 60. HOUR $ 180.00 $ 10,800.00

American Civil Constructors 60. HOUR $ 125.00 $ 7,500.00

Steve Manning Construction 60. HOUR $ 220.00 $ 13,200.00

Rocky Mountain Materials & Asphalt 60. HOUR $ 150.73 $ 9,043.80

Kiewit Infrastructure 60. HOUR $ 200.00 $ 12,000.00

Engineer's Estimate 60. HOUR $ 150.00 $ 9,000.00

62201-3200

RBK Construction 40. HOUR $ 175.00 $ 7,000.00

A&S Construction 40. HOUR $ 240.00 $ 9,600.00

Merry Technology 40. HOUR $ 170.00 $ 6,800.00

American Civil Constructors 40. HOUR $ 160.00 $ 6,400.00

Steve Manning Construction 40. HOUR $ 220.00 $ 8,800.00

Rocky Mountain Materials & Asphalt 40. HOUR $ 198.54 $ 7,941.60

Kiewit Infrastructure 40. HOUR $ 225.00 $ 9,000.00

Engineer's Estimate 40. HOUR $ 175.00 $ 7,000.00

62301-0000

RBK Construction 120. HOUR $ 40.00 $ 4,800.00

A&S Construction 120. HOUR $ 55.00 $ 6,600.00

ROLLER

MOTOR GRADER, 12 FOOT MINIMUM BLADE

HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.5 CUBIC YARD MINIMUM CAPACITY

GENERAL LABOR

Merry Technology 120. HOUR $ 70.00 $ 8,400.00

American Civil Constructors 120. HOUR $ 30.00 $ 3,600.00

Steve Manning Construction 120. HOUR $ 60.00 $ 7,200.00

Rocky Mountain Materials & Asphalt 120. HOUR $ 73.67 $ 8,840.40

Kiewit Infrastructure 120. HOUR $ 45.00 $ 5,400.00

Engineer's Estimate 120. HOUR $ 65.00 $ 7,800.00

62302-1000

RBK Construction 40. HOUR $ 170.00 $ 6,800.00

A&S Construction 40. HOUR $ 110.00 $ 4,400.00

Merry Technology 40. HOUR $ 150.00 $ 6,000.00

American Civil Constructors 40. HOUR $ 90.00 $ 3,600.00

Steve Manning Construction 40. HOUR $ 160.00 $ 6,400.00

Rocky Mountain Materials & Asphalt 40. HOUR $ 280.69 $ 11,227.60

Kiewit Infrastructure 40. HOUR $ 150.00 $ 6,000.00

Engineer's Estimate 40. HOUR $ 150.00 $ 6,000.00

62302-1100

RBK Construction 40. HOUR $ 170.00 $ 6,800.00

A&S Construction 40. HOUR $ 130.00 $ 5,200.00

Merry Technology 40. HOUR $ 170.00 $ 6,800.00

American Civil Constructors 40. HOUR $ 185.00 $ 7,400.00

Steve Manning Construction 40. HOUR $ 200.00 $ 8,000.00

Rocky Mountain Materials & Asphalt 40. HOUR $ 409.46 $ 16,378.40

Kiewit Infrastructure 40. HOUR $ 150.00 $ 6,000.00

Engineer's Estimate 40. HOUR $ 200.00 $ 8,000.00

62405-0200

RBK Construction 98,900. SQYD $ 0.60 $ 59,340.00

A&S Construction 98,900. SQYD $ 3.00 $ 296,700.00

Merry Technology 98,900. SQYD $ 2.00 $ 197,800.00

American Civil Constructors 98,900. SQYD $ 1.00 $ 98,900.00

Steve Manning Construction 98,900. SQYD $ 2.00 $ 197,800.00

Rocky Mountain Materials & Asphalt 98,900. SQYD $ 0.63 $ 62,307.00

Kiewit Infrastructure 98,900. SQYD $ 1.40 $ 138,460.00

Engineer's Estimate 98,900. SQYD $ 1.25 $ 123,625.00

62510-2000

RBK Construction 20. ACRE $ 1,200.00 $ 24,000.00

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

PLACING CONSERVED TOPSOIL, 3-INCH DEPTH

SEEDING, HYDRAULIC METHOD

A&S Construction 20. ACRE $ 1,100.00 $ 22,000.00

Merry Technology 20. ACRE $ 7,350.00 $ 147,000.00

American Civil Constructors 20. ACRE $ 800.00 $ 16,000.00

Steve Manning Construction 20. ACRE $ 1,740.00 $ 34,800.00

Rocky Mountain Materials & Asphalt 20. ACRE $ 1,399.66 $ 27,993.20

Kiewit Infrastructure 20. ACRE $ 1,500.00 $ 30,000.00

Engineer's Estimate 20. ACRE $ 1,150.00 $ 23,000.00

62515-2000

RBK Construction 20. ACRE $ 1,300.00 $ 26,000.00

A&S Construction 20. ACRE $ 1,400.00 $ 28,000.00

Merry Technology 20. ACRE $ 7,350.00 $ 147,000.00

American Civil Constructors 20. ACRE $ 1,300.00 $ 26,000.00

Steve Manning Construction 20. ACRE $ 1,340.00 $ 26,800.00

Rocky Mountain Materials & Asphalt 20. ACRE $ 1,034.84 $ 20,696.80

Kiewit Infrastructure 20. ACRE $ 2,000.00 $ 40,000.00

Engineer's Estimate 20. ACRE $ 1,400.00 $ 28,000.00

62901-0300

RBK Construction 8,500. SQYD $ 2.50 $ 21,250.00

A&S Construction 8,500. SQYD $ 3.00 $ 25,500.00

Merry Technology 8,500. SQYD $ 10.00 $ 85,000.00

American Civil Constructors 8,500. SQYD $ 1.75 $ 14,875.00

Steve Manning Construction 8,500. SQYD $ 4.00 $ 34,000.00

Rocky Mountain Materials & Asphalt 8,500. SQYD $ 3.69 $ 31,365.00

Kiewit Infrastructure 8,500. SQYD $ 2.50 $ 21,250.00

Engineer's Estimate 8,500. SQYD $ 3.65 $ 31,025.00

63301-0000

RBK Construction 85. EACH $ 450.00 $ 38,250.00

A&S Construction 85. EACH $ 350.00 $ 29,750.00

Merry Technology 85. EACH $ 300.00 $ 25,500.00

American Civil Constructors 85. EACH $ 325.00 $ 27,625.00

Steve Manning Construction 85. EACH $ 500.00 $ 42,500.00

Rocky Mountain Materials & Asphalt 85. EACH $ 348.46 $ 29,619.10

Kiewit Infrastructure 85. EACH $ 350.00 $ 29,750.00

Engineer's Estimate 85. EACH $ 300.00 $ 25,500.00

63309-0100

MULCHING, HYDRAULIC METHOD

ROLLED EROSION CONTROL PRODUCT, TYPE 1.C

SIGN SYSTEM

DELINEATOR, TYPE 1

RBK Construction 270. EACH $ 21.00 $ 5,670.00

A&S Construction 270. EACH $ 20.00 $ 5,400.00

Merry Technology 270. EACH $ 100.00 $ 27,000.00

American Civil Constructors 270. EACH $ 18.00 $ 4,860.00

Steve Manning Construction 270. EACH $ 40.00 $ 10,800.00

Rocky Mountain Materials & Asphalt 270. EACH $ 18.58 $ 5,016.60

Kiewit Infrastructure 270. EACH $ 18.00 $ 4,860.00

Engineer's Estimate 270. EACH $ 25.00 $ 6,750.00

63313-0000

RBK Construction 1,850. LNFT $ 6.00 $ 11,100.00

A&S Construction 1,850. LNFT $ 6.00 $ 11,100.00

Merry Technology 1,850. LNFT $ 10.00 $ 18,500.00

American Civil Constructors 1,850. LNFT $ 1.00 $ 1,850.00

Steve Manning Construction 1,850. LNFT $ 4.40 $ 8,140.00

Rocky Mountain Materials & Asphalt 1,850. LNFT $ 1.66 $ 3,071.00

Kiewit Infrastructure 1,850. LNFT $ 6.00 $ 11,100.00

Engineer's Estimate 1,850. LNFT $ 6.00 $ 11,100.00

63313-1000

RBK Construction 3,030. LNFT $ 6.00 $ 18,180.00

A&S Construction 3,030. LNFT $ 1.00 $ 3,030.00

Merry Technology 3,030. LNFT $ 10.00 $ 30,300.00

American Civil Constructors 3,030. LNFT $ 1.00 $ 3,030.00

Steve Manning Construction 3,030. LNFT $ 4.00 $ 12,120.00

Rocky Mountain Materials & Asphalt 3,030. LNFT $ 1.66 $ 5,029.80

Kiewit Infrastructure 3,030. LNFT $ 6.00 $ 18,180.00

Engineer's Estimate 3,030. LNFT $ 6.00 $ 18,180.00

63316-1000

RBK Construction 23. EACH $ 175.00 $ 4,025.00

A&S Construction 23. EACH $ 200.00 $ 4,600.00

Merry Technology 23. EACH $ 250.00 $ 5,750.00

American Civil Constructors 23. EACH $ 175.00 $ 4,025.00

Steve Manning Construction 23. EACH $ 300.00 $ 6,900.00

Rocky Mountain Materials & Asphalt 23. EACH $ 174.23 $ 4,007.29

Kiewit Infrastructure 23. EACH $ 250.00 $ 5,750.00

Engineer's Estimate 23. EACH $ 300.00 $ 6,900.00

RUMBLE STRIP

RUMBLE STRIP, SHOULDER

REMOVE AND RESET SIGN

63401-0700

RBK Construction 68,950. LNFT $ 0.40 $ 27,580.00

A&S Construction 68,950. LNFT $ 0.50 $ 34,475.00

Merry Technology 68,950. LNFT $ 0.45 $ 31,027.50

American Civil Constructors 68,950. LNFT $ 0.50 $ 34,475.00

Steve Manning Construction 68,950. LNFT $ 0.90 $ 62,055.00

Rocky Mountain Materials & Asphalt 68,950. LNFT $ 0.40 $ 27,580.00

Kiewit Infrastructure 68,950. LNFT $ 0.50 $ 34,475.00

Engineer's Estimate 68,950. LNFT $ 0.60 $ 41,370.00

63401-0800

RBK Construction 1,960. LNFT $ 0.40 $ 784.00

A&S Construction 1,960. LNFT $ 0.50 $ 980.00

Merry Technology 1,960. LNFT $ 0.45 $ 882.00

American Civil Constructors 1,960. LNFT $ 0.50 $ 980.00

Steve Manning Construction 1,960. LNFT $ 0.90 $ 1,764.00

Rocky Mountain Materials & Asphalt 1,960. LNFT $ 0.40 $ 784.00

Kiewit Infrastructure 1,960. LNFT $ 0.40 $ 784.00

Engineer's Estimate 1,960. LNFT $ 3.15 $ 6,174.00

63403-0400

RBK Construction 1,600. SQFT $ 20.00 $ 32,000.00

A&S Construction 1,600. SQFT $ 20.00 $ 32,000.00

Merry Technology 1,600. SQFT $ 10.00 $ 16,000.00

American Civil Constructors 1,600. SQFT $ 29.00 $ 46,400.00

Steve Manning Construction 1,600. SQFT $ 5.00 $ 8,000.00

Rocky Mountain Materials & Asphalt 1,600. SQFT $ 20.59 $ 32,944.00

Kiewit Infrastructure 1,600. SQFT $ 20.00 $ 32,000.00

Engineer's Estimate 1,600. SQFT $ 30.00 $ 48,000.00

63405-1300

RBK Construction 4. EACH $ 550.00 $ 2,200.00

A&S Construction 4. EACH $ 600.00 $ 2,400.00

Merry Technology 4. EACH $ 500.00 $ 2,000.00

American Civil Constructors 4. EACH $ 730.00 $ 2,920.00

Steve Manning Construction 4. EACH $ 500.00 $ 2,000.00

Rocky Mountain Materials & Asphalt 4. EACH $ 571.83 $ 2,287.32

Kiewit Infrastructure 4. EACH $ 600.00 $ 2,400.00

Engineer's Estimate 4. EACH $ 200.00 $ 800.00

PAVEMENT MARKINGS, TYPE D, SOLID

PAVEMENT MARKINGS, TYPE D, BROKEN

PAVEMENT MARKINGS, TYPE D

PAVEMENT MARKINGS, TYPE D, TURN ARROW

63405-1500

RBK Construction 14. EACH $ 725.00 $ 10,150.00

A&S Construction 14. EACH $ 700.00 $ 9,800.00

Merry Technology 14. EACH $ 500.00 $ 7,000.00

American Civil Constructors 14. EACH $ 950.00 $ 13,300.00

Steve Manning Construction 14. EACH $ 300.00 $ 4,200.00

Rocky Mountain Materials & Asphalt 14. EACH $ 743.38 $ 10,407.32

Kiewit Infrastructure 14. EACH $ 750.00 $ 10,500.00

Engineer's Estimate 14. EACH $ 200.00 $ 2,800.00

63405-1650

RBK Construction 2. EACH $ 850.00 $ 1,700.00

A&S Construction 2. EACH $ 800.00 $ 1,600.00

Merry Technology 2. EACH $ 350.00 $ 700.00

American Civil Constructors 2. EACH $ 1,000.00 $ 2,000.00

Steve Manning Construction 2. EACH $ 300.00 $ 600.00

Rocky Mountain Materials & Asphalt 2. EACH $ 857.75 $ 1,715.50

Kiewit Infrastructure 2. EACH $ 850.00 $ 1,700.00

Engineer's Estimate 2. EACH $ 500.00 $ 1,000.00

63502-0600

RBK Construction 4. EACH $ 225.00 $ 900.00

A&S Construction 4. EACH $ 200.00 $ 800.00

Merry Technology 4. EACH $ 140.00 $ 560.00

American Civil Constructors 4. EACH $ 400.00 $ 1,600.00

Steve Manning Construction 4. EACH $ 200.00 $ 800.00

Rocky Mountain Materials & Asphalt 4. EACH $ 116.15 $ 464.60

Kiewit Infrastructure 4. EACH $ 220.00 $ 880.00

Engineer's Estimate 4. EACH $ 330.00 $ 1,320.00

63502-0700

RBK Construction 150. EACH $ 8.00 $ 1,200.00

A&S Construction 150. EACH $ 7.00 $ 1,050.00

Merry Technology 150. EACH $ 20.00 $ 3,000.00

American Civil Constructors 150. EACH $ 35.00 $ 5,250.00

Steve Manning Construction 150. EACH $ 38.00 $ 5,700.00

Rocky Mountain Materials & Asphalt 150. EACH $ 5.81 $ 871.50

Kiewit Infrastructure 150. EACH $ 10.00 $ 1,500.00

PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE

PAVEMENT MARKINGS, TYPE D,…